Stormwater Project Meeting

Similar documents
Moon Brook FRP BMP Summary Sheet. Ownership of Land where BMP is Located

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

LID CASE STUDY DESIGN WORKSHOP HSG B/D SOIL EXAMPLE SINGLE FAMILY SUBDIVISION WITH OUTPARCEL

City of Columbia BMP Manual. Volume Calculation Tool and Examples

Draft Rhode Island Stormwater Design and Installation Standards Manual

The Flow. Green Infrastructure Taking Root in Cities 3/23/2015. Green Infrastructure Evolution City Plans/Projects Measureable and Holistic Benefits

MDOT Stormwater BMPs: The Challenge of Design. Janeen McDermott, PE Dan DeVaun, PE

Swan Creek Urban BMP Inventory and Assessment. Jeff Grabarkiewicz, Kari Gerwin, Ann-Drea Hensley TMACOG, Lucas SWCD/Engineers, and Partners

NYC Green Infrastructure Program

Managing Stormwater Runoff with Green Infrastructure "Enhancing Community Resiliency to the Changing Climate"

STORMWATER STRATEGY PROJECTS IN ACTION

Town of Vershire Road Erosion Inventory Report

SOUTH FOX MEADOW STORMWATER IMPROVEMENT PROJECT

Part 4: CRS Stormwater Management Activity (450) and Urban Flooding Best Practices

Low Impact Development in Coastal South Carolina: A Planning and Design Guide

GENERAL INFORMATION What is Stormwater? What is a stormwater utility? What is an impervious surface?

GOING GREEN! NEWBURYPORT S PLAN FOR THE FUTURE

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

Evaluating Urban Stormwater Retrofits in the SE US Coastal Plain

MALLETTS BAY INITIATIVE

Action Plan for Retrofitting Structural BMPs

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM

Town of Corinth Road Erosion Inventory Report

San Mateo County Storm Water Resource Plan

ENVIRONMENTAL STEWARDSHIP, COMMITMENTS, AND COMPLIANCE

Neighborhood-Scale Water Quality Improvements The Broadway Neighborhood Stormwater Greenway Project

East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School. Current site type

From and

4. Contractor (and subcontractors if applicable) certification statement(s)

Planning the BMP. Region 2000 Planning District Commission Lynchburg, VA December 13, 20013

Tigard. City TIGARD STORMWATER. ofn MASTER PLAN. Respect and Care Do the Right Thing Get it Done. Tualatin River Watershed Council

Anne Arundel County s Severn River Watershed Implementation Strategy. Severn River Association

Swatara Township Stormwater Program. 1. There are no storm sewers on or near my property. Why should I pay a fee?

Impervious Cover Project for Climate Resilience in New Jersey

Post Construction BMPs

CAPE ELIZABETH, MAINE TOWN CENTER STORMWATER MANAGEMENT PLAN UPDATE

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

CROWN POINT SUBDIVISION

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

STORMWATER UTILITY PRESENTATION November 18, 2014

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

Community LID Workgroup Issue Paper #6

NYC Green Infrastructure Program

West Little Pimmit Storm Sewer & John Marshall Green Street Projects. July 7, 2015 Nottingham Elementary School

JCCC Campus Stormwater Project: Retrofitting Yesterday s Parking Lots With Today s Best Management Practices

Update on the Bayfront Canal Bypass Project. Recommendation This an informational item only. No City Council action is required at this time.

Bioretention cell schematic key

Agenda. NPDES Phase II Program (US EPA, 2003 Pending 2009) Costs of Stormwater Management and How to Structure a Stormwater Utility

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

Arlington County Watershed Retrofits. Greg Hoffmann Center for Watershed Protection

A G E N D A Council Update Training Room September 26, :45 p.m.

Cost Effective Low Impact Development

A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach

Urban Stormwater Management. Rebecca Leonardson Rui Teles Brooke Ray Smith

Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012

DCBP APPENDIX B Action Plan for Retrofitting Structural BMPs

The use of low head weirs to. perennial streams with their floodplains:

Watershed Planning Workshop

Chapter 4 - Preparation of Stormwater Site Plans

Williamsburg Boulevard Green Streets Project. April 27, 2011 Williamsburg Middle School

Stormwater Management Design Manual

South Bismarck Watershed Model Update and Stormwater Improvement Project

What is YOUR biggest challenge in stormwater control measure accounting/planning?

INTRODUCTION TO THE ADAPTING TO RISING TIDES EXISTING CONDITIONS AND STRESSORS REPORT

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. October 22, 2010

RIVERSIDE, Newton MA June 9, 2011

6.1. INTRODUCTION 6.2. EXISTING CONDITIONS

Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE

Detroit Stormwater Rules and Drainage Fee Updates

Pasco County Watershed Meeting for Flood Impacted Areas Port Richey Watershed

Pollutant Removal Benefits

Objective: To provide practitioners and reviewers with information and design guidelines related to innovations in urban stormwater management.

Types and Basic Design of Post-Construction BMPs

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management

Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey

Low Impact Development and Green Infrastructure 101. The new paradigm for stormwater management

TOWN OF BURLINGTON Conservation Commission

5. FINAL DEVELOPMENT PLAN APPROVAL MENORAH MEDICAL CENTER OFFICE BUILDING Vicinity of the southwest corner of 119 th Street and Nall Avenue

PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER

COUNCIL OF THE TOWN OF LA PLATA. Ordinance No Amended

West Virginia Stormwater Management Manual: Methods.

Leduc Industrial Outline Plan SE W4

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 19, Resurfacing of Aldrich Road West Contract # 11-06

The Benefits and Challenges Associated with Green Infrastructure Practices

Moving from Pilots to a Program: Seattle s Green Infrastructure Program: September 20, 2012

6.5 Lakewood Gulch. Basin Snapshot

Baltimore, MD Lt. Gov. Boyd Rutherford

City of Sun Prairie Wetland Buffer Reduction Request

STORM WATER UTILITY FREQUENTLY ASKED QUESTIONS

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

Amy Bouska Urban Conservationist IDALS-Division of Soil Conservation

Update on Homeowner BMPs

Citywide Integrated Stormwater Management Plan (ISMP) DRAFT ACTION PLAN REVIEW Public Consultation November 16 th, 2016

AGENDA 2015 Community Stormwater Event

Interpreting and Using the RI Site Specific Soil Mapping Standards and Procedures

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

Transcription:

Stormwater Project Meeting City of South Burlington Presentation by: David P. Wheeler and Emmalee T. Cherington, Assistant Stormwater Superintendents Tom DiPietro, Deputy Director of Public Works City of South Burlington Public Works

Stormwater Project Meeting Agenda 6:00 Kennedy Drive Pond 2 6:20 Kennedy Drive Pond 7 6:40 Bartlett Bay Stormwater Treatment System Expansion 7:00 Deane Street / Woodcrest Drive Stormwater Project 7:20 Lindenwood Stormwater Project

Kennedy Drive Pond 2 Retrofit Original Construction in 2006

Location Map

Kennedy Drive Pond 2

Kennedy Drive Pond 2 Existing System Undersized Design Drainage Area: 0.76 Acres (0.71 Impervious) Actual Drainage Area: 3.53 Acres (2.23 Impervious) Only 0.15% Channel Protection Volume (CPv) Proposed Retrofit Expand system to meet CPv requirement Convert from Detention Pond into Gravel Wetland for increased phosphorous removal

Drainage Area Map

Draft Plans

Project Schedule & Funding 11/13/18 Public Meeting 1/15/19 12/15/19 - Project Engineering 1/15/20 Anticipated Bid Date 6/15/20 11/15/20 Construction Funding City received $253,616 VTrans Grant City obligation 20% match ($63,404)

Project Contact Dave Wheeler, Assistant Stormwater Superintendent 802.658.7961 x6113 dwheeler@sburl.com

Questions & Comments

Kennedy Drive Pond 7 Retrofit

Kennedy Drive Pond 7- Location Existing Location of Pond 7 Current Drainage Area

Kennedy Drive Pond 7- Brief Description of the Work Expand the existing Drainage Area of Pond 7 Located within impaired watershed-potash Brook Additional 18.35 acres added to treatment Accommodate the 1-year storm Manage full Channel Protection Volume (CPv) Funding Received $300,000 Vtrans Grant City obligation 20% match ($75,000)

Draft Project Concept Connect to drainage area located north of Williston Rd. Proposing to modify existing pond into a gravel wetland. Potential wetland impacts will need to be determined. Enlarging existing pond is an alternate. Increases the acreage treated by 623%.

Project Schedule 11/13/18 - Public Meeting Thru Dec. 2019 - Project Engineering January 2020 - Anticipated Bid Date 6 months- Anticipated Construction 12/2020- Anticipated Completion

Project Contact Emmalee Cherington, Assistant Stormwater Superintendent 802.658.7961 x 6115 echerington@sburl.com

Questions & Comments

Bartlett Bay Stormwater Treatment System Expansion (BBSTS)

BBSTS Location Map Existing Drainage Area Existing Stormwater Treatment

BBSTS Brief Description of Work Expand the existing Drainage Area of BBSTS Located within impaired watershed- Bartlett Brook Additional 9.34 acres of impervious area Accommodate the 1-year storm 15% flow reduction target for Bartlett Brook TMDL Funding Received $375,720 Vtrans Grant City obligation 20% match ($93,930)

Draft Project Concept Connect to drainage area at Harborview Drive and US Route 7. Proposing to expand existing treatment wetland. Additional 800 FT of culvert. Reposition existing access road Not impacting Class II wetland Additional Drainage Area

Draft Plans

Draft Plans

Draft Plans

Draft Plans

Project Schedule 11/13/18 - Public Meeting Thru Dec. 2019 - Project Engineering January 2020 - Anticipated Bid Date 8 months- Anticipated Construction 12/2020- Anticipated Completion

Project Contact Emmalee Cherington, Assistant Stormwater Superintendent 802.658.7961 x6115 echerington@sburl.com

Questions & Comments

Deane Street / Woodcrest Drive Stormwater Project West End of Deane Street

Project Location

Project Location

Deane Street/Woodcrest Drive Existing Conditions Drainage Area: 7.46 Acres (2.38 Impervious) Collection system discharges directly to Potash Brook Proposed Project Infiltration chambers in Right of Way (ROW) sized to meet Water Quality Volume (WQv) and Channel Protection Volume (CPv) requirements

Drainage Area Map

Draft Plans

Project Schedule & Funding 11/13/18 Public Meeting 8/30/17 8/15/19 - Project Engineering 3/15/19 Anticipated Bid Date 6/15/19 11/15/19 Construction Funding City received $242,000 VTrans Grant City obligation 20% match ($60,500)

Project Contact Emmalee Cherington, Assistant Stormwater Superintendent 802.658.7961 x6115 echerington@sburl.com

Questions & Comments

Lindenwood Stormwater Project Path at End of Lindenwood Drive

Project Location

Project Location

Existing Conditions Lindenwood Drive Drainage Area: 10.6 Acres (2.2 Impervious) Collection system along Brewer Parkway discharges directly to Potash Brook. Proposed Project Install collection system along Lindenwood Dr. Construct Infiltration Basin on City owned parcel to meet WQv and CPv requirements

Drainage Area Map

Draft Plans

Project Schedule & Funding 11/13/18 Public Meeting 8/30/17 12/15/19 - Project Engineering 1/15/20 Anticipated Bid Date 6/15/20 9/15/21 Construction Funding City received $303,574 VTrans Grant City obligation 20% match ($76,000)

Project Contact Dave Wheeler, Assistant Stormwater Superintendent 802.658.7961 x6113 dwheeler@sburl.com

Questions & Comments