BASIC ASSESSMENT PROCESS

Similar documents
ENVIRONMENTAL IMPACT ASSESSMENT

RIVER MAINTENANCE MANAGEMENT PLAN APPLICATION

ENVIRONMENTAL IMPACT ASSESSMENT

ENVIRONMENTAL IMPACT ASSESSMENT

BACKGROUND INFORMATION DOCUMENT (BID) AND INVITATION TO PARTICIPATE

Fabriek Street 45 Paarl. P.O. Box 2632 Paarl Tel: Cell:

Cape Environmental Assessment Practitioners(Pty)

Attention: Interested and Affected Party (I&AP) Commenting Period: 22 November January 2018 GNEC Code: 20327

BASIC ASSESSMENT PROCESS THE PROPOSED CANELANDS EXTENSION, KWAZULU-NATAL KZN DAEA REF NO: DM/0031/2012 BACKGROUND INFORMATION DOCUMENT AUGUST 2012

PROPOSED GARDEN CITY NEW TOWN DEVELOPMENT, KRAAIFONTEIN DRAFT ENVIRONMENTAL IMPACT REPORT Summary Document

BACKGROUND INFORMATION DOCUMENT:

PURPOSE OF MEETING MEETING GUIDELINES PROJECT BACKGROUND ESKOM CLOCOLAN-FICKSBURG 88 KV POWERLINE, FREE STATE

Fabriek Street 45 Paarl. P.O. Box 2632 Paarl Tel: Cell:

NATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) CHAPTER 1: INTRODUCTION

APPENDIX D PUBLIC NOTIFICATIONS

Reg. No. 2008/004627/07 VAT No Facsimile: (044) Progress Street, George Web:

BASIC ASSESSMENT REPORT. Background Information Document

N O T I F I C A T I O N O F I N T E N T T O D E V E L O P

SIBAYA WATERLINE BASIC ASSESSMENT PROCESS. PRE-APPLICATION MEETING WITH EDTEA March 2016

Our Constitutional imperative

Environmental Impact Assessment for Waterway Restoration Projects. Chris John, Technical Director Ecus Ltd.

PUBLIC CONSULTATION MACROBERT INCORPORATED GREENWAY FARMS (PTY) LTD BOKPOORT OPERATIONS INTEGRATED WATER USE LICENCE APPLICATION

TSHWANE STRENGTHENING PROJECT PHASE 1, GAUTENG PROVINCE: Draft Scoping Report: Apollo - Verwoerdburg July 2009

MEETING HELD AT THE EDTEA OFFICES (ethekwini) ON 03 July 2018 AT 10h00. Ms. Naadira Nadasen (NN) Mrs Chen read (CR) and Mrs Tejal Singh (TS)

BACKGROUND INFORMATION DOCUMENT

PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED DEVELOPMENT ERF 3 ROBERTSON WESTERN CAPE PROVINCE

Standard Development Timeline

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

SINGITA SWENI LODGE EXPANSION: SUMMARY REPORT - BAR

Draft Western District Plan

Dispute over the requirement for fire door signage to hotel suites at 124 Devon Street West, New Plymouth

Planning Proposal Concurrent DA/LEP Amendment for Belmont North Pharmacy Amendment No. 24 to Lake Macquarie Local Environmental Plan (LMLEP) 2014

HS2 Interchange Station Design

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager

Water Demand Management Plan

ONTARIO MUNICIPAL BOARD

Former Temple Cowley Pools, Oxford TEMPLE COWLEY LIBRARY * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT.

Longbridge Town Centre Phase 2 Planning Application

Presented by: Remy Norbert DUHUZE Director/ER&PC REMA

Lake Macquarie City. A copy of the published amendment including the instrument and maps, is provided in Attachment 7 of this report.

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HEALTH AND FOOD SAFETY

TOWN OF BRUDERHEIM Report to the capital region board

Planning Proposal under section 55 of the EP&A Act

Planning and Building Department APPLICATION FOR CEMETERY EXPANSION BAYVIEW CEMETERY, 720, 726 AND 740 SPRING GARDENS ROAD

Communicate the results of the EIA for the proposed development;

Executive Summary. Final Environmental Impact Report: Walmer Housing Development, Erf 11305, Port Elizabeth

EIA process in Malaysia. Approaches and Strategies. Way Forward

Site Assessment Technical Document Appendix A: Glossary

2. PROJECT SITE LOCATION & DESCRIPTION

REDZ & POWER CORRIDOR GAZETTING. 25 July Environmental Advisory Services

Planning Proposal Toronto Road, Booragul. Amendment to Lake Macquarie Local Environmental Plan (LMLEP) 2014

Draft Eastern District Plan

Update on the State of California Model Water Efficient Landscape Ordinance (CA MWELO)

RURAL ZONE - POLICY. Rural Zone Policy. Issue: Rural Environment. Ruapehu District Plan Page 1 of 8

South of Eastern Strategic Direction Status Update

PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED SWARTLAND SHOPPING MALL

PRIORITIES COMMITTEE MEETING

Rapid Transit Implementation Working Group September 14, 2017

Implementing sustainable water strategy through development industry engagement

Urban Growth Boundaries

DEVELOPMENT APPLICATION DECISION NOTICE Sustainable Planning Act 2009 (SPA)

Authority. any changes required as a result of the approved CHMP.

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN

S A C R A M E N T O C O U N T Y JACKSON HIGHWAY & GRANT LINE EAST VISIONING STUDY

4 RESIDENTIAL ZONE. 4.1 Background

Public Consultation 23 January Peel Hall, Warrington Board 1. A message from Satnam... Site history...

Great Easton Neighbourhood Plan Statement of Basic Conditions

Stock-Taking on Integrated Coastal Zone Management (ICZM) in the Black Sea IMPLEMENTATION AUDIT QUESTIONNAIRE 2010

Draft Municipal District Local Area Plans. Map Browser. VOLUME THREE Map Browser th November 2016

- INVITATION - COURTESY INFORMATIONAL MEETING

SAFETY CODES COUNCIL ORDER. BEFORE THE FIRE TECHNICAL COUNCIL On June 21, 2012

Anglo American Platinum; Mogalakwena Mine: Construction of Bridge and Gravel Road. Consultation with community members 26 July 2016

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Significant Tree Register

Topham Mall, Bentham, Pitt and Waymouth Street Place Plan

Alternative Routes. St. Vital to La Verendrye Station - Southern Loop Transmission Corridor. 20 different segments 4 segments common to all routes

Environmental Impact Assessment

CORNUBIA RETAIL PARK- PLANNING REPORT REVERT 3

Spatial / Land Use Planning System in Slovakia

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.

City of Surrey PLANNING & DEVELOPMENT REPORT File:

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H

WOKING DESIGN SUPPLEMENTARY PLANNING DOCUMENT (SPD)

SECTION 4(f) DE MINIMIS DOCUMENTATION

N O T I F I C A T I O N O F I N T E N T T O D E V E L O P

Planning Proposal Wangi Power Station Complex Administrative Amendment Lake Macquarie Local Environmental Plan 2014

Progress on implementation of the REDZs and Power Corridors SAPVIA Protea Hotel Balalaika 25 November 2016

BEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT

MERIDAN PLAINS SAND RESOURCE AREA

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

DRAFT IMPACT ASSESSMENT REPORT

Departure from the Development Plan. Town Council objection to a major application. DETERMINE

Town and Country Planning (Local Planning) (England) Regulations 2012, Regulation 22 Submission of Legacy Corporation Local Plan

THE PROPOSED DEVELOPMENT OF A RETIREMENT VILLAGE AND RESIDENTIAL ESTATE, TOKAI

Planning Justification Brief

Proposed Variation to the Midleton Town Development Plan 2013

To evaluate the magnitude and significance of likely impacts and to propose appropriate measures to mitigate potential adverse impacts.

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017

What now for home building?

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Transcription:

BASIC ASSESSMENT PROCESS NOTICE OF A BASIC ASSESSMENT PROCESS FOR THE PROPOSED MIXED USE DEVELOPMENT ON THE REMAINDER OF PORTION 2, REMAINDER OF PORTION 7, PORTION 7, REMAINDER OF PORTION 9, REMAINDER OF PORTION 10 AND THE REMAINDER OF PORTION 32 OF FARM 311, LANGEBERG, DURBANVILLE (INFORMALLY KNOWN AS GLENGARRY DEVELOPMENT) BACKGROUND INFORMATION DOCUMENT (BID) AND INVITATION TO PARTICIPATE 20 JULY 2018 GNEC REFERENCE NO. : 20437 DEA&DP Reference: 16/3/3/6/7/1/A5/20/2163/17 *Please Note: A copy of the document currently on review is available at the Durbanville Public 1. PURPOSE OF THIS DOCUMENT The purpose of this document is to: Library and on the GNEC website. Provide stakeholders with information about the proposed mixed use development at Glengarry, Durbanville Introduce and explain the Basic Assessment Process and Public Participation process to be followed for the proposed development, in terms of applicable environmental legislation (National Environmental Management Act (NEMA), (Act No. 107 of 1998)), as amended; 4 December 2014. Invite all stakeholders to comment on any aspect related to the proposed development; and Notify all stakeholders that the Interested and Affected Party registration period is from Friday 20 July 2018 to Wednesday 22 August 2018

2. PROJECT DESCRIPTION The proposed Glengarry Mixed Use development consists of the Remainder of Portion 2, Remainder of Portion 7, Portion 7, Remainder of Portion 9, Remainder of Portion 10 and the Remainder of Portion 32 of Farm 311, Langeberg in Durbanville totalling approximately 93ha in extent. The site is nestled between Fairtrees Road and the Kuils River to the west, Brackenfell Boulevard to the east, the Glengarry shopping centre and De Bron to the south and Sonstraal Heights residential area to the north. The properties are some of the last remaining open land within the built up Durbanville area and can therefore be used to service the surrounding residential areas in terms of social and institutional amenities. Please refer to Figure 1 for the Locality Map. Guillaume Nel Environmental Consultants were appointed by Promptvest (Pty) Ltd (the applicant) to facilitate the Environmental Impact Assessment process for the development of the abovementioned properties. The applicants propose to develop the site for residential, educational and mixed use purposes with large open spaces between the different precincts and villages. The aim of the application is to apply for development rights for the different development blocks / pockets as the applicants will not be the ultimate developer but will be able to sell the basket of rights to prospecting developers. Approximately 1 800 residential units in various typologies are planned however this could change with the detail designs to be done by each future developer. The development will integrate with the existing road networks and residential areas to the north by the construction of public roads through the site to ease the flow of traffic and to lessen the pressure on Brackenfell Boulevard and Fairtrees Road. The future R300 servitude runs from north to south through the property and thereby dividing the site in two portions of which the R300 cannot be developed. The applicants therefore intend to rehabilitate the extent of the Kuils River crossing the site and to landscape the remaining open space between the Kuils River and the R300 for use as public open space. Application is furthermore made for the construction of associated infrastructure to service the proposed development. This includes the construction various access points and public roads from the surrounding roads network (De Bron, Brackenfell Boulevard, Verdi Boulevard and Charles Way), potable water and sewage connection points to the existing bulk pipelines around the property, internal potable and sewage infrastructure, various storm water detention facilities and electrical infrastructure. Confirmation of

supply capacity for the abovementioned services will be obtained from the various civil services departments at City of Cape Town during the Public Participation Periods to follow. Please refer to Figure 2 below for the proposed Spatial Development Layout. The purpose of the Background Information Document is to serve as introduction to the proposed development. Please refer to the 1 st Draft Pre-Application Basic Assessment Report for a detailed discussion of the proposed development layout and associated infrastructure planned for the proposed property as well as its potential impacts on the surrounding environment and infrastructure. This report will be available on our website at www.gnec.co.za from the 20 th of July 2018. ENVIRONMENTAL IMPACT ASSESSMENT Notice is given in terms of the National Environmental Management Act, 1998 (Act No. 107 of 1998), In terms of Government Gazette No. 38282 and read with Government Notice No. R 983 of 04 December 2014 Activity 12, 19, 27 and 28 that a Basic Assessment Process is required as set out in the Environmental Impact Assessment Regulations made under section 24(5) of the National Environmental Management Act, 1998 (Act No. 107 of 1998) DEFINITION OF AN ENVIRONMENTAL IMPACT ASSESSMENT (EIA) An Environmental Impact Assessment (EIA) is a good planning tool to assist in the identification, evaluation and assessment of potential positive and negative impacts of a proposed development/project on the environment. It also recommends ways to avoid or reduce negative impacts, and ensure that developments are sustainable without affecting people s lives and the environment adversely. As mentioned, an EIA in the form of a Basic Assessment is undertaken in terms of the NEMA, 1998 (Act No. 107 of 1998) and the NEMA EIA Regulations. 2. POTENTIAL ENVIRONMENTAL ISSUES Potential environmental issues that will be addressed in the assessment include inter alia: Noise pollution: Minor noise impacts will occur during the construction phase of the proposed development, as a direct result of construction activities. However these impacts are not expected to be significant, as the impact will only be temporary in nature, and can be adequately mitigated by the implementation of the legally binding Environmental Management Plan (EMP).

A noise impact is expected during the operational phase of the development which will be similar in nature to the existing surrounding land uses. The residential areas will produce noise similar to Sonstraal Heights, Vredekloof Heights and Amanda Glen whilst the mixed use (possibly business or commercial) areas will produce noise related to an office part, mostly motor vehicles entering and existing the premises. The educational facility will also generate some noise pollution during the operating hours, which are expected to be similar to that of the mixed use areas and confined to office hours. These impacts are not expected to be significant as they will be in line with the City of Cape Town s prescribed decibel allowance for the area and will be similar to the existing surrounding land uses. These limits will be included in the Final Environmental Management Plan to be authorized by the City of Cape Town and the Department of Envrionmental Affairs and Development Planning and will be audited on a regular basis. Heritage impact: It is not foreseen that National and Cultural Heritage will be disturbed by the development proposal, as confirmed in the formal response (ROD) from Heritage Western Cape (HWC) following submission of a Notification of Intent to Develop (NID) Visual impact: Some visual impact is expected during the construction and operation phases of the development. During construction the site will be accessed by construction vehicles, however this is temporary and will be confined to the construction period. Once the site is fully developed, the property which is now vacant will be similar to the surrounding land uses in terms of architectural style and density. Large open spaces will allow for visual corridors through the site and the overall greening of the area. The existing tree avenues on site will be retained. Impact on fauna and flora: No impact on any fauna or flora is expected as the site has been used for agricultural purposes in the past and no indigenous vegetation is left on site.

Traffic Impact: ITS Engineers were appointed to assess the impact the proposed development will have on the existing and future flow of traffic and infrastructure in the area. Please refer to the 1 st Draft Pre-Application Basic Assessment Report for a detailed analysis. Various upgrades are proposed which will minimise the potential negative impact on the surrounding road networks. As mentioned, the Basic Assessment Report will identify measures to reduce identified negative impacts, and optimise positive impacts. 3. PUBLIC PARTICIPATION In terms of the NEMA, Public Participation forms an integral part of the environmental assessment process. The Public Participation Process provides people who may be affected by the proposed development with an opportunity to provide comment and to raise issues of concern about the project or to make suggestions that may result in enhanced benefits for the project. Comments and issues raised during the Public Participation Process will be captured, evaluated and included in a Comment and Response Report (CRR). These issues will be addressed and included in the Final Basic Assessment Report which will be submitted to the Department of Environmental Affairs and Development Planning (DEA&DP), to make a decision on whether to approve the application (provide Environmental Authorisation) or not. 4. DELIVERABLES The environmental assessment will culminate in the compilation of a Basic Assessment Report (BAR) and Environmental Management Plan (EMP). The Basic Assessment Report will be submitted to the Department of Environmental Affairs and Development Planning (DEA&DP), the regulatory authority responsible for the review of the report. The DEA&DP has to reach a decision as to whether, and under what conditions, the project may proceed, based on environmental considerations. An Environmental Authorization (EA) may be issued based on the information provided in the Basic Assessment Report. Interested and Affected Parties (I&APs) who have registered will be notified of the Environmental Authorisation (EA)

Activity 5. TIMEFRAMES The table below provides an indication of the proposed timeframes for the project. Estimated Timeframe Compilation of Formal EIA Application November 2018 Submission of Formal EIA Application to DEA&DP November 2018 Compilation of Notification Intent to Develop (NID) DEA&DP to issue AOR (Acknowledgement of Receipt) and Acceptance of the Formal EIA Application Submission of Notification of Intent to Develop (NID) to Heritage Western Cape (HWC) HWC to Respond to the NID and issue Record of Decision (ROD) 38(1)(c) of the NHRA Submission of Notification of Intent to submit and EIA Application (NOI) to DEA&DP Compilation of first draft Basic Assessment Report, including Environmental Management Plan (EMP) First Round Public Participation Process and submission of first draft Basic Assessment Report Notification of Interested and Affected Parties (I&APs) 30 day commenting period Amend first draft Basic Assessment Report and Environmental Management Plan (EMP) Second Round Public Participation Process and submission of 2 nd Pre Application Draft Basic Assessment Report Notification of registered Interested and Affected Parties (I&APs) 30 day commenting period. Amend 2 nd Pre-Application draft Basic Assessment Report and Environmental Management Plan (EMP) Third Round Public Participation Process and submission of 1 st In- Application Draft Basic Assessment Report Notification of registered Interested and Affected Parties (I&APs) 30 day commenting period. Amend 1 st In-Application Draft Basic Assessment Report and Environmental Management Plan (EMP) Completed December 2018 Completed November 2017 September 2017 July 2018 20 July 2018 22 August 2018 August 2018 September 2018 October 2018 October 2018 Submission of Final Basic Assessment Report and Environmental January 2019 November 2018 December 2018 December 2018 January 2019

Management Plan (EMP) to DEA&DP DEA&DP to issue AOR for Final Basic Assessment Report and Environmental Management Plan DEA&DP to decide whether to grant or refuse Environmental Authorisation and inform the applicant and EAP of its decision February 2019 May 2019 Commencement of Activity May 2019 6. INVITATION TO PARTICIPATE Guillaume Nel Environmental Consultants (GNEC) were appointed as an independent Environmental Consultancy by Promptvest (Pty) Ltd to facilitate the Environmental Impact Assessment (EIA) and Public Participation Processes for the development proposal. We would like to invite and encourage all stakeholders to complete and return the enclosed registration sheet and submit it together with any comments to: GNEC Attention: Euonell Visagie P.O. Box 2632 Paarl 7620 Tel: (021) 870 1874 Fax: (021) 870 1873 E-mail: eg@gnec.co.za Additionally, please note, that a hardcopy of the 1 st Draft Pre-Application Basic Assessment Report will be made available at the Durbanville Public Library. Contact Information: Tel: 021 444 7070 or durbanville.library@capetown.gov.za. Additionally also note that all relevant documentation will also be made available to download from our Website at: www.gnec.co.za Please refer to the Documents of Review tab on the left-hand side of the screen and select the folder with code 20437. All project specific documentation will be available within this folder for download and viewing purposes. Please complete and submit the registration sheet together with any comments to GNEC by no later than: Wednesday 22 August 2018

NOTICE OF A BASIC ASSESSMENT PROCESS FOR THE PROPOSED MIXED USE DEVELOPMENT ON THE REMAINDER OF PORTION 2, REMAINDER OF PORTION 7, PORTION 7, REMAINDER OF PORTION 9, REMAINDER OF PORTION 10 AND THE REMAINDER OF PORTION 32 OF FARM 311, LANGEBERG, DURBANVILLE (INFORMALLY KNOWN AS GLENGARRY DEVELOPMENT) REGISTRATION SHEET JULY 2018 GNEC REF: 20437 Title Name and Surname Company Name/Interest Postal-or-Residential Address Area Tel: Postal Code Cell Phone Fax: E-Mail Address Please indicate you preferred method of communication (Please indicate with an X) Fax E-Mail Post Comments (You are welcome to attach more sheets if necessary (Your comments will be considered in the EIA (BA) process) Please provide details of any other person/company whom you would like us to add to our mailing list Title Name and Surname Company Name Tel: Fax No: E-Mail Please complete and return to GNEC by no later than Wednesday 22 August 2018 Attention: Euonell Visagie Tel: 021 870 1874, Fax: 021 870 1873 E-mail: eg@gnec.co.za Thank You for your participation!

Page 11