Spark Extinguishing Systems

Similar documents
Extended Coverage Sidewall Sprinklers

Tail-end valve stations

Procedure for the Approval of New Fire Detection and Alarm Technologies

Wet alarm valve stations

Control and Indicating Equipment

IAS Surveillance Measures for Safes & Strongrooms

COMITÉ EUROPÉEN DES ASSURANCES

CEA 4102 Sprinkler Systems. Requirements and test methods for Foam Proportioners for Sprinkler Systems according to CEA 4001

Audible warning devices for external alarm

COMITÉ EUROPÉEN DES ASSURANCES

VdS SCHADENVERHÜTUNG. VdS-Rules for Intruder Alarm Systems

Rules for Intruder Alarm Systems

ISO INTERNATIONAL STANDARD. Fire detection and alarm systems Part 16: Sound system control and indicating equipment

This document is a preview generated by EVS

INTERNATIONAL STANDARD

This document is a preview generated by EVS

Fact File 48 Guide to BS EN 54-13:2017 Fire Detection and alarm systems:

Electromagnetic compatibility (EMC)

VdS Guidelines CONTENTS

ISO INTERNATIONAL STANDARD. Fire detection and alarm systems Part 20: Aspirating smoke detectors

This document is a preview generated by EVS

ISO INTERNATIONAL STANDARD. Fire detection and alarm systems Part 3: Audible alarm devices

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

Rules for Classification and Construction Additional Rules and Guidelines

ISO INTERNATIONAL STANDARD. Smoke alarms using scattered light, transmitted light or ionization

VdS Guidelines for Hazard Warning Systems (HWS) VdS 3431en. System requirements. VdS 3431en : (01)

Specification for testing to be conducted at periodic surveillance of products and systems

Annex to the Accreditation Certificate D-PL according to DIN EN ISO/IEC 17025:2005

ISO INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

Australian Standard. Fire detection and alarm systems. Part 6: Carbon monoxide fire detectors using electro-chemical cells

This document is a preview generated by EVS

SOUND RECEPTION SYSTEM

ISO INTERNATIONAL STANDARD

CO 2 Fire Extinguishing Systems

Control and Indicating Equipment (CIE) of classes B and C

E-17 Flammable Gas Detection and Alarm System

This is a preview - click here to buy the full publication. High-voltage switchgear and controlgear

AS/NZS :2003 Luminaires - Part 1: General requirements and tests

Fire detection and fire alarm systems

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

Fire detection and fire alarm systems

COPYRIGHT Danish Standards. NOT FOR COMMERCIAL USE OR REPRODUCTION. DS/EN :1999

INTERNATIONAL STANDARD

SOUTH AFRICAN NATIONAL STANDARD

Indicators for Rudder Angle, Rate of Turn, Propeller Shaft Revolution and Propeller Pitch

EN50438 TEST REPORT SUMMARY. Requirements for the connection of micro-generators in parallel with public low-voltage distribution networks

ISO 3999 INTERNATIONAL STANDARD. Radiation protection Apparatus for industrial gamma radiography Specifications for performance, design and tests

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

SOUTH AFRICAN NATIONAL STANDARD

This document is a preview generated by EVS

ISO INTERNATIONAL STANDARD. Fire-fighting hoses Rubber and plastics suction hoses and hose assemblies

SVENSK STANDARD SS-EN 54-21:2006. Brand och räddning Branddetekteringsoch brandlarmsystem Del 21: Utrustning för larm- och felöverföring

ISO INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

Interaction of Water Extinguishing Systems and Smoke and Heat Exhaust Ventilation Systems (SHEVS)

ISO Acceptance tests for Nd:YAG laser beam welding machines Machines with optical fibre delivery Laser assembly

INTERNATIONAL STANDARD

Gas meters - Conversion devices - Part 1: Volume conversion

F-03 FIXED FIRE DETECTION AND FIRE ALARM SYSTEM

CLASSIFICATION NOTES. Type Testing Procedure for. Crankcase Oil Mist Detection and Alarm Equipment

Loss Prevention Standard

INTERNATIONAL STANDARD

DRAFT TANZANIA STANDARD

INTERNATIONAL STANDARD

ETSI TS V1.2.1 ( )

Guidelines. Safety Integrity Level - SIL - Valves and valve actuators. February Valves

Consumer Products Services Germany GmbH Türkheim Germany

Approved products and systems for water mist systems and VdS 3188 for planning and installation

Test Report Garvan Enterprises Limited

INTERNATIONAL STANDARD

FIRE & LIFE SAFTEY STANDARD

This is a preview - click here to buy the full publication

DNVGL-CP-0407 Edition February 2016

Guideline Construction Products Regulation (EU) 305/20122

INTERNATIONAL STANDARD

SVENSK STANDARD SS-EN Fasta släcksystem Komponenter till gassläcksystem

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

Certificate: _02 / 22 March 2013

RADAR REFLECTOR STANDARD FOR CERTIFICATION. DET NORSKE VERITAS Veritasveien 1, N-1322 Høvik, Norway Tel.: Fax:

INTERNATIONAL STANDARD

This document is a preview generated by EVS

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

TECHNICAL DATA 1. PRODUCT NAME 2. DISTRIBUTOR 3. INTRODUCTION 4. FIELD OF APPLICATION 5. TECHNICAL DATA. Page 1 of 6

This document is a preview generated by EVS

Shipboard incinerators with capacities up to 4000 kw

SIMPLIFIED VOYAGE DATA RECORDER (S-VDR)

Loss Prevention Standard

ISO INTERNATIONAL STANDARD. Earth-moving machinery Field of vision of surveillance and rear-view mirrors Part 2: Performance criteria

IMQ SPA scope as CertAlarm CCB and RTL. Last update: 12th June 2017

INTERNATIONAL STANDARD

TECHNICAL SPECIFICATION

Transcription:

VdS Guidelines for VdS 2518en Requirements and Test Methods VdS 2518en : 2008-08 (01)

Publishing house: VdS Schadenverhütung GmbH Amsterdamer Str. 172-174 50735 Köln, Germany Phone: +49 221 77 66 0; Fax: +49 221 77 66 341 Copyright by VdS Schadenverhütung GmbH. All rights reserved.

VdS 2518en : 2008-08 (01) VdS Guidelines for Requirements and Test Methods Content 1 Scope... 4 2 Normative References... 5 3 Definitions... 5 4 Requirements... 5 4.1 Documentation... 5 4.2 Components... 6 4.3 System... 7 5 Test methods... 7 5.1 Examination of the technical documentation for completeness... 7 5.2 Examination of the technical documentation for sufficient information... 7 5.3 Examination of used components which were tested and approved... 7 5.4 Examination of extinguishing system design... 7 5.5 Examination of the technical compatibility of the used components... 7 5.6 Tests of the delay time (electric)... 8 Annex A: Spark detectors... 9 Annex B: Spark control and indication equipment/electrical control devices S.c.i.e./ECD... 10 Annex C: Pressure booster equipment... 11 3

VdS 2518en : 2008-08 (01) 1 Scope These Guidelines specify requirements and test methods for spark extinguishing systems (design systems) for waterbased spark extinguishing installations (assembled systems) according to the VdS Guidelines for Spark Detection, Spark Separation and Spark Extinguishing Systems - Planning and Installation -, VdS 2106. A spark extinguishing system (design system) is a listing of components. The compatibility and the intended interaction of the components is tested in the system testing. Components of spark extinguishing systems for waterbased spark extinguishing installations are: Spark detectors Electric control devices Alarm devices Spark extinguishing devices Components for the water supply (optional, for spark extinguishing installations which are not connected to water supplies of sprinkler or water spray systems) Additional components can be used as far as they do not affect the required operation of the spark extinguishing systems. Diagram 1 shows the schematic design of a waterbased spark extinguishing installation. Spark detectors ECD Alarm device Electrical Control device (ECD) Extinguishing nozzle(s) Solenoid valve Extinguishing devices Strainer Ball valve Water supply Water supply Diagram 1: schematic design of a waterbased spark extinguishing installation All pressures stated in these guidelines are gauge pressures if not indicated otherwise. Note:1 bar = 10 5 N m -2 = 100 kpa 4

VdS 2518en : 2008-08 (01) 2 Normative References These Guidelines incorporate, by dated or undated references, provisions from other publications.these normative references are cited at the appropriate places in the clauses, the publications are listed hereafter. For dated references, subsequent amendments to or revisions of any of these publications apply to these rules only when announced by a change of rules. For undated references the latest edition of the publication referred will apply. VdS 2106, VdS Guidelines for Spark Detection, Spark Separation and Spark Extinguishing Systems Planning and Installation 3 Definitions Following definitions apply for these guidelines: Spark extinguishing system: System for spark extinguishing installations System: Listing of components which were tested for proper interaction and compatibility and which can be used to design and install an installation (assembled system) according to the rules documented. Delay time (electric): Time period between spark detection and triggering of the spark extinguishing device. Delay time (total): Time period between spark detection and spreading of the waterspray across the whole cross section of the duct work. Note: The delay time (total) consists of the delay time (electric) and delay time (mechanic) and is used in the design of spark extinguishing installations to calculate the distance between the spark detector and the spark extinguishing device. Delay time (mechanic): Time period between triggering of the spark extinguishing device and spreading of the waterspray across the whole cross section of the duct work to be protected. 4 Requirements 4.1 Documentation The documentation supplied by the applicant in German language must allow an evaluation of functional, electrical and mechanical compatibility. The following documents must be available. Note: Documents which are already available at VdS (e.g. relating to component approvals) need not be submitted again. 4.1.1 General documentation List of system components (including indication of device type, device designation, VdS Approval number in case of approved devices) Delivery promises of manufacturers of the system components 5

VdS 2518en : 2008-08 (01) 4.1.2 Technical documentation List of technical documents submitted (see VdS 2344) System designation (Type designation) Technical data about system components System specification (features, technical scope of application, technical variants/system configurations, extension stages, regarded guidelines and regulations) A system description A function description Details on system extension including schematic system diagram of maximum extension stage of the system power demand (electric) maximum number of detector groups, detectors and devices per transmission path maximum number of detector groups, detectors and devices per electric control device limit parameter (max. and min. parameter) for each electric inlet and outlet information on communication parameter for each electric transmission path cable parameter for each electric transmission path Block diagram of electric control device Connection schemes and connection instructions for the individual system components 4.1.3 User documentation Operating instructions Manual Installation and mounting instructions Configuration and commissioning instructions Setting instructions Maintenance instructions 4.2 Components The components used in the system have to be tested as described below: Spark detectors according to Annex A; Spark control and indication equipment/electrical control devices S.c.i.e./ECD according to Annex B; Alarm devices according to EN 54-3; Spark extinguishing devices according to VdS CEA 4033; Pressure booster equipment according to Annex C. Note: Spark detectors, S.c.i.e./ECD and alarm devices can be incorporated in systems only if they have got a separate VdS Approval for components (for reasons of practicability). As to other system components (see indents 4 and 5 above as well as further equipment, if applicable) a separate VdS Approval for components can be abandoned on request of 6

VdS 2518en : 2008-08 (01) the manufacturer. In this case the holder of the system approval is considered as manufacturer of these components (with the responsibility to guarantee the manufacturing quality according to VdS 2344). 4.3 System 4.3.1 The documented design of the system configurations (system diagrams of the system) must ensure that the intended operation of the spark extinguishing installation is in compliance with the requirements specified in VdS 2106. 4.3.2 The system components must be technically compatible and interact as intended. All components combined to a spark extinguishing system shall be designed and connected functionally in such a way that the intended operation of the system as well as the components is ensured according to the manufacturer specifications within the limits indicated by the manufacturer as well as according to VdS 2106 and the requirements in 4.2. The functional requirements from the standards and guidelines valid for the individual devices must be fulfilled also within the system configuration(s). 4.3.3 The delay time (electric) may not exceed 10 ms. 5 Test methods 5.1 Examination of the technical documentation for completeness The test refers to the sections 4.1 and 4.2. A visual check of the technical documentation is conducted as for receipt of the documents required. 5.2 Examination of the technical documentation for sufficient information The test refers to the sections 4.1 and 4.2. A visual check of the technical documentation is conducted as to the information required. 5.3 Examination of used components which were tested and approved The test refers to section 4.2. A visual check of the technical documentation is conducted as to the use of tested and approved components (see also note in 4.2). 5.4 Examination of extinguishing system design The test refers to section 4.3.1. A visual check of the technical documentation is conducted and it is examined if the requirements of this section are fulfilled. 5.5 Examination of the technical compatibility of the used components The test refers to section 4.3.2. It is, as far as possible, assessed theoretically by the technical documents if the different components can be functionally combined with one another within the system configuration(s) specified by the applicant and if the intended operation of the system components and thus the system itself can be fulfilled with high probability. The different extension stages of the system (e.g. number of detectors or 7

VdS 2518en : 2008-08 (01) spark extinguishing devices) and functional conditions (e.g. disablements) as well as e.g. different operating voltages or pressures have to be considered. Theoretical or measurement results already available about components as well as reasonable declarations of conformity by the manufacturer can be taken into account during the procedure of the theoretical test. Following aspects are to be considered during the theoretical test, e.g.: Mechanic connections: evaluation of compatibility of connecting points with the connecting parts (e.g. electric clamps/cables or pipe connections) Electric power supply: evaluation of performance characteristics of electric system components during variations of supply parameters (e.g. voltage, current) as well as influences of faults on the transmission paths used for power supply (e.g. protection by current limiting during short circuit) Electric data and signal traffic: evaluation of the transmission characteristics of the transmission path between electric components of the system with minimum and maximum load conditions (e.g. voltage range, time characteristic, illustration of signal routing for sent and received data, transmission protocols within the admissible deviations) Electro magnetic compatibility: evaluation of the immunity of the devices within a given system configuration against electro magnetic influences (e.g. change of immunity by using other cable types) If all parameters for the intended interaction of the components of the system or of individual components are checkable by the theoretical test and the evaluation criteria are fulfilled, it can be stated that the intended operation of the system and thus the compatibility of the corresponding components is ensured with high probability. If this statement cannot be made on the basis of the theoretical test only, further tests in the laboratories are agreed upon and conducted. 5.6 Tests of the delay time (electric) The test refers to section 4.3.3. It is determined by an examination of the technical documents if the requirement of this section has already been checked and fulfilled during the testing of the spark extinguishing device. If not, a test is conducted with test samples. 8

VdS 2518en : 2008-08 (01) Annex A: Spark detectors Requirements and test methods: Parts of CEA 4035 Requirements for function Manufacturer specifies the functions of the spark detector Function test Conduction of a function test on the premises of the manufacturer, considering the variations of supply parameters. The function test(s) will be witnessed by VdS. Environmental tests Specification of a Go-Nogo-test (Actuation of detector by spark source spark source is provided by manufacturer) Conduction of following environmental tests: Cold (operational test) Damp heat, cyclic (operational test) SO 2 -corrosion (endurance test) Vibration (operational test) Vibration (endurance test) EMC A response test (Go-Nogo) is conducted before and after the environmental tests. With the EMC tests Burst, Surge and Static discharge it is tolerated: Flare up (flickering) of indications 1 extinguishing cycle Testing of the software documentation according to VdS 2203 General procedure A test schedule is established, specific to the product, considering similar features or design similarities with components already tested (e.g. flame detectors, spark detectors) 9

VdS 2518en : 2008-08 (01) Annex B: Spark control and indication equipment/electrical control devices S.c.i.e./ECD Requirements: Parts of EN 12094-1 Classification Manufacturer specifies S.c.i.e./ECD for one of the 4 environmental classes according to EN 12094-1. Use of power supply equipment according to EN 54-4 Functional requirements S.c.i.e./ECD must fulfill the requirements for functions/indications according to VdS 2106, sections 3.3 and 3.4. Manufacturer specifies the further functions of S.c.i.e./ECD. Note: Requirements for manual controls/operation are only determined as far as these operations can only be provided in access level 2. If control functions are provided ( e.g. disablement of detectors/detector transmission paths) this will have influence on the requirements for the indication of functional conditions (e.g. a disablement must be indicated visually). Function test Environmental tests according to EN 12094-1 (according to specified environmental class) A function test is conducted before and after the environmental tests. With the EMC tests Burst, Surge and Static discharge it is tolerated: Flare up (flickering) of indications 1 extinguishing cycle General procedure Analogue to spark detectors 10

VdS 2518en : 2008-08 (01) Annex C: Pressure booster equipment Requirements: Manufacturer states the different sizes (different sizes in one family) One function test of each family is conducted on the premises of the manufacturer and witnessed by VdS. 11