Slope Stability Evaluation and Determination of Location of Long Term Stable Top of Slope 233 to 245 Dunlop Street West, Barrie, Ontario

Similar documents
1 SITE AND PROJECT DESCRIPTION

FURTHER TO EXECUTIVE COMMITTEE MEETING #11/12 To be held on Friday, January 11, 2013

APPENDIX F: EXTERNAL APPROVALS

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION

Project phasing plan (if applicable) 12 copies of site plan

TRCA Field Staking Protocol December 2016

FURTHER TO EXECUTIVE COMMITTEE MEETING #10/11 To be held on Friday, November 4, 2011

Activity Residential Site Planning

STORM SEWER OUTFALLS AND CONNECTING OUTFALL CHANNELS. General Submission Requirements

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

2016 Annual Inspection Report

The MSII reports for the bridge indicate that the Annual Average Daily Traffic at the bridge is 100. The road can be considered a low volume road.

plan context INTRODUCTION 10 EXISTING SITE CONDITIONS 16 RELATED PLANS & INITIATIVES 10 CONSULTATION 30

10 Park Lawn Rd - Zoning Amendment Application- Preliminary Report

The City of Winnipeg Bid Opportunity No GEOTECHNICAL REPORT - TEST HOLE LOGS

10.14 ERRATA UPDATE SHEET 3

Station Street/Haig Road Extension Environmental Assessment (EA)Study. Welcome

Executive Committee Meeting Addendum. #7/15 July 3, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members:

HUNTSVILLE PHYSICAL SERVICES DEPARTMENT

Scarborough Waterfront Project

FURTHER TO EXECUTIVE COMMITTEE MEETING #5/06 To be held on Friday, July 7, ERRATA UPDATE SHEET

LEA Consulting Ltd. Consulting Engineers & Planners. November 7, 2014 Our Ref.: 9184/200

66-90 RIVER ROAD EAST RESIDENTIAL DEVELOPMENT BREMONT HOMES TOWN OF WASAGA BEACH OPERATIONS AND MAINTENANCE MANUAL. Prepared by: Phone:

June 22, 2018 Project No /2100

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015

168 & 170 BRADFORD STREET

Grand River Ravines Georgetown Township

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

SITE PLAN REVIEW APPLICATION

Request for Decision. Recommendation. Presented: Monday, Jul 07, Report Date Friday, Jun 20, Type: Public Hearings

PLANNED UNIT DEVELOPMENT APPLICATION

4155 Yonge Street Official Plan Amendment and Rezoning Application Preliminary Report

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 27, 2014

URBAN DESIGN GUIDELINES

Florence County Small Commercial Land Disturbance Permit Application

City of Kitchener Implementing CPTED in the Site Plan Process

SITE PLAN REVIEW APPLICATION AND CHECKLIST

Planning and Building Department, Development and Design Division

STAFF REPORT. December 20, North York Community Council. Director, Community Planning, North York District

SEPA Modification Application

LAND USE ASSESSMENT REPORT (LUAR) PROPOSED AFFORDABLE HOUSING COMPLEX MAIN ROAD PDE FILE NUMBER: REZ

West London Dyke, April 1947 Flood. Forks of the Thames, July 2000 Flood. Source: UTRCA

Drainage Control Plans

Department of Planning & Development Planning Unit

PRESENTED: April 15, 2008 FILE: DP No. 273/ Development Permit No Government Road Townhomes

SITE AND PROJECT DESCRIPTION

Coffee Creek Park Development Low Impact Development (LID)

M. Block & Associates Ltd.

Pontiac Trail 1" = 80' B-1 B-2 B-3 B-4 B-5. to WB S23 C SB U M 14. a c Trl

DAVE SMITH YOUTH TREATMENT CENTRE. City of Ottawa. Planning Rationale and Integrated Environmental Review Statement. Site Plan Control Application

4. Contractor (and subcontractors if applicable) certification statement(s)

Section 3 Non-Structural BMPs

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

DP-2 Development Permit Application

Retrofitting Low Impact Development (LID) for Stormwater at Sacramento State. City of Sacramento Sacramento State Facilities Management

HUDSON VALLEY REGIONAL COUNCIL 3 Washington Center, Newburgh NY

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL

Washtenaw County Conservation District 7203 Jackson Rd Ann Arbor MI Phone: (734) x 5 Fax: (734) Web:

Draft Rhode Island Stormwater Design and Installation Standards Manual

APPLICATION FOR MINOR SITE PLAN REVIEW

Application for Site Plan Review

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

Plat Requirements CHECKLIST FOR SITE PLAN REVIEW

ADDENDUM to the August 2012 Urban Design Brief

Rowntree Mill Road Zoning and Plan of Subdivision Applications Final Report

Zoning Ordinance Chapter 10

5959 Yonge Street Rezoning Application - Preliminary Report

WATER QUALITY IMPACT ASSESSMENT (WQIA) FORM

McKay Road Interchange and Salem / Lockhart Crossing

Director, Community Planning, Etobicoke York District

The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

PLANNING JUSTIFICATION REPORT

280 Manse Road - Official Plan Amendment, Zoning Amendment, Draft Plan of Subdivision Applications - Preliminary Report

Property. Line. Fence. Plantings. Vegetated Buttress. With Sun Tolerant. Vegetated Terrace. Tolerant Plantings Existing

Access. Chapel Parking & Entry Loop Snowbridge Square Skier/Visitor Parking. Dumpster Access. 3 Entry Monument Future Chapel Park

2900 Steeles Avenue East at Don Mills Road in the Town of Markham

STORMWATER - GENERAL NOTES

Alterations to a Designated Heritage Property and Authority to Amend a Heritage Easement Agreement Queen's Park

COMPLIANCE CHECKLIST HILLSIDE RESIDENTIAL DESIGN GUIDELINES MANUAL

Welcome. Mill Creek Ravine Pedestrian Bridges Rehabilitation. Public Information Session #1. Thursday, October 27, :00 8:00 p.m.

General Location Courtyard at LMH Final Development Plan and Final Plat

It is recommended that the Commission receive this report on subway garbage disposal and recycling and note the following:

6 August 11, 2010 Public Hearing APPLICANT AND PROPERTY OWNER: CAVALIER GOLF AND YACHT CLUB

OCEAN POND COTTAGE DEVELOPMENT PLAN

Riparian Buffer on the Bushkill Creek. Policies

Information for File # ARC

APPLICATION FOR REZONING PROPERTY CITY OF HOLLAND, MICHIGAN. Name of Applicant. Address, and Phone # of Applicant

Neighbourhood Guide. For Cambridge Residents In New Neighbourhoods

Development Permit Application Form. Property Owner Information as Registered on Legal Title Property Owner Name: Phone:

City of Lafayette Study Session Staff Report Design Review Commission

From: Director, Community Planning, Etobicoke York District

REMOVE 20' OF STONE WALL C.C.B. REBUILD 20' OF R=1,000.00' L=130.00' CONSTRUCTION STONE WALL ENTRANCE PER DETAIL R=1,000.00' L=65.09' DMH U.P. HYD.

Essential Skills: Reading and Interpreting Maps and Plans

DISTRICT OF LAKE COUNTRY

TO BE COMPLETED BY APPLICANT

Lake Nokomis Shoreline Enhancement Project

Transcription:

geotechnics construction materials testing Ref No.: 17-048 Trinity Consultants Ontario Inc. 885 Don Mills Road, Suite 106 Toronto, ON. M3C 1V9 Attn: Brian J. Schuyler, C.E.T., Senior Consultant Subject: Slope Stability Evaluation and Determination of Location of Long Term Stable Top of Slope 233 to 245 Dunlop Street West, Barrie, Ontario Alston Associates (AA) was retained by Trinity Consultants Ontario Inc. (Trinity) to update the slope stability study undertaken for the site by Terraprobe Inc. in 2012. We understand that this update is required in support of development plan approval by the City of Barrie. A copy of the report titled Slope Assessment, 233 to 241 Dunlop Street West, Barrie, Ontario, File No. 31-12-8129, dated December 3, 2012) prepared by Terraprobe Inc. was provided to AA by Trinity. The site is located on the south side of Dunlop Street West, and consists of the properties with the Municipal addresses 233, 237, 241 and 245 Dunlop Street West. For the purpose of this report Dunlop Street West is considered to be oriented in an east-west direction. A ravine slope is situated on the south section of the site. The location of the top of the staked bank (slope) is shown on the Site Plan dated October 27, 2017, prepared by ISM Architects and Topographic Plan dated August 15, 2017, prepared by Dino Astri Surveying Ltd., both of which are attached to this report. Based on elevations included on the Topographic Plan, the valley lands are situated 5 to 6 m below the tableland throughout the northern section of the site, and consist of a pond (wetland) referred to as Millligan s Pond; a tributary to Bunkers Creek. A narrow creek, less than 2 m in width runs within the ravine through the southwest corner of the site. The creek meanders and is situated within a minimum distance of 8 m from the base of the slope. Based on information contained in the latest Site Plan prepared by ISM Architects, we understand that the proposed development will consist of an eight storey above grade residential building located in the north section of the site. The south section of the site north of the ravine lands will be developed with a parking lot. Within the western section of the site, the south curb of the parking lot will be situated along the line of top of bank. In the remaining area of the site, the parking lot will be situated within a minimum distance of 6 m from the top of the slope. The assessment undertaken by Terraprobe was limited to the properties with the municipal addresses 233 to 241 Dunlop Street West; it did not include the property at 245 Dunlop Street West. The assessment was also based on a concept plan wherein, the proposed parking lot was to be situated a minimum of 10 from the top of slope. The assessment consisted of a visual examination of the site and slope conditions. Boreholes 90 scarsdale road telephone: (905) 474-5265 toronto, ontario fax: (416) 444-3179 M3B 2R7 e-mail: alston.associates@alston.ca

alston associates Reference 17-048 were not drilled at the site and slope stability analyses were not completed. The assessment concluded that the undisturbed slope was considered to be stable against failure with a minimum slope of 2H:1V, and a stability setback allowance is not required; the existing top of slope is the stable top of slope line. Terraprobe also concluded that in the absence of active toe erosion, for clay soil, an erosion allowance of 1 to 4 m be used for the toe erosion allowance. Terraprobe recommended that a minimum of 6 m of erosion access allowance be provided to provide access for long term maintenance of the slope in the event deemed necessary. Based on the above considerations, Terraprobe opined that since the development limit (edge of proposed parking lot) was to be situated a minimum of 10 m from the top of slope, the existing slope is stable and will perform with an appropriate safety factor for the proposed construction. A geotechnical investigation was carried out by AA in 2017 for the proposed development which was to consist of a 3 storey building with a single basement level. A total of 7 boreholes were advanced at the site extended to depths ranging from 2 m to 9.6 m. The investigation revealed that the site is underlain by surface cover of topsoil and fill material, followed by native sand soil. Groundwater was encountered below a depth of 4.5 m below grade. The site was visited by the writer on January 26, 2018, to examine the condition of the slope. Based on observations made at the site, information obtained from the previous Terraprobe report and the findings of the geotechnical investigation report, we concur with the conclusion made by Terraprobe; that the slope is stable and will provide a minimum safety factor of 1.3 against failure. The Ontario Ministry of Natural Resources (MNR) Natural Hazards Policies provide general guidelines for the determination of setback for new developments adjacent to the crest of natural slopes (shoreline bluffs, river valleys, ravines). The setback is determined from the following three (3) setback allowances, measured from the slope toe towards the slope crest: 1. Stable Slope Allowance (stability component of setback) 2. Erosion Access Allowance (access allowance of the setback) 3. Toe Erosion Allowance (erosion component of setback) Stability Component For land development and planning, MNR requires a minimum Safety Factor of 1.3 for engineering design of slopes for stability. This safety factor is used to determine the stability component of the Long Term Stable Top of Slope line (LTSTOSL). Based on the existing slope conditions, the slope is considered to be stable and therefore the stability component is not required; the setback is 0 m. Erosion Access Allowance Based on MNR s Technical Guide for River and Stream Systems, an erosion access allowance is typically required from the LTSTOSL line. The erosion access allowance is to ensure that there is enough safety zone along the top of a slope for people and vehicle to enter or exit an area during emergency and maintenance SLOPE STABILITY EVALUATION AND DETERMINATION OF LOCATION OF LONG TERM STABLE TOP OF BANK 233 TO 241 DUNLOP STREET WEST, BARRIE, ONTARIO 2

alston associates Reference 17-048 work. This allowance may extend into development area provided that the area is not built upon. A minimum 6 m erosion access allowance is typically used. Toe Erosion Allowance The toe erosion allowance is applicable where the base of the slope is situated within a distance of 15 m from the water body. Accordingly a toe erosion allowance will be required. The toe erosion allowance is typically based on several factors, including type of soil, presence or absence of active erosion, and bankfull width. The boreholes advanced at the site by AA in 2017 revealed that the soil within the depth of the slope consists of silty sand or sand with trace to some silt. In the absence of active erosion, MNR recommends a toe erosion allowance of 1 to 2 m, for a bankfull creek width less than 5 m. Given that the creek is situated at least 8 m from the toe of slope, the stream flow in the creek is very slow and Milligan s pond would control velocity and erosion, an erosion allowance of 1 m should be adequate. Based on the above, the total development setback would be 7 m; the sum of erosion access allowance of 6 m and the toe erosion allowance of 1. Sections of the parking lot extend to the top of slope. Should you have any questions regarding this letter, please do not hesitate to contact our office. Yours very truly, alston associates Division of Terrapex Environmental Ltd. Vic Nersesian, P.Eng. Attachments: Site Plan dated October 27, 2017, prepared by ISM Architects. Topographic Plan dated August 15, 2017, prepared by Dino Astri Surveying Ltd. Terraprobe Slope Stability Assessment report dated December 3, 2012. SLOPE STABILITY EVALUATION AND DETERMINATION OF LOCATION OF LONG TERM STABLE TOP OF BANK 233 TO 241 DUNLOP STREET WEST, BARRIE, ONTARIO 3

EDGE OF PAVEMENT CONCRETE SIDEWALK STUMP 0.15 STUMP 0.2 STUMP 0.2 STUMP 0.4 STUMP 0.45 LIMIT OF WOOD FENCE BACK OF CURB BACK OF CURB SSIB(1390)(DISTURBED) UTILITY BO 40.37 N57 26'55"E 60.70 13.53 87.81 2 STOREY BRICK DWELLING 0.6 GARAGE LOT 19 STUMP LOT 19 LOT 18 LOT 17 LOT 16 LOT 18 LOT 17 LOT 16 LOT 15 LOT 15 SIB(1423) (20.12 P2) IB(P1)(WIT) 0.05S P1 & SET WIT 0.15W,0.03S (20.36 P1) (40.23 P2) TBM TOP SSIB ELEVATION=228.13 HP (40.23 P2) (1.96 P3) WOOD DECK (1.88 P3) CHAIN LINK FENCE (0.37 P3) DECK ABANDONED WELL (PROP & SET) (PROP & SET) IB(738) 0.15 IB(1390) N57 26'55"E 101.34 (101.32 P1) (100.58 P2) (P3 & MEAS) 6.19 1.99 1.93 P.I.N. 58791-0019 0.44 SIDED GARAGE (0.22 P3) 0.32 (N32 33'05"W P2 & P3) (N32 16'30"W P1) N32 22'35"W 50.70 (50.75 P3) P.I.N. 58791-0061 (N32 08'10"W P1) N32 05'45"W LIMIT OF FENCE 50.38 LEGAL DESCRIPTION KEY PLAN ISM ARCHITECTS 174 Bayfield Street Barrie, ON L4M 3B5 T: 705.726.2342 E: ian@ismarchitects.ca No. ISSUE/ REVISION DATE 1 CLIENT REVIEW JUN 15/17 2 NEW TOPO AUG 16/17 3 ISSUE FOR SUBMISSION SEPT 01/17 DUNLOP STREET WEST (ELIZABETH STREET BY REGISTERED PLAN 27) P.I.N. 58790-0002 SITE PLAN 1:250 CURB CUT CURB CUT HP HP WV WV 40.54 39.86 IB(P1) 20.33 20.27 (20.12 P2) PORCH 0.05 (60.73 P1) VEST. 2 UNIT 2 195.18m2 12 PROPOSED 8-STOREY RENTAL CONDO /w GRND FLR COMM. 305.21m2 90 UNITS - 1229.53 m2 APT. LOBBY FITNESS UNIT 1 110.03m2 GRAVEL DRIVE WOOD FENCE 50.61 0.2 AT-GRADE PARKING ENTRY 4 MOVE-IN MECH. APT. LOBBY REGISTERED PLAN 27 0.5 0.2 P.I.N. 58791-0015 20 P.I.N. 58791-0062 SOUTH SIDE OF ELIZABETH STREET 14 14 12 14 6 N57 32'00"E 60.94 BELOW GRADE 'ENVIROWIR' GARBAGE STOR. N32 06'05"W 100.99 (N32 02'15"W P1) (N32 33'05"W P2) N32 07'45"W 50.56 CHAIN LINK FENCE ASPHALT DRIVE FLAGPOLE BUSH 0.09 CLF TOP OF BANK IB(NI) IB(738) 20.28 N57 36'10"E 20.28 (20.12 P2) (20.12 P2) ART 1 (34.30 P1 & P4) 34.33 7 (N32 08'00"W P1 & P4) PART 2 AS IN RO135834 TOP OF BANK AS STAKED SUBJECT TO EASEMENT CREEK P.I.N. 58791-0063 NORTH SIDE OF PERRY STREET E.P DEDICATION LAND BUNKERS CREEK (16.11 P4) (16.11 P4) 16.05 PART 3 N57 32'00"E 60.94 (P4 & SET) 40.56 PERRY STREET (BY REGISTERED PLAN 27) STAMP DO NOT SCALE DRAWINGS. THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND REPORT ALL ERRORS AND OMISSIONS TO THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. ORIENTATION CLIENT OF ARCHITECTS IAN S. MALCOLM LICENCE 2853 MUSKOKA D & M CORP. 190 HOTCHKISS ST., GRAVENHURST, ON, DOUG GRAY dgray@granitecondos.com PROJECT 233 DUNLOP STREET WEST, BARRIE, ON PROJECT INFORMATION PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: DRAWING SITE PLAN DRAWING No. A DETAIL No. B SHEET No. WHERE DETAILED A B 90 RENTAL CONDOMINIUMS A100 173941 MM JB ISM 27.10.2017 AS NOTED

DINO ASTRI SURVEYING LTD. 1-661 Welham Road, Barrie, Ontario, L4N 0B7 Phone: 705-792-6780 Fax: 705-792-4164 www.astrisurveying.com Copies available @ www.landsurveyrecords.com