Project will Replace: Utilities Curb Pavement Lighting. City of Madison

Similar documents
Monroe Street Reconstruction. Final Corridor Design Presentation & Open House August 16, 2017

Monroe Street Reconstruction. Public Preconstruction Meeting February 21, 2018

Prince William Street Project (Grant Avenue to Wellington Road)

Cottage Grove Road Reconstruction. City of Madison Engineering

Spring 2018 Construction Update

PennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

Highway 15 Project - Hutchinson

Monroe Street Reconstruction. Business Roundtable March 29, 2017

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

GUIDELINES FOR PERMEABLE SIDEWALK-LANDSCAPING PERMIT

Canal Road City Limits (East of Van Dyke Ave) to Saal Road

Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project

Building Great Neighbourhoods LAURIER HEIGHTS

University Park Subdivision Street Assessment Report

Public Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

Fall 2017 Construction Update

PARKLET PROPOSAL PACKAGE & PROCESS

PROJECTS UNDER CONSTRUCTION

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

Broadway Avenue Streetscape Project City of Albert Lea. Streetscape Design Committee Meeting October 29, 2012

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

City of Richmond. Engineering Design Specifications

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals

Victoria Bridge Municipal Class EA Civic Works Committee

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION AGENDA

DESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

John Portman Boulevard Corridor

SOUTH UNIVERSITY Street Design Alternatives in Progress

TABLE OF CONTENTS I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

APPENDIX F: DETAIL DRAWINGS

Jenifer Street Reconstruction Neighborhood Engagement Meeting November 4, 2015

St. Laurent Transit Improvements Innes / Industrial to Smyth. Public Information Session December 2, 2015

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

CITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details

Design Services for Wiles Road Broward County Project #104026

REVIEW SET ONLY - NOT FOR BIDDING

23 EA , , , , , , , LF , , ,596.

SOUTH UNIVERSITY Street Design Setting a Direction for Schematic Design

Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m.

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

September 28, 2017 Wentworth Avenue (CR 8) Sidewalk Improvements Open House

TRANSPORTATION COMMITTEE

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering

CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN

Expo Line Transit Project. Project Status Update Meeting West End Corridor Segment C

Project Overview & Summary of Existing Conditions

Shell Beach Road Streetscape Frequently asked Questions

Chain Bridge Road Sidewalk Improvements Citizen Council Work Session

City of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change*

2040 Long Range Transportation Plan

FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

Construction Projects Report

CITY OF MANHATTAN BEACH DEPARTMENT OF COMMUNITY DEVELOPMENT. TO: Parking and Public Improvements Commission

Getting Started On Your Green Infrastructure (GI) Plan

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

Roads Plan

RECEIVE AN UPDATE ON THE ALMOND GROVE PHASE II PROJECT

Rt. 29 Solutions Project Delivery Advisory Panel. December 3, 2015

DESIGN CRITERIA PACKAGE

Reconfiguration of The Six Points Interchange. Community Update #2 June 18, 2014

TABLE OF CONTENTS. Building Great Neighbourhoods. Working together to make the most out of your neighbourhood.

Neighborhood Conservation (NC) Program CONCEPT DESIGN REVIEW MEETING NOTES

February 17, Sara Ullman Planner I. Sincerley,

d Escoto, M. City of Chicago Streetscape and Urban Design Program, Chicago Department of Transportation. (2003). Streetscape Guidelines.

DESIGN PUBLIC HEARING APRIL 24, 2018 MUNICIPAL OFFICE BUILDING HARDWICK, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

2018 Woodhill Road Improvements Public Informational Meeting. September 28, :00 pm

Index to Projects by Project Name

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

ASPEN GROVE PROJECT NO. 53B2390 D-1 DETAIL STANDARD NOTES CITY OF MADISON

Flooding Hearing: Long and Short Term Strategies

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION

HUNTSVILLE PHYSICAL SERVICES DEPARTMENT

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

A. Site plan notes. Include the heading Site Plan Notes.

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

St. Clair Avenue West Area Transportation Master Plan

City of Miami MIAMI RIVER BASIN WATER QUALITY IMPROVEMENT REPORT FOR FIRST AND SECOND QUARTER 2010

Chapter 6. Green Streets

Public Information Centre. Welcome

TREE GUARDS AND EDGING

VEHICULAR AND PEDESTRIAN CIRCULATION

CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL

1002 S. Vandeventer Ave: Drive-Thru Variance. Site Address: 1002 S. Vandeventer Ave. Request: Drive-Thru Variance. Company Name: White Castle

DRIVEWAY APRON REPLACEMENT WITH STREET RECONSTRUCTION

Construction Engineering & Inspection

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

2017 General Obligation Bond

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

CTH C RESURFACING Douglas County, Wisconsin

This page left intentionally blank.

Open House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK

ORDINANCE NO

Transcription:

Project will Replace: Utilities Curb Pavement Lighting

Replace sanitary sewer main & laterals Winnebago: Existing 8 main, 1905 Linden: Existing 6 main, 1915, upsize to 8 main Atwood: Existing 12 main, 1905 Laterals replaced to property line (behind sidewalk) Water main & services Winnebago: Existing 6 main sections from 1902, 1916, 1925, 1937 Replace & upsize mains (8 min) Reconnect services to new mains

Storm Sewer 2 parallel mains: 15 from 1907 & 18 from 1955 Plan to replace storm sewer Increase size/capacity of storm sewer Extend storm sewer, if necessary, to improve drainage Street Lighting Existing on MG&E wood poles within most of limits Install City street lighting infrastructure Underground conduit & electrical wiring LED fixtures on galvanized poles

Existing Street: Winnebago St. 48 ft. wide street, approx. 3 ft. wide terraces Travel, bike & parking lanes in both directions Pavement rating 3/10, curb rating 7/10 Wall & railing on south side terrace between Linden & Bashford, due to large grade difference Existing Street: Linden Ave. 24 ft. wide street, approx. 12 wide terraces Pavement rating 4/10, curb rating 8/10 Travel in both directions and parking on one side

Full reconstruction of Winnebago St. Replace all curb & asphalt pavement Options for street width & parking Each option may have bumpouts at crosswalk locations Resurface Linden Ave. Curb to remain, replace pavement Patch Atwood in locations of utility work Future reconstruction project Sanitary sewer work necessary to improve grade

46 ft. wide street (narrow street by 2 ft.) Maintain all lanes Travel, bike & parking lanes in both directions Slightly widen terraces more space for: Improving grade challenges (wall, railing) ADA compliant sidewalk ramps Space for existing trees or new plantings 4 minimum terrace for any tree plantings May still not have 4 in many areas Snow storage Pedestrian bumpouts

Overall Plan

Option 2 40 ft. wide street Space for travel & bike lanes in both directions Parking on one side of street only (removal of 1 side) Larger increase in terrace width; even more space for: Trees both existing and any new plantings Further improve grade issues within south terrace Provide ADA compliant sidewalk ramps Snow Storage Option 3 combination of options 1 & 2 Keep all lanes in a portion of the project Remove parking on 1 side on a portion

Overall Plan

Engineering will review project with Forestry and will work with contractor & inspectors during construction to preserve any trees that remain Street trees will be pruned prior to construction to provide required clearance above street After construction, the site will be reviewed by City Forestry for new plantings and replacements

Close streets during construction open to local traffic & businesses On-street parking removed during construction Access to driveways for most of project Commercial driveways, short duration closures Residential driveways may be closed up to 20 days Sidewalk open on at least one side at all times Pedestrian access to businesses Maintain temporary cross walks At least 2 planned water shutoffs, notified a minimum of 48 hours prior Standard work hours allowed: 7AM-7PM

Item Property Owner Share City Share Curb and Gutter* 50% 50% Pavement 0% 100% Replace Sidewalk/Apron 50% 50% Intersect Curb & Pvmt 0% 100% Storm Sewer 0% 100% Priv Storm Connects 100% 0% Sanitary Sewer Main 0% 100% Sanitary Sewer Laterals 25% 75% Water main & services 0% 100% Street Lighting 100% 0%

Assessments can be paid in lump sum or over 8 years with 3% interest Final assessments will be mailed in the summer the year following the project completion 2019 for this project Final assessments will be calculated based on bid prices and measured quantities

Mail estimated assessments and Public Hearing Notice by Fri 1/26/18 BPW Public Hearing 2/7/18 CC Hearing 2/27/18 Advertise for Bids 3/1/18 Start Construction 5/7/2018

Project Manager Jim Wolfe, 266-4099 jwolfe@cityofmadison.com Sanitary & Storm Sewer Kyle Frank 266-4098, kfrank@cityofmadison.com Water Utility Kelly Miess, 261-9640, kmiess@madisonwater.org Traffic Mark Winter, 266-6543, mwinter@cityofmadison.com Lighting Brian Smith, 261-9625 bsmith@cityofmadison.com http://www.cityofmadison.com/engineering/ projects Will be a pin on Winnebago St.