SEWERS G-101 APPENDIX G SEWERS G-101. Sewers. G-101. Sewers. 1-56 1/13/1956 Submitting a plan from the Municipal Authority for the construction of a sanitary sewage system and sewage treatment plant. 2-56 2/1/1956 Amending Ord. 1-56. 3-56 2/1/1956 Leasing of a sewer system from the Municipal Authority. 12-58 10/1/1958 Submitting a plan from the Municipal Authority for the construction of a street sewer on North Buhl Farm Drive. 3A-59 4/13/1959 Entering into an agreement with the Borough of Sharpsville in which the Borough will permit certain land in the Township to connect with the sanitary sewer of the Borough. 20-59 10/7/1959 Assessing a portion of the cost of the assessable sewers constructed in U.S. Business Route 62. 5-60 8/3/1960 Constructing sanitary sewers in the Donna Drive portion of Clarksville Road. 4-62 4/2/1962 Extending the existing sanitary sewer into an area east of Pennsylvania Route 18 and south of U.S. Route 62. 5-62 4/4/1962 Constructing a sanitary sewer in the portion of Lillian Drive extending from Sharon City limits to Parkview Boulevard. 9-63 9/4/1963 Extending the sanitary sewer in the area east of Pennsylvania Route 18 and south of Morefield Road. 10-63 9/16/1963 Appropriating by eminent domain an easement for sanitary sewer purposes over, under and through the lands of Joseph Heldorfer. 11-63 11/29/1963 Extending the existing sanitary sewer southwardly on South Hermitage Road. 1-65 1/13/1965 Approving the contract between the City of Sharon which provides for the charge of sewage from certain Township structures into the sewer system of the City. 12-65 5/26/1965 Constructing a sanitary sewer in Fairlawn Drive. G:1 12/19/2012
HERMITAGE CODE G-101 14-65 7/14/1965 Constructing a sanitary sewer in portions of Armstrong Way. 17-65 10/13/1965 Constructing the sanitary sewer in a portion of Pine Hollow Boulevard and Knapp Avenue. 21-65 12/2/1965 Constructing sanitary sewers in the area of Broadway Avenue, Wilson Road and South Hermitage Road. 18-66 6/8/1966 Constructing sanitary sewers on a portion of Christy Road. 4-69 5/28/1969 Settling an eminent domain claim and payment of drainage for land appropriated by right of eminent domain as an easement for sanitary sewer purposes. 11-69 9/10/1969 Authorizing the settlement of an eminent domain claim and payment of damages for land appropriated by right of eminent domain as an easement for sanitary sewer purposes. 1-72 1/12/1972 Purchasing an option and operations agreement between the Upper Shenango Valley Water Pollution Control Authority, various municipalities and the City of Sharon Sanitary Authority and the City of Sharon for sewage treatment services. 3-74 4/10/1974 Approving the consulting engineer's report with regard to the construction of an expansion and an increase in the degree of treatment of the sewage treatment plant. 14-74 10/16/1974 Approving the consulting engineer's report with regard to the acquisition and construction of a joint sewer system by Upper Shenango Valley Water Pollution Control Authority. 5-76 7/14/1976 Execution and delivery of a second supplemental agreement of lease by the Municipal Authority and the Municipality of Hermitage. 15-77 7/13/1977 Rescinding Ord. 3A-59. 18-77 8/10/1977 Authorizing the execution and delivery of a first amendment to the service agreement with the Upper Shenango Valley Water Pollution Control Authority. 19-77 8/10/1977 Modifying a portion of an agreement with the Borough of Sharpsville dated April 6, 1959. 8-78 4/12/1978 Entering into an agreement with the City of Sharon to provide for a charge for sewage treatment and sewer connections from the Municipality of Hermitage into the sewer system of the City of Sharon and terminating an existing agreement. 22-78 12/21/1978 Approving constructing and estimated costs of certain sanitary sewers constructed in the Patagonia area. 12/19/2012 G:2
SEWERS G-101 9-79 7/25/1979 Approving the construction of certain sanitary sewers in the Rolling Acres area. 20-81 10/14/1981 Approving the constructing of a certain sanitary sewer in the Mt. Hickory Boulevard area. 5-85 3/13/1985 Executing a service agreement with the Municipal Authority, the Borough of Clark, the Sewer Authority of the Borough of Clark, the Township of South Pymatuning, and the South Pymatuning Municipal Authority providing that sewage from certain areas of the Borough of Clark and South Pymatuning Township will be received and treated at the Bobby Run Sewage Treatment Plant. 10-85 7/10/1985 Executing and delivering a 1985 agreement of lease and guaranty between the Municipal Authority and the City of Hermitage, and the rescission of the 1956 agreement of lease, as supplemented, and authorizing the execution and filing of a debt statement and approval request for said 1985 agreement of lease and guaranty with the Pennsylvania Department of Community Affairs. 11-85 7/10/1985 Approving the consulting engineer's report and cost estimate with regard to the acquisition and construction of the Bobby Run sewer project of the Municipal Authority. 13-85 7/10/1985 Authorizing the Municipal Authority to lay, construct, maintain, repair and replace sanitary sewer lines and appurtenances thereof in streets, roads, alleys and rights-of-way in the Bobby Run area. 14-85 7/10/1985 Approving the constructing and estimated costs to certain sanitary collector sewers to be constructed as the Bobby Run sewer project in the City of Hermitage by the Hickory Township Municipal Authority and approving the charging of said costs of construction within the City by said Authority against the properties benefited, improved or accommodated thereby according to the foot-front rule. Res. 33-88 9/14/1988 Accepting sanitary sewers in Phase II of the Kimberton Estates subdivision within the rights-of-way of Lexington Drive and Bristol Court. Res. 15-89 4/12/1989 Authorizing an addendum to the agreement of October 12, 1988, for the construction of an extension of Llodio Road and storm drainage facility in the City. G:3 12/19/2012
HERMITAGE CODE G-101 10-89 5/9/1989 Entering into an interjurisdictional pretreatment agreement with the City of Sharon, the Upper Shenango Valley Water Pollution Control Authority, the Borough of Sharpsville and the Township of South Pymatuning, providing for the development and implementation of an industrial pretreatment program as required by the Pennsylvania Department of Environmental Resources. 17-89 9/13/1989 Entering into an intermunicipal agreement with the Borough of Sharpsville providing for the division of maintenance responsibilities, sewer connection fees and sewer rental charges relative to the connection of a Hermitage sanitary sewer line to a Sharpsville sewer line. Res. 41-89 11/8/1989 Accepting as a public sewer the sanitary sewer constructed by Ralph Snyder to serve Dream Drive. Res. 4-90 2/14/1990 Accepting as a public sewer the sanitary sewer constructed by Dean Alexander in Phase III of the Kimberton Estates plan of lots. Res. 20-90 -/-/1990 Accepting as a public sewer the sanitary sewer constructed by Steve Finney in Phase 1 of the Hunters Woods final layout plan. Res. 7-91 2/13/1991 Accepting as a public sewer the sanitary sewer constructed by John and Anna Kraynak in preliminary Phase I Kraynak Plan. Res. 18-91 4/16/1991 Accepting as a public sewer the sanitary sewer line constructed by John Marriott to service the John Marriott Plan of Lots 1 and 2. Res. 3-92 1/21/1992 Accepting a portion of the sanitary sewer system in Hunter's Woods Phase II for perpetual Res. 21-92 3/25/1992 Accepting as a public sewer the sanitary sewer line constructed by Michael Gavala. Res. 42-92 5/19/1992 Adopting and approving the sanitary sewer elevation study and Act 537 official sewer plan review prepared by Gills, Guard and Johnson, consulting engineers for the City of Hermitage and the Hermitage Municipal Authority. Res. 51-92 7/14/1992 Adopting and approving the sanitary sewer evaluation study and Act 537 official sewage plan review prepared by Gills, Guard and Johnson, consulting engineers for the City of Hermitage and the Hermitage Municipal Authority. Res. 55-92 10/20/1992 Accepting the sanitary sewer system in Seth Gaugh subdivision Section C, Whippoorwill Drive, for perpetual Res. 57-92 10/20/1992 Accepting the sanitary sewer system in Kimberton Estates Phase 4 for perpetual 12/19/2012 G:4
SEWERS G-101 Res. 8-93 4/20/1993 Accepting a portion of the sanitary sewer system in Hunter's Woods Phase II for perpetual Res. 55-93 11/16/1993 Accepting the sanitary sewer system in Deer Path subdivision Phases II and III, for perpetual Res. 28-94 5/23/1994 Entering into an agreement with the Shenango Valley Water Company providing for the shutting off of the supply of water to premises within the City of Hermitage which are owned or occupied by persons who have neglected or failed to pay sewer rentals or charges for use of the City sewer system. Res. 25-95 5/18/1995 Accepting as a public sewer the sanitary sewer constructed by B & B Realty Development Company in the Buhl Woods subdivision. Res. 44-95 11/16/1995 Accepting the sanitary sewer system in the McConnell's Upper Woods subdivision Section 2, for perpetual Res. 54-95 12/21/1995 Accepting the sanitary sewer system in Deer Path subdivision Phase 5, for perpetual Res. 15-96 4/18/1996 Accepting the sanitary sewer system in GOGA Lot No. 1 and Schook plan of Lots 1, 2, 3, 4, 5, 6, 7 and 8 for perpetual Res. 21-96 7/18/1996 Accepting the sanitary sewer system serving Voytik subdivision Lots 1-5, for perpetual Res. 36-96 10/17/1996 Accepting the sanitary sewer extension constructed as part of the Central Business District improvement project. Res. 3-97 1/16/1997 Accepting the sanitary sewer system serving Vallabh Estates subdivision Lots 1-6, for perpetual Res. 30-97 8/27/1997 Accepting the sanitary sewer system serving Hidden Acres Phase I subdivision for perpetual Res. 32-97 9/24/1997 Accepting the sanitary sewer system serving Seth Gaugh subdivision Section D for perpetual Res. 34-97 9/24/1997 Accepting the sanitary sewer system serving Steeple-chase Farms subdivision for perpetual Res. 3-98 1/28/1998 Accepting the sanitary sewer system in Eagle Point subdivision. Res. 5-98 2/25/1998 Accepting the sanitary sewer system in Ralph Snyder subdivision. Res. 6-98 2/25/1998 Accepting the sanitary sewer system in Carol Snyder subdivision. Res. 21-98 10/22/1998 Supporting the Upper Shenango Valley Water Pollution Control Authority in the effort to complete its Act 537 official sewer facilities plan. G:5 12/19/2012
HERMITAGE CODE G-101 Res. 33-98 12/23/1998 Accepting an extension to the sanitary sewer system in Voytik Estates subdivision for perpetual Res. 2-99 1/27/1999 Accepting the sanitary sewer system in Kraynak-Garden Way development for perpetual Res. 6-99 2/24/1999 Accepting the sanitary sewer system in Ralph Snyder Farm plan Lot 28 for perpetual Res. 31-99 10/27/1999 Accepting the sanitary sewer system in Hidden Acres Phase 2 for perpetual Res. 9-2000 4/25/2000 Accepting for perpetual maintenance the sanitary sewer line serving Sherry Masoto subdivision Lot 1. Res. 10-2000 4/25/2000 Accepting for perpetual maintenance the sanitary sewer system serving Lorenwood residential development Lots 1-32. Res. 27-2000 12/27/2000 Accepting for perpetual maintenance the sanitary sewer infrastructure serving Deer Path residential development Phase 7. Res. 14-2002 7/24/2002 Accepting for perpetual maintenance the sanitary sewer system, the street known as Presidential Boulevard and the stormwater detention basin located in the Gateway Commerce Park subdivision plan, Phase I. Res. 31-2004 9/29/2004 Accepting for perpetual maintenance the sanitary sewer infrastructure in Hermitage Hills Apartments Phase II. 11-2004 10/27/2004 Approving the construction of a sanitary sewer extension along Sample Road. Res. 35-2004 10/27/2004 Accepting the sanitary sewer system in Cherry Hill residential development Lots 1-12, final plan. Res. 36-2004 12/22/2004 Accepting for perpetual maintenance the sanitary sewer infrastructure in the Leali Brothers Excavating final subdivision plan, replat of lots, Lots 1, 2, 4 and 5. Res. 2-2005 2/23/2005 Accepting for perpetual maintenance the sanitary sewer infrastructure serving the Thomas and Mary Gilk subdivision Lots 1, 2, 3 and 4. Res. 14-2005 7/27/2005 Accepting for perpetual maintenance the sanitary sewer infrastructure serving the Freda Snyder Estate subdivision Lot 1. 10-2005 8/24/2005 Approving the construction of a sanitary sewer extension along South Darby Road and Miller Road. 12/19/2012 G:6
SEWERS G-101 Res. 19-2005 9/28/2005 Accepting for perpetual maintenance the sanitary sewer system for the following streets in the Pierce Bluffs Phase I final subdivision plan, Lots 2 to 31 and Open Space A to C: Pierce Bluffs Drive, Alexander Crossing, Stoney Creek Court, and Riverbend Court. Res. 24-2005 10/26/2005 Accepting for perpetual maintenance the sanitary sewer system for Innovation Way. Res. 25-2005 10/26/2005 Accepting for perpetual maintenance the sanitary sewer system for Campus Circle. Res. 27-2005 10/26/2005 Approving the official sewage facilities plan for the City of Sharon and the Upper Shenango Valley Water Pollution Control Authority. 18-2005 12/21/2005 Approving the construction of a sanitary sewer extension along Sample Road. Res. 4-2007 1/28/2007 Accepting for perpetual maintenance the sanitary sewer system for Pierce Bluffs Drive and storm drainage appurtenances in the final subdivision plan of Pierce Bluffs Phase II Lots 32-57 and Open Space Lots D-G. Res. 8-2007 2/27/2007 Accepting for perpetual maintenance the sanitary sewer system for Hermitage Crossing plan of lots, Lots 1-6. Res. 10-2007 2/28/2007 Amending the City of Hermitage Wastewater Pretreatment Program Manual. Res. 24-2008 8/27/2008 Accepting for perpetual maintenance the sanitary sewer system and storm drainage appurtenances located in the Stateline Industrial Park, Lots 1-4, final subdivision plan. Res. 25-2008 7/23/2008 Amending the City of Hermitage Wastewater Pretreatment Program Manual. 6-2009 5/27/2009 Approving the construction of a sanitary sewer extension along Daniel Drive and Lamor Road. 1-2010 1/27/2010 Authorizing an intermunicipal transportation and treatment agreement with the Sharon Sanitary Authority. Res. 2-2012 1/25/2012 Accepting for perpetual maintenance the sanitary sewer system, the street known as Camelot Drive, and the storm drainage appurtenances located in the subdivision plan known as Camelot Estates final plan Lots 1 through 14. 8-2012 7/25/2012 Approving the construction of a sanitary sewer extension serving the Overlook Drive and Hoezle Road areas. G:7 12/20/2017
HERMITAGE CODE G-101 Res. 17-2012 11/28/2012 Accepting for perpetual maintenance the sanitary sewer system, the street known as Indian Run Road, and the storm drainage appurtenances dedicated in the subdivision plan known as Indian Run Group I Ltd. final Lots 1-4. Res. 1-2013 1/23/2013 Accepting for perpetual maintenance the sanitary sewer system, the remaining portion of the street known as Alexander Crossing, and the storm drainage appurtenances dedicated in the subdivision plan known as Final Subdivision Plan Pierce Bluffs Phase II, Lots 32-57 and Open Space Lots D-G, and in the subdivision plan known as Pierce Bluffs Phase III Subdivision Preliminary Plan, Lots 59A-69. Res. 17-2013 9/25/2013 Accepting for perpetual maintenance the sanitary sewer system, the street known as Quaker Circle, and the storm drainage appurtenances dedicated in the subdivision plan known as Quaker Meadow Planned Residential Development Final Plan. Res. 1-2015 1/28/2015 Accepting for perpetual maintenance a sanitary sewer line extension off of Morefield Road near South Hermitage Road and a sanitary sewer line extension along the Shenango Valley Freeway serving LRC Hermitage PA, LLC. Res. 13-2017 12/20/2017 Accepting for perpetual maintenance the sanitary sewer system in Royal Oaks Court and Tuscany Court and the storm drainage appurtenances in the Hidden Acres South Residential Development Final Subdivision Plan Phase I, Lots 1-26. 12/20/2017 G:8