Newark Liberty International Airport Terminal A Redevelopment Program

Similar documents
Adoption of the Rosslyn Sector Plan Site Plan Review Committee (SPRC) Meeting October 26, 2015

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting

MARINA BAY. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 14, 2010

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

Fall 2017 Construction Update

Connecting Nine Buildings in Central Jakarta Together with the MRT. Mulyadi Janto, Director, PT Farpoint Prima

Innovative Worldwide VE Case Studies & How Cultural Values Impact Creativity

Executive Summary. NY 7 / NY 2 Corridor

NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT CYRIL E. KING (STT) AND HENRY E. ROHLEN (STX) AIRPORTS JANUARY 25, 2018

Dumbarton Rail Corridor. Project Scoping Meeting Nov 15, :15 PM City of Newark Nov 16, :15 PM City of Menlo Park

East Corridor Final Environmental Impact Statement

Shelter and Evacuation Plan. 1.0 Purpose. Table of Contents. General Policies Revision # 0 Page # 1 of 25

Existing Conditions. Planning and Design Principles

FY 2005 TRANSPORTATION CAPITAL PROGRAM

WELCOME TO OPEN HOUSE TWO November 28, 2018

Connected Airport INNOVATION TAKES FLIGHT. Taking the Intelligent Airport to New Heights

Connected Airport INNOVATION TAKES FLIGHT. Taking the Intelligent Airport to New Heights

Mavis Road Class Environmental Assessment

5250 // PLAZA WELCOME TO CHARLOTTE S NEW WAY TO WORK, PLAY, + GATHER.

2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director

Port of Seattle Street Vacations Summary April, 2016

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014

SHERIDAN PARKING STRUCTURE PUBLIC INFORMATION MEETING November 11, :00 pm - 8:00 pm

BATHURST QUAY NEIGHBOURHOOD PLAN IMPLEMENTATION. Streetscape & Public Realm Improvement Plan - Canada Malting Silo Site and Eireann Quay

ADDENDUM NO. 1 BID-CONTRACT DOCUMENTS FOR. RFP No Professional Design Services for CCC Le-Jao Student Resource Center

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

NorthPoint, Inc. Community-Based Development Concept

Meeting Purpose: Date and Time: Location: Attendance: Handouts:

Planning and New Starts Development Committee. February 25, 2016

Developer s Program. The Station at East 54

Iowa 100 Extension Project Visualizations for Design and Public Involvement ASCE Transportation Conference November 6, 2013 Ames, Iowa

St. Elizabeths East - 5 Year Anticipated Use Plan

St. Clair Avenue West Area Transportation Master Plan

North Commuter Parkway and Traffic Bridge Project Market Sounding

Request for Proposals

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

The Ambassador Bridge/ Gateway Project

VICTORIA DOWNTOWN DEVELOPMENT PLANNING

Ballston Station Multimodal Study. Stakeholder Meeting October 5, 2010

Tysons Circulator Study: Process and Preliminary Results Summary. March 2012

ATSP3. Advanced Technology Support Program III. Comprehensive Solutions for Obsolescence and Performance Issues:

GREENVILLE-SPARTANBURG AIRPORT DISTRICT REQUEST FOR PROPOSALS FOR DEVELOPMENT SERVICES FOR GSP AIR CARGO FACILITY PHASE 1

Route 110 Alternatives Analysis

A. INTRODUCTION B. NO ACTION ALTERNATIVE

Staff Report. Re: National Park Service Ferry Landing Facilities at Piers 31, 31½ and 33 Joint Meeting with BCDC Design Review Board

An Urban Transportation Perspective of Mumbai, The Maximum City

DOWNTOWN JACKSONVILLE MASTER PLAN S T R E E T H I E R A R C H Y

POTOMAC YARD METRORAIL STATION

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES

Mill Woods Town Centre Proposed Rezoning LDA

Downtown Elkton Station Area Plan, Elkton, MD. Difficult enough to get support for new starts challenge to fund Houston transit

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING SEPTEMBER 18, 2014 JACKSON MANN COMMUNITY CENTER

AASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION

The purpose of tonight s PIC is to:

TRANSPORTATION COMMITTEE

Taming the Bus: Strategies for Urbanizing Suburban Transit. Seth Riseman, Utile, Inc. Architecture + Planning

FDOT/FTBA Construction Conference Work Plan

March 13, Government Center Station. Project Briefing

Jim Harkins DUNDEE WATER FRONT CIRCULATOR DUNDEE WATER FRONT CIRCULATOR. Specialists in Affordable & Sustainable Tramways. A short presentation by

I-95 Interchange & Ellis Road PD&E Study

REQUIRED CHECKLIST FOR Better Streets Plan Section 138.1(c)(2)

The Project. In 2013, construction was completed between 100 Street and 102 Street.

I-84 Hartford Project Open Planning Studio #12. April 25, 2017

RESOLUTION NO. WHEREAS, the City of San José (City ) owns and operates the Norman Y. Mineta San José International Airport ( Airport ); and

5.2 LAND USE AND ZONING

Ohlone College Measure G Project Scope Revisions

Grand Rail Commercial Development Site Plan Application

Taming Tysons Corner Transforming the Quintessential Edge City

Public Works Project Delivery Report

West Gate Tunnel panel hearing

Principal development issues

The Lincoln Neighborhood Corridor Plan. The LiNC

6:00 8:00 PM I-95 FROM EXIT 57 TO EXIT 60 PROJECT

How it may affect the future of your school. Michael France Director, Regulatory Affairs National Air Transportation Association

The Phibbs Bus Exchange Redesign: From Concrete and Asphalt to Raingardens and Bridges!

District Facilities Master Plan

Welcome to the. Open House

2.0 PURPOSE AND NEED. 2.1 Purpose. 2.2 Need Traffic Congestion in and around Downtown Derry

Cold Lake Marina Master Plan

UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

DENVER INTERNATIONAL AIRPORT. Photo provided courtesy of Denver International Airport

Johnson Street Bridge Public Realm Update

ASPEN HILL Minor Master Plan Amendment

THE COUTURE AT A GLANCE $122 MILLION TOTAL PROJECT COST 44 STORIES / 700,000 SQUARE FEET PUBLIC PLAZAS, PARK & PEDESTRIAN BRIDGES 302 MARKET RATE

Commercial Node Plan Devine Street/Jackson Blvd. COLUMBIA, SC

Midtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening

HARBOR BRIDGE. Randall C. Grones, PE - SPD. US 181 Harbor Bridge October

WASHINGTON DC METROPOLITAN AREA QUALIFICATIONS

THE GARDEN CITY PLAN. City of St. Catharines Official Plan. City of St. Catharines

Welcome. to the 95th Street Terminal Improvement Project Public Hearing

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018

Silver Line CPAM UPDATE. Transportation and Land Use Committee October 14, 2016

Appendix G Response to Comments

Courtice Main Street Study Community Vision Workshop PLANNING SERVICES DEPARTMENT

The Residences at Alewife Station

POLICY AMENDMENT AND LAND USE AMENDMENT KILLARNEY/GLENGARRY (WARD 8) NW CORNER OF RICHMOND ROAD AND 33 STREET SW BYLAWS 1P2015 AND 7D2015

Aviation Solutions. Why Tyco for airports? Our systems help protect over 110 airports. Secures over 80% of UK Airports and more than 60 US Airports

2 Project Description

Transcription:

Newark Liberty International Airport Terminal A Redevelopment Program ASCE AIR TRANSPORT CONFERENCE April 5, 2017

Existing Terminal A - In Need Of Major Investment Capacity Constrained Designed for ~9 MAP Over 10 MAP in 2015 Current Deficiencies Operational Issues Screening Airside Corridor State of Good Repair Infrastructure Building Systems Level of Service Future Constraints Insufficient Queuing Space Frontage Congestion Limited Number of Gates Hold Rooms Insufficiently Sized

Daily Crowd Conditions

Planning Efforts Began In 2004 Yielded Redevelopment as the Best Option Restoration - $850 Million SGR Program for 30-Year Life Extension No Capacity Increase Limited Expansion Capability 6-Year Construction Duration Modernization - $2,064 Million SGR Program for 30-Year Life Extension Capacity Increase to the Limit of Existing Terminal Limited Expansion Capability 10-Year Construction Duration Redevelopment Option Redevelopment - $2,100 Million New 33 Gate Terminal Capacity Increase 1 st Phase of Long-Term Expansion Plan 4-Year Construction Duration Program Authorization - Redevelopment March 2016 for $2.3B Authorized Expenditures of $196.3M Modernization Options

Siting of the New Terminal A Terminal B Terminal C Terminal A

Terminal Location and Design $2.32 B Total Program Cost Approx 1M SF Terminal 2020 Partial Opening 2022 Full Opening 33 Gates 45 Gates 13.6 MAP Design Year

Program Includes Four Main Elements Airfield 140 Acres paving Demo existing buildings Design-Bid-Build Landside 8 new bridge structures At-grade roadway work Peripheral ditch work Design-Bid-Build Parking 3,000 spaces Toll plaza and revenue collection Design-Build Terminal 1M square foot terminal Frontage bridge Pedestrian bridge and ramp area Design-Build

Eight Construction Contract Packages

Overall Implementation Timeline

Planning Criteria Design Day Flight Schedule (DDFS) Level of Service C During Peak Hour Operation 33 ADG III Aircraft Gates Dual Taxilanes Head of Stand (HOS)/Tail of Stand (TOS) Service Roads Maximize Staging Areas Inter-Terminal Bus Service

Planning Criteria Security Screening Process 2,350 Pax in Peak Hour (135 Pax/Lane/Hour) Queue Designed for Maximum 10 Minute Wait Flexible Infrastructure Screening Lanes to be Expandable TSA Support Space Unmanned Exit Vestibules

Planning Criteria Check-In Operations Curbside Positions 2.5 Minutes/Passenger Self Check-In Kiosks/No Bags 1.9 minutes/passenger Flexible Positions Check-In Islands Self Bag Tag/Drop Positions Airline-Specific Lounges Odd Size Bag Drops

Current Status Projects In Construction Aviation Fueling System Modifications PSE&G 345 kv Switching Station Infrastructure Renewal Electrical Distribution Bridges N57, N58, N59 and Utilities Projects in Design Airside Utilities and Paving (South) Airside Utilities and Paving (North) Bridges N61, N62 and N63 Demolition of Building 331 Terminal (Design/Build) RFIF RFQ - 4Q 2016 RFP - 1Q 2017 Award - 1Q 2018 Construction - 2018

SITE PLAN Interior View at Check-In Lobby

SITE PLAN Interior View at Check-In Lobby Looking to Airside

SITE PLAN Interior View at Central Hall

SITE PLAN Interior View at East Pier Hammerhead

SITE PLAN Interior View at South Pier

SITE PLAN Interior View at Arrivals Hall

Exterior Landside View SITE PLAN

Exterior Landside View SITE PLAN

Aerial View of Site SITE PLAN