REVIEW GUIDELINES FOR THE DONATION OF PUBLIC ART

Similar documents
Kittson Parkway / Watershed Park Parking Lot

CITY OF SASKATOON COUNCIL POLICY

City of Norwich Policy Regarding Monuments on City Property

HISTORIC SITE AND MONUMENT COMMISSION (HSMC) Instructions for Historical Markers, Monuments, and Public Art Application

PARKS MEMORIALS AND DONATIONS POLICY

City of Langley, WA, Request for Qualifications (RFQ) Seawall Park Design

Memorials, Plaques & Interpretive Signs Policy

Toronto District School Board Church Street Junior Public School

MY BILL OF RIGHTS.ORG COMMISSIONING GUIDELINES & STANDARDS VISION AND PROCESS

1.4 To establish opportunities for local pride in public open spaces. 1.5 To clarify Council s role as an enabler and supporter of this policy.

Growing Community Gardens A Partnership Between WSU Skagit County Extension Master Gardeners and Local Community Gardens

Public Art Guidelines And Public Art Donation Program

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

GUIDELINES FOR PERMEABLE SIDEWALK-LANDSCAPING PERMIT

FEATHER RIVER RECREATION & PARK DISTRICT MEMORIAL GUIDELINES & APPLICATION

Chapter 15. Public Art Guidelines 15.2 GENERAL DESIGN OBJECTIVES 15.1 INTRODUCTION AND PURPOSE 15.3 PUBLIC ART GUIDELINES

(SCHOOL DISTRICT NAME) MAINTENANCE/MANAGEMENT SPECIFICATIONS FOR ATHLETIC FIELDS AND OUTDOOR FACILITIES (SUGGESTED TEMPLATE)

Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ)

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

City of Kingston Heritage Commemoration Program Guidelines: 7 May 2010

VILLAGE OF MOUNT PROSPECT 2016 STREET RESURFACING PROGRAM Frequently Asked Questions (FAQ s)

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

AESTHETIC APPEARANCE. Design Guidelines for Grade-Separated Pedestrian, Cyclist and Equestrian Structures

Protecting Existing Landscape Trees from Construction Damage Due to Grade Changes

University of Delaware

Revitalization of Durand Park. Durand Park Proposal June 2008

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

CALL TO ARTISTS Expression of Interest (EOI)

Enhance the High Line Canal Projects

Artist Call for Expressions of Interest Port Kells Hall Mosaic Project RFEOI #

Request for Decision. Recommendation. Presented: Monday, Jul 07, Report Date Friday, Jun 20, Type: Public Hearings

Minister of the Environment Representative

Proposed Park Master Plan: The Master Plan has been revised to incorporate suggestions received in response to the Park Survey:

Landscape and fencing requirements of this Chapter shall apply to all new landscaped areas.

Equipment Festge County Park

Board Members Vancouver Park Board General Manager Parks and Recreation

BY-LAW NO THE CITY OF BRANDON Fire Prevention Division Phone: (204) Fax: (204)

GUIDELINES FOR DONATING WORKS OF ART TO THE CITY OF NEW YORK/PARKS & RECREATION Periodically updated/last updated September 1999

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

2015 Pond Area Landscape Maintenance Specifications

Xeriscape Rebate Program Manual

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION

City of North Vancouver

Maintenance Fees for Pavers on City Streets

FROM: Acting General Manager, Planning and Development FILE:

HOW TO START A COMMUNITY GARDEN IN YOUR NEIGHBOURHOOD

Note: This checklist is not intended as a research tool but as an aid to planning and evaluating playgrounds.

MUST READ PRIOR TO CONSTRUCTION!

The Right Tree in the Right Place

REQUEST FOR PROPOSAL (RFP)

DESIGN GUIDELINES FOR LARGE SIDEWALK PATIOS ON CITY PROPERTY AND SAMPLE DRAWINGS

Regional Municipality of Wood Buffalo. Design Review Panel DRAFT REPORT

LANDSCAPE AND IRRIGATION PLAN PREPARATION GUIDELINES

Town of Ipswich, Massachusetts Select Board Policy Directive #MBP2012 Adopted: March 12, 2012 Revised: November 5, 2018

CALL FOR ARTIST QUALIFICATIONS SUBMISSIONS. DIA Urban Arts Projects Phase One

Wayfinding. North Gateway: Integrate a vertical gateway marker on the west side of Ward Street at the south corner of Vernon Street.

GUIDELINES REGARDING PERMANENT ARTWORK IN PUBLIC SPACES

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY STANDARD SPECIFICATION. Section SODDING

39 N. B Street San Mateo, California Construction Tree Protection Plan

It is recommended that the Commission receive this report on subway garbage disposal and recycling and note the following:

APPENDIX E: CITY OF HAMILTON* STANDARD REQUIREMENTS FOR PARK OR OPEN SPACE DEVELOPMENT

School Garden Competition Factsheet. RHS Flower Show Tatton Park RHS registered charity no /SCO38262

Modular Grease Trap MGTA

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

THE CORPORATION OF THE MUNICIPALITY OF GREENSTONE BY-LAW 09-48

GUIDELINES EXHIBITION PLACE LOCATION: OBJECTIVES. Structure Plan URBAN DESIGN GUIDELINES

ANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition

CITY OF OVERLAND PARK POSITION DESCRIPTION

A cknovvledgements. Table of Contents. Project Introduction...1

Liquefied Petroleum Gas Facility Written Fire Safety Analysis

Burrowing Owl Habitat Project at the Albany Plateau. (a component project of the Gilman Street Playing Fields Project City of Berkeley) March 10, 2006

Exhibit A. Scope of Work

Fuel Oil Heating Installation Inspection Report #1 2008

Development Permit Application Form. Property Owner Information as Registered on Legal Title Property Owner Name: Phone:

Installation Instructions. For the 18 Built-In Dishwasher and Front Color Panels

CREEKSIDE VILLAGE HOMEOWNERS ASSOCIATION LANDSCAPE RULES CONTENTS

Natural Areas Certification Program Guidelines

TOWN OF SPENCER FIRE and EMERGENCY SERVICES

REQUEST FOR BIDS LANDSCAPING SERVICES HAYMARKET, VIRGINIA

Cultural Landscape Heritage Impact Statement Terms of Reference

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

HILLSIDE CEMETERY MONUMENT GUIDELINES

38 Queen s University Campus Master Plan Part 1

Liquefied Petroleum Gas Facility Written Fire Safety Analysis

providing proof of liability insurance, indemnifying the City from any claims or liabilities arising from use of City property.

University of Minnesota Duluth Stormwater Features on the UMD Campus

Grand River Ravines Georgetown Township

KINGMAN IS GROWING! Column

BIG ROCK GARDEN Annual Sculpture Exhibition

Section 9 Landscaping and Street Trees

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING

CITY OF SANTA ANA Public Works Agency. PARKWAYS..What are they, and why are they important?

PARTF Scoring System for Grants

PREPARING THE PLANTING HOLE

511 - RIP RAP - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511

City of Richmond. Engineering Design Specifications

SECTION 605 PLANTING

P A R K L E T 2016 PILOT PROJECT

CHAPTER 4: GENERAL LANDSCAPING STANDARDS 4.1 ALL PLANT STOCK 4.2 TREES

Risk Management for an Event example

Transcription:

REVIEW GUIDELINES FOR THE DONATION OF PUBLIC ART OR MEMORIALS This document outlines the process for the review of proposed donations of public art or memorials to be sited in Vancouver parks. Many conditions govern the acceptance and installation of art and memorials. Park Board approval is required in all cases. ACCEPTANCE CONDITIONS no civic funds will be provided for production, siting or installation a sponsor or co-sponsor must present the proposal all expenses related to the donation and review process rest with the sponsor the sponsor must provide the funds for maintenance at the time of installation When the Park Board receives a request to accept and install public art or a memorial and provided the conditions outlined above are met, the following steps are set in motion: consultation with the City of Vancouver's Public Art Committee and the appointment of a panel to review design, social and merit issues a technical review by the Park Board of the site and the work (if created) public consultation DESIGN, SOCIAL AND MERIT ISSUES An evaluation of the suitability of the proposed work to the site including reference to park design and social impact may be undertaken by a panel appointed by the Park Board in conjunction with the City's Public Art Committee. This panel will make a recommendation which will form part of the report to be taken to the Park Board. Items considered in the evaluation will include: relationship of proposal to the history of the site relationship to the geography or specific location of the site and its surroundings relevance to Vancouver, British Columbia and/or Canada and in what order consistency with park or site design including heritage aspects compatibility with other existing or proposed artworks, buildings, structures, etc. in the park the suitability of the scale of the proposed work to the site in the case of a memorial, whether the cause being memorialized is significant to a large enough community to warrant placing it in a public park conformity to Human Rights Legislation in the case of a memorial, whether the significance of what is being memorialized is enough to override technical or aesthetic concerns any issues related to the sponsor that should be addressed feasibility of the funding plan

concerns relating to an educational or interpretive plaque or component in the proposal the public response to this proposal (Staff will provide an analysis) an assessment of whether the proposed work contributes to, enhances or benefits the park TECHNICAL INFORMATION The following provides details on technical aspects of installing art or memorials in Vancouver parks. Park Board staff will review proposals with reference to these points: A) THE SITE 1) Impact Some sites cannot handle increased use and traffic flow. Conflict with existing horticultural work or adjacent playing fields. Installation in parks can start no later that mid-september and must be completed by mid- October due to potential site damage. Environmental impact will be assessed. Conflict with any uses of the park (review to include all seasons, weekends and weekdays, all times of day). Other programmed or special uses of the site (picnics, special events, traditional uses). 2) Trees If any work is to be located near trees the Park Board arborist must be consulted. Digging near trees is problematic. Tree roots generally extend to the drip line of the canopy and cannot be disturbed. Tree growth needs to be considered. Nothing can be attached tightly to trees. Access for tree maintenance must be preserved. 3) Vandalism Some parks have a history of vandalism. 4) Utilities Check for underground lines, power, gas, sprinkler or drainage systems, etc. Review all above-ground services, wires etc. 5) Soil Factors Toxicity, drainage, suitability for bearing weight or anchoring etc. Cost of removing soil including contaminated soil must be factored into a project budget. 6) Impact on Park Grounds Maintenance Installation cannot increase the cost of grounds maintenance. For example, a base for an installation must be flush with the ground surface and provide a 20cm-free border so that mowers can move around it. Gravel in a park setting moves around and can affect mowing ability.

Space between work and the nearest tree or structure must allow for the passage of a large gang mower. Mulch may be required around tree bases etc. to discourage grass growth. 7) Other Site Considerations Park design is complete. Heritage aspects. View corridors. Accessibility for people with disabilities. Other installations nearby, artworks First Nations' burial grounds, or monuments in the park/vicinity. Potential for work near traffic being distractive to motorists. Respect for existing architecture. There are detailed guidelines for murals. Shade will be create algae growth. 8) Future Site Use Plans May Exist B) THE ARTWORK 1) Public safety standards, including nighttime use are of critical concern Approval by the Risk Management Office of the City of Vancouver may be required. All structures require an engineer's sealed drawings to address anchoring, stability, load bearing and seismic concerns. There should be no accessible sharp edges, points, or projections that can cut, puncture or cause injury by impact. Sheet materials should be finished on exposed edges. No components or group of components should form an angle or opening that can trap a person's neck or head. CSA and/or other applicable building codes and standards may apply to structures. 2) Corrosion Cables must be protected against corrosion. Ends should be inaccessible or capped and anchored by means such as eye splice/thimble fillings. Hollow elements should be designed or treated to minimize the possibility of corrosion. 3) Water Water components in the proposed work must meet City standards and criteria. Water must be recirculated and provision may need to be made for drainage from November to March and include maintenance funds for the system operation. Extra maintenance levies will be applied for pump maintenance and to cover pipe bursts, etc. A water hook-up permit for bringing water to the site from the City's Permits and Licences Department must be obtained. All work done on water must be by a trades certified plumber. 4) Electricity and Mechanical

An electrical permit from the City's Permits and Licences Department is required. Any connections to city street or parks' electrical circuits must be approved by City and/or Park Board staff. An estimate of power needs and the cost of that power needs must be provided and budgeted for by the sponsor. All electrical and mechanical components must be CSA approved. Unless isolated, there must be no pinch, crush or shear points caused by junctions of two components moving relative to one another. 5) Lighting If lighting is a component the proposed light placement and levels must be consistent with the use of the park. 6) Structure Structural components must be designed to meet City of Vancouver Building Code requirements. Structural components require engineer's sealed drawings and, upon completion, as-built drawings. Structures must be capable of supporting the weight of climbers and environmental loads. Structures flush with sidewalks or paths must be capable of supporting a vehicle weight. Any structure that is potentially climbable requires ground surfacing that can minimize the impact of the fall (e.g. pea gravel, sand, wood chips, or manufactured resilient surface). Structural integrity considerations should include whether hardware lends itself to unauthorized loosening and whether joints and connections meet strength requirements. All structures must be approved by the Park Board. 7) Work placed in a walking surface The leading vertical edge should not exceed 3mm to avoid tripping hazards. Interior vertical edges should not exceed 6mm. Skid-resistant properties should be equivalent to concrete sidewalks. Mosaic cannot be installed in asphalt. Depressions in the surface should not catch the spike heels of women's shoes. Depressions in surfaces should not cause water to pool causing an ice hazard. The art must support vehicle weight (National Building Code requirements for sidewalks where there is potential for vehicle loading is 12 kpa and load of 54 kn acting over an area of 750mm x 750mm. 8) Plaques The wording and siting of any plaques related to the public art or memorial must be approved by the Park Board. This approval should be gained at the time of project approval. Plaques should in general be no larger than 40cm x 40cm. 9) Shelter Any work which results in a permanent shelter will require special approval. This includes structures providing shelter from the rain or a partially concealed space which might cause

safety concerns connected to concealment. Offer the opportunity for clandestine activity. Concrete holds the smell of urine. 10) Plantings The Park Board cannot supply the resources to maintain planted installations. 11) Maintenance Artwork must be designed and constructed so as to minimize maintenance requirements, vandalism, theft or graffiti. Aspects of the proposed work such as materials, construction, hollows for water collection, etc. might cause wear and excessive maintenance cost. Water damage over time on any wooden elements must be considered. Artwork should not be designed so as to collect garbage or litter. On completion, the artists must supply a maintenance manual including a list of coatings and paints and a schedule of maintenance frequencies. Costs for maintenance are the responsibility of the sponsor. The Park Board will work with the artist or sponsor to estimate these costs and project them for the anticipated life of the artwork. The costs of restoring the site must be paid up-front. 12) Installation All standard safety precautions must be taken on-site during installation and include clearing the area of tools and equipment, fencing the area if required, and ensuring that all present, volunteers or paid workers follow safety guidelines such as wearing boots hard hat, etc. as needed. Safety considerations must include both workers and general public. Contractors must provide to the Park Board a WCB Clearance letter and proof of insurance. The project will not be deemed accepted until final sign-offs by Park Board, the 'as-built' plans are reviewed and the site and installation inspected. PUBLIC CONSULTATION To ensure that the public and stakeholders have access to and input into the process of siting public art or memorials in parks, a public consultation process is required. The following provides guidelines. All costs of the process are borne by the sponsor. 1) Neighbourhood parks A two block area adjacent to parks will be leafleted advising of the proposal (where appropriate). Leaflets will be delivered or supervised by Park Board staff. Signage on the site advising of the proposal and asking for comments may be required inplace for three weeks. Comments to the Park Board will be taken by mail and email for two to three weeks. Stakeholders will be notified. (e.g. Community Centre Associations, resident groups, etc.) 2) City-wide parks Signage will be posted on the site for a three week period. Notice will be placed in the nearest public facility at the same time as the signs are posted.

Appropriate stakeholders will be notified. Depending on the nature of the proposal and the site chosen, a public meeting and/or a random survey as well as leafleting in the neighbourhood may be required. Ads may be taken in newspapers. All proposals for Stanley and Queen Elizabeth Parks and waterfront parks will require a more extensive process than for other parks. Park Board staff will conduct the consultation and analyse the results of the process. If there is significant concern expressed about the proposal this will be communicated to project sponsors.