PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Similar documents
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

City of Waco Stormwater Management Regulations

Severn River Sub-Watershed: BMP 09-Retrofit

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Village of Forest Park. July 27, Sewer Separation Evaluation

TENTATIVE MAP CHECKLIST

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010

SITE PLAN REVIEW APPLICATION AND CHECKLIST

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Brigitte A. Berger, Director of Engineering

7th Avenue Creek Master Plan Development Project. City of St. Charles, IL. IAFSM CONFERENCE March 14, 2018 MARKET

Project Descriptions for FY 15

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

Leduc Industrial Outline Plan SE W4

Problem Understanding

CRESCENT RESOURCES INC.

APPLICATION FOR MINOR SITE PLAN REVIEW

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

City of Elmhurst. Comprehensive Flood Plan. City of Elmhurst. City Council Meeting September 15, 2014

Old Mill Community Association Bioretention Facility

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

APPLICATION FOR MINOR SITE PLAN REVIEW

Final Report: Appendix F. LID Driveway Retrofit at Ocean Spray Processing Facility, Middleboro Supporting Information

CHECKLIST FOR PHASE II DRAINAGE REPORT

MATHEWS COUNTY RURAL DITCH ENHANCEMENT STUDY

Northern Branch Corridor DEIS December 2011

Flooding Hearing: Long and Short Term Strategies

STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS

NAPA COUNTY PUBLIC WORKS Standards & Specifications

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

6.1 Bioretention Areas

4. CONCEPT PLAN DEVELOPMENT

Lower Meramec Multi-Jurisdictional Floodplain Management Plan Public Involvement (Results of Early Public Engagement) 27 June 2018

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT


When planning stormwater management facilities, the following principles shall be applied where possible.

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013

City of O Fallon, Missouri Stormwater Management Policy

Town of West Point Plan of Development

POLE BRIDGE ROAD NEAR FIVE LOT FARM

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

4. Contractor (and subcontractors if applicable) certification statement(s)

Alternatives Analysis Summary Memorandum

Pollutant Removal Benefits

Just The Basics: Illicit Discharge. What does it mean to me?

Urban Stormwater: Best Practice Environmental Management Guidelines. CSIRO This electronic edition published by CSIRO PUBLISHING, 2006.

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

Draft Rhode Island Stormwater Design and Installation Standards Manual

The Engineer/Developer s Perspective on Storm Water Management

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

Washington County, Maryland Division of Public Works Policy Manual

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

C ity of Grande Prairie Development Services Department

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

SOIL EROSION AND SEDIMENT CONTROL

TOWN OF GOLDEN BEACH DRAINAGE COMPUTATION WORKSHEET Last Updated January 13th, 2017

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

Palisades Outline Plan

Do you know there your MS4 is?

Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool at Bristol County Agricultural High School, Dighton - Supporting Information

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs

Level 1 Downstream Analysis

2 ALTERNATIVES AND OPTIONS

No Adverse Impact. A Proposed National Standard. Association of State Floodplain Managers Annual Conference Kansas City, MO.

R1a: REINFORCED TURF TO REPLACE GRAVEL /GRASS PARKING ADJACENT TO SOUTH PENNSYLVANIA AVENUE.

Sewer & Storm Drain Systems

STORM WATER UTILITY FREQUENTLY ASKED QUESTIONS

Appendix D - Technical Design Criteria for BMPs

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

a. Site Topography and Relationship to Surrounding Topography

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

2016 WORKSHOP LVR Field Trip

PRELIMINARY CONDITIONAL USE SUBMITTAL CHECKLIST REQUIREMENTS

CRYSTAL LAKE FLOODING STUDY

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts

Advance Engineering & Surveying PLLC

Review Zone Application for D&R Canal Commission Decision

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

Moon Brook FRP BMP Summary Sheet. Ownership of Land where BMP is Located

Structural Stormwater Best Management Practices

Construction Site Erosion Control

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School. Current site type

Table of Contents. Attachments Attachment A Photos Attachment B Site Map. Pages 3 of 9

Figure 1 Cypress Street Study Area Location Map

City of Mt. Juliet Planning & Zoning Department. Site Plan Checklist. Site plan cklist v1.18

2018 Annual Landfill Inspection Report

LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST

Coco Palms Community Development District. Engineer s Report Infrastructure Improvements

INDEX EXECUTIVE SUMMARY...1 BASIC INFORMATION AND PROCEDURES...3 EXISTING CONDITIONS EXISTING UTILITIES

WEST HILL BUSINESS PARK AREA STRUCTURE PLAN

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

City of Petersburg, VA Stormwater Utility Frequently Asked Questions

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

High Point Community: Site Drainage Technical Standards. High Point Community Site Drainage Technical Standards

NAI Principles In Gwinnett County

Transcription:

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: 362 Featherstone Dr Project ID Number: 27-3 Problem: Anecdotal evidence suggests a natural spring exists in the backyard of 362 Featherstone Drive. With heavy rains (3-4 times per year) water seeps out of the ground, dispersing along the backyard and eventually entering a creek. The City has installed 2-3 rain boxes in close proximity to the spring seepage in an attempt to store the water underground, with the outfall pipes connecting to the resident s private system. The first box was installed in the Fall of 26 and the later box(es) installed in the Spring of 27. The resident reported that while the rain boxes may give slight relief during smaller storms, minimal improvement is observed during larger events. The surfacing water has contributed to a sump in the yard, approximately 4-feet wide and 2-3 feet deep. The resident reports than sheet flow during a heavy rain event is often 2-inches deep, flowing through a large portion of the backyard. No reports of structural flooding are known. Proposed Solution: Installation of a dry creek bed will allow for the surfacing flow from the spring to have a protected flow path, decreasing the likelihood of surface erosion. Required Easements: 362 Featherstone Drive (Temporary Construction Easement) Commentary: There is an existing area inlet in the yard; MSD does not claim ownership. Project may be eligible for City of Town & Country Storm Water Maintenance Policy. PROJECT SCOPE OF WORK

PROJECT INFORMATION SUMMARY CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: 362 Featherstone Dr Project ID Number: 27-3 Number of Properties Impacted: Number of Easements Required: Number of Properties Benefited: Opinion of Probable Construction Cost (OPC): Location Benefit Identification (LBI) Project Points: $,689.6.3 Project Source: x Citizen Complaint Municipality Maintenance Government Agency Category of Problem: Description Cost to Benefit Ratio: 38,992 Coordination Required: MSD Corps of Engineers MO DNR MODOT County Highways City Streets City Parks County Parks x Municipality: City of Town & Country Railroad: x Other: Utility Service Providers Attached Supplemental Information: x Project Scope of Work x Conceptual Plan Drawing x Itemized Opinion of Probable Construction Cost (OPC) x Location Benefit Identification (LBI) Forms x Existing Condition Photos A: Frequent structural flooding from creeks or rivers (floodplain) B: Frequent structural flooding from overland flow (non-floodplain) C: Frequent roadway flooding D: Infrequent structural flooding from creeks or rivers (floodplain) E: Infrequent structural flooding from overland flow (non-floodplain) F: Infrequent roadway flooding G: High risk structural erosion H: High risk roadway erosion x I: Yard erosion J: Moderate risk structural erosion K: Moderate risk roadway erosion L: Erosion or flooding of common ground or unmaintained area x M: Yard flooding N: Flooding from inadequate sinkhole O: Flooding from inadequate roadway drainage P: Maintenance of stormwater system facilities x Q: Other Possible discharge from upstream sinkhole Other Notes: Project may be eligible for the City of Town & Country Storm Water Maintenance Policy. MSD/MO American Water Base Map Number(s): FEMA FIR Map Number(s): 2P4, 2P 2989C32K PROJECT INFORMATION SUMMARY

OPINION OF PROBABLE CONSTRUCTION COST CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: 362 Featherstone Dr Project ID Number: 27-3 ITEM ESTIMATED UNIT EXTENDED NUMBER PAY ITEM DESCRIPTION QUANTITY UNIT PRICE PRICE Mobilization Lump Sum $469.9 $469.9 2 Excavation Class "C" 3 Cubic Yards $28. $829.63 3 Dry Creek Bed Stone Square Yards $2. $3,2. 4 Sodding - Fescue 4 Square Yards $. $,6. Protection and Restoration of Site Lump Sum $2,33. $2,33. SUB-TOTAL - CONSTRUCTION: $8,4.97 Estimated Engineering Fee: $,. Estimated Geotechnical Engineering Fee: $6,. Estimated Property Survey/Strip Map Preparation Fee: $. Estimated Property Title/Easement Search Report Fee: $4. Estimated Topographic Survey Fee: $2,. Estimated Property Rights Acquisition Document Preparation Fee: $4. Estimated Cost of Easements: $,. Estimated Construction Survey Fee: $. SUB-TOTAL: $38,99.97 3% Contingency: $,697.9 TOTAL: $,689.6 OPINION OF PROBABLE CONSTRUCTION COST

City of Town & Country Location Benefit Identification Project Name: 362 Featherstone Dr Project Id Number: 27-3 Location Address / Description: 362 Featherstone Dr Total Calculated Benefit Points:.3 Evaluation Category Problem Type Benefit Points High Medium Low Public Structure Residential Structure Retaining Wall (Public) Street ROW Improved Channel Retaining Wall (Private) Drainage Structure 2 Yard 3 Unimproved Channel Erosion Other Erosion Subtotal 6 Public Structure Residential Structure Impassable Traffic Passable Traffic Accessory Structure Yard Flooding Other Flooding Subtotal Drainage Structure 2 Improved Channel Unimproved Channel Street Gutter Swale / Berm Other (Rain Boxes) 3 Maintenance Maintenance Subtotal Street Yard Drainage Other Drainage Subtotal Frequency Rating Degree of Risk > / year Life / Limb / year Health / years Property Value. / years Frequency Rating Multiplier Degree of Risk Multiplier.

27-3 Roof drain and underground storage box pipe outfall, looking northwest at 362 Featherstone, existing area inlet seen to left, ownership not claimed by MSD. (27)

27-3 Silt build-up in bottom of existing area inlet, no pipes leading out seen. (27) Hole in yard on west portion of property, believed to be from a natural spring outfall. (27) Hole in yard, approximately 4-feet in diameter and 2-feet deep, concrete edge of underground storm box can be seen. (27) Sheet flow coming from hole in yard. (27)

Project Location 34 6 38 27 Existing 373 U V -ft Contours 36 FEATHERSTONE DR 2P-S 64 349, % Sanitary Manhole " ) Stormwater Inlet, % 3 # * V U 4 Stormwater Manhole Stormwater Intake/Outfall Stormwater Gravity Main Stormwater Channel Impervious V U Sanitary Gravity Main Pavement '' 2P-4D Parcels Proposed Proposed Improvements Strip Map Limits Topo Limits FEMA Flood Hazard Zone 2'' Regulatory Floodway 4 2P-4S 4 2P-S 3 2P-46D 3 64 3 '' 2'' 362.% Annual Chance Flood Hazard 2P4-7S 3 3 ' ' 33'' 3 Proposed Solution Description 2P4-42S Install a dry creek bed to allow flow to have a protected flow path. 342 2 2P4-43S 2P4-44S 4 2 4 Feet inch = 4 feet Warning: If this bar does not measure " then drawing is not to scale City of Town & Country Stormwater Program 66 2 2 '' 362 Featherstone Dr 2 4 2P4-9D 334 2 342 2P4-S.3 $,69 38,992 A natural spring is believed to discharge in the yard, causing ponding and erosion. 33'' Easements Required Properties Impacted Properties Benefited Project Benefit Points Conceptual Cost Cost to Benefit Ratio Problem Description.2% Annual Chance Flood Hazard 27-3