SERVICE LEVEL IMPROVEMENT PLAN (SLIP) GREEN SPACE AND PARKS

Similar documents
Delhi May 6-7, Paper to be published in Urban Update during South Asian Cities Summit organized by AIILSG and UCLG, New

UDF PLANS AND GUIDELINES

Local Growth Planning in North Central Green Line Communities

HERITAGE A SUPLEMENT TO TOOLKIT ON FORMULATION OF CITY DEVELOPMENT PLAN. Focus on. Ministry Of Housing and Urban Poverty Alleviation

Published in March 2005 by the. Ministry for the Environment. PO Box , Wellington, New Zealand ISBN: X.

Streets for People, Place-Making and Prosperity. #TOcompletestreets

Mission Transformation: India's Smart City Mission. Jagan Shah Director, National Institute of Urban Affairs India

Consolidated Workshop Proceedings Report

3 Urban Design and the State Highway Network

Parks Renaissance. Strategy. Director, Operations. General Committee. Presentation to. May 16, Barb Rabicki

Group Executive Liveability and Natural Assets

Vietnam Scaling up Urban Upgrading Project (SUUP)

MUNICIPAL CORPORATION UDAIPUR

Town of Oakville Streetscape Strategy

SMART CITIES IN INDIA 2018

Toronto Complete Streets Guidelines

3. Endorse the LRT vision in transforming Surrey into Connected-Complete-Livable communities, and more specifically, the official vision statement:

City of Mahtomedi Park System Plan Public Hearing Draft: September 13, 2006

Downtown Whitby Action Plan

CONCEPT NOTE- CITY DEVELOPMENT PLAN DHARAMSHALA

MAGALIESBURG DEVELOPMENT INITIATIVE (MDI)

PARTF Scoring System for Grants

Taking forward the All London Green Grid

BENJAMIN BANNEKER PARK FRAMEWORK PLAN (PLAN ADOPTION)

Municipal Development Plan 2013

Consolidated Workshop Proceedings Report

North Commuter Parkway and Traffic Bridge Project Market Sounding

BRE Strategic Ecological Framework LI Technical Information Note 03/2016

Executive Summary. Parks and Recreation Plan. Executive Summary

Enclosures Appendix 1: Draft Golders Green Station Planning Brief. Summary

Ebbsfleet Development Corporation

The Roots of Green Infrastructure Nicosia District - Cyprus. Nicosia Development Agency (ANEL)

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

implementation r expression in landscape

VCA Guidance Note. Contents

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

Sustainable urban mobility plans Overview of the concept. EPA Polis workshop 17 May Stuttgart

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

Task Force on Kai Tak Harbourfront Development. Station Square at Kai Tak

Policy and Resources Committee 10 th October Green Infrastructure Supplementary Planning Document (SPD) Summary. Title

Rapid Transit Implementation Working Group September 14, 2017

Agenda. Smart city introduction. National and global models. Thoothukudi overview & smart city approach

Public Art Plan. We have elected to submit Public Art Plans before or concurrently with the CSP Submittal per the FDP Manual

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

CITY COUNCIL AGENDA REPORT

WINCHESTER TOWN 3.1 LOCATION, CHARACTERISTICS & SETTING

Welcome THE SITE PHASE 1 EXCLUSION ZONE.

Slope Stability Management Framework

1 Introduction. Chapter. In this chapter:

SHORELINE, FLOOD AND COASTAL DEFENCE MANAGEMENT PLANS

Neighbourhood Planning Local Green Spaces

Objectives and Strategies for the Integration of Recreation, Parks and Open Space in Regional Plans

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018

8implementation. strategies

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

Former Temple Cowley Pools, Oxford TEMPLE COWLEY LIBRARY * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT.

Amy Burbidge North Northants Joint Planning and Delivery Unit Tresham Garden Village

Downtown Streetscape Manual & Built Form Standards

Highland Council Allotment Policy

Envision Sustainable Infrastructure

THE CORPORATION OF THE TOWNSHIP OF KING REPORT TO COMMITTEE OF THE WHOLE. The Parks, Recreation & Culture Department respectfully submit the following

DOWNTOWN PARKS & PUBLIC REALM PLAN

CALGARY: City of Animals Edited by Jim Ellis

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

JOINT DECLARATION BETWEEN THE EUROPEAN UNION AND THE REPUBLIC OF INDIA ON A PARTNERSHIP FOR SMART & SUSTAINABLE URBANISATION. New Delhi, 6 Oct 2017

Describing the Integrated Land Management Approach

GUIDELINES FOR SELECTION/SCRUTINY OF ROADS AND BRIDGES PROJECTS UNDER NABARD SCHEME

Mary Norwood. Mayoral Forum on Greenspace Responses

CHAPTER 1 Introduction

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

Hobart A Strategic Framework

13 Extending the Esri Enterprise Licence Agreement

FAQ S about Restoration Planning FROM THE Department of Ecology WEBSITE:

A VISION FOR BLAIRGOWRIE

Resolution XII NOTING also that with the increasingly rapid urbanization, wetlands are being threatened in two principle ways:

Memorials, Plaques & Interpretive Signs Policy

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

North Adelaide Playspace and Pocket Orchard

Scope of application and the purpose of the Law

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018

Draft Resolution XII.10

SITE ANALYSIS CALVARY HOSPITAL NORTH ADELAIDE LARGE INSTITUTIONS AND COLLEGES DPA CALVARY HOSPITAL

Managing our Landscapes Conversations for Change

Food-sensitive planning and urban design

City Council March 27, Parks, Recreation, and Trails Master Plan

The Turtle Creek Master Plan- A Summary. July 7, 2011

AT A GLANCE... Our People, Culture & Place. A plan to sustain Ballarat s heritage (final draft)

Task Force on Harbourfront Developments on Hong Kong Island

c. DTAH Toronto Complete Streets Guidelines

The New Plan for Milton Keynes. Growth to

Report Date: June 25, 2013 Contact: Nick Kassam Contact No.: RTS No.: VanRIMS No.: Meeting Date: July 10, 2013

Sectoral workshop on Green infrastructure implementation. Multiple benefits of Green Infrastructure

THE ARCHITECTURAL POLICY OF ESTONIA. Passed at the Parliamentary sitting , protocol no. 43, item no. 5

THE WHARVES DEPTFORD STATEMENT OF COMMUNITY INVOLVEMENT EXECUTIVE SUMMARY. May 2015 MOVING FORWARD

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

GENERAL INFORMATION. PETUS description of tool in use Pedestrian Master Plan for the city of Liège

DRAFT FOR PUBLIC REVIEW. Game Plan for a Healthy City

Christine Toner, Consultation Leader

Transcription:

SERVICE LEVEL IMPROVEMENT PLAN (SLIP) GREEN SPACE AND PARKS 1. Assess the Service Level Gap First and foremost aspect of SLIP is to assess the existing situation and service levels gaps for organisedgreen Space and Parksbased on standards prescribed in URDPFI Guidelines and National Building Codes (Refer AMRUT Guidelines; Para 3.1.6& 6.2). This shall also include describing existing institutional framework vis-à-vis development and maintenance of organised green space/ parks. In order to assess the service level gap the City shall have to review all policies, plans; scheme documents etc., hold discussions with concerned officials and citizens, as per the requirement and conduct physical assessment of city parks to understand the current status (Refer Indicative Parks Assessment Tool as given in Annex-1). The city should undertake overall assessment of Parks and Open/ Green Space in terms of a) available general services and facilities, b) Physical Activities resources, c) family facilities including child friendly play equipment s, and, d) aesthetics and other While discussing about the existing status of the organised green space in your city make a sincere effort to analyze the proportion of area under the categorization of parks as per URDPFI Guidelines eg: Housing Area Park (HAP), Neighbourhood Park (NP) Community Park (CP), District Park (DP), and Sub-City Park (SCP). Also focus on qualitative aspects of existing parks like geographical distribution across the city, encroachments, child and elderly friendly features;staffing, maintenance & equipment issues; and maintenance by RWAs/ Corporates under their CSR Activities etc. Please respond to the questions given below (Word Limit:500 words). What are the available data sources/ plans/ reports/ schemes that exists as regards development and maintenance of parks? Review the recommendation on open/ green space as per Master Plan/ Development Plan and map existing green cover against the same. 1

Does the ULB follow URDPFI Guidelines to categorize its organised greens/ parks/ open space or follow its own categorization? If ULB follow its own categorization, what is the rationale and how well they are interlinked to development of parks? What is the per person open space availability in the city in general and within built-up areas? The Corporation has prepared the Revised City Development Plan as per CDP guidelines (April 2013) issued by the Ministry of Urban Development which includes parks and open spaces. It is important to note that there are many open spaces in Panaji, maidan, parks and squares, as a heritage of the Portuguese urban model. The green spaces in Panaji are managed and maintained either under CCP or Forest department of Government of Goa. There are 14 numbers of parks and 25 numbers of other lawns / landscaped traffic islands in the CCP area. They can be categorized as under 1. Small parks and gardens set along the traditional Street and Square pattern 2. A river front that runs along most of its length 3. A white sand beach at its west-tip 4. Large open maidans that are part of the current planning 5. No development zone along with the road that goes towards Old Goa. As per the present land use pattern 0.80 km2 of the city area is under parks and open spaces which is close to 10% of the total area. This suffices the minimum allocation of 10% as per urban and regional design plan formulation and implementation (URDPFI) guidelines. Open space availability is 19.96 sqm per person in the city. Many of the parks are well maintained, however they are also underused. The main challenge lies in making them useful, accessible and safe. It is imperative that they are connected to each other and to the network of facilities through nonmotorized routes. They have to form a coordinated network that allows pedestrian access to all points of the city. 2

Table 1: Service Level Status Sr. No. Indicators Present Status Benchmark 1 Per Person Open Space in Plain Areas as per URDPFI 20 sq.m per person 10-12 sq.m. per person 2 Per Person Open Space in Built-Up Areas as per National Building Code (NBC) Source: Revised CDP for Panaji 2014-3 sq.m. per person Have the ULB/ City prepared park wise inventory of facilities and amenities? (ULB should identify some of the quick-win parks, which could be developed with minimal intervention that can attract good number of citizens) As part of the CDP, the list of parks has been prepared.however, the inventory of facilities and amenities has not been carried out so far. Azad Maidan has the potential to attract citizens if facilities are improved. How is the physical condition of parks in the city? Do they have boundary wall, fenced area, facilities of public conveniences, tubewell, dustbins etc. (Mention in proportions, if possible) The parks in the city are maintained. Conveniences such as good public toilets, drinking fountains, dustbins and improved seating arrangements are required in almost all parks. Many of them are under used as they are surrounded by busy roads. It is important to make them more accessible and safe by linking them with proper walking/cycling paths and planned parking areas. For example, Ambedkar Garden near Bus stand. It is also observed that high compound walls restrict the people from using them desirably. For example: Municipal Garden.It is one of the oldest gardens in the city. The space adjoining it is completely wasted. It is important to redesign the adjoining areas in order to make them more pedestrian friendly, provide amenities and make this park more attractive. Quality standards of play equipmentsshould be improved. For example: Joggers Park,Altinho and Children s Park, Miramar. 3

Good maintenance of the equipments, grounds, plants are very important for park safety. Whether parks have well planned play area encouraging physical activity? Are they equipped with child friendly play equipments, snack/ ice cream parlours/ kiosks etc. (Mention in proportions, if possible) There are planned play areas with equipments for children in the parks. The quality standards of these equipmentsneed to improve. Facilities for outdoor gym/adult exercise station should be provided in the parks. Restrooms need upgradation. In some parks, provisions have to be made for changing rooms/restrooms. How well aesthetics component have been built in parks of your city? Are they well illuminated, landscaped manicuredwith waterbodies/ fountains etc. wherever possible? (Mention proportions, if possible) Parks are mostly well illuminated. However, maintenance of light fixtures is an issue. Surveillance measures are required at the park. Another problem is that the access to many of the parks are not well illuminated. There is scope of improvement to the design and landscape by adding more shade giving trees to the design. Are there some running schemes/ projects Central/ State/ Donor funded in the city as regard development of parks/ open spaces? Or else ULB is funding park development of parks/ green space out of its own budget? ULB is funding maintenance program of parks. Explain the process how a park/ open space is normally shortlisted for development? Does the city have rationale for park selection for development or it is done on ad-hoc basis. Green spaces plan has been proposed in the Holistic Masterplan document. List the organizations/ authorities/ private sector firms etc. and describe their roles and responsibilities in development of city parks/ open space along with green area under their jurisdiction. 4

Table 2:Jurisdiction wise Allocation of Green Space and Parks Sr. No. Jurisdiction No. of Parks Area of Parks 1 ULB 16 0.80 (in sq.m.) Proportion (in %age) 2 Development Authority - - 3 Private Ownership Corporate/ NGOs Total 16 Source: Analysis of ULB Level Data 2. Bridging the Gap - - Once the gap between the existing Service Levels is computed, list out initiatives undertaken in different ongoing programs/ projects/ master development plans to address these gaps. While bridging the gaps convergence with other ongoing Central, State and Local Government Programs/Schemes will also be looked into. Based on above, objectives will be developed to bridge the gaps (AMRUT Guidelines; Para 6.3, Annexure-2; Table 2.1). Each of the identified objectives will be evolved from the outcome of physical assessment of parks using Assessment Tools for Parks (Refer Annex-1 of this document) and meeting the opportunity to bridge the gap. As per para 5.1 (Sr.No.6) of AMRUT guidelines all projects involving development of green spaces & parks shall have to make special provision for child friendly components and establish a system of maintenance with local residents participation. At least one park from each of the 500 ULBs under AMRUT would be taken up for developing facilities for Children, Youth and Elderly. Assessment of the current status of City parks/ open spaces would clearly bring out the gap/ dearth of open spaces in terms of area allocation, having inadequate citizen friendly features and issues pertaining to its maintenance. And these will lead to formulation of three broad objectives. Please respond to the following questions in not more than 500 words. Have the city took physical assessment of city parks? (ULB s may refer Annex-1 indicative procurement of this document). CCP has proposed to involve private sector in the development and maintenance of parks in the city in return for advertisement rights. Their scope will include undertaking of physical assessment, upgrading of facilities and maintenance. The proposal is due to be tendered. 5

Try estimating demand gap of open/ green space in the city as per the URDPFI norms and space requirement as per NBC code. Green cover is sufficient as per NBC requirement. However, they have to form a coordinated network that allows pedestrian access to all points of the city. Explain how the city plans to fill the gap in green cover and progressively enhance green cover within City to 15% over next 5 years. Other than the parks, the riverfront is also a huge asset to the city which must be opened up to the citizens.this is a very attractive area with an incredible landscape that should be enhancedit is proposed to develop a promenade along the riverfront, connecting and continuing loose segments of the existing promenade, aiming to turn it into one of the landmarks and tourist attractions of the city. It is also important to extract all the potential of the Santa Inez and Ourem creeks as urban green axes.it is intended to improve their environmental conditions and turn them into attractive public spaces for walking and leisure, linking recreational areas. The road from Mandovi bridge to Ribandaris flanked by the River on one side and the salt pans and mangroves on the other, through a unique landscape.it is planned to create a biodiversity park to conserve the local fauna and provide leisure space for the citizens as well as the tourists. Assess and describe, if requisite provisions as per Master Plan and other State legislation have already been made? There is a Green Spaces masterplan as part of the Holistic masterplan document. CCP has also prepared an action plan document for parks in the city. Explain the city s action plans to make special provisions for installing child friendly components in the city parks as per AMRUT Guidelines. Provisions have been outlined in the Holistic Masterplan which covers child friendlyequipments, universal accessibility etc. Explore option for O&M Contracts with (RWAs/ Citizens Groups/ Corporate Groups - CSR). Explain how the city plans to establish a system of maintenance with active citizens engagement as per AMRUT Guidelines CCP has proposed to involve private sector in the development and maintenance of parks in the city in return for advertisement rights. Their scope will include undertaking of physical assessment, upgrading of facilities and maintenance. The proposal is due to be tendered. 6

List out initiatives undertaken in different ongoing programs and projects to address the gaps in enhancing the green cover. For this provide details of ongoing projects being carried out under different schemes with status and when the existing projects are scheduled to be completed? Provide information in Table XX. Table 3: Status of Ongoing/ Sanctioned Sr. No. Name of Project Scheme Name - Cost in RsLak hs Month of Complet ion Status (as on dd Month 2015) No ongoing projects at present. Objectives Based on above, objectives will be developed to bridge the gaps. While developing objectives following question shall be responded so as to arrive at appropriate objective. Please provide a set of 2-3 objectives to meet the gap in not more than 100 words. Objectives - Provide more public and green spaces - Improve existing conditions with new quality standards. 3. Examine Alternatives and Estimate Cost Suggest alternatives/ options to complete the ongoing projects pertaining to developing parks and green spaces. Identify quick-win parks and open space which can also have play area and associated facilities for Children, Youth & Elderly. (Word Limit: 100 Words) 1. Upgradation of Azad Maidan 2.23 CR Project will include facilities such as tot lot, jogging track, benches, pavers, lighting improvement and landscaping. It is located in the city centre and once developed is expected to attract many citizens. Citizen Engagement ULBs will organize and conduct city level citizen consultation and receive feedback on the suggested alternatives and innovations. Each alternative will be discussed with citizens and activities to be taken up will be prioritized to meet the service level gaps. ULB will prioritize these activities and their scaling up based on the available resources. (AMRUT Guidelines; Para 6.6, 6.7 & 7.2). Please explain following questions in not more than 200 words detailing out the needs, aspirations and wishes of the local people. (Word Limit: 100 Words) Has all relevant stakeholders groups been involved in the consultation? 7

Yes Has ward/ zone level consultations held in the city? Yes Has alternatives explored are crowd sourced? Yes What is feedback on the suggested alternatives and innovations? Facilities for upgraded child friendly equipments, improved accessibitlity, outdoor gym were well received by people. Has alternative taken up for discussions are prioritized on the basis of consultations? Yes. Suggested alternatives had been taken and prioritized. What methodology adopted for prioritizing the alternatives? Citizen accessibility and stakeholder meeting. 4. Prioritize Projects Based on the citizen engagement, ULB will prioritize these activities and their scaling up based on the available resources to meet the respective objectives. While prioritizing projects, please reply following questions (Word Limit: 100 Words) What are the sources of funds? Source of funds will be through AMRUT. Has projects been converged with other program and schemes? NO Has projects been prioritized based on more with less approach? YES 5. Conditionalities Describe the Conditionality s of each project in terms of availability of land, environmental & social obligation and clearances, required NOC, financial commitment, approval and permission needed to implement the project.(word Limit:100 words) There will be no difficulty with respect to the conditionalities since the following reasons. The park proposed to be developed on the lands owned by this ULB. The park development project is a green project No environmental issues will arise. The ULB is capable of bearing its contribution as per the guidelines issued in this mission. 8

6. Resilience Required approvals will be sought from competent authority and organizations. The resilience factor would be built in to ensure environmentally sustainable, safe and secured park development schemes. (Word Limit:100 words) Resilience factors would be incorporated in the DPR once the project is approved as per AMRUT guidelines. 7. Financial Plan Once the activities are finalized and prioritized after consultations, investments both in terms of capital cost and O&M cost has to be estimated. (AMRUT Guidelines; para 6.5) Based on the investment requirements, different sources of finance have to be identified. Financial Plan for the complete life cycle of the prioritized development will be prepared. (AMRUT Guidelines; para 4, 6.6, 6.12, 6.13 & 6.14). The financial plan will include percentage share of different stakeholders (Centre, State and City) including financial convergence with various ongoing projects. While preparing finance plan please reply following questions (Word Limit:100 words) How the proposed finance plan is structured for transforming and creating infrastructure projects? It is proposed to get funds from GOI 50% and State Government 50%. List of individual projects which is being financed by various stakeholders? At present O&M is under scope of CCP Has financial plan prepared for identified projects based on financial convergence and consultation with funding partners? Yes Is the proposed financial structure is sustainable? If so then whether project has been categorized based on financial considerations? The financial structure proposed for the implementation of the present project is sustainable. The project has been categorized based on the importance of the service level and financial considerations Have the financial assumptions been listed out? Financial assumption has been made for the implementation of the proposed project that the project fund to be shared by the GoI and State. Does financial plan for the complete life cycle of the prioritized development? 9

Yes, the plan has been prepared for the life cycle of the project period. Does financial plan include percentage share of different stakeholders (Centre, State, ULBs and) The financial plan is prepared with the assumptions that 100% of the project cost will be shared by the stake holders as follows. GoI share - 50% State Government share - 50% Does it include financial convergence with various ongoing projects. No Financial convergence with various ongoing projects Does it provide year-wise milestones and outcomes? Yes, the year-wise milestones are tabulated below. Details in financial plan shall be provided as per Table 2.7, 2.8, 2.9, 2.10 and 2.11. These tables are based on AMRUT guidelines tables 2.1, 2.2,2.3.1,2.3.2, and 2.5. # # # 10

Table 2.7: SLIP Master Plan of all projects to achieve universal coverage of parks during current Mission period Name of City: Panaji (FYs 2015-16 to 2019-20) (As per Table 2.1 of AMRUT Guidelines) Sl. No Project Name Priority Number Change in service levels Year in which to Year in which proposed be implemented to be completed Estimated cost (Rs. in Crore) 1 Upgradation of Azad Maidan 1 2015-16 2016-17 2.45 Total 2.45 Amount in Crores 11

Table 2.8: SLIP - Details of Prioritized Projects Proposed under AMRUT duringcurrent FY: Sector Wise Name of City: Panaji (FYs 2015-16) (As per Table 2.2 of AMRUT Guidelines) Sl.No Project Name Physical components Change in service levels Estimated cost Indicator Existing (As is) After (to be) 1. Upgradation of Azad Maidan Boundary wall Walkers path Pebble path Landscape Child friendly play equipments Street lighting Benches Public conveniences Per Person Open Space in Plain Areas as per URDPFI (Benchmark) 10-12 Sq.m per person 20 Sq.m per person 20 Sq.m per person 2.45 Crore Amount in Crores 12

Table 2.9: SLIP - Proposed Funding and Sharing Pattern for Priority Projects: Sector Wise Name of City: Panaji (FYs 2015-16) (As per Table 2.3.1 of AMRUT Guidelines) Sl.No. Name of the project Total Project 1 Upgradation of Azad Maidan cost Share GoI State ULB Others Total 2.45 1.225 1.225-2.45 Total 2.45 1.225 1.225 2.45 Table 2.10: SLIP- Source of Funds from GoI/State/ULB (for all sectors andprioritized projects) Name of City: Panaji (FYs 2015-16) (As per Table 2.3.2 of AMRUT Guidelines) Sl.No. Project GoI 1 Upgradation of Azad Maidan 1.225 14 th FC - State Others Total 1.225 1.225 14th FC ULB Others Total Conver gence Amount in Crores Others - - Total 1.225-1.225 1.225-2.45 Amount in Crores Total 2.45 13