Fire Alarm Inspection, Testing, Maintenance. Assuring the System s Operational Reliability

Similar documents
NFPA 72 Code Changes vs 2013

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement

Automatic Fire Alarm Association Webinar On Inspection, Testing, And Maintenance Of Fire Alarm Systems

Are You Prepared? The impending impact of Code on Servicing Security Systems

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

STANDARDS UPDATE NOTICE (SUN) ISSUED: February 5, 2018

2019 COURSE CATALOG (rev )

26 of 128 9/23/2014 9:25 AM

OUTLINE FOR FIRE PREVENTION ACTIVITY

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

Addendum # 2 Wicomico County Circuit Court Second Floor Renovations Date of Addendum: 2/6/2017

Typical Areas of Poor RF Coverage

CAN/ULC-S INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

The 2013 National Fire Alarm and Signaling Code

Fire Protection Systems Operation and Maintenance 3 PDH / 3 CE Hours

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning

COMMISSION ORDER. IT IS FURTHER ORDERED that the Request for Bid and Notice to Bidders be displayed on the Franklin County website.

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

Safe Operating Procedure

Koffel Associates, Inc.

UNIVERSITY. Facilities Management

Fire Alarm Wiring. Circuit types, styles and limitations

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS

ICC CODE CORNER 2012 IFC Code & Commentary

MULTI-PHASED FIRE ALARM AND MASS NOTIFICATION SYSTEM UPGRADES: The Authority Having Jurisdiction (AHJ) and Proper Planning

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used.

Table OUT OF SERVICE. Building Fire Video 1/15/ Inspection, testing and maintenance. Standards Further Referenced by FCNYS

INSPECTION AND TESTING FORM

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

NFPA 80 Overview January 21, 2016

NEMA Applications Guide

Slide 1. Slide 2 Instructor. Slide 3. NFPA 25 The Owner s Manual. Roles & Responsibilities DISCLAIMER

4/18/2017. *2012 edition of NFPA 99 has gone through a major overhaul. *This document is now a Code.

Subject: Fire Protection Impairment Program Reference: NFPA (see bottom of page 5) Effective Date: August 2014 Distribution All YC Employees

Understanding, Applying and Enforcing NFPA 25. James D. Lake NFSA Director of Training

API MANUAL OF PETROLEUM MEASUREMENT STANDARDS

JEFFERSON COUNTY PUBLIC SCHOOLS FIRE WATCH PROGRAM

Alarm. A warning of danger. An indication of the existence of a condition that requires immediate action. (SIG-FUN)

NFPA 99 for Facility Managers

Should you have further questions, please feel free to contact the Fire Prevention Branch.

FIREFLY II PLUS RELEASE DEVICES INSTALLATION MANUAL

Fire System Impairment Policy

UC Irvine Environmental Health & Safety TITLE: FIRE WATCH AND OUT OF SERVICE NOTIFICATION

NFPA Siemens Industry, Inc. All rights reserved. usa.siemens.com/infrastructure-cities

Impairments to Fire Protection Equipment

DIVISION 21: FIRE SUPPRESSION SYSTEMS SECTION Fire Protection Systems Protecting Cold Storage and Unheated Warehouses

Southaven Fire Department Fire Marshal s Office 8710 Northwest Drive Southaven, Mississippi Phone: Fax:

Canadian Fire Alarm Association. Fire Alarm System Activation. Fire Alarm with malfunction history

I. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018

HIGH-RISE RETROFIT ORDINANCES - NO and NO

RE: PERMIT REQUIRED TO WORK ON FIRE ALARM SYSTEMS IN THE RMWB

Please think twice about printing this matrix. You can it, along with your ballot to or

THE "SS90" SERIES RELEASE DEVICES MODEL B2 INSTALLATION MANUAL

NFPA 25 and the Influence of Liability

Fire Protection System Contractors and Systems. Submission of the Application for a Water-Based Fire Protection Inspector Permit

Addressing Sound Masking Requirements in the National Fire Alarm and Signaling Code and UL Standards

Circulation Report for SIG-TMS Comments Document # 72

Life Safety Code NFPA 10 NFPA 13 NFPA 25 NFPA 72 NFPA 90A NFPA 110 NFPA 99 THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #7

RELEASE DEVICES RELEASE DEVICE-WPS MODELS A/B INSTALLATION MANUAL U.L. LISTED CANADIAN LISTED CSFM: :100 GENERAL DESCRIPTION:

Changes in NFPA

THE "SS90" SERIES RELEASE DEVICES MADE IN THE U.S.A. MODELS A/B INSTALLATION MANUAL

MADE IN THE U.S.A. MODELS A/B INSTALLATION MANUAL

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Firefly II Multi Voltage RELEASE DEVICES. Firefly II & IIB-MV INSTALLATION MANUAL

Fire Alarm Acceptance Testing & On-Going Maintenance with The Joint Comm. Standards / Reporting. Prepared Especially for : OSFM TEC 2016

MODEL B2 INSTALLATION MANUAL

National Fire Protection Association M E M O R A N D U M. Technical Committee on Testing and Maintenance of Fire Alarm and Signaling Systems

Maintaining Building and Fire Safety During Active Assailant Events and Other Terrorist Events

Management Practices: Fire Protection Impairments November 2015

VERIFICATION OF FIRE ALARM SYSTEMS

Fire Protection System Contractors and Systems. Submission of the Application for a Water-Based Fire Protection Inspector

RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER FIRE PROTECTION SPRINKLER SYSTEM CONTRACTORS

SOLID STATE SECURITIES, INC. THE "SS90" SERIES RELEASE DEVICES MADE IN THE U.S.A. SS90-WPS MODEL A/B INSTALLATION MANUAL

Understanding and Applying NFPA 25

Report on First Revision June 2014 NFPA 5000

7.3 Design and Development Design and development planning Design and development inputs Design and development outputs 7.3.

CAN/ULC-S1001, INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION & LIFE SAFETY SYSTEMS Simon Crosby, LEL, CET, CFPS October 21, 2015

Winnipeg Fire Department Fire Prevention Branch

Date Issued: December 14, 2017 Revision: 2.1

Design & Construction Standards, Revised January

SECTION CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY

Fixed Fire Protection Getting it right, Ensuring Performance and Value

Report on First Revision November 2013 NFPA 731

Iowa State Fire Marshal

Can You Hear Me Now?

SOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P THE ENGINEER AND THE TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS.

PQS Independent type-testing protocol

CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS

MNEC NFPA 72 WHITE PAPER

Can You Hear Me Now?

Florida Building Code Chapter 9 Fire Protection Systems Advanced Course

MADE IN THE U.S.A. ADVANCE FIRE CONTROL MODEL LM21-AFC MANUAL RELEASE DEVICES TEST WEEKLY TO ASSURE PROPER OPERATION OF RELEASE DEVICE/CONTROL PANEL

Applying Performance-based Fire Alarm System Design Part 4

2010 FIRE CODE OF NEW YORK STATE

DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM

Fort Rouge Leisure Centre Section HVAC Upgrades Phase 2 Page 1 of 5 Bid Opportunity No March 2013 FIRE ALARM SYSTEMS

AGENDA NFPA TECHNICAL COMMITTEE ON NOTIFICATION APPLIANCES. Report on Comments Meeting, October 13-14, Richmond Marriott, Richmond, VA

Advisory Brief to Prince George City Council On the Matter of Bylaw 8727, 2013, Fire Protection and Emergency Response Bylaw

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

Transcription:

Fire Alarm Inspection, Testing, Maintenance Assuring the System s Operational Reliability

What does AFAA-NE do? Education We supply the tools our members require to perform within the guidelines of our code driven business Influence Code and Standards Members sit on various boards and governing bodies that help influence and create codes and standards Provide a Communication Network www.afaa-ne.org, FaceBook and Dinner Meetings Promote Public Safety Raise awareness for Life Safety in the communities we serve

What we will cover 1. Why do we Inspect, Test and Maintain (ITM) 2. Who can perform ITM? 3. What, When, How? 4. Documentation, Documentation, Documentation

Why Do We Inspect? 14.2.1.1 The Purpose for initial and reacceptance inspections is to ensure compliance with approved design documents and to ensure installation in accordance with this code and other required installation standards. 14.2.1.2 The purpose of initial and reacceptance tests of fire alarm and signaling systems is to ensure system operation in accordance with the design documents. 14.2.1.3 The purpose for periodic inspections is to assure that obvious damages or changes that might affect the system operability are visually identified. 14.2.1.4 The purpose for periodic testing is to statistically assure operational reliability.

Who can perform ITM? 10.5.3.1 Inspection Personnel. Inspections shall be performed by personnel who have developed competence through training and experience that are acceptable to the authority having jurisdiction or meet the requirement of 10.5.3.4 10.5.3.2 Testing Personnel. Testing personnel shall have knowledge and experience of the testing requirements contained in this Code, of the equipment being tested, and of the test methods. That knowledge and experience shall be acceptable to the authority having jurisdiction or meet the requirements of 10.5.3.4 10.5.3.3 Service Personnel. Service personnel shall have knowledge and experience of the maintenance requirements contained in this Code, of the equipment being serviced or maintained, and of the service and maintenance methods. That knowledge and experience shall be acceptable to the authority having jurisdiction or meet the requirements of 10.5.3.4

Who can perform ITM? 10.5.3.4 Means of Qualification. Qualified personnel shall include but not be limited to, one or more of the following: (1) Personnel who are factory trained and certified for the specific type and brand of system being serviced. (2) Personnel who are certified by a nationally recognized certification organization acceptable to the authority having jurisdiction. (3) Personnel, either personally or through their affiliation with an organization that is registered, licensed, or certified by a state or local authority to perform service on systems addressed within the scope of this Code. (4) Personnel who are employed and qualified by an organization listed by a nationally recognized testing laboratory for the servicing of systems within the scope of this Code.

What, When, How? Table 14.3.1 Visual Inspection Component Initial Acceptance Periodic Frequency (D.M.A.S.) Method Reference Table 14.4.3.2 Testing Component Initial Acceptance Periodic Frequency (D.M.A.S) Method

Documentation, Documentation, Documentation 14.2.5 System Documentation. Prior to system maintenance or testing, the record of completion and any information required by Chapter 7 regarding the system alterations, including specifications, wiring diagrams, and floor plans, shall be provided by the owner or a designated representative to the service personnel upon request. 14.2.5.1 The provided documentation shall include the current revisions of all fire alarm software and the revisions of software with which the fire alarm software interfaces. 14.2.5.2 The revisions of fire alarm software, and the revisions of the software in the systems with which the fire alarm software interfaces, shall be verified for compatibility in accordance with 23.2.2.1.1

Documentation, Documentation, Documentation 7.6 Inspection, Testing and Maintenance Documentation. 7.6.1 Test plan documentation shall be provided in accordance with 14.2.10 The purpose of a test plan is to document what was and was not actually tested (Annex) 7.6.2 Acceptance testing documentation shall be provided in accordance with 14.6.1 7.6.3 Reacceptance test documentation shall be provided in accordance with 14.6.1 7.6.4 Periodic inspection and testing documentation shall be provided in accordance with 14.6.2 thru 14.6.4 7.6.5 Impairment documentation shall be provided in accordance with Section 10.20

Documentation, Documentation, Documentation 7.6 Inspection, Testing and Maintenance Documentation 7.6.6 Record of Inspection and Testing. The record of all inspections, testing, and maintenance as required by 14.6.2.4 shall be documented using either the record of inspection and testing forms, Figure 7.8.2(g) through Figure 7.8.2(l), or an alternative record 10.20 Impairments Owner must be notified of impairment Owner must keep record of impairment for 1 year after it is corrected Supervising Station must notify AHJ of terminated monitoring Service provider must notify AHJ on any system down 8 hours Mitigating Measures determined by AHJ, from notice to fire watch Owner must be notified when impairment is corrected

Let s talk Questions? Is a vacuum or compressed air the preferred method to clean detectors? How do you test a Non-Restorable Heat Detector? When don t you need to perform a Sensitivity Test on smoke detectors? Thank you!!!