PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Similar documents
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Problem Understanding

City of Waco Stormwater Management Regulations

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

SITE PLAN REVIEW APPLICATION AND CHECKLIST

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

Northern Branch Corridor DEIS December 2011

Kickapoo Woods Restoration Plan

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

Leduc Industrial Outline Plan SE W4

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

Just The Basics: Illicit Discharge. What does it mean to me?

Old Mill Community Association Bioretention Facility

CRESCENT RESOURCES INC.

URBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION

CHECKLIST FOR PHASE II DRAINAGE REPORT

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Pollutant Removal Benefits

Village of Forest Park. July 27, Sewer Separation Evaluation

Maintaining Your Neighborhood Stormwater Facilities How to identify stormwater facilities and keep them working

Severn River Sub-Watershed: BMP 09-Retrofit

When planning stormwater management facilities, the following principles shall be applied where possible.

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015

Draft Rhode Island Stormwater Design and Installation Standards Manual

4.6. Low Impact and Retentive Grading

TENTATIVE MAP CHECKLIST

Chapter 3 Site Planning and Low Impact Development

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Washington County, Maryland Division of Public Works Policy Manual

City of O Fallon, Missouri Stormwater Management Policy

POLE BRIDGE ROAD NEAR FIVE LOT FARM

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

2018 Annual Landfill Inspection Report

Public Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment

APPLICATION FOR MINOR SITE PLAN REVIEW

2016 WORKSHOP LVR Field Trip

David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012

Guidelines for Streambank Protection

East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School. Current site type

Stormwater BMP and Stream Restoration in a City Park. Jeff Herr P.E., D.WRE Jill Stachura

Brigitte A. Berger, Director of Engineering

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) General Application

Wisconsin NRCS Direct Volume Method Bank Recession Rate Categorizations

Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County

SECTION 6. Routine Maintenance Activity Details

continues in the watershed, additional flood control and water quality / natural system improvements may be required in the future.

CITY OF VALPARAISO STORMWATER MASTER PLAN

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

USF System Campus Master Plan Updates Goals, Objectives and Policies

City of Elmhurst. Comprehensive Flood Plan. City of Elmhurst. City Council Meeting September 15, 2014

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT


MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

Erosion Control for Home Builders in the. City of Jacksonville

Town of Vershire Road Erosion Inventory Report

APPLICATION FOR MINOR SITE PLAN REVIEW

Jill Stachura STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. October 2013 Southeast Stormwater Association Annual Conference, Charlotte, NC

R1a: REINFORCED TURF TO REPLACE GRAVEL /GRASS PARKING ADJACENT TO SOUTH PENNSYLVANIA AVENUE.

Public Meeting for the Redevelopment of. July 17,2018 7pm to 9pm Rolling Knolls Elementary School

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

STREAM BUFFERS

CHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08)

Design Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield

Town of Essex Small Site Erosion Control Guide

Chapter 14. Stormwater Quality Introduction

Flooding Hearing: Long and Short Term Strategies

Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. July 2013 Jill Stachura

Understanding Stormwater Drainage Maintenance

City of Dade City AMEC Project No Dade City Stormwater Master Plan September 2012 Page 32

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

Urban Stormwater Management. Rebecca Leonardson Rui Teles Brooke Ray Smith

Lower Meramec Multi-Jurisdictional Floodplain Management Plan Public Involvement (Results of Early Public Engagement) 27 June 2018

Construction Site Erosion Control

Alternate Green Stream Bank Stabilization Methods

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015

Standard Operating Procedure: Outfall Inspections

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

C ity of Grande Prairie Development Services Department

Do you know there your MS4 is?

MATHEWS COUNTY RURAL DITCH ENHANCEMENT STUDY

AWR Engineering, LLC

VEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

Moon Brook FRP BMP Summary Sheet. Ownership of Land where BMP is Located

POST CONSTRUCTION STORMWATER MANAGEMENT FOR "WHITE OAK SEWER INTERCEPTOR"

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES

NAPA COUNTY PUBLIC WORKS Standards & Specifications

Major Subdivision Sketch Plan Checklist

4. Contractor (and subcontractors if applicable) certification statement(s)

HUDSON VALLEY REGIONAL COUNCIL 3 Washington Center, Newburgh NY

Transcription:

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 25-5 Problem: Stormwater collected from the neighborhood upstream is released at 9 Muirfield Lane and flows west toward Bellerive Country Club. The stormwater exits the outfall and has no defined flow path, creating yard erosion. In order to slow down the erosion, the residents have placed soil, brick, and rocks, but the improvements often get washed out by the high flows. The backyards of 6, 7, 2, 2, and 22 Muirfield Lane have soggy conditions and ditches carved out by erosion. Near 22 Muirfield Lane, the landscape changes from mowed lawns to a small rock swale. The rock has eroded away. Next is a wooded riparian area, which is hidden and likely not often accessed by the nearby residents. The entire reach is in very poor health. The stream is downcutting and widening. Portions of the stream have been lined with large riprap. There is little ground vegetation because the canopy of primarily honeysuckle shades and inhibits the growth of the understory. There is debris in the channel, including a lawnmower, fallen trees and branches, and a mess of live cables. The stagnant water in the stream is blue-green, cloudy, and smells of sewage. At the Bellerive Country Club, the flow is piped. Water is collected and is piped to the west. Proposed Solution: Install bioswales upstream of the project area to reduce flow coming through backyards. At the outlet of the pipe from Muirfield Ln, install a vegetated reinforced earthen swale until approximately the midpoint of the lot for. Construct grade controls at the outfall and again around the midpoint of the new swale. At the downstream end of the swale, install a level spreader to encourage the flow to spread out (much like it does in this location already). Farther downstream near the property line between 6 and 22 Muirfield Ln, remove the existing rock channel and install bank protection with a rock toe. End improvements where the channel moves into the wooded area, with a grade control to lock in the elevation. Required Easements: 5 Muirfield Lane (Temporary Construction Easement) 6 Muirfield Lane (Temporary Construction Easement) 9 Muirfield Lane (Temporary Construction Easement) 2 Muirfield Lane (Temporary Construction Easement) 22 Muirfield Lane (Temporary Construction Easement) Commentary: At the lower end of the reach, average reach slope is approximately 3.5% (typical stable slope is.5 to.7%). Scour line in this area is approximately 3-feet above channel bed, and the bed width is approximately 6-feet wide. Due to the odors in the area, it is recommended that MSD be contacted to investigate their sanitary sewer system. PROJECT SCOPE OF WORK

PROJECT INFORMATION SUMMARY CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 25-5 Number of Properties Impacted: Number of Easements Required: Number of Properties Benefited: Opinion of Probable Construction Cost (OPC): (LBI) Project Points: 5 $94,24.69 7.8 Project Source: x Citizen Complaint Municipality Government Agency Category of Problem: Description Cost to Benefit Ratio: 24,93 Coordination Required: x MSD x Corps of Engineers x MO DNR MODOT County Highways City s City Parks County Parks x Municipality: City of Town & Country Railroad: x : Local Utility Service Providers Attached Supplemental Information: x Project Scope of Work x Conceptual Plan Drawing x Itemized Opinion of Probable Construction Cost (OPC) x (LBI) Forms x Existing Condition Photos A: Frequent structural flooding from creeks or rivers (floodplain) B: Frequent structural flooding from overland flow (non-floodplain) C: Frequent roadway flooding D: Infrequent structural flooding from creeks or rivers (floodplain) E: Infrequent structural flooding from overland flow (non-floodplain) F: Infrequent roadway flooding G: High risk structural erosion H: High risk roadway erosion x I: Yard erosion J: Moderate risk structural erosion K: Moderate risk roadway erosion L: or flooding of common ground or unmaintained area M: Yard flooding N: from inadequate sinkhole O: from inadequate roadway drainage P: of stormwater system facilities Q: Notes: MSD/MO American Water Base Map Number(s): FEMA FIR Map Number(s): 7P4 2989C88K PROJECT INFORMATION SUMMARY

OPINION OF PROBABLE CONSTRUCTION COST CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 25-5 ITEM ESTIMATED UNIT EXTENDED NUMBER PAY ITEM DESCRIPTION QUANTITY UNIT PRICE PRICE Mobilization Lump Sum $2,6.35 $2,6.35 2 Bank Protection - Biostabilization 8 Square Yards $6. $,8. 3 Bioswale 76 Square Yards $77. $3,552. 4 Clearing Square Yards $,. $,. 5 Excavation Class "B" 26 Cubic Yards $55. $,452. 6 Excavation Class "C" 238 Cubic Yards $28. $6,652.8 7 Grade Control 27 Cubic Yards $5. $4,5. 8 Level Spreader Each $,. $,. 9 Rock Toe Protection 42 Square Yards $5. $4,83. Seeding & Live Staking 8 Square Yards $45. $8,. Sodding - Fescue 4 Square Yards $.5 $4,6. 2 Vegetated Reinforced Earthen Swale 295 Square Yards $5. $3,975. 3 Protection and Restoration of Site Lump Sum $,3.53 $,3.53 SUB-TOTAL - CONSTRUCTION: $,933.69 Estimated Engineering Fee: $2,. Estimated Geotechnical Engineering Fee: $6,. Estimated Property Survey/Strip Map Preparation Fee: $4,85. Estimated Property Title/Easement Search Report Fee: $2,. Estimated Topographic Survey Fee: $6,8. Estimated Property Rights Acquisition Document Preparation Fee: $2,25. Estimated Cost of Easements: $5,. Estimated Construction Survey Fee: $583. SUB-TOTAL: $49,46.69 3% Contingency: $44,825. TOTAL: $94,24.69 OPINION OF PROBABLE CONSTRUCTION COST

Project Id Number: 25-5 2925 Ladue Rd (Golf Course) Total Calculated :.4 ROW Yard Subtotal Yard 2 Swale / Berm 3 Yard > / year Life / Limb / year / 5 years Property Value. / years Multiplier Multiplier.

Project Id Number: 25-5 5 Muirfield Ln Total Calculated :.4 ROW Yard Subtotal 2 Yard Swale / Berm Yard > / year Life / Limb / year / 5 years Property Value. / years Multiplier Multiplier.

Project Id Number: 25-5 6 Muirfield Ln Total Calculated :.9 ROW 9 Yard 3 Subtotal 2 Yard 6 Swale / Berm 6 Yard > / year Life / Limb / year / 5 years Property Value. / years Multiplier Multiplier.

Project Id Number: 25-5 7 Muirfield Ln Total Calculated :.4 ROW Yard Subtotal Yard Swale / Berm Yard > / year Life / Limb / year / 5 years Property Value. / years Multiplier Multiplier.

Project Id Number: 25-5 8 Muirfield Ln Total Calculated :.4 ROW Yard Subtotal Yard Swale / Berm Yard > / year Life / Limb / year / 5 years Property Value. / years Multiplier Multiplier.

Project Id Number: 25-5 9 Muirfield Ln Total Calculated :.5 ROW 3 Yard 3 Subtotal 6 Yard 6 Swale / Berm 7 Yard > / year Life / Limb / year / 5 years Property Value. / years Multiplier Multiplier.

Project Id Number: 25-5 Total Calculated :.9 ROW 3 Yard 3 Subtotal 6 Yard Swale / Berm Yard > / year Life / Limb / year / 5 years Property Value. / years Multiplier Multiplier.

Project Id Number: 25-5 2 Muirfield Ln Total Calculated :.4 ROW Yard Subtotal Yard Swale / Berm Yard > / year Life / Limb / year / 5 years Property Value. / years Multiplier Multiplier.

Project Id Number: 25-5 22 Muirfield Ln Total Calculated :. ROW 3 Yard Subtotal 4 Yard 6 Swale / Berm 6 Yard > / year Life / Limb / year / 5 years Property Value. / years Multiplier Multiplier.

Project Id Number: 25-5 23 Muirfield Ln Total Calculated :.4 ROW Yard Subtotal 2 Yard Swale / Berm Yard > / year Life / Limb / year / 5 years Property Value. / years Multiplier Multiplier.

25-5 (25) (28) Outlet structure at 9 Muirfield Lane. Looking west from near 2 Muirfield Lane, just downstream of outlet pipe. (25) near 9 Muirfield Ln. (28)

25-5 (25) (28) Looking east from near 2 Muirfield Lane. Conditions appear to be slightly worse on site. Looking southwest. After eroded channels, topography flattens out and less erosion is observed. Runoff enters a rock channel near trees seen straight ahead in picture. (28) Rock swale near 6 & 22 Muirfield Ln. Downstream portion is washed out due to inadequate rock size. (28)

25-5 Looking upstream at 5 Muirfield Lane; no low vegetation is established, erosion occurring. (25) Cloudy blue-green water in stream, smells of sewage; possible location of sanitary break. (25) Typical stream reach at 5 Muirfield Lane. (25) Damaged utilities just north of stream near 23 Muirfield Lane. (25) Downstream point of stream reach at 2925 Ladue Road (Bellerive Country Club). (25) 2-inch pipe outfall at 22 Muirfield Lane.

25 34 29 26 24 27 7P-3D 495 52 V U 2925 5 5 7P4-5S Proposed Improvements Strip Map Limits Topo Limits FEMA Flood Hazard Zone 5 5 2 7P4-4D 7P4-2S Regulatory Floodway.% Annual Chance Flood Hazard.2% Annual Chance Flood Hazard 9 2 5 495 7P4-38D 5'' 2'' 7P4-S Easements Required Properties Impacted Properties Benefited Project Conceptual Cost Cost to Benefit Ratio 36 7P4-34D 5 53 6 5 5 55 8 Yard erosion and ponding is occurring in the backyards of several properties. Proposed Solution Description 54 5 5 5 5 55 495 49 485 7P4-26D 2'' 53 2'' 52 5 2'' 7P4-27D 64 Feet inch = feet Warning: If this bar does not measure " then drawing is not to scale 3 2 City of Town & Country Stormwater Program 5 38 7P4-27S Create a defined, reinforced swale at the outfall of the pipe. Remove and replace existing rock swale to the west. 7P4-28S 7P4-26S 4 5 535 7P4-36D 545 37 52 5 52 48 475 7 2'' 5 7.8 $94,242 24,93 Problem Description 7P4-4S 7P4-37D Stormwater Gravity Main Proposed 7P4-7S 7P4-5S Stormwater Intake/Outfall Parcels 7P4-6S 22 Stormwater Manhole Pavement 35 7P4-4D Stormwater Inlet Impervious MUIRFIELD LN 2 '' 475 23 24'' " ) Sanitary Gravity Main Stormwater Channel 53 48 485 49 4 Sanitary Manhole # * 7P4-39D 5 V U, %, % 2'' 7P-8S 34 28 27 525 64 Existing -ft Contours 525 U V 7P-59S 52 32 Project Location 25-5