DEPARTMENT OF PUBLIC WORKS AND ENVIRONMENTAL SERVICES C. KOLESA

Similar documents
DUAL TECHNOLOGY OCCUPANCY/VACANCY SENSOR SWITCH (WS XX DT XX/WS OS DTDR XX)

Ho-Chunk Gaming THUNDERBIRD ENGINEERING, INC. MILWAUKEE: (414) MADISON: (608)

ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED

4-WAY BLOW CEILING MOUNTED CASSETTE Daikin air conditioners for shops, restaurants and offices

6. Drawing E29: Replace E29 with attached RE29, provided in Attachment #1.

Atlas and Helios Unit Heaters Janus 05 Air Conditioners AIX Stainless Steel Unit Heaters Atlas STP Door Curtains Jetstream Induction Flow Optimizers

Technical Description

SERVICE MANUAL. Commercial Air Conditioning. MULTI upgrade series

Technical Description

M.A.M.I. Silentron. Outdoor Wireless Dual Technology Intrusion Detector

Technical Description

ENGINEERING STANDARD FOR FIRE-FIGHTING SPRINKLER SYSTEMS ORIGINAL EDITION. Nov. 1993

ABBREVIATION LIST FAN SCHEDULE SERVED (IN) POWER (SONES) HP W VOLT PHASE VFD MFG EC N/A (LBS) SPLIT SYSTEM HEAT PUMP (OUTDOOR UNIT) SCHEDULE

Note: The office/work area is not in the scope of the PER. Existing Condition

FIRE ALARM: BY OTHERS, IF REQUIRED.

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS


SAFETY CONSIDERATIONS

FIRE ALARM: BY OTHERS, IF REQUIRED.

Element D Services Electrical

TS Series. Technical Instructions. Document No. TS-4000 June 25, TS-CE Combustion Enclosures with LMV5. Description

SPM-4000-DC GUARDIAN INFINITY SPACE PRESSURIZATION MONITOR AND DUAL CONTROLLER

SCC Inc. TS Series. Technical Instructions. Document No. TS 5000 February 12, TS CE Combustion Enclosures with LMV3.

A. This Section includes the following lighting control devices:

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards

Wiring Diagrams Units Produced After April 20, 2009

Daikin air conditioners for small rooms in multi application

Corbin Building. Technical Assignment 2. Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth

CHAPTER 4 EXPERIMENTAL STUDIES

Heating, air-conditioning, cooling

Eagle PIR-018 / PIR-045 / PIR-100 Outdoor Passive Infrared Detectors

Town of Cicero Local Code Amendments

elite Model ELN Centralized Emergency Lighting Inverter Systems 550 W to 1.5 KW Systems

A tool for professionals.

'_'(;ut< L FE, (}[JR NSPIR/_;I'K}N.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018

Wiring Diagrams. 38ARZ ARS ARD Air-Cooled Condensing Units 50/60 Hz

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2


FUEL OIL DAY TANKS. SST Level Controller: UL 508 LISTED

Electrical Design Guidelines Table of Contents

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER

ITC 2000 HEATING CONTROL CABINET. Installation & Operation Manual

Extension of a Virtual Refrigerant Charge Sensor

TABLE LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE Uncovered Parking Areas. Building Grounds. Walkways 10 feet wide or greater

CHAPTER 20 SERVICE EQUIPMENT

Precision Air Conditioners

SINGLE CONVENIENCE OUTLET, WALL MOUNTED RECESSED +18" AFF

PUMP CONTROL CENTER (PCC)

16.34 Multiplex Fire Alarm System Construction Standards Page 1 of 5

POINT OBSTRUCTION CONTROLLER POC TOUCHSCREEN CONTROLLERS

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

THE GREAT BRITISH BOILER. Visit Call Get advice, latest prices and help on choosing the right boiler for you.

SECTION LIGHTING CONTROL DEVICES

Daikin air conditioners for shops, restaurants and offices

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

DIVISION 16 ELECTRICAL

Do you want a versatile solution to make significant savings? AIR-TO-WATER HEAT PUMP

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

SECTION LIGHTING CONTROLS

Installation Manual. Power Plus Box THERMAL MODULES CONDENSING. Installation Manual

Wiring Diagrams DIAGRAM INDEX

TABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51

LIGHT LEVEL REQUIREMENTS MINIMUM ACCEPTABLE FOOT CANDLES

Comfort. COMFORT Sabiana circular unit heaters, for ceiling installation only,

Parts for Avery Dennison ST9000 TM Plastic Staple Attacher Old Style

Project No Belleville Fire Hall/Headquarters and Emergency Operations Centre Section Belleville, Ontario Page 1 of 10

Port of Portland Conveying Equipment Guidelines

Heat Exchanger models

TRANS ATLANTIC TRADING ENTERPRISE INC.

A. This Section includes the following lighting control devices:

THE INTELLIGENT CHOICE IN COMFORT SINGLE & MULTI TYPE AIR CONDITIONERS

Vacuum-ultraviolet Ozone Systems. Installation & Operation Manual. Model OZ-SPA

PRELIMINARY. w w w. d a i k i n e u r o p e. c o m FDQ-B

Daikin air conditioners for small rooms in multi application

Model VPS Pressure Limiting (VFD) Electric Fire Pump Controller with Soft Start Bypass

BENSON AMBIRAD. ... Variante Gas Fired Unit Heaters ... HEATI NG AND VENTILATION S OLUTIONS

Lindsay Frederick. Lighting + Electrical. Ron Dodson Faculty Advisor. Native American Cultural Center Arizona. Technical Report 2

Chapter 1 General... 5

FIGURE 1 OUTAGAMIE COUNTY LANDFILL PROJECT LOCATION EAST LANDFILL LANDFILL OFFICE AND SCALE WEST LANDFILL EXISTING MRF COUNTY ROAD OO EXISTING FLARE

Chromalox. Installation, Operation. Screw Plug Heating Solution Control Panel Assembly for Screw Plug Heaters RENEWAL PARTS IDENTIFICATION

Daikin air conditioners for shops, restaurants and offices

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

Heat Recovery Units. EXTERNAL STATIC REQUIRED (in.h2o) (Pa) MOTOR (Bhp/Hp) (bkw/kw) SPEED (rpm)

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES

Fluid Cooler Fan and Pump control panel

B. Configuration of system shall be through Schneider Electric in Homewood, Illinois (Jerry Lanfear ).

Project: Customer: Engineer: Pump Manufacturer: Model GPY + GPU. with Automatic Power Transfer Switch

wiring diagrams AIR-COOLED CONDENSING UNITS SPLIT-SYTEM HEAT PUMP UNIT UNITS PRODUCED AFTER SEPTEMBER 1996 DIAGRAM INDEX

SINGLE-PACKAGE ROOFTOP HEAT PUMP UNITS INDEX. VOLTAGE (3 Ph, 60 Hz) ACCESSORIES

AIR-COOLED CONDENSING UNIT UNITS PRODUCED AFTER JANUARY, 1996 INDEX SCHEMATIC DIAGRAM FIG. NO.

MULTI INVERTER SERIE H6M

University of Houston Master Construction Specifications Insert Project Name SECTION FIRE PROTECTION PUMPS PART 1 - GENERAL

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL

WCA3**4. Product Specifications

PART GENERAL 1.01 SECTION INCLUDES

Daikin air conditioners for shops, restaurants and offices

IMPORTANT CB26UH CBX26UH. Service Literature. CB26UH and CBX26UH Series Table of Contents. Model Number Information... 2

Transcription:

GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN D. CAO C. KESA 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 GENERAL INFORATION INSTRUENTATION SYBS AND LEGEND DATE: OCTOBER 06 HAZEN NO.: 4-004 I-

SODIU BISULFITE TEPORARY TANK SODIU BISULFITE TEPORARY TANK LEVEL LEVEL HI INTERLOCKS: HI VUE (GAL). REFER TO SECTION 7950 FOR TRANSFER PUPS AUTOATIC SHUTDOWN INTERLOCKS BASED ON STORAGE TANK AND EISTING DAY TANK LEVELS. VUE (GAL). PUP AUTOATIC SHUTDOWN ON LOW SUP LEVEL. FP-460-HH- (EISTING, SEE NOTE ) SUP LEVEL HIGH LAH-95-- & 95-- RED STROBE STORAGE TANK HIGH HIGH LAHH-95-- ALAR HORN NOTES: FP-460-HH- (EISTING, SEE NOTE ). VENT TO OUTSIDE OF THE BUILDING WITH FRP SCREEN.. ALL NEW I/O SIGNALS SHOWN HERE SHALL BE TERINATED TO EISTING PLC REOTE I/O RACKS FP-460-HH- IN BUILDING HH. DISCRETE INPUTS SHOWN ON THIS WILL BE TERINATED TO EISTING SPARE PLC DISCRETE INPUTS. IF SPARE I/O IS NOT AVAILABLE, NEW PLC DISCRETE INPUT ODULE SHALL BE PROVIDED AND INSTALLED IN EISTING PLC SPARE SLOTS. () RELAY SIGNALS () RELAY SIGNALS VENT LINE TO SCRUBBER SEE NOTE SODIU BISULFITE TRUCK LOADING STATION FILL LINE OVERFLOW LINE US RECIRCULATION LINE EISTING SODIU BISULFITE DAYTANK CP IN BUILDING HH (LOW LEVEL) EISTING SODIU BISULFITE DAYTANK CP IN BUILDING HH (HIGH LEVEL) RECIRCULATION LINE US OVERFLOW LINE FILL LINE SODIU BISULFITE TRUCK LOADING STATION CONTINENTAL CARBON VPC 000 AIR-PHASE CARBON VESSEL * * * * * EISTING DAYTANK IN BUILDING HH ADDENDU /6 PV GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN D. CAO C. KESA 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 TEPORARY CHEICAL BUILDING (PP) INSTRUENTATION SODIU BISULFITE TEPORARY STORAGE DATE: OCTOBER 06 HAZEN NO.: 4-004 I-PP-

# # # # # # # # OS OS # PC # # F # # F DD H T R # # # # DENOTES FITURE TYPE (TYP.) SEE SPECIFICATION 6500 FOR FITURE SCHEDULE # DENOTES CIRCUIT NUBER (TYP.) RECTANGULAR FITURE LEFT: CEILING OUNTED FITURE RIGHT: WALL OUNTED FITURE EERGENCY WALL-OUNTED FITURE: LEFT: STANDARD RIGHT: REOTE-HEAD LEFT: CEILING OUNTED EIT SIGN RIGHT: WALL OUNTED EIT SIGN SHADED PORTION DENOTES SIGN FACE PE-OUNTED FITURE PHOTOCELL LEFT: CEILING OUNTED OCCUPANCY SENSOR RIGHT: WALL OUNTED OCCUPANCY SENSOR DENOTES TYPE DENOTES RECEPTACLE TYPE (TYP.): GFCI DENOTES GROUND FAULT CIRCUIT INTERRUPT UPS DENOTES UNINTERRUPTIBLE POWER SUPPLY WPCR DENOTES WEATHERPROOF CORROSION RESISTANT # DENOTES CIRCUIT NUBER (TYP.) RECEPTACLES: LEFT: SIPLE IDDLE: DUPLE RIGHT: QUADRUPLE ULTI-OUTLET RECEPTACLE: LEFT: SIPLE RIGHT: DUPLE OTHER RECEPTACLES: LEFT: 40 VT RIGHT: SPECIAL PURPOSE FIRE ALAR CONTR PANEL FIRE ALAR ANNUNCIATOR PANEL FIRE ALAR PULL STATION FIRE ALAR INDICATOR: DENOTES ALERT TYPE (TYP.): A DENOTES AUDIBLE V DENOTES VISIBLE (# DENOTES STROBE INTENSITY) FIRE ALAR INDICATOR OUNTED ABOVE A FIRE ALAR PULL STATION DUCT DETECTOR SOKE DETECTOR: DENOTES TYPE: Z DENOTES IONIZATION P DENOTES PHOTOELECTRIC T DENOTES THERAL HEAT DETECTOR THEROSTAT ABIENT TEPERATURE TRANSITTER START G CPT 480/0VAC O H A STOP E-STOP STOP L.O. START DISCONNECT SWITCHES CONTACTS TORQUE SWITCH LIIT SWITCHES TEPERATURE SWITCHES/ THEROSTATS PRESSURE SWITCHES LEVEL SWITCHES FLOW SWITCHES TIE DELAY SWITCHES PTT G ET SV PR STOP -POSITION SELECTOR SWITCH: HOA DENOTES HAND/OFF/AUTO OOA DENOTES ON/OFF/AUTO LOR DENOTES LOCAL/OFF/REOTE FOR DENOTES FORWARD/OFF/REVERSE PUSHBUTTON SWITCHES: LEFT: N.O./RIGHT: N.C. TET DENOTES LEGEND PLATE USHROO HEAD EERGENCY STOP PUSHBUTTON SWITCH N.C. AINTAINED: TET DENOTES LEGEND PLATE PUSHBUTTON SWITCH N.C. WITH LOCK-OUT: TET DENOTES LEGEND PLATE SELECTOR SWITCH: TET DENOTES LEGEND PLATE THERAL OVERLOAD RELAY NO TS NC TS TS NORC NOFC NCRO NCFO TS TS TS TS TS TS TS TS TS NOTC NOTO NCTO NCTC TS TS TS TS INDICATOR LIGHT: LEFT: STANDARD/RIGHT: PUSH-TO-TEST DENOTES COR RUN TIE ETER SENOID VALVE TS TS OTOR PROTECTION RELAY CONTR POWER TRANSFORER ECHANICAL INTERLOCK CONNECTION NOTATION LEGEND: NO/NC: NORALLY OPEN/CLOSED RO/RC: RISE-TO-OPEN/CLOSE FO/FC: FALL-TO-OPEN/CLOSE TO/TC: TIE-OPEN/CLOSE CONTACTS: TET DENOTES COIL ID SWITCHES: TET DENOTES TAG NUBER TS TS TS N.C. 00AF 00AT 0A P 0A P HP 800AF 800AP 800AT LSIGZ CTR TSH TE RP SH E 00A P 5 FR kva 480-0/08V DRY TRANS 0A P 0A P N.C. ETU # -YYYYY 0A CF 00A 00A 800AF 800AP 800AT LSIGZ CTR 00A N.C. E.O. BATT. 800AF 800AP 800AT LSIG TRANSFORER PROTECTIVE RELAY: NUBER DENOTES IEEE DEVICE FUNCTION OTOR AND TYPICAL ADDITIONAL DEVICES: TSH: TEPERATURE SWITCH SH: OTOR SPACE HEATER CF: COING FAN TE: TEPERATURE ELEENT E: OISTURE DETECTOR INSTRUENT TAG: DENOTES INSTRUENT TYPE Y DENOTES INSTRUENT NUBER SEE I FOR INSTRUENT ABBREVIATIONS FUSE FUSED DISCONNECT SWITCH DISCONNECT SWITCH FUSED DISCONNECT SWITCH LOW-VTAGE POWER CIRCUIT BREAKER: LEFT: FIED-OUNT RIGHT: DRAWOUT E.O. DENOTES LY OPERATED LSIG DENOTES INSTALLED TRIP FUNCTIONS: L DENOTES LONG-TIE S DENOTES SHORT-TIE I DENOTES INSTANTANEOUS G DENOTES GROUND FAULT Z DENOTES ZONE-SELECTIVE INTERLOCKING CTR DENOTES BREAKER-SPECIFIC CT AND RATIOS EDIU-VTAGE DRAWOUT POWER CIRCUIT BREAKER: E.O. DENOTES LY OPERATED BATT. DENOTES BATTERY BACKUP POWER LOW-VTAGE DED CASE CIRCUIT BREAKER LEFT: THERAL-AGNETIC TRIP UNIT RIGHT: ELECTRONIC TRIP UNIT OTOR CIRCUIT PROTECTOR GROUND 00A 6 PULSE VFD 5% 0A 00A ACTIVE FILTER 6 PULSE VFD 00A RVSS IC OC 0A 00A SPD ka #% F R 6 PULSE VFD 00A ST K RVSS 00A PST IC 5% OC IC OC IC RVSS IC OC IC LEFT: RESISTOR RIGHT: LINE REACTOR: #% DENOTES IPEDANCE CAPACITOR SHUNT TRIP SURGE PROTECTIVE DEVICE KIRK-KEY INTERLOCK LEFT: FVNR STARTER: DENOTES NEA SIZE DP DENOTES DEFINITE PURPOSE CONTACTOR RIGHT: FVR STARTER LEFT: VFD WITH LINE REACTOR IDDLE: VFD WITH HARONIC FILTER RIGHT: VFD WITH LINE REACTOR AND FVNR BYPASS DENOTES NEA SIZE LEFT: RVSS STARTER RIGHT: RVSS STARTER WITH FVNR BYPASS VFD WITH RVSS BYPASS TRAY Y S S 00AF 00AT S S S E Y # P-- L L L L 500kW 480V,Ø,4W L S ATS S 480V, 800A Ø 4W 4P 65kA OPEN TRANSITION ATS S 480V, 800A Ø 4W 4P 65kA OPEN TRANSITION ATS 480V, 800A Ø 4W 4P 65kA OPEN TRANSITION ATS S 480V, 800AF/800AT Ø 4W 4P 65kA OPEN TRANSITION S ATS 480V, 800AF/800AT Ø 4W 4P 65kA OPEN TRANSITION EQUIPENT CONNECTION GROUND RODS: LEFT: BURIED RIGHT: IN TESTWELL GENERATOR INSTRUENT TAG: DENOTES INSTRUENT TYPE # DENOTES INSTRUENT NUBER SEE I FOR INSTRUENT ABBREVIATIONS CONDUIT TAGS: P DENOTES POWER C DENOTES CONTR I DENOTES INSTRUENTATION - DENOTES CONDUIT ID CCB-STYLE ATS OR TS DUCTBANK SECTION CUT IDENTIFIER: DENOTES DUCTBANK ID E DENOTES NUBER WHERE SECTION CUT IS LOCATED DUCTBANK TAG: DENOTES DUCTBANK ID CABLE TRAY TAG: DENOTES CABLE TRAY ID Y DENOTES SCHEDULE REFERENCE CONTACTOR-STYLE ATS OR TS CONTACTOR-STYLE ATS OR TS WITH OFF POSITION CONTACTOR-STYLE ATS OR TS, SERVICE-ENTRANCE RATED DRAWOUT CB-STYLE ATS OR TS # WALL SWITCH: DENOTES TYPE: NO SUBSCRIPT DENOTES SINGLE-PE SWITCH DENOTES -WAY SWITCH 4 DENOTES 4-WAY SWITCH DENOTES ANUAL OTOR STARTER # DENOTES CIRCUIT NUBER WPCR DENOTES WEATHERPROOF CORROSION RESISTANT SH YYY OTOR SPACE HEATER COIL: DENOTES TYPE: DENOTES OTOR STARTER CR DENOTES CONTR RELAY TD DENOTES TIE DELAY RELAY PR DENOTES INTERPOSING PILOT RELAY LC DENOTES LIGHTING CONTACTOR Y DENOTES REFERENCE LINE NUBER 600:5 () 50:5 () 480:0 () CT: NUBERS DENOTE CT WINDING RATIO AND CT QUANTITY GFCT: NUBERS DENOTE GFCT WINDING RATIO AND GFCT QUANTITY PT: NUBERS DENOTE PT WINDING VTAGES AND PT QUANTITY 8 PULSE VFD 00A OC RVSS OC PA TELEPHONE OR NETWORK DROP PAGER RECEPTACLE HORN/LIGHT DEVICE PA UNIT COBINATION OTOR STARTER DISCONNECT SWITCH LOCAL CONTR STATION ADDENDU /6 PV GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN LOCATED IN CC LOCATED IN STAND-ALONE OTOR STARTER/CONTRLER LOCATED IN FIELD LOCATED AT PANEL: DENOTES PANEL ID: L DENOTES LOCAL CONTR STATION DENOTES EISTING DAY TANK CONTR PANEL DENOTES SODIU BISULFITE TANK FILL PANEL (FP-95-0-) DENOTES CENTRAL CONTR AND ETER PANEL 4 DENOTES CARBON REGENERATION SYSTE CONTR PANEL 5 DENOTES CARBON TRANSFER CONTR PANEL 0 /" " DRAW-OUT ELEENT LEFT: PANELBOARD RIGHT: COBINATION POWER UNIT DENOTES PANEL ID LIGHTNING ARRESTOR 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 #% RVAT STARTER: DENOTES NEA SIZE #% DENOTES TAP SETTING LEGEND CONDUIT HOE RUN CONDUIT EPOSED CONCRETE ENCASED CONDUIT CONDUIT CONCEALED FLEIBLE CONDUIT CONCRETE ENCASED DUCTBANK LEFT: CONDUIT RISE (TURN UP) RIGHT: CONDUIT DROP (TURN DOWN) DATE: OCTOBER 06 HAZEN NO.: 4-004 E-

AE AHU AIC AIT ANSI ASCE ASE AF AT ATS BC BKR (L/V)CP CPT CT DSW DVP ECB EHH EH EO ET ETU FAAP FACP FS FSL FVNR FVR GFCI GFCT GNG GND HOA HPU IC IEEE ISO JB LCS LP ANALYSIS ELEENT AIR HANDLING UNIT APERE INTERRUPTING CAPACITY ANALYSIS INDICATING TRANSITTER AERICAN NATIONAL STANDARDS INSTITUTE AERICAN SOCIETY OF CIVIL ENGINEERS AERICAN SOCIETY OF ECHANICAL ENGINEERS APERE FRAE APERE TRIP AUTOATIC TRANSFER SWITCH BYPASS CONTACTOR BREAKER (LOCAL/VENDOR) CONTR PANEL CONTR POWER TRANSFORER CURRENT TRANSFORER DUCTBANK DISCONNECT SWITCH DOINION VIRGINIA POWER ENCLOSED CIRCUIT BREAKER ELECTRIC HAND HE ELECTRIC ANHE LY OPERATED ELAPSED TIE ETER ELECTRONIC TRIP UNIT FIRE ALAR ANNUNCIATOR PANEL FIRE ALAR CONTR PANEL FLOW SWITCH FLOW SWITCH LOW FULL VTAGE NON-REVERSING FULL VTAGE REVERSING GROUND FAULT CIRCUIT INTERRUPTER GROUND FAULT CURRENT TRANSFORER GO-NO GO GROUND HAND-OFF-AUTO HYDRAULIC POWER UNIT INPUT CONTACTOR INSTITUTE OF AND ELECTRONICS ENGINEERS INTERNATIONAL ORGANIZATION FOR STANDARDIZATION JUNCTION BO LOCAL CONTR STATION LIGHTING PANEL PB PC PCC PE PIT PLC PP PST PT PTT RCS RECP RIO R RTD RTU RVAT RVSS SA S.E. SP. C. SPD SST TB TC TO TSH T TYP UPS VFD WPCR WT FR PULLBO PHOTOCELL POINT OF COON COUPLING PRESSURE ELEENT PRESSURE INDICATING TRANSITTER PROGRAABLE LOGIC CONTRLER POWER PANEL PHASE SHIFTING TRANSFORER POTENTIAL TRANSFORER PUSH TO TEST REOTE CONTR STATION RECEPTACLE REOTE I/O ROO RESISTANCE THERAL DEVICE REOTE TELEETRY UNIT REDUCED VTAGE AUTO TRANSFORER REDUCED VTAGE SID STATE SUPPLY AIR SERVICE ENTRANCE SPARE CONDUIT SURGE PROTECTIVE DEVICE STAINLESS STEEL TEST BLOCK TIED CLOSE TIED OPEN TWISTED SHIELDED TRANSFORER TYPICAL UNINTERRUPTIBLE POWER SUPPLY VARIABLE FREQUENCY DRIVE WEATHER PROOF CORROSION RESISTANT WALK THROUGH TRANSFORER FITURE TYPE LAP/ FITURE WATTAGE DESCRIPTION FR AND ODEL EW 70/0 WALL OUNTED, EERGENCY FITURE, 0-77 VAC WITH 6 OR VDC NICKEL CADIU BATTERY, GRAY CORROSION AND IPACT RESISTANT DED FIBERGLASS HOUSING, TIE DELAY SHUTOFF, SURGE AND BROWN-OUT PROTECTION, AND LOW VTAGE BATTERY CUT-OFF. BATTERY SHALL BE SUITABLE FOR 90 INUTES (INCLUDING ALL REOTE HEADS AS SHOWN ON S). TWO 5W LED HEADS WET LOCATION LISTED. HOPHANE DESOTO 90, PHILIPS RHYNO SERIES, OR LITHONIA IND SERIES. W.5W WALL-OUNTED, RED LED EIT SIGN, 0-77VAC, BLACK FACEPLATE, DIE CAST ALUINU HOUSING, SINGLE/DOUBLE FACE AS INDICATED ON THE S, NICKEL CADIU BATTERY WITH SELF-DIAGNOSTICS, BROWNOUT AND SURGE PROTECTED, DAP LOCATION LISTED. LW LW 7W (A) WALL-OUNTED, 0-77VAC, LED LIGHT FITURE, COR TEPERATURE OF 5000K, PRISATIC BOROSILICATE GLASS LENS, 0 LEDS, IESNA TYPE III EDIU DISTRIBUTION, BLACK DIE-CAST ALUINU HOUSING, 000A DRIVER, 6500 LUEN INIU, AND WET LOCATION LISTED. 7W (A) WALL-OUNTED, 0-77VAC, LED LIGHT FITURE, COR TEPERATURE OF 5000K, PRISATIC BOROSILICATE GLASS LENS, 0 LEDS, IESNA TYPE III EDIU DISTRIBUTION, BLACK DIE-CAST ALUINU HOUSING, 000A DRIVER, 7000 LUEN INIU, INTEGRAL BATTERY BACKUP WITH 90 INUTES ILLUINATION TIE, AND WET LOCATION LISTED. LWa SAE AS LW WITH INTEGRAL PHOTOCELL. LL HOPHANE AGELLAN E SERIES, LITHONIA LE SERIES, OR DUALLITE SEPRA SERIES. HOPHANE W4G LED, HUBBELL LED PG SERIES, OR GE EWS SERIES. HOPHANE W4G LED, HUBBELL LED PG SERIES, OR GE EWS SERIES. 74W (A) PE-OUNTED, 0-77VAC, LED LIGHT HOPHANE FITURE, COR TEPERATURE OF 5000K, PETRU PRISATIC BOROSILICATE GLASS LENS, PLED SERIES, IESNA TYPE 5 HIGH ANGLE DISTRIBUTION, CROUSE-HINDS CORROSION-RESISTANT GRAY CAST PV SERIES, ALUINU HOUSING, 8000 LUEN OR GE H INIU, AND WET LOCATION LISTED. SERIES. ROUND, BASE OUNTED, TAPERED, 0FT. ANODIZED ALUINU PE. PE SHALL INCLUDE A LOCKING SWIVEL JOINT OR TELESCOPING ACTION THAT ALLOWS THE PE AND FITURE TO BE LOWERED TO AN ACCESSIBLE HEIGHT FOR LADDER-FREE AINTENANCE. NOTES:. UNLESS SPECIFICALLY NOTED OTHERWISE, ALL UNDERGROUND CONCRETE ENCASED CONDUITS SHALL BE PER STANDARD DETAIL 680.. THE INSTALLATION OF ALL CONCRETE ENCASED CONDUITS SHALL COPLY WITH ACI 8, SECTION 6.. CONTRACTOR SHALL SUPPLY EPANSION JOINT FITTINGS AS REQUIRED FOR THERAL EPANSION AND DEFLECTION.. BOND ALL NEW CONCRETE ENCASED GROUND CONDUCTORS TO EISTING GROUND CONDUCTORS IN ALL ANHES, PULL BOES, CABLE TRAYS, AND SIILAR LOCATIONS WHERE APPLICABLE. 4. UNLESS OTHERWISE SPECIFIED OR NOTED, ALL WALL OUNTED PANELS, ENCLOSURES, AND SIILAR EQUIPENT SHALL BE OUNTED 6'-6" (A) FRO THE TOP OF THE PANEL TO FINISHED FLOOR OR GRADE. 5. UNLESS OTHERWISE NOTED, ALL LIGHTING SWITCHES, CONTR SWITCHES, AND SIILAR EQUIPENT SHALL BE OUNTED WITH THEIR CENTERLINE APPROIATELY 4'-0" ABOVE FINISHED FLOOR, SLAB, OR GRADE. THEROSTATS SHALL BE OUNTED 4'-4" ABOVE FINISHED FLOOR. 6. A SEPARATE EQUIPENT GROUNDING CONDUCTOR SHALL BE PROVIDED FOR EACH CIRCUIT (SEPARATE CONDUCTOR IN THE CONDUIT). THE CONDUCTOR SHALL BE TERINATED AT THE PROPER DEVICE, TERINAL, OR LUG AT THE POWER SOURCE (CC GROUND BUS, PANELBOARD GROUND BUS, ETC.). GROUND CONDUCTOR SIZE SHALL BE PER THE LATEST EDITION OF THE NEC. 7. UNLESS SPECIFICALLY NOTED OTHERWISE, EISTING PAVEENT SHALL BE SAW CUT AND REOVED TO ALLOW FOR THE INSTALLATION OF NEW DUCTBANKS. AFTER INSTALLATION, REPLACE PAVEENT WITH NEW TO ATCH ORIGINAL CONDITIONS. 8. LIGHTNING PROTECTION SHALL BE PROVIDED FOR THE STRUCTURES INDICATED ON THE S AND IN ACCORDANCE WITH SECTION 6670. 9. CONDUIT HOERUNS ARE NOT SHOWN ON S. CONTRACTOR SHALL REFER TO CONDUIT AND WIRE SCHEDULE, RISER DIAGRAS, SINGLE LINE DIAGRAS, AND OTHER S FOR CONDUIT AND WIRE REQUIREENTS. 0. ALL COPONENTS, SYSTES, AND NON-BUILDING STRUCTURES SHALL BE DESIGNED IN ACCORDANCE WITH THE REQUIREENTS OF SPECIFICATION 06 - ANCHORAGE AND BRACING. LS LSL LSLL LSH LSHH LT LEVEL SWITCH LEVEL SWITCH LOW LEVEL SWITCH LOW-LOW LEVEL SWITCH HIGH LEVEL SWITCH HIGH-HIGH LEVEL TRANSITTER. CONTRACTOR SHALL PROVIDE SPECIAL SEISIC CERTIFICATION (SSC) FRO ANUFACTURER OF EQUIPENT FOR ALL SYSTES DEEED ESSENTIAL BY SPECIFICATION 06. SPECIAL SEISIC CERTIFICATION SHALL BE IN COPLIANCE WITH THE CURRENT EDITION OF ASCE 7. FR ULTI-FUNCTION RELAY H ANHE OD OTOR OPERATED DAPER OG OTOR OPERATED GATE OTOR OPERATED LOUVER OV OTOR OPERATED VALVE PR OTOR PROTECTION RELAY TD OUNTED TS ANUAL TRANSFER SWITCH WTS OTOR WINDING TEPERATURE SWITCH NC NORALLY CLOSED NEC NATIONAL CODE NEA NATIONAL ANUFACTURERS ASSN NFPA NATIONAL FIRE PROTECTION ASSOCIATION NO NORALLY OPEN NTS NOT TO SCALE OC OUTPUT CONTACTOR OVERLOAD GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 GENERAL NOTES AND ABBREVIATIONS DATE: OCTOBER 06 HAZEN NO.: 4-004 E-

DVP INCOING SERVICES 4.5kV, ɸ, 4W, 60HZ R R9 R T4RLS R R57 R 4R R 4R58 OCCOQUON SUBSTATION No.4 ()000C - 4.5Kv HAYFIELD SUBSTATION No. ()000C - 4.5Kv DVP RECLOSER, TYPICAL. DVP OFFSITE EQUIPENT (FUTURE) G-095- G-095- G-095- G-095-4 G-095-5 000kW 460V,Ø,4W 000kW 460V,Ø,4W 000kW 460V,Ø,4W 000kW 460V,Ø,4W 000kW 460V,Ø,4W TRANSFORER GSU VA 460V-4.5kV DVP 5kV SERVICE SWITCHES WITH ETERING /SPSB 4 5 00A N.C. E.O. BATT. 5 00A N.C. E.O. BATT. 5 00A N.C. E.O. BATT. 5 00A N.C. E.O. BATT. 5 00A N.C. E.O. BATT. 5 00A 5 00A 5 00A 5 00A OIL FILLED SUBSTATION 50A AJ7 AJ8 4 4 R RGSU DVP TRANSFORER, TYPICAL (SS-) 500kVA (SS-) 500kVA (SS-0) 750kVA (SS-0) 750kVA (SS-) 000kVA (SS-) 000kVA CIRCUIT /STANY POWER SYSTE BUS (SPSB) DVP AJ47 DC- DVP AJ6 DVP AK4 DC-0 DVP AK40 DVP AK94 DC- DVP AK8 /SPSB 4 BJ BJ45 4 4 DC-9 /SPSB 4 DJ9600 DJ960 4 4 750kVA (SS-) 750kVA (SS-4) 750kVA (SS-4) 750kVA (SS-) 500kVA (SS-) 500kVA (SS-) DVP BJ05 DC- DVP BJ050 DVP BJ06 DC-4 DVP BJ060 DVP BJ DC- DVP BJ40 /SPSB 4 BJ40 BJ0 4 4 (SS-8) 00kVA (SS-8) 00kVA (SS-) 500kVA (SS-) 500kVA (SS-6) 500kVA (SS-6) 500kVA 500kVA (SS-7) 500kVA 500kVA (SS-8) 500kVA 000kVA (SS-9) 000kVA (SS-7) 500kVA (SS-7) 500kVA DVP AJ5 TS-8 DVP AJ6 DVP BJ50 DC- DVP BJ500 DVP BJ6 DC-6 DVP BJ60 (SS-7) DVP CJ400 DC-7 DVP CJ40 (SS-8) DVP DK7 DC-8 DVP DK70 (SS-9) DVP DJ9 DC-9 DVP DJ90 DVP EJ5400 DC-7 DVP EJ540 /SPSB 4 /SPSB 4 CK7 CK70 DK DK0 4 4 4 4 5000kVA (SS-4) 5000kVA 000kVA (SS-5) 000kVA (SS-) 500kVA (SS-) 500kVA 000kVA (SS-0) 000kVA (SS-6) 500kVA (SS-6) 500kVA (SS-4) DVP CK8 DVP CK80 (SS-5) DVP CK9 DVP CK90 DVP CK8 TS-4 DC-5 TS- DVP CK80 (SS-0) DVP DL DC-0 DVP DL DVP CK9 DC-6 DVP CK90 GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 EISTING PLANT ONE-LINE DIAGRA DATE: OCTOBER 06 HAZEN NO.: 4-004 E-

DVP INCOING SERVICES 4.5kV, ɸ, 4W, 60HZ R R9 R T4RLS R R57 R 4R R 4R58 OCCOQUON SUBSTATION No.4 ()000C - 4.5Kv HAYFIELD SUBSTATION No. ()000C - 4.5Kv DVP RECLOSER, TYPICAL. DVP OFFSITE EQUIPENT (FUTURE) G-095- G-095- G-095- G-095-4 G-095-5 000kW 460V,Ø,4W 000kW 460V,Ø,4W 000kW 460V,Ø,4W 000kW 460V,Ø,4W 000kW 460V,Ø,4W TRANSFORER GSU VA 460V-4.5kV DVP 5kV SERVICE SWITCHES WITH ETERING /SPSB 4 5 00A N.C. E.O. BATT. 5 00A N.C. E.O. BATT. 5 00A N.C. E.O. BATT. 5 00A N.C. E.O. BATT. 5 00A N.C. E.O. BATT. 5 00A 5 00A 5 00A 5 00A OIL FILLED SUBSTATION 50A AJ7 AJ8 4 4 R RGSU DVP TRANSFORER, TYPICAL (SS-) 500kVA (SS-) 500kVA (SS-0) 750kVA (SS-0) 750kVA (SS-) 000kVA (SS-) 000kVA CIRCUIT /STANY POWER SYSTE BUS (SPSB) DVP AJ47 DC- DVP AJ6 DVP AK4 DC-0 DVP AK40 DVP AK94 DC- DVP AK8 /SPSB 4 DC-9 /SPSB 4 P-DVP-00 P-DVP-00 BJ 4 BJ45 4 DJ9600 4 DJ960 4 P-DVP-000 P-DVP-00 750kVA (SS-) 750kVA (SS-4) 750kVA (SS-4) 750kVA (SS-) 500kVA (SS-) 500kVA SEE NOTES AND (SS-) DVP BJ05 DC- DVP BJ050 DVP BJ06 DC-4 DVP BJ060 DVP BJ DC- DVP BJ40 ANHE EH-9600, SEE NOTE ANHE EH-960, SEE NOTE /SPSB 4 BJ40 BJ0 4 4 (SS-8) 00kVA (SS-8) 00kVA (SS-) 500kVA (SS-) 500kVA (SS-6) 500kVA (SS-6) 500kVA 500kVA (SS-7) 500kVA 500kVA (SS-8) 500kVA (SS-9) 000kVA (SS-9) 000kVA (SS-7) 500kVA (SS-7) 500kVA DVP AJ5 TS-8 DVP AJ6 DVP BJ50 DC- DVP BJ500 DVP BJ6 DC-6 DVP BJ60 (SS-7) DVP CJ400 DC-7 DVP CJ40 (SS-8) DVP DK7 DC-8 DVP DK70 DVP DJ9 DC-9 DVP DJ90 DVP EJ5400 DC-7 DVP EJ540 /SPSB 4 /SPSB 4 CK7 4 CK70 4 DK 4 DK0 4 NOTES: 5000kVA (SS-4) DVP CK8 (SS-4) 5000kVA DVP CK80 000kVA (SS-5) DVP CK9 (SS-5) 000kVA DVP CK90 (SS-) 500kVA DVP CK8 TS-4 DC-5 TS- (SS-) 500kVA DVP CK80 (SS-0) 000kVA DVP DL DC-0 (SS-0) 000kVA DVP DL (SS-6) 500kVA DVP CK9 DC-6 (SS-6) 500kVA DVP CK90. CONTRACTOR SHALL FURNISH AND INSTALL NEW CONDUIT BETWEEN DJ9600 AND DVP-OWNED TRANSFORER EJ5400. DVP SHALL FURNISH AND INSTALL CONDUCTORS.. CONTRACTOR SHALL FURNISH AND INSTALL NEW CONDUIT BETWEEN DJ960 AND DVP-OWNED TRANSFORER EJ540. DVP SHALL FURNISH AND INSTALL CONDUCTORS.. DVP SHALL PROVIDE ADEQUATE CABLE TO ALLOW CONDUCTOR SPLICING INSIDE ANHES UNDER PHASE. GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 NEW PLANT ONE-LINE DIAGRA DATE: OCTOBER 06 HAZEN NO.: 4-004 E-4

GRAVITY FILTER BUILDING (DD) STANY GENERATORS TRUE NORTH PLANT NORTH EQUALIZATION BASIN (QQ) GRAVITY FILTERS EFFLUENT PUP STATION (DD) TERTIARY CLARIFIER (CC) TERTIARY CLARIFIER (CC) CHEICAL FEED BUILDING FERRIC AND PYER (S) EQUALIZATION BASIN (QQ) TRANSFORERS INCLINE IING BUILDING (I) CARBON REGENERATION BUILDING (GG) SODIU BISULFITE BUILDING (PP) ONOEDIA FILTER BUILDING (FF) LOWER POTOAC PARKWAY CLEARWATER DRIVE BUILDING AND GROUNDS STORAGE BUILDING (U) AWT AINTENANCE BUILDING (T) APW PUPING STATION (HH) AWT CHLORINATION AND DECHLORINATION BUILDING (HH) D CCHESTER ROAD 76" 48" OUTFALL EISTING GRAVEL PARKING LOT OUTFALL STRUCTURE (TT) OVERALL SITE PLAN - EISTING " = 60'-0" "=60'-0" 60 0 0 60' GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 OVERALL SITE PLAN - EISTING DATE: OCTOBER 06 HAZEN NO.: 4-004 E-5

NOTES: GRAVITY FILTER BUILDING (DD) STANY GENERATORS. CONTRACTOR SHALL DEISH AND REOVE EISTING DUCTBANK IN ITS ENTIRETY BETWEEN CABINET EJ9600 AND TRANSFORER EJ5400, AND SHALL DEISH AND REOVE EISTING DUCTBANK IN ITS ENTIRETY BETWEEN CABINET EJ960 AND TRANSFORER EJ540. TRUE NORTH PLANT NORTH EQUALIZATION BASIN (QQ) EQUALIZATION BASIN (QQ) TRANSFORERS GRAVITY FILTERS EFFLUENT PUP STATION (DD) INCLINE IING BUILDING (I) DC-7, SEE NOTE TERTIARY CLARIFIER (CC) TERTIARY CLARIFIER (CC) CHEICAL FEED BUILDING FERRIC AND PYER (S). DEISH AND REOVE EISTING DUCTBANKS, AS NEEDED, TO ALLOW THE ECAVATION FOR THE NEW TEPORARY BISULFITE FACILITY (PP).. DISCONNECT CONDUCTORS POWERING THE EISTING SODIU BISULFITE FACILITY (PP) IN THE DISTRIBUTION CENTER DC-7. DEISH AND REOVE EISTING DUCTBANK TO EISTING SODIU BISULFITE FACILITY (PP) AS NEEDED. COORDINATE WITH DEITION WORK SHOWN ON C-. 4. CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF THE REAINING EISTING DUCTBANK AND DIRECT-BURIED CONDUITS LOCATED IN THE VICINITY OF EISTING 76" 48" PIPES. DEISH AND REOVE EISTING DUCTBANK AND CONDUITS, AS NEEDED, TO FACILITATE INSTALLATION OF THE NEW 60" OUTFALL PIPELINE IN ADDITION TO STRUCTURES TT AND TT. SEE NOTE SODIU BISULFITE BUILDING (PP), SEE NOTE 5 CARBON REGENERATION BUILDING (GG) ONOEDIA FILTER BUILDING (FF) LOWER POTOAC PARKWAY 5. RELOCATE WIFI ANTENNA AND RADIO FRO WEST WALL OF FACILITY PP TO NEAREST LIGHT PE. PROVIDE POWER FRO DC-7 PANELBOARD USING " PVC BURIED CONDUIT WITH #, #GND. ETEND FIBER OPTIC CABLE FRO CHEICAL TRENCH TO THE NEW RADIO LOCATION IN " PVC DIRECT-BURIED CONDUIT. CLEARWATER DRIVE BUILDING AND GROUNDS STORAGE BUILDING (U) AWT AINTENANCE BUILDING (T) SEE NOTE SEE NOTE 4 APW PUPING STATION (HH) AWT CHLORINATION AND DECHLORINATION BUILDING (HH) D CCHESTER ROAD 76" 48" OUTFALL EISTING GRAVEL PARKING LOT OUTFALL STRUCTURE (TT) OVERALL SITE PLAN - DEITION " = 60'-0" "=60'-0" 60 0 0 60' ADDENDU /6 PV GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 OVERALL SITE PLAN - DEITION DATE: OCTOBER 06 HAZEN NO.: 4-004 E-6

STANY GENERATORS GRAVITY FILTER BUILDING (DD) TRUE NORTH PLANT NORTH EQUALIZATION BASIN (QQ) GRAVITY FILTERS EFFLUENT PUP STATION (DD) TERTIARY CLARIFIER (CC) TERTIARY CLARIFIER (CC) CHEICAL FEED BUILDING FERRIC AND PYER (S) INCLINE IING BUILDING (I) EQUALIZATION BASIN (QQ) LOWER POTOAC PARKWAY CARBON REGENERATION BUILDING (GG), SEE E-GG- SEE E-8 FOR PARTIAL PLAN CLEARWATER DRIVE CONTRACTOR STORAGE AND STAGING AREA ONOEDIA FILTER BUILDING (FF) LOWER POTOAC PARKWAY SEE E-9 FOR PARTIAL PLAN SEE E-8 FOR PARTIAL PLAN CLEARWATER DRIVE BUILDING AND GROUNDS STORAGE BUILDING (U) AWT AINTENANCE BUILDING (T) TEPORARY CHEICAL BUILDING (PP), SEE E-PP- EHH-4 EHH- EHH- EFFLUENT CHABER (TT), SEE E-TT- APW PUPING STATION (HH) B J 76" 48" OUTFALL INTEREDIATE STRUCTURE (TT) A SEE E-9 FOR PARTIAL PLAN AWT CHLORINATION AND DECHLORINATION BUILDING (HH), SEE E-HH- EHH-5 EHH- D CCHESTER ROAD EISTING GRAVEL PARKING LOT OUTFALL STRUCTURE (TT), SEE E-TT- OVERALL SITE PLAN - NEW " = 60'-0" "=60'-0" 60 0 0 60' ADDENDU /6 PV GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 OVERALL SITE PLAN - NEW DATE: OCTOBER 06 HAZEN NO.: 4-004 E-7

NOTES: TRUE NORTH PLANT NORTH. CONTRACTOR SHALL TERINATE DUCTBANK 5-FEET FRO EQUIPENT PAD. FINAL CONNECTION TO EQUIPENT PAD SHALL BE INSTALLED BY UTILITY COPANY.. CONTRACTOR SHALL FURNISH AND INSTALL 8'x8'x8' EDIU VTAGE ANHES.. INSTALLATION OF EDIU VTAGE CONDUCTORS AND CABLE TERINATIONS SHALL BE COPLETED BY UTILITY COPANY. 4. CONTRACTOR PROVIDED WORK ON SERVICE ENTRANCE SHALL COPLY WITH DOINION VIRGINIA POWER COPANY REQUIREENTS. DC-7 TRANSFORER CJ400 (SS-7) TRANSFORER CJ40 (SS-7) TRUE NORTH PLANT NORTH VFI SWITCH DJ9600 SEE NOTE 680 EH-9600, SEE NOTE SEE BOTTO LEFT ATCHLINE FOR CONTINUATION VFI SWITCH DJ960 C E F SEE NOTE AUILIARY CHEICAL STORAGE FACILITY INSTALLED UNDER PHASE- D SEE NOTE 680 EH-960, SEE NOTE F E -DVP E-0 CLEARWATER DRIVE CLEARWATER DRIVE UV DISINFECTION FACILITIES INSTALLED UNDER PHASE- F F E SEE NOTE E UV DISINFECTION FACILITIES INSTALLED UNDER PHASE- SEE NOTE TRANSFORER EJ5400 (SS-7) TRANSFORER EJ540 (SS-7) SEE TOP RIGHT ATCHLINE FOR CONTINUATION PARTIAL SITE PLAN " = 0'-0" PARTIAL SITE PLAN " = 0'-0" 0 0 0 0' "=0'-0" GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 PARTIAL SITE PLANS DATE: OCTOBER 06 HAZEN NO.: 4-004 E-8

NOTES: TRUE NORTH PLANT NORTH H ANHE COVER AND FRAE LSL LSH PRECAST CONC VAULT SUP PUP SBSP-95-- (BELOW) TRUE NORTH PLANT NORTH. CONTRACTOR SHALL CONNECT EPOSED SODIU BISULFITE PIPING HEAT TRACE CONTRLER TO EISTING OUTDOOR RECEPTACLE. RECEPTACLE IS OUNTED DIRECTLY ABOVE EPOSED PIPING.. CONTRACTOR SHALL FURNISH AND INSTALL EPOSED CONDUITS ALONG HANDRAIL FRO AWT CHLORINATION BUILDING TO END OF HANDRAIL. SEE E-TT- FOR CONDUIT AND WIRE SCHEDULES.. CONTRACTOR SHALL FURNISH AND INSTALL DIRECT-BURIED CONDUITS ALONG EFFLUENT CHABER PERIETER FRO END OF HANDRAIL TO EFFLUENT CHABER (TT) JUNCTION BOES. SEE S E-TT- AND E-TT-. 4. REFERENCE C-YP- FOR SODIU BISULFITE HEAT TRACING INSTALLATION LOCATIONS. 5. NOT ALL PIPING IS SHOWN ON THIS FOR CLARITY. REFERENCE C-YP S FOR SITE PIPING. 6. POWER UST BE AINTAINED TO GUARD SHACK AT ALL TIES. PROVIDE TEPORARY POWER AS REQUIRED TO AINTAIN THE OPERATION OF THE SHACK AND GATE. S TO THE GUARD SHACK ARE ONE () 480V, Ø, 0A CIRCUIT AND ONE () 40V, Ø, CIRCUIT POWER FRO THE BUILDING HH ROO. SUP PUP CONTR PANEL (FP-95-4-) LOWER POTOAC PARKWAY SITE LIGHTING HANDHE ONOEDIA FILTER BUILDING (FF) WASTE OIL RECEIVING STATION WASTE OIL RECEIVING STATION CONTR PANEL DUCTBANK FOR RELOCATION OF LIGHTING S I PARTIAL SITE PLAN - CHEICAL TRUCK SPILL CONTAINENT SUP /8" = '-0" SODIU BISULFITE PIPING, SEE NOTE 4 G RELOCATION OF WASTE OIL RECEIVING STATION DUCTBANK BUILDING AND GROUNDS STORAGE BUILDING (U) TRUE NORTH TEPORARY SODIU BISULFITE FACILITY (PP), SEE E-PP- EISTING WASTE OIL RECEIVING STATION DISCONNECT PLANT NORTH EPOSED SODIU BISULFITE PIPING, SEE NOTE H 680 SEE PARTIAL SITE PLAN, THIS I APW PUPING STATION (HH) DUCTBANK FOR RELOCATION OF LIGHTING S A EHH- EFFLUENT CHABER (TT), SEE E-TT- AWT CHLORINATION AND DECHLORINATION BUILDING (HH), SEE E-HH- NOTE 6 SITE LIGHTING PE K L END OF HANDRAIL EPOSED CONDUITS ALONG HANDRAIL, SEE NOTE AWT CHLORINATION AND DECHLORINATION BUILDING (HH), SEE E-HH- 680 DIRECT-BURIED CONDUITS, SEE NOTE PARTIAL SITE PLAN " = 0'-0" PARTIAL SITE PLAN " = 0'-0" "=0'-0" 0 0 0 0' ADDENDU /6 PV GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 PARTIAL SITE PLANS DATE: OCTOBER 06 HAZEN NO.: 4-004 E-9

NOTES:. COORDINATE WITH ENGINEER DURING FOR STUB UP LOCATIONS OF SPARE CONDUITS. 4 " 8 5 8 " 6 5 6 " 6 5 6 " 4 " 8 5 8 " 6 5 6 " 6 5 6 " DUCTBANK NUBER CONDUIT SIZE FRO TO -A P-TT-0 " JB-TT- JB-TT- I-TT-004 " JB-TT- JB-TT- SPARES " SEE NOTE -B P-TT-0 " JB-TT- JB-TT- I-TT-004 " JB-TT- JB-TT- SPARES " SEE NOTE 5 8 " 6" 6" 5 8 " 6" 6" -C P-DVP-000 6" DJ9600 EJ5400 6 5 6 " 6 5 6 " P-DVP-00 6" DJ9600 EJ5400 -D P-DVP-00 6" DJ960 EJ540 P-DVP-00 6" DJ960 EJ540 E F -E P-DVP-000 6" DJ9600 EJ5400 P-DVP-00 6" DJ9600 EJ5400 DVP DUCTBANK DETAIL NTS -DVP E-8 -F P-DVP-00 6" DJ960 EJ540 P-DVP-00 6" DJ960 EJ540 -G P-PP-0 " WASTE OIL RECEIVING STATION DSW WASTE OIL RECEIVING STATION CP P-PP-08 " WASTE OIL RECEIVING STATION DSW WASTE OIL RECEIVING STATION CP CONDUIT NO. SIZE FRO TO CONDUCTORS REARKS P-DVP-000 6" DJ9600 EJ5400 INSTALLED BY DVP P-DVP-00 6" DJ9600 EJ5400 INSTALLED BY DVP P-DVP-00 6" DJ960 EJ540 INSTALLED BY DVP P-DVP-00 6" DJ960 EJ540 INSTALLED BY DVP P-DVP-004 6" EHH-4 EHH-5 EPTY W/ PULLSTRING P-DVP-005 P-DVP-006 -H P-PP-000 4" CC- AIN PP-BLDG ECB C-PP-005 " FP-460-HH- CJB-PP- I-PP-004 " FP-460-HH- CJB-PP- P-PP-05 4" CC- AIN PP-BLDG ECB C-PP-008 " SODIU BISULFITE DAYTANK CP CJB-PP- SPARES " SEE NOTE -I P-PP-0 " SITE LTG PE SITE LTG HANDHE SPARE " SEE NOTE -J P-DVP-004 6" EHH-4 EHH-5 -K P-TT-007 /4" JB-TT- FUTURE DO CONTRLER P-TT-0 " JB-TT- JB-TT- SPARES " SEE NOTE -L I-TT-000 " JB-TT- FUTURE DO CONTRLER I-TT-004 " JB-TT- JB-TT- SPARES " SEE NOTE - P-TT-007 /4" JB-TT- FUTURE DO CONTRLER I-TT-000 " JB-TT- FUTURE DO CONTRLER 5 SPARES " SPARES " GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 DUCTBANK DETAILS AND DUCTBANK SCHEDULE DATE: OCTOBER 06 HAZEN NO.: 4-004 E-0

TRUE NORTH PLANT NORTH AKE-UP CARBON STORAGE TANK NO. AKE-UP CARBON STORAGE TANK NO. SPENT CARBON TANK NO. SPENT CARBON TANK NO. DUPLE SUP PUP GG-9 CARBON ETERING SCREW NO. AKE-UP CARBON TRANSFER PUP SYSTE 7-B CARBON ETERING SCREW NO. CARBON ETERING SCREW NO. CARBON ETERING SCREW NO. CARBON ETERING SCREW NO. SPENT CARBON TRANSFER PUP SYSTE 5-A SPENT CARBON TRANSFER PUP SYSTE 5-B BOTTO POWER PLAN /4" = '-0" ADDENDU /6 PV GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN N. SIEBACH 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 CARBON REGENERATION BUILDING (GG) BOTTO POWER PLAN DATE: OCTOBER 06 HAZEN NO.: 4-004 E-GG-

TRUE NORTH PLANT NORTH BLOWER AIR INTAKE LP-9A ATS CC-9 DUPLE CONDENSATE RETURN ACTIVATED CARBON SLURRY PUP NO.A ACTIVATED CARBON SLURRY PUP NO.A FURNACE NO. AIR WASH BLOWER NO. FURNACE NO. CENTRAL SHAFT COING FAN CENTRAL SHAFT COING FAN WATER CONTAINERS COBUSTION AIR BLOWER NO. WATER CONTAINERS COBUSTION AIR BLOWER NO. AIR WASH BLOWER NO. CHEICAL TANK CHEICAL TANK STEA BOILER NO. BOILER NO. CONTR PANEL BOILER NO. CONTR PANEL WATER SYSTE WATER SYSTE WATER HEATER CARBON TRANSFER CONTR PANEL LOWER INTEREDIATE DEITION PLAN /4" = '-0" ADDENDU /6 PV GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN N. SIEBACH 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 CARBON REGENERATION BUILDING (GG) LOWER INTEREDIATE DEITION PLAN DATE: OCTOBER 06 HAZEN NO.: 4-004 E-GG-

TRUE NORTH PLANT NORTH BLOWER AIR INTAKE LP-9A ATS CC-9 DUPLE CONDENSATE RETURN ACTIVATED CARBON SLURRY PUP NO.A ACTIVATED CARBON SLURRY PUP NO.A FURNACE NO. AIR WASH BLOWER NO. FURNACE NO. CENTRAL SHAFT COING FAN CENTRAL SHAFT COING FAN WATER CONTAINERS COBUSTION AIR BLOWER NO. WATER CONTAINERS COBUSTION AIR BLOWER NO. AIR WASH BLOWER NO. CHEICAL TANK CHEICAL TANK STEA BOILER NO. BOILER NO. CONTR PANEL BOILER NO. CONTR PANEL WATER SYSTE WATER SYSTE WATER HEATER CARBON TRANSFER CONTR PANEL LOWER INTEREDIATE POWER PLAN /4" = '-0" ADDENDU /6 PV GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN N. SIEBACH 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 CARBON REGENERATION BUILDING (GG) LOWER INTEREDIATE POWER PLAN DATE: OCTOBER 06 HAZEN NO.: 4-004 E-GG-

TRUE NORTH PLANT NORTH SUPPLY FAN No. HEATING BOILER INSTRUENT AIR COPRESSOR DUPLE BOILER FEED PUPS AIR DRYER DUPLE BOILER FEED PUP CONTR PANEL INSTRUENT AIR COPRESSOR FURNACE NO. FURNACE NO. HEATING BOILER CONTR PANEL SCRUBBER No. SCRUBBER No. EHAUST FAN No. 6 SUPPLY FAN NO. EHAUST FAN NO. 7 UPPER INTEREDIATE POWER PLAN /4" = '-0" ADDENDU /6 PV GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN N. SIEBACH 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 CARBON REGENERATION BUILDING (GG) UPPER INTEREDIATE POWER PLAN DATE: OCTOBER 06 HAZEN NO.: 4-004 E-GG-4

TRUE NORTH PLANT NORTH EHAUST FAN NO. (ON ROOF) LIGHTING PANEL LP9B TRANSFORER SUPPLY FAN NO. EHAUST FAN NO. (ON ROOF) CARBON DEWATERING SCREW NO. CARBON DEWATERING SCREW NO. FURNACE NO. ACTIVATED CARBON STORAGE TANK NO. EHAUST FAN NO.5 (ON ROOF) ACTIVATED CARBON STORAGE TANK NO. FURNACE NO. INDUCED DRAFT FAN NO. EHAUST FAN NO.4 (ON ROOF) INDUCED DRAFT FAN NO. INDUCED DRAFT FAN NO. TOP POWER PLAN /4" = '-0" ADDENDU /6 PV GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN N. SIEBACH 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 CARBON REGENERATION BUILDING (GG) TOP POWER PLAN DATE: OCTOBER 06 HAZEN NO.: 4-004 E-GG-5

CC-9A 480V, 800A, Ø, W, 65kA 5A 5A 00AF 5AT 00AF 5AT 0A 0A 00AF 0AT 00AF 0AT 0A 0A 0A 00AF 0AT 0A 0A INST PWR PNL AIR COP CONT DUPL PUP CONT BOILR CONT PNL 5 5 5 5 7.5 EHAUST FAN NO. EF-FF- EHAUST FAN NO. 4 EF-FF-4 SPACE SPACE SPACE SPACE FURNACE DRIVE No COBUSTION AIR BLOWER No INST TRANSFORER INSTRUENT PWR PANEL 5kVA INSTR PWR FR CRS- AFTER BURNER TURBO SPACE AIR COPRESSOR INSTRUENT AIR COPRESSOR DUPLE COND RET PUP No SPACE CARBON DEWATERING PUP SCREW INDUCED DRAFT FAN No FUEL OIL PUP BOILER CONTR PANEL CENTER SHAFT COING FAN BLOWER No No No No AKEUP CARBON PANEL FER PUP No - SYST 00AF 5AT 00AF 5AT 5A 5A 00AF 5AT 00AF 5AT 00AF 0AT 00AF 0AT 00AF 60AT 00AF 0AT 00AF 60AT 00AF 80AT AIR COP CONT S S AIR COP CONT S S 0kVA 480-0/08V L L 7.5 7.5 5 5 5 SPARE SUPPLY SPARE SPACE ACTIVATED FLUSH CARBON SPENT SPACE FAN No. CARBON SLURRY PUP NoA WATER PUP FF- AKEUP ETER SCREW CARBON AKEUP SCREW EF-0 EF-4 SUPPLY FAN SF- SUP PUP GG-9 INSTRUENT AIR COPRESSOR SPARE SUPPLY FAN SF- LIGHTING PNL. LP-9E ATS INSTRUENT AIR COPRESSOR LIGHTING PNL. LP-9A ATS LIGHTING PNL. LP-B ACTIVATED CARBON SLURRY PUP NoA EDIA TRANSFER PUP No.(5A) P744 EDIA TRANSFER PUP No.(5A) P745 480V, 800A, Ø, W, 65kA 00AF 5AT 400A AF AT AF AT AF AT 400A 00AF T 00AF 5AT 00AF 5AT 00AF 5AT 00AF 5AT 00AF 0AT 00AF 5AT 00AF 0AT 00AF 0AT 5 5 6KVA 480-0/08Y P,4W 0kVA 480-0/08V 0kVA 480-0/08V DUPL PUP CONT BOILR CONT PNL DUPL PUP CONT CRANE CONT 50 50 5 5 PNL 5 5 5 5 5 5 SPARE AIR WASH BLOWER NO. B7 AIN TIE AIN AIR WASH FLUSH WATER TANK DRAIN BRIDGE CRANE INSTRUENT ACTIVATED BLOWER NO. PUP FF- PUP FF-4 B7 TRANSFORER PANEL IPP-FF CARBON SLURRY PUP B ACTIVATED CARBON SLURRY PUP B SPENT CARBON FER PUP No- SYST 5B SPENT CARBON FER PUP No - SYST 5B AKEUP CARBON FER PUP-SYST 7B CARBON DEWATERING SCREW No SPENT CARBON ETER SCREW No CARBON AKEUP ETER SCREW No LP 9C FR LP-9D FR LP-9E FR 'B' DUPLE SUP PUP GG-9 SPARE BOILER CONTR PANEL DUPLE FUEL OIL PUPS CC-9 DEITION SINGLE LINE DIAGRA ADDENDU /6 PV GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN N. SIEBACH 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 CARBON REGENERATION BUILDING (GG) CC-9 DEITION DATE: OCTOBER 06 HAZEN NO.: 4-004 E-GG-6

00AF 0AT 00AF 0AT 00AF 0AT 00AF 0AT 00AF 0AT 00AF 0AT 00AF 0AT 00AF 5AT 00AF 0AT 00AF 5AT 00AF 0AT FEED PPS CONT PNL AIR COP CONT TO LP-9A BOILR CONT PNL 5 5 7.5 5 5 5 SPACE BOILER FEED PUPS CONTR EF- CENTER SHAFT COING FAN No INDUCED DRAFT FAN No INSTRUENT AIR COP No EF- SPACE FURNACE DRIVE NO. COBUSTION AIR BLOWER NO. EF-5 EF-8 EF-9 SPARE SPACE AFTERBURNER TURBO BLOWER No. EF- SPACE LP-9A FR 'B' SPACE SUP PUP FF- BOILER CONTR PANEL CONDENSATE RETURN DUP 00AF 5AT 00AF 5AT 00AF 5AT 00AF 5AT 00AF 5AT INST PWR PNL WATER HTR A/C No SPARE WATER HEATER A/C UNIT No INST TRANSFORER INSTRUENT PWR PANEL 5kVA INSTR PWR FR CRS- EHAUST FAN No EE-FF- EHAUST FAN No EE-FF- EHAUST FAN No4 EE-FF-4 SPACE SPACE SPACE CC-9 DEITION SINGLE LINE DIAGRA ADDENDU /6 PV GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN N. SIEBACH 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 CARBON REGENERATION BUILDING (GG) CC-9 DEITION DATE: OCTOBER 06 HAZEN NO.: 4-004 E-GG-7

FRO FRO NOTES:. EISTING CC-9A SHALL BE DEISHED. LOADS WHICH WERE PREVIOUSLY SUPPLIED FRO EISTING CC-9A SHALL BE SUPPLIED FRO NEW CC-9. P- P-. CONTRACTOR SHALL INTERCEPT AND UTILIZE EISTING POWER AND CONTR WIRING FEEDING THE EQUIPENT SHOWN FRO EISTING CC-9A AND RECONNECT TO NEW CC-9. CC-9 ENCLOSURE 5B POWER ONITOR 00AF 000AT K 5C 6A K 00AF 000AT 7C POWER ONITOR 7B. EISTING CONDITIONS PERTAINING TO CC-9A ARE SHOWN AS ACCURATELY AS POSSIBLE BASED UPON AVAILABLE RECORD S. PRIOR TO ODIFYING OR REOVING ANY EISTING EQUIPENT, THE CONTRACTOR SHALL FIELD VERIFY THE EISTING CONDITIONS AND NOTIFY THE ENGINEER OF POTENTIAL CONFLICTS WITH THE WORK SHOWN HERE. 480VAC, Ø, W, 000A, 65kA, TIN-PLATED COPPER BUS 5A SPD 50kA N.0. K 6B SPD 50kA 50AF 50AT G 00AF 00AT F 5A E 5A D 5A C 5A B 5A A 5A D 5A C 5A B 0A INST PANEL NO. 400A 4A 5 AF AT 00 000 400A 8A 5 0A INST PANEL NO. 50A 9B 50A 9C 5A 0A 5A 0B 5A 0C 5A 0D 5A 0E 5A 0F A 9A SPARE SPARE SPARE SPARE SPARE SPARE SEE NOTE, TYP. 50 50 5 5 SUPPLY FAN SF- SUPPLY FAN SF- SUP PUP GG-9 SUP PUP FF- EHAUST FAN NO.4 EF-FF-4 EHAUST FAN NO. EF-FF- AIR WASH BLOWER NO. B7 AIR WASH BLOWER NO. B7 FLUSH WATER PUP FF- TANK DRAIN PUP FF-4 SUP PUP FF- EHAUST FAN NO. EE-FF- EHAUST FAN NO. EE-FF- EHAUST FAN NO.5 EE-FF-5 00AF 60AT A 00AF 0AT B 00AF 0AT C 00AF 0AT D 00AF 0AT E 00AF 0AT F 00AF 0AT G H I J K L L K J I H G 00AF 00AF 00AF 00AF 50AF 5AF 00AF 00AF 00AF 00AF 00AF 0AT 60AT 60AT 00AT 50AT 00AT 0AT 60AT 60AT 0AT 0AT 00AF 0AT F 00AF 0AT E 00AF 0AT D 00AF 0AT C 00AF 0AT B 00AF 0AT A 0kVA 480-0/08V A TO LP-9A ATS C TO LP-9E ATS B TO LP-9A ATS D TO LP-9E ATS 0kVA 480-0/08V 0kVA 480-0/08V DRY TRANS 5A 5A 5A 5A P- P- P- P- 5A 5A 5A 5A DRY TRANS DRY TRANS LP-9B 6kVA P, 4W IPP-FF LP-9C LP-9D CP kw kw CP EF-0 EF-4 EF- EF- CRANE CONTR PANEL AC UNIT NO. TO BUILDING AND GROUNDS STORAGE BUILDING (U) TO AWT AINTENANCE BUILDING (U) TO BUILDING (RR) TO GUARD SHACK WATER HEATER SUP PUP CONTR PANEL EF-5 EF-8 EF-9 EF- CC-9 SINGLE LINE DIAGRA ADDENDU /6 PV GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN 0 /" " N. SIEBACH 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 CARBON REGENERATION BUILDING (GG) CC-9 SINGLE LINE DIAGRA DATE: OCTOBER 06 HAZEN NO.: 4-004 E-GG-8

NOTES:. ONLY NEW & ODIFIED CONNECTIONS TO PLC ARE SHOWN. A B C D SEE NOTE S S S S L ATS 0kVA 480-0/08V L ATS 0kVA 480-0/08V C- C- PLC DRY TRANS DRY TRANS I- I- CC-70-A LP-9A LP-9E PLC PARTIAL CONTR ONE-LINE DIAGRA LP-9A AND LP-9E SINGLE LINE DIAGRA SECTION SECTION SECTION SECTION 4 SECTION 5 SECTION 6 SECTION 7 SECTION 8 SECTION 9 SECTION 0 SECTION A B A 5A SPD SPD 0A A B C E D F B C A INST PANEL 5B POWER ONITOR 6A TRANSFER CONTRS 7B POWER ONITOR 9A INST PANEL 0B 0C C E D F 4A 8A G H D B 9B 0D G H I J E C 5C AIN 6B TIE 7C AIN 0E I J 9C K L F G D 0F K L ELEVATION (NTS) ADDENDU /6 PV GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN N. SIEBACH 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 CARBON REGENERATION BUILDING (GG) CC-9 ELEVATION AND RISER DIAGRAS DATE: OCTOBER 06 HAZEN NO.: 4-004 E-GG-9

8 4 L 6 L 7 480VAC L 7 480VAC L 7 L 8 L 7 80 4 9 74 L 5 CPT 480/0VAC 40 CPT 480/0VAC 75 480VAC L 6 4 76 L 7 8 9 0 4 5 6 7 O H A OO OO STOP L BLOWER NO. CR TO CENTRAL CONTR AND ETER PANEL CR5 8 START L BLOWER NO. TO BLOWER NO. CR50 CR5 CR TO P CR5 PILOT FAIL FRO BLOWER NO. BEARING TEP 8 TD0 CR WINDING TEP 8 TD 0 CR PTT R CR 5 OTOR FAIL TIER RUN ALAR 4 4 44 45 46 47 48 49 50 5 5 O H A OO OO L BLOWER NO. CR48 STOP TO CENTRAL CONTR AND ETER PANEL CR50 4 START L BLOWER NO. TO BLOWER NO. CR5 CR50 CR48 TO P CR50 PILOT FAIL FRO BLOWER NO. BEARING TEP 4 TD45 CR48 WINDING TEP 4 TD 45 CR 48 PTT R CR 50 OTOR FAIL TIER RUN ALAR 77 78 79 80 8 8 8 84 85 86 87 CR84 TO P CPT 480/0VAC O H A OO OO L CR86 TO P FS STOP CR84 5 TO CARBON TRANSFER CONTR PANEL START 80 TD8 5 CR86 TO CARBON TRANSFER CONTR PANEL 80 TD8 CR84 80 TD 8 CR 84 PTT R CR 86 OTOR FAIL TIER RUN ALAR 8 9 TO ANNUNCIATOR TO P TO BLOWER NO. 5 54 TO ANNUNCIATOR TO P TO BLOWER NO. 88 89 TANK DRAIN PUP FF-4 CONTR SCHEATIC 0 AIR WASH BLOWER NO. CONTR SCHEATIC 55 AIR WASH BLOWER NO. CONTR SCHEATIC 90 56 9 9 6 L 57 L 9 480VAC L 58 480VAC L 9 4 L 59 L 94 5 60 95 6 CPT 480/0VAC 6 CPT 480/0VAC 96 7 8 9 0 O H A OO OO STOP PILOT 4 L 9 START L 9 9 TD 0 0-5 SEC SET @ SEC RUN OTOR FAIL TIER 6 6 64 65 66 O H A OO OO L STOP 5 START 6 TD64 5 6 TD 64 0-5 SEC SET @ SEC OTOR FAIL TIER 97 98 99 00 0 CR CR 9 TD0 CR ALAR 67 68 CR67 CR69 CR69 CR67 6 CR 67 PTT R RUN 0 0 4 5 TO ANNUNCIATOR SPARE SPARE 69 70 TO P TO P TO CARBON TRANSFER CONTR PANEL TO CARBON TRANSFER CONTR PANEL TD64 CR67 CR 69 ALAR 04 05 SUPPLY FANS SF- AND SF- CONTR SCHEATIC FLUSH WATER PUP FF- CONTR SCHEATIC ADDENDU /6 PV GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 CARBON REGENERATION BUILDING (GG) CONTR SCHEATICS DATE: OCTOBER 06 HAZEN NO.: 4-004 E-GG-0

CONDUIT NO. SIZE FRO TO CONDUCTORS REARKS P-GG-000 P-GG-00 P-GG-00 P-GG-00 P-GG-004 P-GG-005 P-GG-006 P-GG-007 P-GG-008 P-GG-009 P-GG-00 P-GG-0 P-GG-0 P-GG-0 P-GG-04 P-GG-05 P-GG-06 P-GG-07 P-GG-08 P-GG-09 P-GG-00 P-GG-0 P-GG-0 P-GG-0 P-GG-04 P-GG-05 P-GG-06 P-GG-07 P-GG-08 P-GG-09 P-GG-00 P-GG-0 P-GG-0 P-GG-0 P-GG-04 P-GG-05 P-GG-06 P-GG-07 P-GG-08 P-GG-09 P-GG-040 P-GG-04 P-GG-04 P-GG-04 P-GG-044 P-GG-045 P-GG-046 P-GG-047 P-GG-048 P-GG-049 P-GG-050 P-GG-05 P-GG-05 P-GG-05 P-GG-054 P-GG-055 P-GG-056 P-GG-057 P-GG-058 P-GG-059 P-GG-060 P-GG-06 P-GG-06 P-GG-06 P-GG-064 P-GG-065 P-GG-066 P-GG-067 P-GG-068 P-GG-069 P-GG-070 P-GG-07 P-GG-07 P-GG-07 P-GG-074 P-GG-075 P-GG-076 P-GG-077 P-GG-078 P-GG-079 CONDUIT NO. SIZE FRO TO CONDUCTORS REARKS C-GG-000 C-GG-00 C-GG-00 C-GG-00 C-GG-004 C-GG-005 C-GG-006 C-GG-007 C-GG-008 C-GG-009 C-GG-00 C-GG-0 C-GG-0 C-GG-0 C-GG-04 C-GG-05 C-GG-06 C-GG-07 C-GG-08 C-GG-09 C-GG-00 C-GG-0 C-GG-0 C-GG-0 C-GG-04 C-GG-05 C-GG-06 C-GG-07 C-GG-08 C-GG-09 C-GG-00 C-GG-0 C-GG-0 C-GG-0 C-GG-04 C-GG-05 CONDUIT NO. SIZE FRO TO CONDUCTORS REARKS I-GG-000 I-GG-00 I-GG-00 I-GG-00 I-GG-004 I-GG-005 I-GG-006 I-GG-007 I-GG-008 I-GG-009 I-GG-00 I-GG-0 I-GG-0 I-GG-0 I-GG-04 I-GG-05 I-GG-06 I-GG-07 I-GG-08 I-GG-09 I-GG-00 I-GG-0 I-GG-0 I-GG-0 I-GG-04 I-GG-05 I-GG-06 I-GG-07 I-GG-08 I-GG-09 I-GG-00 I-GG-0 I-GG-0 I-GG-0 I-GG-04 I-GG-05 ADDENDU /6 PV GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 CARBON REGENERATION BUILDING (GG) CONDUIT AND WIRE SCHEDULES DATE: OCTOBER 06 HAZEN NO.: 4-004 E-GG-

C:\Users\zzdrojewski\Documents\4-004-PP-ELEC_zzdrojewski.rvt /4/06 :58:5 A PLANT NORTH N #4/0 BARE COPPER GROUND CONDUCTOR, TYP, SEE NOTE 5 NOTES:. OUNT LUINAIRE TYPE "LW" '-0" AFF.. OUNT LUINAIRE TYPE "W" 6" ABOVE DOOR FRAE. SB SUPPLY HEAT TRACE NO., NO., AND NO. T-LP- GROUND ROD, TYP 6806, TYP. T-LP- ECB WIRE TROUGH, SEE NOTE 6 AIN PP-BLDG ECB E LWa LP-/4 HEAT TRACE CONTRLERS,TYP, SEE DETAIL ON E-PP- EW LP-/ LW LP-/a LP- PANEL LW LP-/a LP-/ OUNTING RACK, TYP, SEE NOTE LIT 95-- LIT 95-- GFCI BISULFITE TRANSFER PUP NO. (SBTP-95--) SODIU BISULFITE BULK TANK NO. LWa LP-/4 LP-/7 LW LP-/a LSH 95-- LSL 95-- DISCONNECT RATED RECEPTACLE FOR SUP PUP EUH- BISULFITE TRANSFER PUP NO. (SBTP-95--) SUP PUP (BELOW) EUH- DSW SODIU BISULFITE BULK TANK NO. OUNTING RACK, TYP, SEE NOTE LW LP-/a SUP PUP CONTR PANEL (FP-95--) CONNECT TO STRUCTURAL REBAR, TYP LP-/ GFCI LP-/a W LP-/ LW LP-/a EW LP-/ GROUND ROD WITH TESTWELL, TYP 6700, TYP. LOUVER L- (ABOVE) LWa LP-/4 CP- (ALAR-ONLY PANEL). 4. 5. 6. 7. 8. 9. OUNT LUINAIRE TYPE "EW" '-0" AFF. OUNT LUINAIRE TYPE "LWa" 9'-0" ABOVE GRADE. WHERE FITURES ARE SHOWN ABOVE DOOR FRAES, OUNT LUINAIRE TYPE "LWa" 6" ABOVE DOOR FRAE. GROUND RING CONDUCTOR SHALL BE #4/0 BARE COPPER WIRE 0" INIU BELOW FINISHED GRADE. ALL GROUND CONDUCTORS TO EQUIPENT OR STRUCTURAL STEEL SHALL BE BARE COPPER WIRE. CONTRACTOR SHALL FURNISH AND INSTALL 8" 8" HINGED INIU NEA R WIRE TROUGH 6" BELOW ENCLOSED CIRCUIT BREAKERS. REFERENCE E-PP-. CONTRACTOR SHALL FURNISH AND INSTALL LIGHTNING PROTECTION SYSTE FOR THIS STRUCTURE IN ACCORDANCE WITH SPECIFICATION SECTION 6670. '-0" ABOVE FINISHED FLOOR IS WITHIN THE LIQUID CONTAINENT AREA. CONDUITS SHALL NOT PENETRATE OR BE ATTACHED TO FLOORS OR WALLS INSIDE OF LIQUID CONTAINENT AREA WITHOUT SPECIFIC ENGINEER APPROVAL. CONDUIT SHALL BE INSTALLED ON PLYWOOD WALLS WHERE POSSIBLE. CONDUIT INSTALLED TO CEILING SUPPORTS AY IPACT FUTURE TANK AINTENANCE. ALL DEVICES AND EQUIPENT SHOWN ATTACHED TO THE WALLS SHALL BE ATTACHED TO THE PLYWOOD WALL ABOVE THE CONTAINENT AREA UNLESS INDICATED OTHERWISE. CONDUIT WITHIN THE TEPORARY CHEICAL BUILDING SHALL BE SCHEDULE 80 PVC. ASSOCIATED CONDUIT BOES, STRAPS, SUPPORTS, AND SIILAR SHALL BE PVC OR FRP. CONDUIT OUTSIDE OF THE TEPORARY CHEICAL BUILDING SHALL BE RGS AND ALL BOES AND FITTINGS SHALL BE NEA R OR NEA 4 PER SPECIFICATION 6. WATER HEATER ECB " CITY WATER LINE BOND " CW LINE TO GROUND GRID LP-/ GFCI LP-/a CJB-PP- FIRE ETINGUISHER, TYP W LP-/ BISULFITE TRANSFER PUP PANEL NO. (FP-95--) BISULFITE TRANSFER PUP PANEL NO. (FP-95--) LW LP-/a LE 95-- EUH- DSW EUH- LP-/ EW LW LP-/a FRP ACCESS LADDER, TYP EERGENCY SHOWER/EYEWASH, TYP GFCI LP-/ LW LP-/a LE 95-- FS 95-- CAUSTIC VENT SCRUBBER AREA 0.. SODIU BISULFITE IS A NON-FLAABLE SUTION THAT IS NOT IDENTIFIED AS A HAZARD IN NFPA 80, ANNE D. THE TEPORARY CHEICAL BUILDING SHALL BE RATED AS UNCLASSIFIED AS DEFINED IN ARTICLE 500 OF THE NATIONAL ELECTRIC CODE. ETHODS AND ATERIALS SHALL REFLECT THIS CLASSIFICATION. CONTRACTOR SHALL OUNT PANELS A INIU OF 48" ABOVE PLATFOR TO ALLOW ACCESS. INSTANT WATER HEATER LWa LP-/4 LWa LP-/4 E EF- CP- TEPORARY SODIU BISULFITE TANK FILL CONTR PANEL (FP-95-0-) SODIU BISULFITE TANK FILL CABINET HEAT TRACE FOR FSL-95-- PIPING FS 95-- LEGEND: LIGHTNING PROTECTION SYSTE DOWNLEAD CONDUCTOR AS REQUIRED, TYP, SEE NOTE 7 NON-PERANENT PROCESS AREA ADDENDU /6 PV GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN. VANHORNE 0 /" " O C P ONWEALTH GERALD J. RATASKY ROFESSIONAL OF VIRGINIA Lic. No.655 ENGI NEER 405 RIDGE TOP ROAD, FAIRFA, VA. 00 CERTIFICATE OF AUTHORITY: 77 FAIRFA COUNTY, VIRGINIA DEPARTENT OF PUBLIC WORKS AND TEPORARY CHEICAL BUILDING (PP) TOP POWER AND LIGHTING PLAN DATE: HAZEN NO.: OCTOBER 06 4-004 E-PP-

480V, Ø FRO CC- IN EISTING AWT CHLORINATION FACILITY (HH) 50AF 50AT P-PP-000 P-PP-05 NEA R AIN PP-BLDG ECB EISTING CC- SECTION A, SEE NOTE 50AF 50AT NOTES:. TO PROVIDE POWER TO TEPORARY CHEICAL BUILDING (PP), CONTRACTOR SHALL FURNISH AND INSTALL WESTINGHOUSE TYPE W CIRCUIT BREAKER IN EISTING CC-, SECTION A, LOCATED IN EISTING AWT CHLORINATION FACILITY (HH). REFERENCE E-HH- FOR CC- LOCATION.. CONTRACTOR SHALL SPLICE CONDUCTORS IN THE WIREWAY IN A NEAT AND WORKANLIKE ANNER. CONTRACTOR SHALL USE INSULATED, ULTI-CONDUCTOR CONNECTORS AS ANUFACTURED BY PARIS, OR EQUAL.. COORDINATE LOCATION OF JUNCTION BO WITH HEAT TRACE INSTALLER. P-PP-00 NEA R 8"8" (INIU) WIREWAY, SEE NOTE P-PP-000 P-PP-05 AWT CHLORINATION FACILITY (HH) REOTE I/O PANEL FP-460-HH- SODIU BISULFITE DAYTANK CONTR PANEL P-PP-00 P-PP-00 TO TEPORARY CHEICAL BUILDING (PP) C-PP-005 I-PP-004 C-PP-008 00AF 70AT NEA R T-LP- ECB 5AF 00AT NEA R WATER HEATER ECB CC- SINGLE LINE DIAGRA CJB-PP- P-PP-004 T-LP- 45KVA 480-0/08V Ø, 4W DRY-TYPE P-PP-005 P-PP-006 C-PP-000 FS SODIU BISULFITE ROO EYEWASH/SHOWER C-PP-00 FS SODIU BISULFITE FILL STATION EYEWASH/SHOWER C-PP-00 BISULFITE TRANSFER PUP PANEL NO. (FP-95--) C-PP-0 C-PP-006 I-PP-005 C-PP-00 C-PP-007 I-PP-006 I-PP-008 TEPORARY SODIU BISULFITE TANK FILL PANEL (FP-95-0-) C-PP-00 C-PP-06 C-PP-0 BISULFITE TRANSFER PUP PANEL NO. (FP-95--) C-PP-004 LP- TEPORARY CHEICAL BUILDING SINGLE LINE DIAGRA INSTANT WATER HEATER FRO LP- FRO LP- I-PP-00 LIT LE SODIU BISULFITE TEP STORAGE TANK NO. I-PP-00 LIT LE SODIU BISULFITE TEP STORAGE TANK NO. C-PP-0 SUP PUP CONTR PANEL (FP-95--) LSH LSL SODIU BISULFITE STORAGE AREA SUP C-PP-07 SUP PUP CONTR PANEL (FP-95-4-) LSH LSL SODIU BISULFITE STORAGE AREA SUP EISTING CONTR CONDUIT 0A P WASTE OIL RECEIVING STATION CONTR PANEL EISTING POWER CONDUIT P-PP-0 P-PP-08 WASTE OIL RECEIVING STATION DISCONNECT CIRCUIT SUPPLIED THROUGH GROUND FAULT EQUIPENT PROTECTOR FRO LP-, SEE PANEL SCHEDULE P-PP-0 P-PP-05 TEPORARY CHEICAL BUILDING RISER DIAGRA FRO LP- FRO LP- WASTE OIL RECEIVING STATION RISER DIAGRA 0A LOCKABLE SNAP SWITCH SUP PUP CONTR PANEL (FP-95--) SUP PUP CONTR PANEL (FP-95-4-) P-PP-007 P-PP-009 FRO LP- FRO LP- FRO LP- LOCATED DISCONNECT ADJACENT TO CONTRLER WIRE SIZE PER PANEL SCHEDULE HEAT TRACE CONTRLER JUNCTION BO CONTRLER, ONE PER CIRCUIT /4" CONDUIT (SCHEDULE 40 PVC, WHERE INSTALLED IN PIPE TRENCH) POWER CONNECTION BO, SEE NOTE, TYP HEAT TRACE INSTALLED PER ANUFACTURER'S RECOENDATION SUP PUP (SBSP-95--) P-PP-0 DISCONNECT RATED RECEPTACLE P-PP-04 SUP PUP (SBSP-95--) P-PP-06 DISCONNECT RATED RECEPTACLE P-PP-07 BISULFITE TRANSFER PUP PANEL NO. (FP-95--) P-PP-008 P-PP-00 BISULFITE TRANSFER PUP PANEL NO. (FP-95--) 60A P EUH- P-PP-09 60A P EUH- P-PP-00 C-PP-04 CP- P-PP-00 L- CP- P-PP-09 P-PP-0 C-PP-05 EF- END CAP, TYP HEAT TRACE CONNECTION DETAIL NOT TO SCALE SUP PUP CONTR PANELS RISER DIAGRA TRANSFER PUP NO. (SBTP-95--) TRANSFER PUP NO. (SBTP-95--) TRANSFER PUPS NO. AND NO. RISER DIAGRAS UNIT HEATERS RISER DIAGRAS EHAUST FAN EF- RISER DIAGRA ADDENDU /6 PV GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 TEPORARY CHEICAL BUILDING (PP) SINGLE LINE DIAGRA AND RISER DIAGRAS DATE: OCTOBER 06 HAZEN NO.: 4-004 E-PP-

L 8 6 7 0VAC, Ø 44 NOTES:. UNLESS OTHERWISE NOTED, ALL LIGHTING AND RECEPTACLE WIRE SHALL BE #, #GND IN /4" CONDUIT. 08VAC L 8 DISCONNECT RATED RECEPTACLE. LINE VTAGE THEROSTAT PROVIDED PER VENTILATION SCHEDULE ON SHEET H-PP-. 4 L 9 5 40 6 CPT 08/0VAC 4 7 4 8 9 0 DT HIGH LEVEL O O A DT LOW LEVEL IN SERVICE JOG W 8 R CONTR POWER ON RUN 4 44 45 46 STOP L.O. START 44 LSL-95-- W 44 R CONTR POWER ON RUN Y FAIL 47 48 LSH-95-- RESET CR 47 Y HIGH LEVEL ALAR 4 49 CR47 5 50 Y FAIL 6 SODIU BISULFITE TRANSFER PUP NO. & NO. CONTR SCHEATIC 5 CR47 7 8 7 5 5 HIGH LEVEL ALAR TO SB TANK FILL CONTR PANEL (FP-95-0-) 9 0 0VAC, Ø DISCONNECT RATED RECEPTACLE 54 SUP PUP CONTR PANEL (FP-95-4-) CONTR SCHEATIC 08/0 VTS LP- TYPE: NEA R 4 5 6 7 8 9 0 LSH-95-- CR0 STOP L.O. START 7 RESET LSL-95-- CR0 W 7 R CR 0 Y Y CONTR POWER ON RUN HIGH LEVEL ALAR FAIL PHASE, 4 WIRE AIN BREAKER OUNT: SURFACE 50A P VT-APERES VT-APERES ODS DESCRIPTION WIRE TRIP PE No. No. PE TRIP WIRE DESCRIPTION ODS A B C A B C - CHE BLDG - INDOOR LTG SEE NOTE 0 70 70 0 SEE NOTE CHE BLDG - RECEPTACLES - - CHE BLDG - EERGENCY LTG SEE NOTE 0 60 450 4 0 SEE NOTE CHE BLDG - OUTDOOR LTG - 5 40 40 6 - TRANSFER PUP NO. SEE RISER 0 7 40 40 8 0 SEE RISER TRANSFER PUP NO. - 9 40 40 0 - FS-95-- P-PP-07 0 50 00 0 P-PP-0 SB TANK FILL CONTR PANEL - - FS-95-- P-PP-08 0 50 00 4 0 P-PP-0 LIT-95-- - GFEP SB HEAT TRACE NO. P-PP-04 0 5,800 00 6 0 P-PP-0 LIT-95-- - GFEP SB HEAT TRACE NO. P-PP-05 0 7,800 500 8 0 P-PP-0 FSL-95-- HEAT TRACE GFEP GFEP SB HEAT TRACE NO. P-PP-06 0 9,800 4,67 0 4,67 4,67 40 SEE RISER EUH- - - EUH- SEE RISER 40 4,67 4,67 4 5 4,67 0 6 0 SEE RISER EF- - - SUP PUP CP ( FP-95--) SEE RISER 0 7 500 00 8 0 P-PP-04 TANK FILL CABINET - - SUP PUP CP ( FP-95-4-) SEE RISER 0 9 500-0 0 SPARE - - SPARE 0 - - 0 SPARE - - SPARE 0 - - 4 0 SPARE - - SPARE 0 5 - - 6 0 SPARE - - SPARE 0 7 - - 8 0 SPARE - - SPARE 0 9 - - 40 0 SPARE - - SPARE 0 4 - - 4 0 SPARE - TOTAL 7,67 6,947 7,7 5,77 5,47 5,87 TOTAL 4 5 HIGH LEVEL ALAR TO SB TANK FILL CONTR PANEL (FP-95-0-) SUP PUP CONTR PANEL (FP-95--) CONTR SCHEATIC GFCI - GROUND FAULT CIRCUIT INTERRUPTER (5mA) LOD - LOCK-ON DEVICE LFD - LOCK-OFF DEVICE GFEP - GROUND FAULT EQUIPENT PROTECTOR (0mA) PHASE TOTAL TOTAL LOAD (VA),094,84,54 8,00 TOTAL LOAD (A) 05 K AIC 00kA SPD ADDENDU /6 PV GP DEVELOPENT SUBITTAL 0/6 PV PERIT SUBITTAL 0/6 PV EASURE " THEN 0 /" " 405 RIDGE TOP ROAD, SUITE 400 FAIRFA, VIRGINIA 00 CERTIFICATE OF AUTHORITY: 77 TEPORARY CHEICAL BUILDING (PP) CONTR SCHEATICS AND PANEL SCHEDULE DATE: OCTOBER 06 HAZEN NO.: 4-004 E-PP-