ROANOKE STREET IMPROVEMENTS CHRISTIANSBURG, VIRGINIA VDOT PROJECT # U000-154-R24 UPC #: 108868 VICINITY MAP This project is to be constructed in accordance with the Virginia Department of Transportation 2016 Road and Bridge Specifications as well as the 2016 Road and Bridge Standards, the American Association of State Highway and Transportation Officials (AASHTO), A Policy on Geometric Design of Highways and Streets, 2011; AASHTO Guide for the Planning, Design, and Operation of Pedestrian Facilities, July 2004, AASHTO Guide for Development of Bicycle Facilities, 2012, the Virginia Work Area Protection Manual, latest edition, the Virginia Erosion and Sediment Control Handbook, latest edition, the Manual on Uniform Traffic Control Devices, latest edition, the Standard Highway Signs Book, latest edition, and the project plans and technical specifications. LEGEND Town Certification: By signature of a person of responsible charge from the locality, the locality shall certify on the title sheets that the plans are complete, constructible, and biddable and accounted for, and all permits necessary for construction have been obtained. Signature Title X Date X INDEX OF SHEETS: 1. TITLE SHEET 2. GENERAL NOTES AND TYPICAL SECTIONS 2A. VDOT STANDARD DETAILS 3. SHEET LAYOUT 4-7. PLAN SHEETS 8-9. TEMPORARY TRAFFIC CONTROL 1
1/8" GENERAL NOTES TYPICAL SECTIONS 1 2 1 2 General Notes and Details SIDEWALK SECTION CONTROL JOINT EXPANSION JOINT 2
DATE: February 20, 2018 DRAWN BY: MDA CHECKED BY: JDW 2A VDOT Details HURT&
Roanoke Street SW Improvements (5' WIDE SIDEWALK WITH VARIABLE GRASS BUFFER STRIP) Inde Sheet 3
Roanoke Street SW Improvements (5' WIDE SIDEWALK WITH VARIABLE GRASS BUFFER STRIP) Plan Sheet 4
Roanoke Street SW Improvements (5' WIDE SIDEWALK WITH VARIABLE GRASS BUFFER STRIP) Plan Sheet 5
Roanoke Street SW Improvements (5' WIDE SIDEWALK WITH VARIABLE GRASS BUFFER STRIP) Plan Sheet 6
Roanoke Street SW Improvements (5' WIDE SIDEWALK WITH VARIABLE GRASS BUFFER STRIP) Plan Sheet 7
ROADWAY CLASSIFICATION PARK STREET - NOT CLASSIFIED, LOCAL (25 MPH) EAST STREET - NOT CLASSIFIED, LOCAL (25 MPH) PROJECT NUMBERS VDOT PROJECT NUMBER: U000-154-R08, P101, R201, M501 UPC: 105770 TEMPORARY TRAFFIC CONTROL REFERENCES TTC-1.0: WORK BEYOND THE SHOULDER OPERATION TTC-5.0: SHOULDER OPERATION WITH MINOR ENCROACHMENT TTC-24.0: NON-STATIONARY OPERATION ON A TWO-LANE ROADWAY USING FLAGGERS TTC-53.0: SIGNING FOR PROJECT LIMITS LOCAL EMERGENCY RESPONSE AGENCY CONTACT LIST (911) TOWN OF CHRISTIANSBURG POLICE DEPARTMENT 540-382-3131 TOWN OF CHRISTIANSBURG FIRE DEPARTMENT 540-382-4388 VDOT TRAFFIC OPERATIONS CENTER (SOUTHWEST REGION) 540-375-0170 VIRGINIA STATE POLICE (DIV. 6 AREA 40) 540-375-9518 SMART TRAFFIC 1-866-378-7743 PROPOSED CONSTRUCTION SEQUENCE EACH STAGE OF CONSTRUCTION WILL INCLUDE THE FOLLOWING GENERAL STEPS: 1. INSTALLATION OF PROJECT LIMITS SIGNAGE. 2. INSTALLATION OF APPROVED TEMPORARY TRAFFIC CONTROL MEASURES. 3. PERFORM DEMOLITION ACTIVITIES. 4. INSTALLATION OF PROPOSED PEDESTRIAN IMPROVEMENTS. 5. RESTORATION OF PROPERTY. 6. REMOVAL OF TEMPORARY TRAFFIC CONTROL MEASURES. 7. REMOVAL OF PROJECT LIMITS SIGNAGE. PROPOSED CONSTRUCTION PHASES INCLUDE (AS DETERMINED BY THE CONTRACTOR): SHOULDER WORK ON SOUTH SIDE OF PARK STREET PEDESTRIAN IMPROVEMENTS ADJACENT TO SOUTH SIDE OF PARK STREET WILL BEGIN WITH INSTALLATION OF TEMPORARY TRAFFIC CONTROL AND E&S MEASURES FOLLOWED BY THE REMOVAL OF CONFLICTING STRUCTURES WITHIN THE SHOULDERS AND INSTALLATION OF THE MSE RETAINING WALL, CG-6 CURB AND GUTTER, AND PROPOSED SIDEWALK. ONCE THE SIDEWALK IS ESTABLISHED, RESTORATION OF PROPERTY AND PERMANENT SEEDING WILL BE INSTALLED. FINALLY E&S MEASURES WILL BE REMOVED, AND TEMPORARY TRAFFIC CONTROL REMOVED. Temporary Traffic Control NOTES 1. PROJECT CATEGORY: TYPE A, CATEGORY II. 2. THIS PLAN DEPICTS A SUGGESTED SEQUENCE OF CONSTRUCTION FOR THIS PROJECT. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SEQUENCE PLAN TO GAIN APPROVAL FROM VDOT PRIOR TO BEGINNING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF LANE CLOSURES WITH VDOT. 3. TWO-LANE TRAFFIC SHALL BE MAINTAINED AT ALL TIMES UNLESS APPROVED BY THE ENGINEER. LANE WIDTHS SHALL BE A MINIMUM OF 10 FEET. FLAGGING OPERATIONS MAY BE REQUIRED FOR CERTAIN TASKS. THE USE OF FLAGGING OPERATIONS SHALL BE CARRIED OUT AS APPROVED AND DIRECTED BY THE ENGINEER. 4. VEHICULAR AND PEDESTRIAN ACCESS TO ADJOINING PROPERTIES SHALL BE MAINTAINED AT ALL TIMES. 5. ALL TEMPORARY TRAFFIC CONTROL PLANS AND MEASURES SHALL BE COMPLETED PER THE 2011 VDOT WORK AREA PROTECTION MANUAL AND AT NO ADDITIONAL COST TO THE OWNER. 8
ROADWAY CLASSIFICATION PARK STREET - NOT CLASSIFIED, LOCAL (25 MPH) EAST STREET - NOT CLASSIFIED, LOCAL (25 MPH) PROJECT NUMBERS VDOT PROJECT NUMBER: U000-154-R08, P101, R201, M501 UPC: 105770 TEMPORARY TRAFFIC CONTROL REFERENCES TTC-1.0: WORK BEYOND THE SHOULDER OPERATION TTC-5.0: SHOULDER OPERATION WITH MINOR ENCROACHMENT TTC-24.0: NON-STATIONARY OPERATION ON A TWO-LANE ROADWAY USING FLAGGERS TTC-53.0: SIGNING FOR PROJECT LIMITS LOCAL EMERGENCY RESPONSE AGENCY CONTACT LIST (911) TOWN OF CHRISTIANSBURG POLICE DEPARTMENT 540-382-3131 TOWN OF CHRISTIANSBURG FIRE DEPARTMENT 540-382-4388 VDOT TRAFFIC OPERATIONS CENTER (SOUTHWEST REGION) 540-375-0170 VIRGINIA STATE POLICE (DIV. 6 AREA 40) 540-375-9518 SMART TRAFFIC 1-866-378-7743 PROPOSED CONSTRUCTION SEQUENCE EACH STAGE OF CONSTRUCTION WILL INCLUDE THE FOLLOWING GENERAL STEPS: 1. INSTALLATION OF PROJECT LIMITS SIGNAGE. 2. INSTALLATION OF APPROVED TEMPORARY TRAFFIC CONTROL MEASURES. 3. PERFORM DEMOLITION ACTIVITIES. 4. INSTALLATION OF PROPOSED PEDESTRIAN IMPROVEMENTS. 5. RESTORATION OF PROPERTY. 6. REMOVAL OF TEMPORARY TRAFFIC CONTROL MEASURES. 7. REMOVAL OF PROJECT LIMITS SIGNAGE. PROPOSED CONSTRUCTION PHASES INCLUDE (AS DETERMINED BY THE CONTRACTOR): SHOULDER WORK ON SOUTH SIDE OF ROANOKE STREET PEDESTRIAN IMPROVEMENTS ADJACENT TO SOUTH SIDE OF ROANOKE STREET WILL BEGIN WITH INSTALLATION OF TEMPORARY TRAFFIC CONTROL AND E&S MEASURES FOLLOWED BY THE REMOVAL OF CONFLICTING STRUCTURES WITHIN THE SHOULDERS AND INSTALLATION OF THE CG-6 CURB AND GUTTER, AND PROPOSED SIDEWALK. ONCE THE SIDEWALK IS ESTABLISHED, RESTORATION OF PROPERTY AND PERMANENT SEEDING WILL BE INSTALLED. FINALLY E&S MEASURES WILL BE REMOVED, AND TEMPORARY TRAFFIC CONTROL REMOVED. Roanoke Improvements Temporary Traffic Control NOTES 1. PROJECT CATEGORY: TYPE A, CATEGORY II. 2. THIS PLAN DEPICTS A SUGGESTED SEQUENCE OF CONSTRUCTION FOR THIS PROJECT. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SEQUENCE PLAN TO GAIN APPROVAL FROM VDOT PRIOR TO BEGINNING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF LANE CLOSURES WITH VDOT. 3. TWO-LANE TRAFFIC SHALL BE MAINTAINED AT ALL TIMES UNLESS APPROVED BY THE ENGINEER. LANE WIDTHS SHALL BE A MINIMUM OF 10 FEET. FLAGGING OPERATIONS MAY BE REQUIRED FOR CERTAIN TASKS. THE USE OF FLAGGING OPERATIONS SHALL BE CARRIED OUT AS APPROVED AND DIRECTED BY THE ENGINEER. 4. VEHICULAR AND PEDESTRIAN ACCESS TO ADJOINING PROPERTIES SHALL BE MAINTAINED AT ALL TIMES. 5. ALL TEMPORARY TRAFFIC CONTROL PLANS AND MEASURES SHALL BE COMPLETED PER THE 2011 VDOT WORK AREA PROTECTION MANUAL AND AT NO ADDITIONAL COST TO THE OWNER. 9