Improvements Municipal Class Environmental Assessment. Public Information Centre #1 June 11, 2015

Similar documents
Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

Recreational Pathway Crossing of Richmond Street Municipal Class Environmental Assessment. Public Information Centre #2 April 22, 2015

Western Road/Wharncliffe Road North Widening from Platts Lane to Oxford Street. Municipal Class Environmental Assessment Public Information Centre #1

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

Portage Parkway Environmental Assessment Public Information Centre No. 1

Mavis Road Class Environmental Assessment

Heritage Road Improvements from Steeles Avenue to Rivermont Road

Commissioners Road West Realignment Environmental Assessment

City of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street

Public Information Centre #1

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

Commissioners Road West Realignment Environmental Assessment

Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways

St. Clair Avenue West Area Transportation Master Plan

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017

City of Toronto. Emery Village Transportation Master Plan

GEOMETRIC IMPROVEMENTS AND WATERMAIN LOOPING MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT

Public Information Centre. Welcome

Shift Rapid Transit Public Participation Meeting May 3, 2017

WELCOME TO OPEN HOUSE # 3

Appendix B-13: Community Stakeholders Group Meeting Materials and Minutes

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN

WELCOME TO OPEN HOUSE TWO November 28, 2018

Blackfriars Bridge Municipal Class Environmental Assessment. Public Information Centre #1 November 19 th, 2014

Public Information Centre No. 1 King-Vaughan Road Bridge Replacement Municipal Class Environmental Assessment City of Vaughan

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation. Public Information Centre #1

The Gore Road Queen Street East to Castlemore Road

North York Centre South Service Road

Rapid Transit Implementation Working Group September 14, 2017

Bus Rapid Transit Backgrounder. December 2016

Rapid Transit Implementation Working Group

The purpose of tonight s PIC is to:

Station Street/Haig Road Extension Environmental Assessment (EA)Study. Welcome

Welcome to the Public Information Update for

Appendix E: Evaluation of Network Alternatives - July 2017

WELCOME and introduction

Master Plan Class Environmental Assessment for Downtown Mississauga Road Improvements

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

One River Environmental Assessment. Welcome!

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Appendix M4 - Part 1. Public Information Centre Summary Report. Appendix M4

Lambeth Main Street Streetscape Improvements

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Class Environmental Assessment. Public Information Centre 3

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

TABLE OF CONTENTS Page

Burloak Drive Grade Separation

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 57/58 WEST BLOCK PLAN BLOCK PLAN FILE BL.57/58W.99 HUNTINGTON BUSINESS PARK LAND OWNERS

Dundas Place Flexible Street Public Information Centre

3.0 master plan concept

Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill. March 30, 2017

Introduction. Public Information Package. Project website. Overview. Class Environmental Assessment Process

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

Report to: Development Services Committee Report Date: April 24, 2017

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

London s Bus Rapid Transit System

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON AUGUST 13, 2018

SCTPO Project Summary September 2014

Coordinated Transit Planning in Toronto SmartTrack GO RER Scarborough Relief Line Waterfront Transit

City of London Adelaide Street North - Canadian Pacific Railway Grade Separation Class Environmental Assessment Study Report

South Federal corridor improvements

Redevelopment of Ajax Plaza Area Public Open House Meeting February 19, 2015 Questions and Answers

2. Existing & Future Conditions

Environmental Study Report

7 HIGHWAY 7 CORRIDOR AND VAUGHAN N-S LINK ENVIRONMENTAL ASSESSMENT RECOMMENDED ALIGNMENT

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

Integration of Trees into Roads Policy - the road to success -

King-Spadina Secondary Plan Community Consultation Meeting. Michelle Knieriem, City Planner October 11, 2017

Subarea 4 Indian Creek. Vision The combination of park networks and transportation amenities make Subarea 4 the greenest hub in the Corridor.

Baby Point Wastewater Pumping Station Forcemain Class Environmental Assessment Study

McKay Road Interchange and Salem / Lockhart Crossing

ONLINE PUBLIC INFORMATION CENTRE

Welcome. Walk Around. Talk to Us. Write Down Your Comments

WELCOME CPT CORRIDOR AREA PROJECT BACKGROUND BROOKSIDE BLVD. The objectives of the CPT Functional Design Study included:

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

Angeline Street North Corridor

This Review Is Divided Into Two Phases:

M E M O R A N D U M. Chair and Members of North West Planning Advisory Committee

DETROIT RIVER INTERNATIONAL CROSSING STUDY. Walpole Island First Nations Meeting December 13, 2007

1.0 INTRODUCTION AND BACKGROUND

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Public Meeting #3 May 9, 2009 MVVA Team

Purpose of Open House #3

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

East River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement

3.10 Network Assessment and Business Case

Glenborough at Easton Land Use Master Plan

Public Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment

Planning Division Case Report

Master Environmental Servicing Plan & Secondary Plan

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Table of Contents. Executive Summary...S-1

MAYFIELD WEST SECONDARY PLAN PHASE 2

Key Moves in the Plan

URBAN DESIGN BRIEF. Saginaw Subdivision 124 SAGINAW PARKWAY, CAMBRIDGE OCTOBER 2015 OUR FILE 1422A

California Environmental Quality Act (CEQA) Environmental Review Process

Transcription:

Western Road & Sarnia Road/Philip Aziz Avenue Improvements Municipal Class Environmental Assessment Public Information Centre #1 June 11, 2015

1. Welcome We re hosting this Public Information Centre (PIC) to provide you with information about possible improvements to the Western Road & Sarnia Road / Philip Aziz Avenue intersection. Here you will learn about: The Municipal Class Environmental Assessment (Class EA) process; Project background information & study purpose; Problems & opportunities associated with the study area; Natural and social/cultural environment conditions; Current traffic conditions; Recent Western Road Improvements Improvement alternatives; Preliminary recommended improvement alterantives; How we are planning to keep you involved; and Next steps. Recent Western Road Improvements

2. Study Process PHASE 1 PHASE 2 PHASE 3 PHASE 4 PHASE 5 PHASE 1 : Problem/Opportunity Identify & describe the problem/opportunity. PHASE 2 : Alternative Solutions Prepare environmental inventory Identify & evaluate Alternative Solutions Establish the Preferred Solution Prepared and File the Project File (Schedule B projects) PHASE 3: Alternative Design Concepts for Preferred Solution Identify and evaluate Alternative Design Concepts Identify environmental effects Select the Preferred Design PHASE 4: Environmental Study Report Prepare and File Environmental Study Report (Schedule C projects) PHASE 5 : Implementation Project design and construction Municipal Class Environmental Assessment Process We are here. This study will follow the requirements of the Municipal Class Environmental Assessment process as defined by the Municipal Engineers Association (as amended in 2007 & 2011). Schedule B projects include Phases 1, 2 & 5. Schedule C projects include Phases 1 5. This project is proceeding as a Schedule C project (Phases 1-4).

3. Study Area Note: Study area may also include adjacent lands and/or roads.

4. Background & Purpose of the Study The 2030 Transportation Master Plan (TMP) identified necessary improvements to the study area. These include: Intersection improvements to accommodate forecasted increase in traffic; Signal improvements to support transit signal priority; Address safety; and Improve road width constraints along Philip Aziz Avenue. In 2007, improvements were made to Western Road north of Huron University College to Richmond Street. These improvements included road widening, bike lanes, medians and signage. Concurrent Class EAs are underway that may impact/influence this study area (Western Road/Wharncliffe Road Class EA, Rapid Transit Class EA). Western University draft Master Plan (2015) identifies significant development along the study area and corridors.

5. Study Area Features Huron University College On-street Bike Lanes Proposed Parking Lot Expansion Brescia University College Springett Parking Lot Western University Existing Storm Outlet Transit Priority Optimization Corridor Busiest Transit Stops Philip Aziz Property Existing Woodland Proposed Primary Development Sites (Draft Western University Master Plan) Primary Commuter Bike Route (Bicycle Master Plan) Proposed Priority On-street Bike Lanes (2030 TMP) Proposed On-street Bike Lanes (Sarnia Road Class EA) Platts Lane

6. Existing Conditions Traffic Primary trip generating/destination areas: Springett parking lot Huron University College parking lot Average Daily Traffic Western Road 26,000 vehicles per day Sarnia Road 23,000 vehicles per day Pedestrian Traffic Mid-block pedestrian crossing volume is equal to the amount of pedestrian crossing at the Western Road/Sarnia Road intersection Level of Service intersection is operating over capacity at a level of service (LOS) D in the AM and LOS F in the PM. Acceptable operations are generally considered LOS A to C. Critical failure of a system occurs at LOS E & F. See Board #7 for further details Collisions (2011 to 2013) 19 mid-block collisions 54 intersection collisions 7 pedestrian/vehicle collisions

7. Existing Conditions Weekday AM Peak Hours Weekday PM Peak Hours Traffic Analysis Elgin Rd Huron College Western Rd ¹ Elgin Rd Elgin Rd Huron College Western Rd ¹ Elgin Rd The Level of Service (LOS) at an intersection is determined by the amount of traffic delay. LOS A Little or no delays LOS B Short traffic delays LOS C Average delays LOS D Long traffic delays LOS E Very long delays LOS F Extreme delays causing congestion. The current LOS along the study corridor is illustrated in these figures for the peak travel times: morning (AM) and evening (PM). Brescia Lane Lambton Ave Brescia Lane Lambton Ave Sarnia Rd Althouse College Western Rd Philip Aziz Ave Sarnia Rd Althouse College Western Rd Philip Aziz Ave Legend Turning Movements: Level of Service A Level of Service B Level of Service C Level of Service D Level of Service E Level of Service F Intersection: Level of Service A Level of Service B Level of Service C Level of Service D Level of Service E Level of Service F Platts Lane Platts Lane

8. Existing Conditions Natural Environment A desktop analysis was conducted to determine potential Species at Risk (SAR) within 1 km of the study area. The following species may occur within the study area: Terrestrial Species* 9 breeding birds (including Bank Swallow, Barn Swallow and Bobolink); 14 reptiles (including Spotted Turtle, Queensnake and Blanding s Turtle); 8 bats (including Little Brown Myotis and Northern Long-eared Myotis). Aquatic Conditions* 10 fish species (including Gravel Chub, Eastern Sand Darter and Black Redhorse); 10 mussel species (including Fawnsfoot, Kidneyshell and Rainbow Mussel). Woodland Area Barn Swallow Eastern Sand Darter Little Brown Myotis The woodland located southeast of the Western Road/Sarnia Road intersection contains the following vegetation: Manitoba Maple. Black Walnut, Wild Mustard, Common Buckthorn, Hackberry A small cattail wetland also occurs. Tree Assessment A boulevard tree inventory and assessment was conducted and evaluated 130 trees along the study corridor. Most trees were found to be in fair to good condition. Common Buckthorn * Majority of these species are associated with the Thames River corridor. Wild Mustard

9. Existing Conditions Archaeological Assessment Stage 1 archaeological assessment: High potential for the recovery of Aboriginal and Euro-Canadian archaeological resources within parts of the study area. Stage 2 study will be required for lands outside of the disturbed road allowance. Brescia University College Cultural & Built Heritage Resources The study area contains the following cultural & built heritage resources: One designated heritage property (Philip Aziz) Four listed properties: Brescia University College Huron University College Cronyn House Cronyn Hall Huron University College One additional historic feature (unmarked 19 th century Euro-Canadian cemetery) Cronyn House

10. Problem/Opportunity Statement Problems: Existing road/intersection experiences capacity or over capacity conditions; Traffic congestion, increased delays and decreasing level of service will result if untreated; Western Road/Sarnia Road intersection is currently operating at a low level of service; and Existing storm drainage system is not at current design standards. Existing conditions at Western Road & Sarnia Road Opportunities: Improve intersection turning movements; Provide additional road capacity by removing constraints; Provide continuity with Western Road north and south of the study area; Improve stormwater drainage; Improve intersection operations; Improve pedestrian and cyclist facilities; and Enhance streetscape conditions. Recent Western Road Improvements

11. Alternative Planning Solutions Planning solutions are alternatives that can implement the problems/opportunities identified on Board #10. The Planning Solutions for this project are identified below: 1. Do Nothing this alternative provides a basis to which other alternative planning solutions can be compared. 2. Expand Pedestrian, Bicycle, Transit Use - This alternative would involve diverting current traffic within the corridor from vehicles to pedestrian, bicycle and transit use. 3. Operational Improvements - This alternative would consider operational improvements to the intersection and study corridor (improved turning lanes, intersection signalization optimization). 4. Improvements to Parallel Roads - This alternative considers improvements to Wonderland Road, Platts Lane and Richmond Street to increase corridor capacity. 5. Improvements to Local Roads - This alternative would involve utilizing local roads (such as Brescia Lane or Kininvie Drive) to improve destination access. 6. Improvements along Philip Aziz Avenue - This alternative would involve widening Philip Aziz Avenue to provide improved traffic operations, sight distances, to build cycling facilities and adequately support pedestrian usage.

12. Summary of Evaluation Many alternatives are being considered to address problems and opportunities: Long List of Alternative Ideas Screening Result Alternatives for Further Study 1. Do Nothing Does not address the problem statement. Does not comply with 2030 TMP. 2. Expand Pedestrian, Bicycle, Transit Use Not possible for sufficient diversion to these modes of transportation to solely address the problem. 3. Operational Improvements Does not provide sufficient improvement to address the current rated capacity when carried forward as a sole solution. Does not prevent continued service degradation when carried forward as a sole solution. 4. Improvements to Parallel Roads Will not provide necessary capacity relief within the north/south corridor. Wonderland Road is outside of an acceptable proximity. Does not solve the local turning movement issue. 5. Improvements to Local Roads Supports Western University it Master Plan with a secondary collector. Diverts traffic away from Sarnia Road & Western Road. Direct route to Springett parking lot. 6. Improvements along Philip Aziz Avenue Addresses the problem statement. Complies with 2030 TMP. Will prevent continued service degradation. Not carried forward Carried Forward To be studied further in Phase 3 Carried Forward To be studied further in Phase 3 Not carried forward Carried Forward To be studied further in Phase 3 Carried Forward To be studied further in Phase 3

13. Recommended Solution The Recommended Planning Solution is a combination of : Alternative 2: Expand Pedestrian, Bicycle, Rapid Transit Use & Alternative 3: Operational Improvements & Alternative 5: Improvements to Local Roads & Alternative 6: Improvements along Philip Aziz Avenue These alternatives ti will be the basis upon which h alternative ti design concepts are developed d and evaluated.

HURON ST SHERWOOD AVE VICTORIA ST ST REGENT THE PARKWAY WHARNCLIFFE RD N CEDAR AVE 14. Alternative Planning Solutions HURON UNIVERSITY COLLEGE ENTRY ¹ Alternate routing to parking lots and secondary service road to future Western Master Plan buildings. WESTERN UNIVERSITY ENTRY qp nm qp Enhance ROW visual appeal by landscaping nm qp RAMSAY RD PHILIP AZIZ AVE nm BLOOMFIELD DR qp BRESCIA LANE ROLLINGWOOD CIR Improvements to Philip Aziz Avenue ROW and facilities nm KININVIE DR qp SARNIA RD STIRRUP CRT NEVILLE DR SLEIGHTHOLME AVE WESTERN RD Enhance operations for pedestrian bicycle and transit corridor Planning Solutions & Enhancements These potential solutions and enhancements will be the basis for design alternatives to be considered in Phase 3 of the study. FORD CRES COOMBS AVE EDGAR DR CHEPSTOW CLOSE CHEPSTOW GATE CASTLEGROVE BLVD CHESHAM CRT TAMBLYN DR CHESHAM GROVE CHESHAM AVE HOLLYWOOD CRES PLATT'S LANE FOX AVE SUFFOLK PL

15. What Happens Next? Spring 2015 Consider input from the public, agencies and stakeholders to confirm Preferred Solution Summer 2015 Determine Alternative Designs that t can implement the Preferred Solution Fall 2015 Hold PIC #2 to present the Recommended d Design Alternative Thank you for attending and participating in the study process. We encourage you to fill out a comment sheet provided and drop it in the comment box or send your comments by June 25, 2015 to either of the Project Managers listed below: Tony Fediw, P.Eng., Project Manager AECOM Canada 250 York Street, Suite 410 London ON, N6A 6K2 Tel: 519-963-5898 Email: antony.fediw@aecom.com Karl Grabowski, P.Eng., Transportation ti Design Engineer The Corporation of the City of London 300 Dufferin Avenue London ON, N6A 4L9 Tel: 519-661-2500 Ext. 5071 Email: kgrabows@london.ca Public comments will be collected in accordance with the Freedom of Information and Protection of Privacy Act. With the exception of personal information, all comments will become part of the public record. Additional information is available on the City of London website: http://www.london.ca/residents/environment/eas/pages/default.aspx