Solar tunnel dryer type Hohenheim

Similar documents
Infrared Modules for Industrial Processes. Heraeus Noblelight

Infrared Modules for Industrial Processes. Heraeus Noblelight

1.1. The unit shall be manufactured with quality, durability, and professionalism.

LOW COST TERRACE (FLAT SURFACE) SOLAR DRYER

IRFTS SHADOW SOLAR SOLAR SHADE HOUSE STRUCTURE ENERGY PRODUCTION AND SUN PROTECTION

METHOD OF TEST FOR PREPARATION OF MARSHALL SPECIMENS 3. APPARATUS. Canadian Council of Independent Laboratories June 2016 LS-261 R27 ASTM D

CHIMNEY SOLAR DRYER MANUAL

INNOVATIVE SOLAR TUNNEL DRYER

DOMOTHERM CLASSIC TWIN/S MAT

The new WAREMA external venetian blind 80 S PROVEN THINGS IN PERFECTION

BUBBLE-Maker. Necessary tools and materials:

Art and Picture Hanging Rail Systems SYSTEMS. Display with Elegance

NCERT solution for Heat

INSTALLATION INSTRUCTIONS POLARIS RANGER 800 XP

Pleated blinds, free hanging units FS, FK, FE Description

Level 1 Physics, 2013

Technology and components for blinds. We start your innovations

Small Solar Tunnel Dryer

Arctica Solar 1500 Series Heater Installation Manual

2" and 2 1/2" Wood Horizontal Blinds 2", 2 1/4" and 2 1/2" Faux Wood Horizontal Blinds. Installation & Operating Instructions

SOLARMATIC TM. Solar Pool Heating Controller OWNERS MANUAL. Manufactured in Australia By

Contents. 1. Seed Harvesting, Drying, Packaging, Pre- Treatment and Storage : - Processing & Quality Assurance

PROCESSING OF VEGETABLES IN A SOLAR DRYER IN ARID AREAS

Installation, Operation and Maintenance Instructions for ThermaFlex Gasketed Plate Heat Exchangers

Solar Dryer. Background

Smoke extraction duct of sheet steel

TREATMENT OF TEXTILES OR THE LIKE; LAUNDERING; FLEXIBLE MATERIALS NOT OTHERWISE PROVIDED FOR

FSLIMPRO

RETAIL MERCHANDISING OUR PARTS PUT YOU IN THE PASSING LANE. Sell more with POP displays! velvac.com

DRYING PERFORMANCE OF ROTATING AND SOLAR TUNNEL DRYER FOR PRODUCTION OF QUALITY DRIED FISH

USING PLANTS TO STABILIZE STREAM BANKS

Maintenance instructions for Duco's Ventilation systems

DRYING OF FOODS. Note that there are two types of air temperature:

Installation, Operation and Maintenance Instructions ThermaFlex Gasketed Plate Heat Exchanger OM010

Cornell Waste Management Institute

Compact RV Dryer. Capacity: 3.2Kg USER MANUAL. Warranty P/N:

Service Manual 26 Self Trimming Export Fireplace with 3 Stage On/Off Remote

SERVICE MANUAL FOR MODEL RM-10

SAF-T-LINER MVP-ER PARTS MANUAL. Heaters Section. Page 8-1. Heaters 10/96

TRUSTY PRODUCTS, INC.

Solar Drying of Fruits and Vegetables

FLOOR WARMING PRODUCTS. For more ALL PICTURES & GRAPHICS ARE FOR ILLUSTRATION ONLY


Installation Instructions. For the 18 Built-In Dishwasher and Front Color Panels

Flexibility Plus Power: The New Large-Area Vacuum Gripping System FMP/FXP

BANK UNDERDRAIN (ALTERNATE LOCATION) (PIPE SHALL BE WRAPPED WITH GEOTEXTILE) DRAINAGE LAYER GRANULAR MATERIAL CLASS II 3" NOMINAL DEPTH

The equipment for storage and transportation of grain

Accurate perfection. VACUUM FORMED COMPONENT HOLDERS VACUUM FORMED COMPONENT HOLDERS. 28 Accurate perfection.

White Speckles on the Garment

Read this entire manual before operation begins.

A Regional Research and Dissemination Programme. Phase III SOLAR BOX DRYER DESIGN, CONSTRUCTION AND OPERATION MANUAL

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

WASHER & DRYER REPAIR

External venetian blinds

SOLAR TUBE COLLECTORS

SERVICE MANUAL. Freestanding cooker 500 and 600 / Range Gas- gas Electric CFSGSV14 CFSGWH14 CFSESV14 CFSEWH14

852 SMD REWORK SOLDERING STATION MANUAL

Supply air unit VEKA Installation & Maintenance

and stove-enamelled, incorporating the tilt/raise and lower mechanism. The end caps are colour co-ordinated.

Vertical Blinds. Step by Step Installation Instructions

OPERATOR S MANUAL. BASIC PROJECT CENTERS Some instructions and drawings may not apply to your specific unit. SAFETY SERVICE PARTS CAPACITIES

73 Series Spectrophotometer. Accessory fitting and operation manual

flue pipes flue pipes

Hand-drawn curtain rails. wide channel

Building and testing Lunch Box Alarms By: Liam R.

Information paper 18. Prepared by: David Clark. book:

USSC LLC 4 ONE LLC FIELD MODIFICATION INSTRUCTIONS

Making the Gattling Gun Condenser Materials: Method: 10.

Built-in Gas Hob CZ55554 CZ55571

SCC 101 G Valid as of G11SE0404 up to G11SE... SCC 101 G

Atmos EasySolar. Installation Instructions for. In-roof and flat roof installation with flat plate collectors

OFF. 20 min. 60 min. 30 min. 60 min OFF. 100 min Start. 200 min 150 min

THROUGH-WALL AIR-TO-AIR HEAT PUMP AND AIR CONDITIONER. Instruction Manual. Model AMB-12H

MANUAL AND INSTALLATION PROCEDURE PRODUCT APPEARANCE

Coffee Maker Senseo Latte Select HD7850/60. Coffee volume overview

THE WIDTH AND HEIGHT OF THE LIGHT HOLE IN THE WINDOW WING IS MEASURED IN THE FOLLOWING WAY:

Pet blow Molding Machine 4KVT

Team Built Tools and Jigs. Team FIRST Fare 2017

Product Care Instructions

External venetian blinds sunlight included 40% ENERGY SAVINGS WITH INTELLIGENT SUN SHADING

SECTION DUCTWORK. A. Section Painting: Weld priming, weather resistant, paint or coating.

KD-27A SERIES DISHWASHERS

PLEASE READ PRODUCT GUIDE NOTE IN FULL BEFORE COMPLETING ORDER FORM, 1 BLIND PER ORDER FORM, STATE QUANTITY IN BOX PROVIDED BELOW

Installation Manual PS-200 & PS-201

External venetian blinds from Griesser. Metalunic

EXPANSION JOINT PRODUCTS

Rated Available. Vertical Slider Window System. For the best profile anywhere. NEW VEKA Vertical Slider

900 Quadrant Steam Shower Cabin with 6 Body Jets

TILE ROOF DUCTING KIT. instruction manual VDKRT 12 MONTH WARRANTY

Winter covers. tuboclima

Aluminum Heating Mantles

OPERATING INSTRUCTIONS DUST EXTRACTOR FM300S

Installation of Glass Lined Equipment

PART II. THE PRECLEANING OF PADDY

INSTALLATION INSTRUCTIONS

Basin Mixer. Installation & Aftercare Instructions. Please retain for future reference.

Installation Manual PS-225 & PS-275

A PROUD HERITAGE OF EXPERIENCE & QUALITY DISHWASHER BR- DWSH01- S

Installing Protectowire Linear Heat Detector

7165 Dust Collector Owner s Manual

Transcription:

Solar tunnel dryer type Hohenheim

How to manufacture a solar tunnel dryer type Hohenheim 1. Checklist before installation Before you start to manufacture the tunnel dryer you have to consider following requirements: - an even plane for installation of the tunnel dryer - the main wind direction must not blow into the outlet of the tunnel dryer - the collector and drying section should be free of shades - you need two person for installation 2. Tools you will need during installation: - drill machine - water-level - gripper for blind rivet - screw drivers - hammer - screw clamps - measuring rod - welding apparatus 3. Installation - preparation of the even plane - manufacturing of all parts considering the parts list. (unit of measurement are in mm; 1 inch = 25,4mm) - gradually follow the guidance 4. Management - As the product has usually a high nutrient value it is easily spoiled by mould or microorganisms when it is warm and not dried enough. Therefore, it is essential that the product is placed in the dryer section latest 10:30 a.m. - Contamination of the product, e.g. by falling on the ground must not be used anymore as the whole lot can be spoiled. - To avoid insects from product close the back from the dryer with a net.

Parts list Position Marking Semifinished part Units Total demand Unit 1 side plate short blank sheet 2,0mm 4 2 side plate long blank sheet 2,0mm 16 1m² 3 side plate blank sheet 1,5mm 18 8 m² 4 base frame square pipe 30mm x 30mm 10 33 m 5 u-profil 20mm x 20mm x 1mm 38 m 6 wooden floor 36 m² 7 wooden border (distance piece) 48mm x 24mm 60 m 8 fan plate blank sheet 1,5mm x 300mm x 2000mm 1 0,6 m² 9 corrugated iron 0,75mm x 800mm x 2000mm 12 pieces 10 fan 3 pieces 11 blank sheet blank sheet 0,6mm x 1000mm x 2000mm 8 pieces 12 roof rack pipe 16,5mm x 2,25mm 20 21 m 13 roof connector pipe 26mm x 1,5mm 10 1,5 m round bar 12mm 10 1,5 m 14 solar panel 1 piece 15 roof support flat steel 30mm x 8mm 3 6 m 16 blind rivet (roof and u-profil) 4mm x 8 150 pieces 17 blind rivet (roof) 4,8mm x 10 50 pieces 18 blind rivet (base frame) 4,8mm x 8 180 pieces 19 wood srcew 4mm x 20mm 150 pieces 20 machine screw M10 x50 6 21 roof pipe pipe 22mm x 2mm 19 m foil holder pipe 1 inch 9 m foil 20m x 2,8m 56 m² foil clip 1 inch 18 pieces edge protection 31 m black colour 20 m²

Prefabricated units

Base frame

Fig: 1 base frame with side plate long Fig: 2 base frame with side plate long complete

Fig: 3 base frame fixed with side plate Fig: 4 make holes for rivet in side plate

Fig: 5 base frame fixed with side plate and drilled holes Fig: 6 rivet stick into the holes

Fig: 7 finished rivet from outside Fig: 8 finished rivet from inside

Fig: 9 base frame assembling Fig: 10 base frame assembling

Fig: 11 fix the next side plate Fig: 12 drilling

Fig: 13 rivet Fig: 14 shows the gripper for blind rivet

Fig: 15 base frame assembling short time before finished

Fig: 16 u-profile Fig: 17 fix u-profile with a clamp

Fig: 18 make holes Fig: 19 rivet

Fig: 20 finished base frame with u-profile

Base frame with wooden floor

Fig: 21 wooden floor with holes for the three fans Fig: 22 insert the wooden floor

Fig: 23 insert the wooden floor Fig: 24 finished wooden floor

Fig: 25 make holes through side plate long Fig: 26 screw wooden floor from underside

Base frame with blank sheet and corrugated iron

Fig: 27 shows a fan insert and rivet in fan plate Fig: 28 shows the three fans upside

Fig: 29 shows the three fans underside Fig: 30 shows the fan plate built-in the dryer

Fig: 31 make holes and screw on the fan plate Fig: 32 shows the fans

Fig: 35 insert the corrugated iron Fig: 36 insert the corrugated iron

Fig: 37 insert the corrugated iron Fig: 38 insert the corrugated iron

Fig: 39 make sideward holes and screw on the corrugated iron

Fig: 40 screw on wood strip to stabilize blank sheet Fig: 41 screw on wood strip to stabilize blank sheet

Fig: 42 insert the blank sheet Fig: 43 insert the blank sheet, make sideward holes and screw it on

Fig: 44 finished base frame with absorber and drying area

Roof assembling

Fig: 45 roof rack Fig: 46 roof connector

Fig: 47 roof connector assembled with roof rack and roof pipe

Fig: 48 shows the dryer with roof

Fig: 49 shows the solar panel Fig: 50 foil attached with edge protection

Fig: 51 front side closed with foil Fig: 52 front side closed with foil

Fig: 53 front side closed with foil Fig: 54 foil supporter

Fig: 55 shows foil supporter and foil holder Fig: 56 foil clip with a rubber layer to protect foil

Fig: 57 foil holder who stretch the foil Fig: 58 shows the opened dryer

Fig: 59 shows how the foil supporter works Fig: 60 shows the dryer from back side