Stormwater Solutions for Residential Sites. Section 2 Stormwater Management Approach VERSION 1.0. EcoWater Solutions. Prepared for

Similar documents
I602. Birdwood Precinct

4.6. Low Impact and Retentive Grading

A LARGE MULTI-FUNCTIONAL BIORETENTION DEVICE

STORMWATER FLOOD REPORT

DFH JOINT VENTURE. Stormwater Management Report for Proposed Residential Subdivision at Graham Block, Pokeno

Plan Review Checklist

Placement of the soil should be in lifts of mm and loosely compacted (tamped lightly with a backhoe bucket).

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

Washington County, Maryland Division of Public Works Policy Manual

When planning stormwater management facilities, the following principles shall be applied where possible.

Leduc Industrial Outline Plan SE W4

I611. Swanson North Precinct

Urban Stormwater: Best Practice Environmental Management Guidelines. CSIRO This electronic edition published by CSIRO PUBLISHING, 2006.

Pollutant Removal Benefits

Implementing sustainable water strategy through development industry engagement

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010

CHECKLIST FOR PHASE II DRAINAGE REPORT

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

GENERAL INFORMATION What is Stormwater? What is a stormwater utility? What is an impervious surface?

39 WALLACEVILLE STRUCTURE PLAN

6.1. INTRODUCTION AND SUMMARY OF FINDINGS

SH16 Western Ring Route Henderson Creek to Huruhuru Road Bridge

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

City of Waco Stormwater Management Regulations

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects

Chapter 3 Site Planning and Low Impact Development

City of Petersburg, VA Stormwater Utility Frequently Asked Questions

Pennsylvania Stormwater Best Management Practices Manual. Chapter 1. Introduction and Purpose

4. CONCEPT PLAN DEVELOPMENT

6.1. INTRODUCTION 6.2. EXISTING CONDITIONS

Design GuidelineThemes: Integrated Stormwater Detention and Landscape

Stormwater and GSI - Setting the Stage and Rain garden and cistern sizing

6.5 Lakewood Gulch. Basin Snapshot

RURAL ZONE - POLICY. Rural Zone Policy. Issue: Rural Environment. Ruapehu District Plan Page 1 of 8

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

STAFFORD TRACT NORTH OF US90A 1.0 INTRODUCTION 1.1 OBJECTIVE

Appendix I. Checklists

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

4. Contractor (and subcontractors if applicable) certification statement(s)

Soil Erosion and Sediment Control

Technical note. Option 3a (cyan route) Project: To: A428 Bus Enhancement Scheme. Rid Hollands, Colin Young

Bioretention cell schematic key

Chapter 2 Roof Downspout Controls

Urban Stormwater Management. Rebecca Leonardson Rui Teles Brooke Ray Smith

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Draft Rhode Island Stormwater Design and Installation Standards Manual

BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT

Northern Branch Corridor DEIS December 2011

Authority. any changes required as a result of the approved CHMP.

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

Stormwater Management Plan (SWMP) Revision Date: 11/05

I609. Penihana North Precinct

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

NORTH EAST INDUSTRIAL ZONE

Post Construction BMPs

Stormwater Utility and Connection Fees

Appendix 6-A. Site Plan Preparation and Submission as Part of the Land Development Process

Chapter 4 - Preparation of Stormwater Site Plans

Table 4.7.1: Swales Potential Application and Storm Water Regulation

USF System Campus Master Plan Updates Goals, Objectives and Policies

New Development Stormwater Guidelines

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

No Adverse Impact. A Proposed National Standard. Association of State Floodplain Managers Annual Conference Kansas City, MO.

Chapter 1: General Program Information

Patrick E. Lindemann INGHAM COUNTY DRAIN COMMISSIONER. Towar Rain Garden Drains A Low-Impact Urban Retrofit

Lead Local Flood Authority SuDS Policy Statement

STORMWATER MANAGEMENT PLAN: ERAND GARDENS X70

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

6.1 Bioretention Areas

Olympic Park, London. SuDS used. 1. Location. 2. Description. Case study

Beyond Runoff Reduction: Thorough Green Infrastructure Design. Zach Sample, PE Innovyze

DCA , Stormwater Quality and Facilities Ordinance June 23, 2009

STREAM BUFFERS

Article 20 Stormwater Management

Site Design (Table 2) Fact Sheet & Focus Questions:

Part 4: CRS Stormwater Management Activity (450) and Urban Flooding Best Practices

QUEENSTOWN LAKES DISTRICT COUNCIL SUBDIVISION DESIGN GUIDELINES

City of Lafayette Study Session Staff Report Design Review Commission

Figure 1 Cypress Street Study Area Location Map

Howard Street, Salford, Manchester

OFFICE CONSOLIDATION SECONDARY PLAN AREA 22 THE BRAMALEA SOUTH INDUSTRIAL SECONDARY PLAN

The use of low head weirs to. perennial streams with their floodplains:

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

Cahill Associates Inc. West Chester, PA

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Public Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment

STORMWATER QUALITY MARION STREET GREEN INFRASTRUCTURE PROJECT COMMON SOURCES OF URBAN POLLUTANTS URBAN STORMWATER

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20

S o u t h C e n t r a l O u t l i n e P l a n. Leduc Business Park. North Leduc Industrial Area Structure Plan C it y of Led u c.

Modeling Cumulative LID Features for Floodplain Impacts in an Urban Watershed in Houston, TX

East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School. Current site type

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

RAIN GARDENS. Task: PART 1 (60 minutes) Student Directions: Steps you will be following: Directions for beginning: Source Information:

Transcription:

VERSION 1.0 Stormwater Solutions for Residential Sites Section 2 Stormwater Management Approach Prepared for EcoWater Solutions A Department of Waitakere City Council 113 Central Park Drive Henderson WAITAKERE CITY November 2004

2 Stormwater Management Approach Stormwater Management Approach 2.1 Do the Methods Described in this Document Apply? It is important as a first step to establish whether or not the design approaches detailed in this document apply to a given situation. The design approaches and methods in this document primarily cover situations where there is no existing drainage system to connect into, or connection to an existing drainage system is difficult due to limitations with the capacity of an existing network or other problems (e.g. access to a connection). Where there is no drainage network site development is generally limited to 15% impervious cover on a residential site (WCC District Plan). Where there is an existing network the option of connecting to, or increasing the volume of stormwater discharging to this network will need to be determined from WCC. WCC has developed models of the stormwater network throughout Waitakere City, and the outputs from these need to be referenced by WCC staff to check whether there are any limitations in the network. The following key decision points apply: 1. Is there an existing stormwater network either on the property or within 50 m and does it have capacity for additional flow (up to the 20 % AEP)? If the answer is yes, then stormwater from the development can be discharged to the network. If connection is possible but capacity is a problem, the methods described below may apply. WCC should be consulted to confirm the correct approach. If there is no possible connection point to a network then an alternative discharge point needs to be identified in conjunction with WCC. 2. Is there a stream on or near to the property where stormwater could be discharged, or is discharge to the coast a possibility? If the answer is yes, methods described in this document apply. If the answer is no the possibility of discharging to an adjacent road should be investigated. 3. Is the property adjacent to a road with kerb and channel and if so is there a stormwater network with catchpits? If the answer is yes the option of connection to the road drainage system should be explored with WCC. WCC will advise if direct connection is possible and if methods described in this document to attenuate flows must be applied upstream of such a connection. If the answer is no, discharge options are clearly limited and the property owner will need to talk with WCC directly about possible site-specific solutions. 2-1

Stormwater Management Approach 2.2 Design Approach This document supports the following design approach to stormwater management defined as: Maintain existing (pre-development) peak flows from a property for events up to the 50 % AEP (2 year return period) storm event and minimise increases in runoff volume where practicable. This design approach is applicable to the whole of a site and not just the proposed new development. Local drainage networks in Waitakere City are generally designed to convey flows associated with the 20 % AEP event. When a more severe event occurs drainage passes via overland flow paths that are generally designed for a 1 % AEP event. This approach provides protection to streams immediately below sites as well as mitigating against increased flooding locally and further downstream. Property owners are advised to confirm with Council that this design approach is applicable to their site before progressing with design of a stormwater management system based on this approach. 2.3 Design Information The design information in this document has been developed to provide the flexibility to select the various stormwater management options and combination of options that are most appropriate for a site. Property owners may wish to develop sites using different methods that are applicable to the site conditions and the style of development. For instance it may not be feasible to fully offset the effects of development by constructing a roof tank due to architectural and landscaping concerns. Similarly rain gardens may be more applicable to green-fingered owners. This document provides flexibility for landowners to implement combinations of methods to be used. Sections 4 to 9 outline various stormwater management options, and provide appropriate design detail to select combinations of stormwater management techniques. 2-2

Stormwater Management Approach 2.4 Site Layouts An important first step is to understand where stormwater currently flows on the site. Obtain the relevant drainage plans from Council for the site. It is very important to consider the location of any development in relation to existing overland flow paths. Blockage of overland flow paths by construction of new buildings or landscaping can cause stormwater to be diverted into site or neighbouring buildings. This is one of the most common causes of localised flooding. Before progressing with any new development talk to Council about overland flow paths, to check if any run through the property and try and observe directly where water flows on the site when it rains. This will assist with designing the layout for a stormwater management system. The ultimate discharge point for stormwater from the site should be determined based on application of the process outlined in Section 2-1. When assessing the placement of stormwater detention devices, consideration of the proximity to residential dwellings needs to be made. For example if you are considering the use of a raingarden it should be located downgradient of the house and sufficient freeboard needs to be provided between the floor of the house and the stormwater detention area. The topography and ground stability of the site must also be considered. Rain gardens are likely to be unsuitable for steep sites. Figures 2-1 illustrates conceptual layouts of typical sites showing possible stormwater management systems that could be implemented to mitigate the effects of development on the environment and downstream infrastructure. 2-3

Stormwater Management Approach 2.5 Application of Methods not Listed in the Document This document is intended to be a guide to appropriate stormwater management on sites of 1,000 m 2 or less. The stormwater management measures listed in the document are simple to use and aimed at providing methods that are considered most applicable for the conditions encountered. However other variations of the methods proposed in this document may be used if designed in accordance with the ARC technical publications referenced earlier (Section 1.5). Details of all methods used and the design details should be included with any application for building consent. 2-5