Non-Metallic Mining Reclamation Checklist

Similar documents
TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

ARTICLE VI: SITE PLAN REVIEW

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Huntington Stormwater Utility

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

Gloucester County PLAN SUBMITTER'S CHECKLIST

Chapter 4 - Preparation of Stormwater Site Plans

Erosion & Sediment Control Plan Application Form & Checklist

Draft Rhode Island Stormwater Design and Installation Standards Manual

ARTICLE 17 SITE PLAN REVIEW

SOIL EROSION AND SEDIMENT CONTROL

Section 1 TABLE OF CONTENTS

4. Contractor (and subcontractors if applicable) certification statement(s)

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

PLAN SUBMITTER'S CHECKLIST

MONROE COUNTY PROPOSED RECLAMATION PLAN

Rule D Wetland and Creek Buffers

Essential Skills: Reading and Interpreting Maps and Plans

Development Permit Application Form. Property Owner Information as Registered on Legal Title Property Owner Name: Phone:

SEMSWA s Role in the Land Development Process

QUARRY REHABILITATION PLANS Specifications (version 1.3)

SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

CITY OF SCANDIA ORDINANCE NO. 174

PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

Holmberg & Howe, Land Surveyors and Civil Engineers Zoning District: R-35

New Development Stormwater Guidelines

Plan Review Checklist

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)


APPLICATION FOR MINOR SITE PLAN REVIEW

TO BE FILLED OUT BY APPLICANT

EROSION AND SEDIMENT CONTROL FOR STORMWATER MANAGEMENT

Preliminary Sediment & Stormwater Management Plan Review Checklist DATE RECEIVED: PROJECT NUMBER: PROJECT NAME:

Procedures IV. V. Rural Road Design Option

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

Florence County Small Commercial Land Disturbance Permit Application

Surface Coal Mining and Reclamation in ND. Guy Welch ND Public Service Commission

SITE PLAN REVIEW APPLICATION AND CHECKLIST

CITY OF ST. AUGUSTA STEARNS COUNTY MINNESOTA ORDIANCE NO AN ORDINANCE ESTABLISHING REGULATIONS FOR STORMWATER MANAGEMENT

PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA Inspections Office Fax

Soil Erosion and Sediment Control

Plat Requirements CHECKLIST FOR SITE PLAN REVIEW

PARK CITY MUNICIPAL CODE TABLE OF CONTENTS TITLE 15 LAND MANAGEMENT CODE - CHAPTER 2.21

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

Stormwater Management Resource Type:

Neo-Traditional Overlay Application

Master Land Use Plan Application

Volume 2, Chapter 12 - Revegetation

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

APPENDIX J PERFORMANCE STANDARDS FOR GRAVEL MINE, PIT MINE, OR QUARRY

4. To assure that adequate screening and buffering will be provided between the planned project and contiguous properties;

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Major Subdivision Sketch Plan Checklist

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

OFFICE CONSOLIDATION By-law Number 30-92

Urban Planning and Land Use

Appendix 6-A. Site Plan Preparation and Submission as Part of the Land Development Process

Step 2/3: Sediment & Stormwater Management Plan Review Checklist

APPLICATION FOR MINOR SITE PLAN REVIEW

Stormwater Pollution Prevention Plan Oneonta Heights Oneonta, NY TABLE OF CONTENTS PAGE

APPLICATION FOR REZONING PROPERTY CITY OF HOLLAND, MICHIGAN. Name of Applicant. Address, and Phone # of Applicant

LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST

LICENSES FOR UTILITY CROSSINGS OF PUBLIC LANDS AND WATERS ACCORDING TO MINNESOTA RULES CHAPTER [Rules Effective July 1, 2004]

Public Review Draft Oceanside Subarea Habitat Conservation Plan/ Natural Communities Conservation Plan

City of Shady Cove Riparian Ordinance Ordinance XXX

Zoning Ordinance Chapter 10

CITY OF KELOWNA MEMORANDUM. Date: June 20, 2001 File No.: Z City Manager Planning and Development Services Department

4. UTILITIES ELEMENT.

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 2010 Legislative Session. Council Members Dernoga and Olson

Appendix I. Checklists

Weston s Wetlands, Stormwater, & Open Space

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

King and Queen County Department of Building & Zoning P.O. Box 177, King and Queen Courthouse, VA Phone: Fax:

National Wildlife University Reston, Virginia Habitat Restoration George Mason University Grounds Shop Fairfax, Virginia 22030

LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST

City of Sun Prairie Wetland Buffer Reduction Request

STORM SEWER OUTFALLS AND CONNECTING OUTFALL CHANNELS. General Submission Requirements

Town of West Point Plan of Development

4.6. Low Impact and Retentive Grading

3/7/2013. Compliance & Sustainability

WAKE COUNTY STORMWATER MAINTENANCE CHECKLIST

ATTACHMENT 1 WILSON MINE LECROY AREA SEMIPERMANENT DEWATERING SYSTEM

F. The following uses in the HR District: attached single-family dwellings, condominiums, and institutional uses; and

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

Pennsylvania Stormwater Best Management Practices Manual. Chapter 1. Introduction and Purpose

2. As a condition of the City s MS4 Permit, the City is obliged to adopt and enforce a POST- CONSTRUCTION STORMWATER CONTROL ordinance.

CHECKLIST FOR PHASE II DRAINAGE REPORT

CHAPTER 22 Rural Open Space Community Developments

Minnesota Department of Natural Resource - Natural Resource Guidance Checklist Conserving Natural Resources through Density Bonuses

Town of Windsor. Stormwater Manual

Transcription:

Eau Claire County DEPARTMENT OF PLANNING AND DEVELOPMENT Eau Claire County Courthouse, Rm. 1510 721 Oxford Avenue Eau Claire, Wisconsin 54703-5481 (715) 839-4741 f Housing & Community Development 839-6240 Emergency Services Management 839-4736 Land Information 839-4742 Land Use Controls 839-4743 Building Inspection 839-2944 Land Conservation 839-6226 Planning 839-5055 Non-Metallic Mining Reclamation Checklist The purpose of the checklist is to use as a guide to preparing a reclamation plan. **ATTACH COMPLETED CHECKLIST WITH RECLAMATION PLAN** NR 135.19(1) PLAN REQUIRED - An operator who conducts or plans to conduct nonmetallic mining on or after August 1, 2001 shall submit to the regulatory authority a reclamation plan that meets the requirements of this section and complies with the standards of Subch. II. To avoid duplication, the reclamation plan may, by reference, incorporate existing plans and materials that meet the requirements of Chapter NR 135.

I OWNER/OPERATOR INFORMATION OWNER OPERATOR (if different) Name: Address: City: Name: Address: City: State: Zip: State: Zip: Phone Number: Cell Phone: E-Mail Address: Phone Number: Cell Phone: E-Mail Address: 1 Include the owner/operator information on the reclamation plan. 2 Attach a copy of the lease agreement or proof of ownership to Eau Claire County. **Indicate on the line after each box, the page and section number where that item can be found in reclamation plan.** III. SITE INFORMATION A. MINNING AREA NR 135.19(2) SITE INFORMATION - The reclamation plan shall include information sufficient to describe the existing natural and physical conditions of the site, including, but not limited to: 1 Description of the mine location with detail to allow someone to locate on a road map. 2 Legal Description of the property(s) where the nonmetallic mining is proposed. 3 Describe the total acres affected by this project; include stockpiles, processing, roads etc. 4 Describe any setbacks from roads and property lines.

5 Describe the movement of nonmetallic mining from phase to phase. 6 Describe the depth and geologic composition of the non-metallic deposit, (submit soil boring results). 7 Environmental Review a Describe Threatened and Endangered species on and adjacent to the site. b Describe the Archeological and Historical Resources on the site. 8 Biological Information a Describe the plant communities and wildlife habitat on and adjacent to the mining site, (if using the Natural Heritage Inventory- NHI-attach legend). b Describe the depth to groundwater and the data used to determine the depth, (borings, WI groundwater map, well data, GPS boring location etc). 9 Describe the depth to bedrock and the data used to determine that depth. 10 Estimate the volume of material to be extracted in each phase. 11 Estimate the volume of material available on site for reclamation. 12 Enclose the wetland delineation report, if applicable. B. MAPS & ATTACHMENTS (indicate the scale and a north direction arrow) NR 135.19(2)(a) Maps of the nonmetallic mining site including the general location, property boundaries, the areal extent, geologic composition and depth of the nonmetallic mining deposit, the distribution, thickness and type of topsoil, the approximate elevation of ground water, the location of surface water and the existing drainage patterns. 1 Show location of proposed non-metallic mining location in Eau Claire County. 2 Show location of proposed non-metallic mining location in the Township. 3 Aerial photo indicating the landowners within 300' of the parcel(s) to be mined. 4 Aerial photo showing the existing 10' interval contour lines. 5 Aerial photo showing the following: (use more than one aerial photo for this information if necessary) a Location of the proposed mining boundaries. b Location of surface water: lakes, rivers, ponds, streams and intermittent streams, and label appropriately c Location of wetlands on proposed mining site and extending out 1/4 mile from the property line. d Location of any utilities or manmade structures.

e Location of wells on and within 1/4 mile of the proposed site. f Location of forested areas and agricultural land. g Location of concentrated flow and arrows indicating drainage patterns. h Location of separation boundaries, (example flood plains etc.). i Location of existing roads and right-of-way lines. 6 Attach the bedrock map of Eau Claire County with descriptions and Map Units 7 Attach the map of the Hydrogeology of Eau Claire County, referring to groundwater flow. III. RECLIMATION MEASURES NR 135.19(4) RECLAMATION MEASURES - The reclamation plan shall include a description of the proposed reclamation, including methods and procedures to be used and a proposed schedule and sequence for the completion of reclamation activities for various stages of reclamation of the nonmetallic mining site. The following shall be included: A. Reclamation Measures 1 NR 135.19(4)a - EARTHWORK AND GRADING - A description of the proposed earthwork and reclamation, including final slope angles, high wall reduction, benching, terracing and other structural slope stabilization measures and if necessary a site specific engineering analysis performed by a registered professional engineer as provided by s. NR 135.10 (1) and (2). a Describe the proposed earthwork for the slope reconstruction for reclamation. b Describe the final depths in relationship to the groundwater table. 2 NR 135.19(4)(b) - TOPSOIL - The methods of topsoil or topsoil substitute material removal, storage, stabilization and conservation that will be used during reclamation storage, stabilization and conservation that will be used during reclamation. Describe the substitute topsoil to be used if the amount is not available to achieve the post mining a land use onsite. b Describe methods used to reapply topsoil. 3 NR 135.19(4)(c) - TOPOGRAPHY - A plan or map which shows anticipated topography of the reclaimed site and any water impoundments or artificial lakes needed to support the anticipated future land use of the site. a Describe the final slope %, (no more that 3:1 or 33%). Describe benching and terracing and high wall reduction necessary, if applicable, (must be engineer b designed). 4 NR 135.19(4)(d) - STRUCTURES - A plan or map which shows surface structures, roads and related facilities after the cessation of

mining. a Describe what the site will look like after the cessation of mining. 5 NR 135.19(4)(e) - COST - The estimated cost of reclamation for each stage of the project or the ntire site if reclamation staging is not plannede. Include a reclamation budget, (financial assurance needed for the number of acres open each year of a operation). 6 NR 135.19(4)(f) - REVEGETATION PLAN - A revegetation plan which shall include timing and methods of seed bed preparation, rates and kinds of soil amendments, seed application timing, methods and rates, mulching, netting and any other techniques needed to accomplish soil and slope stabilization. a Describe the revegetation plan: b Describe the planned vegetation to be established, (grasses/legumes, trees, shrubs, etc). c Describe the revegetation seed bed preparation. d Describe the method of planting proposed vegetation. e Describe the rates per acre of the planned vegetation. Describe the proposed date(s) or schedule when seeding, (use the NRCS seeding sheet 710SS sheet f as a guideline). g Describe in detail measures used to maintain slope stabilization. 7 NR 135.19(4)(g) - REVEGETATION STANDARDS - Quantifiable standards for revegetation adequate to show that a sustainable stand of vegetation has been established which will support the approved post mining land use. Standards for revegetation may be based on the percent vegetative cover, productivity, plant density, diversity or other applicable measures. Describe the quantifiable standard for revegetation for successful reclamation, (percent vegetative cover, productivity, plant density and diversity). a 8 NR 135.19(4)(h) - EROISION CONTROL - A plan and, if necessary, a narrative showing erosion control measures to be employed during reclamation activities. These shall address how reclamation activities will be conducted to minimize erosion and pollution of surface and groundwater. a Describe the erosion control methods used, (mulching, netting, etc.). 9 NR 135.19(4)(I) - INTERIM RECLAMTION - A description of any areas which will be reclaimed on an interim basis sufficient to qualify for the waiver pursuant to s. NR 135.41 and which will be subsequently disturbed prior to final reclamation. Descriptions shall include an identification of the proposed areas involved, methods of reclamation to comply with the standards in subch. II and timing of interim and final reclamation. a Describe any areas of interim reclamation that will be disturbed prior to final reclamation.

10 NR 135.19(4)(I) - SAFETY MEASURES - A description of how the reclamation plan addresses the long term safety of the reclaimed mining site. The description shall include a discussion of site specific safety measures to be implemented at the site and include measures that address public safety with regard to adjacent land uses. a Describe any safety measures installed to address the safety of the public. B. MAPS & ATTACHMENTS (indicate the scale and a north direction arrow) 1 Aerial photo showing the following: a Location of planned roads and structures to remain after mining operation cease. b 2' contour lines. 1 Cross section showing slope steepness and length, (must be less that 3:1). 2 Location of water impoundments and depths. 3 Location of wetlands. 4 Location of other land uses or site features. c Arrows showing the drainage patterns entering and leaving the site. d Location of and type of erosion control methods installed to insure sediment control. Location of the proposed post mining land use, (agriculture land, trees, native prairie, oak savanna, e etc.). f Location of benching and terracing or high wall reduction if applicable. IV. SOIL MANAGEMENT INFORMATION A. SOILS INFORMATION 1 Describe the soil types in the proposed non-metallic mining area, (available on the NRCS websoil survey online). 2 Describe the thickness of the topsoil on site. 3 Estimate the volume of the topsoil available on site, (cu yds). 4 Estimate the topsoil required for reclamation, (cu yds). 5 Describe the method used to remove topsoil.

6 Describe the method used in the placement (environmentally safe location) and storage of the topsoil. 7 Describe the methods used to stabilize the topsoil stockpiles. B. MAPS & ATTACHMENTS (indicate the scale and a north direction arrow) 1 Map identifying the soil types, soil description, map information for the proposed mining boundaries. V. MINING OPERATIONS A. Mining Intent 1 Describe the materials to be mined and include methods used to extraction the materials. 2 Describe the method used to remove overburden, storage location and stabilization. 3 Estimate a timetable and the sequence through each of the phases. 4 Describe any storm water impoundments to be used. 5 Describe the erosion control methods installed to prevent run-off from the site. 6 Describe intent to mine in relationship to the groundwater table. 7 Estimate the volume of the material available in overburden/topsoil berms. 8 Estimate the volume of the overburden/topsoil used in the construction of the settling pond embankments, (if applicable). 9 Estimate the volume of material required to reclaim the mine bottom and side slope in each phase. 10 Describe methods for site dewatering and effluent discharge. (if applicable) B. MAPS & ATTACHMENTS (indicate the scale and a north direction arrow) 1 Aerial photo showing the following: a Location of the proposed nonmetallic mining boundaries. b Location of soil borings test holes. Attach soil boring log information and label to correspond with the appropriate identification on the c map.

d Location of the point of entry off of the main road. e Location of any proposed wells. f Location of each phase of nonmetallic mining and the order to be mined. g Location and size of overburden and topsoil locations h Location of stocked sand and/or sand and gravel Location and type of erosion control method for topsoil/overburden piles, site runoff and i stabilization of slopes. j Arrows showing drainage patterns during mining, (specify where water will leave the site). k Location of settling ponds. l Location of the proposed facilities; such as the wet/dry plants, offices, etc. m Location and discharge point of site dewatering systems, (if applicable). 2 Attach erosion control material sheets, and installation procedures for each product to be installed. 3 4 Attach a minimum of 2 cross sections to detail the planned topography of the proposed site include the existing groundwater elevation, mining depths and proposed final elevations. Attach a cross section for each of the following; settling ponds, water impoundment basins and proposed ponds in relationship to existing ground, bedrock, groundwater elevation and final elevation. VI. POST MINING OPERATIONS NR 135.19(3)(a)POST-MINING LAND USE - The reclamation plan shall specify a proposed post mining land use for the nonmetallic mine site. The proposed post mining land use shall be consistent with local land use plans and local zoning at the time the plan is submitted, unless a change to the land use plan or zoning is proposed. The proposed post mining land use shall also be consistent with any applicable state, local or federal laws in effect at the time the plan is submitted. (b) - Land used for nonmetallic mineral extraction in areas zoned under a farmland preservation zoning ordinance pursuant to subch. III of ch. 91, Stats., shall be restored to agricultural use. 1 Describe the post mining land use, (agriculture, pasture, forest, native prairie). 2 Describe the inspection and maintenance plan for monitoring site upon reclamation. 3 Assure that the post mining land use complies with federal, state and local laws in effect at the time submittal.

VII. FEES NR 135.39(1)FEES- Fees shall be assessed pursuant to this section for all unreclaimed acres of a nonmetallic mining site. NR 139.39(2) COLLECTION - Eau Claire County shall collect annual fees from the operator based on the unreclaimed acreage of each nonmetallic mining site described in sub (1). Annual fees shall be collected for the previous calendar year. 1 Have you received a copy of the Nonmetallic Mining Fee Assessment form from the Eau Claire County Zoning Office? VIII. FINANCIAL ASSURANCE NR 135.40 (2) FILING - Following approval of the nonmetallic mining reclamation permit, and as a condition of the permit, the operator shall file a financial assurance payable exclusively to Eau Claire County. NR 135.40 (3) AMOUNT AND DURATION OF FINANCIAL ASSURANCE - The objective of financial assurance is to ensure that Eau Claire County has access to funds necessary to implement site reclamation in the event that the operator does not perform the agreed upon duties. The funds shall accurately reflect the cost for the Eau Claire County to hire outside help to perform reclamation. The main purpose of financial assurance is to ensure that the operator will faithfully execute the requirements of the approved reclamation plan, the applicable reclamation ordinance and Ch. NR 135. Refer specifically to s. Nr 135.40 for details of state wide financial assurance requirements, as well as the applicable county or municipal reclamation ordinances. Forms of financial assurances may include but are not limited to: Bond - collateral; also known as a performance or forfeiture bond; an instrument provided by a surety company; a 3- party agreement that serves as a guarantee that the provider will pay costs associated with fulfilling the permittee s obligations in the event of a default. Certificate of deposit - collateral; a deposit with Eau Claire County to guarantee performance of obligations under a reclamation permit. Irrevocable letter of credit - similar to a bond with the bank or financial institution taking the place of a surety; established solely for the purpose of guaranteeing performance of obligations under a reclamation permit. Irrevocable trust - trust created by the permittee solely for the purpose of guaranteeing performance of obligations of guaranteeing performance of obligations Escrow account - account with a bank or financial institution established by the permittee to satisfy the financial assurance requirements, (i.e. to guarantee the performance of the reclamation activities described in a reclamation permit). NR 135.40(7) CERTIFICATION OF COMPLETION RELEASE - The operator shall notify Eau Claire County, by filing a notice of completion, at

the time he or she determines that reclamation of any portion of the mining site or the entire site is complete. VIII. REGULATORY AUTHORITY RIGHT TO INSPECT NR 135.42 REGULATORY AUTHORITY RIGHT TO INSPECT - (1) No person may refuse entry or access onto a nonmetallic mining site of a duly authorized officer, employee or agent of the regulatory authority or the department who presents appropriate credentials to inspect the site for compliance with the nonmetallic mining reclamation permit, the applicable reclamation ordinance, this chapter or ch. 295, subch. I, Stats. Any person who enters the site under this right of inspection shall obtain training and provide their own safety equipment needed to comply with any federal, state or local laws or regulations controlling persons on the nonmetallic mining site. X. SIGNATURE 1 Include with the reclamation plan, the signature page provided by Eau Claire County Soil & Water Conservation Department. XI. OTHER IMPORTANT INFORMATION 1 A copy of any and all permits obtained for the operation of the mining shall be submitted to Eau Claire County. I, hereby certify, as duly authorized representative or agent that has completed this checklist (name of the operator) in the preparation for the reclamation plan on the property and that the reclamation plan complies with the (property owners) Wisconsin Nonmetallic Mining Reclamation Standards established in ss NR 135.05 through NR 135.15, WI Code, the Eau Claire County Non-Metallic Mining Ordinance and best management practices are installed and maintained. Signature Date