ROANOKE STREET IMPROVEMENTS CHRISTIANSBURG, VIRGINIA VDOT PROJECT # U R24 UPC #:

Similar documents
PARKLET PROPOSAL PACKAGE & PROCESS

Access Management and Site Plan Review. Robert W. Hofrichter Asst Administrator, Transportation and Mobility Planning Division April 2014

Town of West Point Plan of Development

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION

ARTICLE 6: Special and Planned Development Districts

PROJECT SHOWING MINUTES

Green Book 7 th Edition Summary of Changes. Jim Rosenow NCITE Geometric Design Committee August 30, 2018

3. Additional driveways may be permitted where determined by the Planning Commission to adequately accommodate traffic or ensure public safety.

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

(APN: );

City of Mt. Juliet Planning & Zoning Department. Site Plan Checklist. Site plan cklist v1.18

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

2040 Long Range Transportation Plan

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

Pennsy Greenway Trail

Aashto Maintenance Manual For Roadways And Bridges Full Online

FIRE SERVICE FEATURES

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

Highway Oriented Commercial Development Criteria

ORDINANCE AN ORDINANCE TO ADD A NEW SECTION 4.N. IN THE ZONING CODE FOR THE TOWN OF MIDDLETOWN, RELATING TO MIXED-USE DEVELOPMENT

A/E REVIEW CHECKLIST SITE & LANDSCAPE

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

February 17, Sara Ullman Planner I. Sincerley,

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

Asbury Chapel Subdivision Sketch Plan

Section 9 Landscaping and Street Trees

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

Request Alternative Compliance (Commercial Parking Lot in Restricted Area) Staff Recommendation Approval. Staff Planner Ashby Moss

Design Speed / Target Speed Primer. Jim Rosenow AASHTO Technical Committee on Geometric Design June 12, 2018

Creating Complete Roadway Corridors:

Gloucester County PLAN SUBMITTER'S CHECKLIST

Rt. 29 Solutions Project Delivery Advisory Panel. December 3, 2015

COMPLETE GREEN STREET CHECKLIST

Reconstruction Project. Wayzata Task Force Meeting September 3, 2009

DESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

EXHIBIT A STEAMBOAT SPRINGS FIRE PREVENTION SERVICES ADMINISTRATIVE POLICY & PROCEDURE MANUAL

DRAFT MAP AMENDMENT FLU 04-4

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

CITY OF ZEELAND PLANNING COMMISSION

Project Overview. Get Involved. Public Information Meeting. Contact Information

20 November 12, 2014 Public Hearing APPLICANT:

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

June 17, ACHD Board of Commissioners. Mindy Wallace Planning Review Supervisor. PUD /Cantabria Apartments

ENGINEERS AND SURVEYORS INSTITUTE A public/private partnership CITY OF ALEXANDRIA, VIRGINIA MINIMUM SUBMISSION REQUIREMENTS SITE PLAN

INTER-AGENCY COORDINATION MEETING

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

This chapter provides minimum development standards supplementing the applicable standards as set forth in Chapter

PLAN SUBMITTER'S CHECKLIST

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Chain Bridge Road Sidewalk Improvements Citizen Council Work Session

CRESCENT RESOURCES INC.

Specification and Construction Plans For: South Bethany Landscaping Improvement Plan Contract Number T

Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort District Form- Based Code. Staff Recommendation Approval

DESIGN SCENE SUBJECT INDEX

APPENDIX G: TOWN ORDINANCE REVIEW

ARLINGTON COUNTY, VIRGINIA

understanding Green Infrastructure In Zoning

Florence County Small Commercial Land Disturbance Permit Application

Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project

Abingdon Urban Path System

Transportation Research Center

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

I.T.S. PLAN ALONG I-95 INSTALL FIBER OPTIC LINE PROJECT SHOWING Tuesday, June 18, 2013, 1:30pm Ashland Residency Conference Room

VDOT Vegetation Management Policy

Section 4(f) De Minimis Memorandum for the Hickman Road over Tuolumne River Bridge Replacement Project (Bridge No. 38C 0004)

ARTICLE 13 STREETS General

ARTICLE 13 STREETS General

Capital Projects impacting Odenton Town Center

MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION AGENDA

EXHIBIT A STEAMBOAT SPRINGS FIRE PREVENTION SERVICES ADMINISTRATIVE POLICY & PROCEDURE MANUAL

Proposed Staging Plan For:

CITY OF DAVIS DESIGN REVIEW INFORMATION CHECKLIST

Community Development Rezoning Report REZ14-006

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

Welcome to the. Citizen Information Meeting for the Martinsville Southern Connector Study. The purpose of this meeting is to:

The transportation system in a community is an

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

Berkshire Regional Planning Commission Clearinghouse Review Report

CONCEPT PLAN APPLICATION

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

startup. Construction of contractor entrance off University City Blvd connecting to Lot 8 has started.

Preserving Green Streetscape Character on Hillside Drive

Wiles Road from University Drive to Riverside Drive

Citizen Information Meeting

ARLINGTON COUNTY, VIRGINIA

ARTICLE 9: Landscaping

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

City of Burlington Downtown Street Design & Construction Standards

Site Development Plan (SDP) Checklist

September 28, 2017 Wentworth Avenue (CR 8) Sidewalk Improvements Open House

SECTION 1000 HIGHWAY CORRIDOR OVERLAY DISTRICT REGULATIONS

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1150 OF PUTNAM COUNTY, WEST VIRGINIA Page 95 ARTICLE 1150 SITE PLAN REVIEW

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.

Chapter 3 Site Planning and Low Impact Development

SITE PLAN REVIEW APPLICATION AND CHECKLIST

Transcription:

ROANOKE STREET IMPROVEMENTS CHRISTIANSBURG, VIRGINIA VDOT PROJECT # U000-154-R24 UPC #: 108868 VICINITY MAP This project is to be constructed in accordance with the Virginia Department of Transportation 2016 Road and Bridge Specifications as well as the 2016 Road and Bridge Standards, the American Association of State Highway and Transportation Officials (AASHTO), A Policy on Geometric Design of Highways and Streets, 2011; AASHTO Guide for the Planning, Design, and Operation of Pedestrian Facilities, July 2004, AASHTO Guide for Development of Bicycle Facilities, 2012, the Virginia Work Area Protection Manual, latest edition, the Virginia Erosion and Sediment Control Handbook, latest edition, the Manual on Uniform Traffic Control Devices, latest edition, the Standard Highway Signs Book, latest edition, and the project plans and technical specifications. LEGEND Town Certification: By signature of a person of responsible charge from the locality, the locality shall certify on the title sheets that the plans are complete, constructible, and biddable and accounted for, and all permits necessary for construction have been obtained. Signature Title X Date X INDEX OF SHEETS: 1. TITLE SHEET 2. GENERAL NOTES AND TYPICAL SECTIONS 2A. VDOT STANDARD DETAILS 3. SHEET LAYOUT 4-7. PLAN SHEETS 8-9. TEMPORARY TRAFFIC CONTROL 1

1/8" GENERAL NOTES TYPICAL SECTIONS 1 2 1 2 General Notes and Details SIDEWALK SECTION CONTROL JOINT EXPANSION JOINT 2

DATE: February 20, 2018 DRAWN BY: MDA CHECKED BY: JDW 2A VDOT Details HURT&

Roanoke Street SW Improvements (5' WIDE SIDEWALK WITH VARIABLE GRASS BUFFER STRIP) Inde Sheet 3

Roanoke Street SW Improvements (5' WIDE SIDEWALK WITH VARIABLE GRASS BUFFER STRIP) Plan Sheet 4

Roanoke Street SW Improvements (5' WIDE SIDEWALK WITH VARIABLE GRASS BUFFER STRIP) Plan Sheet 5

Roanoke Street SW Improvements (5' WIDE SIDEWALK WITH VARIABLE GRASS BUFFER STRIP) Plan Sheet 6

Roanoke Street SW Improvements (5' WIDE SIDEWALK WITH VARIABLE GRASS BUFFER STRIP) Plan Sheet 7

ROADWAY CLASSIFICATION PARK STREET - NOT CLASSIFIED, LOCAL (25 MPH) EAST STREET - NOT CLASSIFIED, LOCAL (25 MPH) PROJECT NUMBERS VDOT PROJECT NUMBER: U000-154-R08, P101, R201, M501 UPC: 105770 TEMPORARY TRAFFIC CONTROL REFERENCES TTC-1.0: WORK BEYOND THE SHOULDER OPERATION TTC-5.0: SHOULDER OPERATION WITH MINOR ENCROACHMENT TTC-24.0: NON-STATIONARY OPERATION ON A TWO-LANE ROADWAY USING FLAGGERS TTC-53.0: SIGNING FOR PROJECT LIMITS LOCAL EMERGENCY RESPONSE AGENCY CONTACT LIST (911) TOWN OF CHRISTIANSBURG POLICE DEPARTMENT 540-382-3131 TOWN OF CHRISTIANSBURG FIRE DEPARTMENT 540-382-4388 VDOT TRAFFIC OPERATIONS CENTER (SOUTHWEST REGION) 540-375-0170 VIRGINIA STATE POLICE (DIV. 6 AREA 40) 540-375-9518 SMART TRAFFIC 1-866-378-7743 PROPOSED CONSTRUCTION SEQUENCE EACH STAGE OF CONSTRUCTION WILL INCLUDE THE FOLLOWING GENERAL STEPS: 1. INSTALLATION OF PROJECT LIMITS SIGNAGE. 2. INSTALLATION OF APPROVED TEMPORARY TRAFFIC CONTROL MEASURES. 3. PERFORM DEMOLITION ACTIVITIES. 4. INSTALLATION OF PROPOSED PEDESTRIAN IMPROVEMENTS. 5. RESTORATION OF PROPERTY. 6. REMOVAL OF TEMPORARY TRAFFIC CONTROL MEASURES. 7. REMOVAL OF PROJECT LIMITS SIGNAGE. PROPOSED CONSTRUCTION PHASES INCLUDE (AS DETERMINED BY THE CONTRACTOR): SHOULDER WORK ON SOUTH SIDE OF PARK STREET PEDESTRIAN IMPROVEMENTS ADJACENT TO SOUTH SIDE OF PARK STREET WILL BEGIN WITH INSTALLATION OF TEMPORARY TRAFFIC CONTROL AND E&S MEASURES FOLLOWED BY THE REMOVAL OF CONFLICTING STRUCTURES WITHIN THE SHOULDERS AND INSTALLATION OF THE MSE RETAINING WALL, CG-6 CURB AND GUTTER, AND PROPOSED SIDEWALK. ONCE THE SIDEWALK IS ESTABLISHED, RESTORATION OF PROPERTY AND PERMANENT SEEDING WILL BE INSTALLED. FINALLY E&S MEASURES WILL BE REMOVED, AND TEMPORARY TRAFFIC CONTROL REMOVED. Temporary Traffic Control NOTES 1. PROJECT CATEGORY: TYPE A, CATEGORY II. 2. THIS PLAN DEPICTS A SUGGESTED SEQUENCE OF CONSTRUCTION FOR THIS PROJECT. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SEQUENCE PLAN TO GAIN APPROVAL FROM VDOT PRIOR TO BEGINNING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF LANE CLOSURES WITH VDOT. 3. TWO-LANE TRAFFIC SHALL BE MAINTAINED AT ALL TIMES UNLESS APPROVED BY THE ENGINEER. LANE WIDTHS SHALL BE A MINIMUM OF 10 FEET. FLAGGING OPERATIONS MAY BE REQUIRED FOR CERTAIN TASKS. THE USE OF FLAGGING OPERATIONS SHALL BE CARRIED OUT AS APPROVED AND DIRECTED BY THE ENGINEER. 4. VEHICULAR AND PEDESTRIAN ACCESS TO ADJOINING PROPERTIES SHALL BE MAINTAINED AT ALL TIMES. 5. ALL TEMPORARY TRAFFIC CONTROL PLANS AND MEASURES SHALL BE COMPLETED PER THE 2011 VDOT WORK AREA PROTECTION MANUAL AND AT NO ADDITIONAL COST TO THE OWNER. 8

ROADWAY CLASSIFICATION PARK STREET - NOT CLASSIFIED, LOCAL (25 MPH) EAST STREET - NOT CLASSIFIED, LOCAL (25 MPH) PROJECT NUMBERS VDOT PROJECT NUMBER: U000-154-R08, P101, R201, M501 UPC: 105770 TEMPORARY TRAFFIC CONTROL REFERENCES TTC-1.0: WORK BEYOND THE SHOULDER OPERATION TTC-5.0: SHOULDER OPERATION WITH MINOR ENCROACHMENT TTC-24.0: NON-STATIONARY OPERATION ON A TWO-LANE ROADWAY USING FLAGGERS TTC-53.0: SIGNING FOR PROJECT LIMITS LOCAL EMERGENCY RESPONSE AGENCY CONTACT LIST (911) TOWN OF CHRISTIANSBURG POLICE DEPARTMENT 540-382-3131 TOWN OF CHRISTIANSBURG FIRE DEPARTMENT 540-382-4388 VDOT TRAFFIC OPERATIONS CENTER (SOUTHWEST REGION) 540-375-0170 VIRGINIA STATE POLICE (DIV. 6 AREA 40) 540-375-9518 SMART TRAFFIC 1-866-378-7743 PROPOSED CONSTRUCTION SEQUENCE EACH STAGE OF CONSTRUCTION WILL INCLUDE THE FOLLOWING GENERAL STEPS: 1. INSTALLATION OF PROJECT LIMITS SIGNAGE. 2. INSTALLATION OF APPROVED TEMPORARY TRAFFIC CONTROL MEASURES. 3. PERFORM DEMOLITION ACTIVITIES. 4. INSTALLATION OF PROPOSED PEDESTRIAN IMPROVEMENTS. 5. RESTORATION OF PROPERTY. 6. REMOVAL OF TEMPORARY TRAFFIC CONTROL MEASURES. 7. REMOVAL OF PROJECT LIMITS SIGNAGE. PROPOSED CONSTRUCTION PHASES INCLUDE (AS DETERMINED BY THE CONTRACTOR): SHOULDER WORK ON SOUTH SIDE OF ROANOKE STREET PEDESTRIAN IMPROVEMENTS ADJACENT TO SOUTH SIDE OF ROANOKE STREET WILL BEGIN WITH INSTALLATION OF TEMPORARY TRAFFIC CONTROL AND E&S MEASURES FOLLOWED BY THE REMOVAL OF CONFLICTING STRUCTURES WITHIN THE SHOULDERS AND INSTALLATION OF THE CG-6 CURB AND GUTTER, AND PROPOSED SIDEWALK. ONCE THE SIDEWALK IS ESTABLISHED, RESTORATION OF PROPERTY AND PERMANENT SEEDING WILL BE INSTALLED. FINALLY E&S MEASURES WILL BE REMOVED, AND TEMPORARY TRAFFIC CONTROL REMOVED. Roanoke Improvements Temporary Traffic Control NOTES 1. PROJECT CATEGORY: TYPE A, CATEGORY II. 2. THIS PLAN DEPICTS A SUGGESTED SEQUENCE OF CONSTRUCTION FOR THIS PROJECT. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SEQUENCE PLAN TO GAIN APPROVAL FROM VDOT PRIOR TO BEGINNING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF LANE CLOSURES WITH VDOT. 3. TWO-LANE TRAFFIC SHALL BE MAINTAINED AT ALL TIMES UNLESS APPROVED BY THE ENGINEER. LANE WIDTHS SHALL BE A MINIMUM OF 10 FEET. FLAGGING OPERATIONS MAY BE REQUIRED FOR CERTAIN TASKS. THE USE OF FLAGGING OPERATIONS SHALL BE CARRIED OUT AS APPROVED AND DIRECTED BY THE ENGINEER. 4. VEHICULAR AND PEDESTRIAN ACCESS TO ADJOINING PROPERTIES SHALL BE MAINTAINED AT ALL TIMES. 5. ALL TEMPORARY TRAFFIC CONTROL PLANS AND MEASURES SHALL BE COMPLETED PER THE 2011 VDOT WORK AREA PROTECTION MANUAL AND AT NO ADDITIONAL COST TO THE OWNER. 9