Kittson Parkway / Watershed Park Parking Lot

Similar documents
Rainwater Management Landscape-Based Solutions. The Corporation of Delta Showcasing Innovation Series September 21, 2007

Homeowners Guide to Stormwater BMP Maintenance

Appendix D - Technical Design Criteria for BMPs

Maintaining Your Neighborhood Stormwater Facilities How to identify stormwater facilities and keep them working

Maintaining Your Neighborhood Stormwater Facilities

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Urban Water Management and Soils (ESRM 311 & SEFS 507)

Green Infrastructure Overview

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

DEALING WITH STORM WATER MANAGEMENT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

VEHICULAR AND PEDESTRIAN CIRCULATION

FACT SHEET: Pervious Pavement with Infiltration

Rain Gardens. A Welcome Addition to Your Landscape

Green Infrastructure & Low Impact Development

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

Green Street BMP Matrix

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Local Stormwater Retrofit Case Studies. Westmoreland County Conservation District Updated 11/2011

Small Project Guidance Document

Homeowners Guide to Stormwater BMP Maintenance

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

Small Town Sustainable Stormwater Solutions

Green Streets An Innovative Street Design Approach

BIORETENTION FACILITY

Toronto Complete Streets Guidelines

Glencoe Elementary School Parking Lot Retrofit 825 SE 51 st Street

Insert Community Name. Homeowner Guide for On-Site Stormwater BMP Maintenance and Care

Green City, Clean Waters

Post Construction BMPs

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

Green Infrastructure and Low-Impact Development Technologies

J. Paul Guyer, P.E., R.A.

Lesson 2: Stormwater Best Management Practices (BMPs)

Proposed Credit Program

Storm Water Managament at the University of Michigan

Spokane River Forum: City of Spokane Permeable Pavements

5.0 Storm Water Landscape Guidance Introduction

CHAPTER 8. Mrs. Zimman s Class - Central Elementary

2

LANDSCAPING. Design. Development of the site shall not unreasonably impair the ability of adjoining properties to utilize solar energy.

Keep the Rain, not the runoff! Residential Best Management Practice (BMP) Incentive Program Criteria

Municipal Guide to. Storm Water Management Techniques

GREEN INFRASTRUCTURE FEASIBILITY STUDY HARRISON

Structural Stormwater Best Management Practices

A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region

Rainwater Management an issue for the 21 st Century. Hydrological Cycle

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

Kelly Elementary School 9030 SE Cooper Street, Portland, Oregon

Subsurface Infiltration Bed

BY GEOFF DEIGAN 2 0 I l l i n o i s P a r k s a n d R e c r e a t i o n w w w. I L i p r a. o r g

BEST LOCAL LAND USE PRACTICES

Low Impact Development. Charlene LeBleu Auburn University Landscape Architecture (334)

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

BMP Suitability Matrix

STORMWATER TOOL. Rain Garden

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

ATTACHMENT A STORMWATER MANAGEMENT TECHNIQUES Cahill Associates Environmental Consultants

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

The following general requirements will be met for all planter box installations:

Urban Watershed Mentors

Moon Brook FRP BMP Summary Sheet. Ownership of Land where BMP is Located

Chapter 6. Green Streets

Planning and Design: Applied LID Techniques Redevelopments, Housing, Mixed Use, Infrastructure

Ecosystems and Biodiversity Ecosystem Services in the City. City of Burnaby Environmental Sustainability Strategy

Table 4.7.1: Swales Potential Application and Storm Water Regulation

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

n1. Design 5.4.6a Urban Bioretention 5.4.6a Urban Bioretention Variations: Planter box, Extended tree pits, Stormwater curb extensions.

Grass Buffer T-1. Description. Site Selection. Designing for Maintenance

AWR Engineering, LLC

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Stormwater Low Impact Development - A Natural Solution

Stormwater Prevention and Control

APPENDIX G: TOWN ORDINANCE REVIEW

Tour of Nonpoint Source Pollution Reduction Projects in the Western Lake Superior Watershed

Preventing Storm Water Pollution

Town of Essex Small Site Erosion Control Guide

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

Use of Best Management Practices

JCCC Campus Stormwater Project: Retrofitting Yesterday s Parking Lots With Today s Best Management Practices

Keele Campus Storm Drainage. Presented by Mark Hagesteijn September 24, 2013

West Little Pimmit Storm Sewer & John Marshall Green Street Projects. July 7, 2015 Nottingham Elementary School

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018

Low Impact Development Site Design

Preventing Storm Water Pollution

Page 19 L.L.C. (Previously the United Salad Co. Garage) 939 SE Alder St.

Case Study: Dallas Green Infrastructure for Stormwater

Inspection and Maintenance of Stormwater Best Management Practices

Water Conservation Incentive Program

12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

CITY OF SANTA ANA Public Works Agency. PARKWAYS..What are they, and why are they important?

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

EROSION PREVENTION BMP SUGGESTED USES MATRIX

Transcription:

Kittson Parkway / Watershed Park Parking Lot Date Constructed: Summer 2005 Site Location / Description: Kittson Parkway, North Delta, British Columbia. Permeable parking lot adjacent to Watershed Park; entrance off Kittson Parkway. Project Description: Civil Works: Permeable paver parking lot Stormwater: Stormwater infiltrates beneath parking lot Operational Issues: Pervious pavers will require periodic cleaning to remove sediment buildup between pavers, this site has a high rate of leaf litter from the adjacent forest Project Outcome: Pavers are aesthetically pleasing and give a visual impression of being more sustainable than an asphalt surface Watershed Park Project Site

Completed project Overflow drainage SF-Rima 200mm x 200mm x 80mm permeable pavers

Holly Park Parking Lot and Rain Garden Date Constructed: Fall 2005 Site Location / Description: 62 Street, Ladner, British Columbia. Permeable parking lot and rain garden constructed in conjunction with new synthetic turf field. Project Description: Civil Works: Permeable asphalt parking lot Stormwater: Stormwater infiltrates beneath parking lot; when parking lot becomes saturated, water goes through overflow drain into rain garden (overflow was necessary because Ladner has a high water table) Plants: Rain garden planted with native, water-tolerant plants (hawthorn) Operational Issues: Maintenance: Permeable asphalt should be vacuumed regularly to maintain porous space; we do not have vacuum equipment so we are washing the asphalt with high-pressure water (this is another recommended cleaning technique) Project Outcome: Permeable asphalt is working; paved surface remains free of water during heavy rainfall events Drainage system works well; rain garden has standing water throughout the wet season Project Site Holly Elementary School

Parking lot under construction Permeable asphalt parking lot

55B Street BMP Date Constructed: Fall 2005 Site Location / Description: 55B Street near 14B Avenue, Tsawwassen, British Columbia. BMP located between a parking lot and a road. Project Description: Drainage Problem: Gravel area between parking lot and street is often flooded Drainage Solution: Stormwater runoff flows from road into curbed planter area via curb cuts Plants: Small trees are planted at intervals between curb cuts, allowing water to infiltrate into the ground before reaching the overflow drain Operational Issues: none Project Outcome: Not constructed as designed due to miscommunication; the idea was for the water to run into the planter and infiltrate; not much water enters the planter as constructed because the soil in the planter was accidentally mounded for planting; asphalt diverters were installed in an attempt to mitigate this problem Project Site

BMP area prior to construction After construction (January 2006)

After planting (July 2006) Asphalt diverter for directing drainage into planter

86 Avenue North Delta Community Park Date Constructed: April 2006 Site Location / Description: 86 Avenue interface with North Delta Community Park, North Delta, British Columbia. BMP is a vegetated infiltration swale above a filled ditch. Project Description: Civil Works: Sidewalk adjacent to park; asphalt paving improvements on 86 Ave Stormwater: o Stormwater runoff flows from road into planted infiltration swale (no curb) o Stormwater pipe diverted into infiltration gallery beneath swale; empty plastic boxes used to store and infiltrate water on site; excess water flows back into storm system Plants: Bottom of swale contains water-tolerant plants; swale sides contain drought-tolerant plants; strip of grass along 86 Avenue helps filter contaminants from vehicles before entering planted area Operational Issues: Maintenance: A grass strip must be mowed and the planted area weeded Project Outcome: Swale works well; the plants were so popular that many were stolen by residents Project Site North Delta Community Park

Project Site Pre-construction site conditions (after ditch infill)

Construction of underground infiltration gallery After construction and planting (April 2006) barriers were later removed

Lyon Rd at Cougar Canyon Elementary School Date Constructed: August 2005 Site Location / Description: Lyon Road, North Delta, British Columbia. BMP located at an elementary school crosswalk; near Cougar Canyon environmental reserve. Project Description: Civil Works: Curb extensions at school crosswalk contain planting areas Stormwater: o Stormwater from road directed into planting areas via cuts in curb o Planting areas formed into swales to infiltrate water o Drain rock under planting areas for infiltration o Overflow at low end of swales leads to existing storm system o Perforated pipe leads from catch basin back into drain rock under garden, maximizing the amount of water infiltrated into ground Plants: Bottom of swale contains water-tolerant plants; swale sides contain drought-tolerant and erosion-controlling plants Operational Issues: Maintenance: Some of the plants are perennials, requiring a higher level of maintenance than shrubs. Vandalism: Location next to sidewalk creates easy access for bicycles; plants were damaged by bicycle tires; this damage decreased once plants became established and filled out the swale Project Outcome: Project was successful in diverting water from street into BMP; plants are healthy Project Site Cougar Canyon Environmental Reserve Cougar Canyon Elementary School

Crosswalk before construction (spring 2005) North side during construction (summer 2005) South side during construction

North side after planting; overflow grate still to be installed on pipe in foreground South side after planting (summer 2005) North side during heavy rainfall event (September 2005); runoff entering from the curb cut was absorbed by the drain rock within 50cm of entering the swale

Sunwood Drive & Wade Road Date Constructed: August 2005 Site Location / Description: Intersection of Sunwood Drive and Wade Road, North Delta, British Columbia. Residential area. BMP located in curb extension. Project Description: Civil Works: Curb extension at intersection for traffic calming Stormwater: o Stormwater from road directed into planting area via cuts in curb o Planting area formed into swale to infiltrate water o Drain rock under swale for infiltration o Overflow at low end of swale leads to existing storm system o Perforated pipe leads from catch basin back into drain rock under garden, maximizing the amount of water infiltrated into ground Plants: Bottom of swale contains water-tolerant plants; swale sides contain drought-tolerant and erosion-controlling plants Operational Issues: Contractor education: Landscape contractor was not properly educated as to the BMP function of this site. Although contract drawing indicates swale, excess mulch was placed in the BMP causing water to leave instead of enter the planting area through the curb cut. This soil grading deficiency will be repaired. Project Outcome: More grading work required to properly divert water from street into BMP Plants are very healthy; nearby resident might be watering the garden Project Site Wade Rd Park

Prior to construction Curb cut During construction

After planting; shows excess soil and incorrect grading Extent of runoff into swale BMP during heavy rainfall event; water not absorbed as desired due to high soil levels in planted area Section showing construction details

July 2006 July 2006

Delview Park Swale - South Date Constructed: October 2005 Site Location / Description: Delview Park, North Delta, British Columbia. Community park with sports fields and passive use areas. Park is surrounded by single-family residential lots. Located near the corner of 116 Street and 92 Avenue. Project Description: Drainage Problem: Homes to the west of the park are flooded every year when runoff from the park enters the adjacent properties. Solution: Construction of a swale and rain garden along the length of three properties near the west entrance to the park; swale underlain with sand Plants: Swale planted with native plants and trees; purpose of using native plants was to reduce water in the soil by evapotranspiration; plant species selected are all tolerant of wet soil conditions Operational Issues: Maintenance: Volunteers are removing the major weeds, but the general idea is to allow the garden to fill with plant material in order to absorb the water Flooding: The overflow drain can become clogged with leaves in the fall; Parks Operations and local residents monitor pond to ensure flooding does not occur Project Outcome: Project was successful in reducing flooding to adjacent properties; it turned out that the winter water table was higher than our overflow drain and there was standing water until early summer; we fixed this problem by adding drain rock Delview Park Delview Secondary School Project Site

Note grass damaged by annual winter flooding Prior to construction (summer 2004) Swale under construction; installation of sand and topsoil Final grading of topsoil complete Completed project (October 2005)

Community planting party; native, water-tolerant plants were used

Swale in action (October 2005) Swales flowing into rain garden pond (October 2005)

Erosion after unusually wet winter (February 2005) Erosion after unusually wet winter (February 2005)

Placement of rock in swale to prevent erosion and standing water (July 2006)

Delview Park Swale - North Date Constructed: Fall 2005 Spring 2006 Site Location / Description: Delview Park, North Delta, British Columbia. Community park with sports fields and passive use areas. Park is surrounded by single-family residential lots. Located near the corner of 116 Street and 92 Avenue. Project Description: Drainage Problem: Homes to the west of the park are flooded every year when runoff from the park enters the adjacent properties. Solution: Construction of a swale along the length of three properties at the northwest corner of the park; swale underlain with drain rock Plants: Swale planted with turf to reduce erosion and maintain grassed surface for sports field users Operational Issues: Timing: Project construction began in October; wet weather slowed construction considerably because movement of large equipment on wet turf damaged the playing fields; construction in dry weather would have been preferable Project Outcome: Project was very successful in reducing flooding to adjacent properties; the key to the success of this project was the use of drain rock Delview Park Delview Secondary School

Temporary trench (summer 2005) Installation of drain rock Completed swale (October 2005)

Temporary trench (hidden by overgrown grass) (summer 2005) Completed swale with berm on fence side (October 2005)

Swale after re-grading to make shallower for sports field users; planted with grass (April 2006)

Evergreen Lane Parking Lot Date Constructed: Summer 2005 Site Location / Description: Evergreen Lane & 47 Avenue, Ladner, British Columbia. Parking lot for seniors recreation centre and lawn bowling club; residential / civic area. Project Description: Civil Works: Parking lot Stormwater: o Stormwater from crowned parking lot flows into planting beds o Overflow drains in each planting bed connect to storm system o Main water-collecting beds contain 1.5 metres of topsoil to collect and infiltrate stormwater o Drain rock was not feasible. Ladner is below sea level, so winter groundwater levels are near surface. Plants: Central areas of gardens contain water-tolerant plants; swale sides contain drought-tolerant and erosion-controlling plants Operational Issues: Summer Maintenance: Some plants are perennials, which require a higher level of maintenance Winter Maintenance: Grade change between asphalt parking surface and concrete walkway resulted in a minor depression between the two areas; this depression will require salting on cold days to ensure pedestrian safety Project Outcome: High volume of topsoil appears to be successful in containing all runoff from the paved surfaces McKee Seniors Centre Memorial Park Project Site

Site prior to construction Sidewalk around planting area under construction

Stamped asphalt parking lot under construction Planting beds for stormwater collection (east side)

Permeable pavers on low-use driveway; tree retained Planting bed for stormwater collection (west side) Completed project after heavy rainfall event; note pooling of water between asphalt parking lot and concrete walkway, and within the planting area

Flower display (June 2006) Flower display (August 2006)

Cougar Canyon Elementary School Rain Garden Date Constructed: August 2006 Site Location / Description: 11664 Lyon Rd, North Delta, British Columbia. School parking lot drains into rain garden. Adjacent to Cougar Canyon environmental reserve. Project Description: Civil Works: Removal of two catch basins in parking lot; water redirected toward rain garden; garden overflows into storm system. Plants: Garden contains drought-tolerant plants; many plants are native; design of garden was meant to mimic alpine, forest, and coastal plant communities Signage: A sign was installed to explain the reason for the rain garden to students and the public Operational Issues: Maintenance: Plants will be maintained by volunteers and the school board Project Outcome: Construction was a success; no problems. Plants were installed by Streamkeepers and every child attending Cougar Canyon elementary school during the 2006/2007 school year Project Site Cougar Canyon Environmental Reserve Cougar Canyon Elementary School

Prior to construction (March 2006) Swale excavation (August 2006)

Swale completed (August 2006) After planting by volunteers and entire student population of Cougar Canyon Elementary (November 2006)

Lyon Rd and Lawrie Crescent BMP Date Constructed: August 2006 Site Location / Description: Intersection of Lyon Rd and Lawrie Crescent, North Delta, British Columbia. Roadside swale drains into rain gardens. Project Description: Civil Works: Sidewalk installation and repaving; road drains to swale Plants: Drought-tolerant, low maintenance plants were used in this design Operational Issues: None Project Outcome: New sidewalk cleaned up streetscape; rain gardens functional Westview Park Project Site Watershed Park

Pre-construction condition (spring 2006) After construction (October 2006). Grass swale drains to rain garden. Overflow drain is behind the stop sign. Existing garden behind construction area was retained.

108 Street Parking Improvements Date Constructed: Fall 2006 Site Location / Description: 108 St at Mackie Park, North Delta, British Columbia. New asphalt parking area drains into rain gardens Project Description: Civil Works: Construction of asphalt 90 N parking Plants: Drought-tolerant, native plants were used in this design Operational Issues: None Project Outcome: Some adjustments to grading and gravel was required in gardens, but otherwise the gardens function properly to infiltrate water from parking areas Mackie Park Project Site

Before construction After construction (January 2007). Rain gardens collect and infiltrate water from paved parking areas.

120 Street Sidewalk Project Date Constructed: not constructed as of February 2007 Site Location / Description: 120 St south of Hwy 10, North Delta, British Columbia. Runoff drains into roadside swales. Project Description: Civil Works: Road repaving; at-grade sidewalk construction; some ditch infill on Surrey s side of the road Stormwater: No curb and gutter; runoff drains into roadside swales; most swale sections are turf; swales expand into larger rain gardens at street intersections Plants: Drought-tolerant, mostly native plants were used in this design Operational Issues: None Project Outcome: Project Site

Fairlight Ditch Daylighting Date Constructed: Summer 2006 Site Location / Description: 5612 Fairlight Crescent, North Delta, British Columbia. Runoff drains into daylighted, landscaped ditch. Project Description: Civil Works: A 10-metre section of the 300mm concrete storm pipe on Fairlight Crescent was removed to construct a new section of ditch Stormwater: The purpose of daylighting the ditch was to allow stormwater in the pipe to infiltrate into the ground; bottom of the ditch contains drain rock to increase rate of infiltration Plants: Resident at this address planted and maintains the garden Operational Issues: None Project Outcome: Construction went as designed Resident made fine-tuning modifications to make ditch appear more like a natural stream Ditch appears to be working; water was observed during a heavy rain storm to be flowing into the ditch at a high volume and flowing out of the ditch at a much lower volume Watershed Park Endersby Park Project Site

Site prior to construction During construction (June 2006); installing river rock over wrapped drain rock

Construction complete (June 2006); temporary mesh installed on road side of ditch to minimize erosion until plants are installed After resident added driftwood and boulders (July 2006)

During heavy rainfall event (November 2006) During heavy rainfall event (November 2006)