Greater Albany Public Schools May 2017 Ballot Measure for School Repairs, Crowding and Job Training

Similar documents
Briar Crest Elementary

2014 Bond District-wide Facility Repairs

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

2014 Bond District-wide Facility Repairs

PLATTEVILLE MIDDLE SCHOOL

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

Master Facility Planning Update School Board Meeting May 26, 2016

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

School District of Milton 5- Year Capital Maintenance and Improvement Plan

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Florence High School / Middle School Page 1 of 3 Florence, WI

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

2014 Bond Project Guide

Facility Improvements

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015

Forest Hills Facilities Plan

Tillamook High School Bond Projects

Alessandro Volta Elementary School

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

NYC Department of Education

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

Richard Henry Lee Elementary School

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

Ashland School District Facility & Capacity Assessment Report 2005

John Palmer Elementary School

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

Washington Irving Elementary School

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

Master Project List Report

Genevieve Melody Elementary School

Josefa Ortiz De Dominguez Elementary School

Calmeca Academy of Fine Arts and Dual Language

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

NYC Department of Education

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

Agustin Lara Elementary Academy

NYC Department of Education

Edward Jenner Elementary Academy of the Arts

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

DeWitt Clinton Elementary School

Charles W Earle Elementary School

NYC Department of Education

George B Swift Elementary Specialty School

Rockwell/Johnson School Renovations Project. Existing Conditions September, 2016

Oxford Hills School District Capital Renewal Plan Updated March 2017

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

REPORT CARD TO THE COMMUNITY MAY 15, 2018

NYC Department of Education

NYC Department of Education

NYC Department of Education

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

Sidney Sawyer Elementary School

NYC Department of Education

Francis M McKay Elementary School

HVAC / Boilers / Hot Water. Expected Life Span. very rough estimates Condition/Issue Age. Athletics / Gyms

NYC Department of Education

NYC Department of Education

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1

Joseph Brennemann Elementary School

NYC Department of Education

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.

NYC Department of Education

Facilities Master Planning

NYC Department of Education

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

Design Presentation. Chief Operations Officer Willie Burroughs

GARCIA GALUSKA DESOUSA Consulting Engineers

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Oscar DePriest Elementary School

NYC Department of Education

NYC Department of Education

5 Year Capital Improvement Plan Update

NYC Department of Education

New High School Concept

Updated: 8/16/ Facilities Profile

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL

Siemens Building Technology MEP Existing Conditions

NYC Department of Education

Comprehensive Inspection Agency (CIA) RESIDENTIAL & COMMERCIAL FEE SCHEDULE

6. Discussion of Existing Conditions

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

NYC Department of Education

NORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS. Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan

NYC Department of Education

NYC Department of Education

Mechanical System Description

January 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining.

Transcription:

PUBLIC SCHOOLS Greater Albany Public s for Repairs, Crowding and Job Training CRITICAL FACILITY UPGRADES ADA Improvements: Architectural Improvements: Envelope Improvements Including Roofs: Exterior Improvements: Fire/Life/Safety Improvements: Hazardous Material Abatement & Floor Replacement: Mechanical/Electrical/Plumbing Improvements: Site Work Improvements: Technology Improvements: $ 2,572,000 $ 4,226,000 $ 14,436,000 $ 235,000 $ 3,834,000 $ 3,977,000 $ 17,205,000 $ 2,425,000 $ 1,090,000 $ 50,000,000 ELEMENTARY SCHOOLS Oak Grove Elementary Site Add new classrooms, a cafeteria, bus loading zone, and a modernization of the existing building creating a minimum capacity of 400 students. $ 18,000,000 New Elementary Construct a new school with a minimum capacity of 500 students in Northeast Albany. $ 36,000,000 HIGH SCHOOLS West Albany High Construct the first phase of a school replacement which will include classrooms, multi-purpose commons space, vocational-technical education space, and an auditorium. South Albany High Auxiliary gymnasium/multipurpose vocational-technical education space Existing Little Theatre Renovations Modernization and expansion of vocational-technical education spaces $ 42,000,000 $ 3,500,000 $ 500,000 $ 6,000,000 MIDDLE SCHOOL VOCATIONAL-TECHNICAL Middle Vocational-Technical Education Space Remodeling $ 3,000,000 TOTAL $ 159,000,000 Note: Each project amount is an estimate, actual costs will vary. Feb. 13, 2017

PUi3LIC SCHOOL.S Greater Albany Public s Critical Facility Upgrades by Location Albany Community Pool $ 1,218,000 Albany Options $ 64,000 Calapooia Middle $ 6,170,000 Central Elementary $ 795,000 Clover Ridge Elementary $ 85,000 District Office $ 475,000 Facilities Building $ 911,000 Fairmount $ 463,000 Fir Grove Elementary $ 107,000 Lafayette Elementary $ 3,417,000 Liberty Elementary $ 2,949,000 Memorial Middle $ 3,904,000 North Albany Elementary $ 867,000 North Albany Middle $ 4,948,000 Oak Elementary $ 1,137,000 Oak Grove Elementary $ 586,000 Periwinkle Elementary $ 1,443,000 South Albany High $ 7,946,000 South Shore Elementary $ 2,259,000 Sunrise Elementary $ 1,992,000 Takena Elementary $ 1,006,000 Tangent Elementary $ 799,000 Timber Ridge $ 83,000 West Albany High $ 4,601,000 Waverly Elementary $ 1,784,000 $ 50,009,000 (Not $SOM as a result ofrounding)

F'UHLIC SCHO(JL.~; Greater Albany Public s Critical Facility Upgrades: Albany Community Pool Albany Community Pool Replace fire alarm control panel with new. Add smoke detection as 47,000 needed to comply with code for fully sprinklered building and mechanical system requirements. Add audible and visual notification appliances in occupied areas. Albany Community Pool Replace existing pool water heat exchanger and control valve. 66,000 Albany Community Pool Install better ventilation for the pool mechanical area. 79,000 Albany Community Pool Install insulation and/or protective finishes on metal services in the pool 39,000 mechanical area. Albany Community Pool Remove all existing pneumatic controllers, actuators and thermostats if 63,000 existing systems remain. Install all electronic devices. If new HVAC systems are installed, new diqital controls to be provided. Albany Community Pool Replace the boiler with a new more efficient boiler. 102,000 Albany Community Pool Replace the four ventilation units with new units for higher ventilation rates. 598,000 Albany Community Pool Roofing 157,000 Albany Community Pool Includes Mech Piping Insulation, VAT removal+ new VCT Flooring. 67,000 1,218,000

PUi3L.IC SCHOOLS Greater Albany Public s Critical Facility Upgrades: Albany Options Albany Options CORE Network, Infrastructure, Security Cameras, and VOiP upgrades 64,000 64,000

r>ljbl!c SCHOC)LS Greater Albany Public s Critical Facility Upgrades: Calapooia Middle Calapooia Middle Replace the tunnel exhaust fans with a new ventilation system. 27,000 Calapooia Middle Remove all existing pneumatic controllers, actuators and thermostats if 189,000 existing systems remain. Install all electronic devices. If new HVAC svstems are installed, new diaital controls to be orovided. Calapooia Middle Commission the controls to verify proper operation. 79,000 Calapooia Middle Remove unused control panels and devices. 12,000 Calapooia Middle Rebuild Tunnel fan systems in place at 6 ea. locations. 897,000 Calapooia Middle Sections of the parking lot are failing. 677,000 Calapooia Middle Replacement of Plumbing Fixtures and Piping 58,000 Calapooia Middle Replace galvanized pipe with new copper pipe. 71,000 Calapooia Middle Restrooms rehabilitation and ADA improvements 39,000 Calapooia Middle Replace 250 lockers in PE locker rooms (& refurbish space as needed) 512,000 Calapooia Middle Food Science Classroom Upgrade 366,000 Calapooia Middle Roofing. 1,843,000 Calapooia Middle Seismic reinforce gyms and cafeteria. 298,000 Calapooia Middle Seismic capacity of connections along window walls recommended. 477,000 Calapooia Middle Seismically reinforce boiler chimney or demo 29,000 Calapooia Middle CORE Network, Infrastructure, Security Cameras, and VOiP upgrades 70,000 Calapooia Middle IT wiring in modular. 16,000 Calapooia Middle Includes Mech Piping Insulation, VAT removal+ new VCT Flooring. 435,000 Calapooia Middle Storm Water Emergency Generator 75,000 6,170,000

., Greater GREATER ALBANY PUBLIC SCi-{()OLS Albany Public s Critical Facility Upgrades: Central Elementary Central Elementary existinq fire alarm devices and cablinq. Central Elementary Provide exhaust for kitchen equipment. 25,000 Central Elementary Wheel chair Lift 364,000 Central Elementary The parking lot pavement is failing. 110,000 Central Elementary Replacement of Plumbing Fixtures and Piping 29,000 Central Elementary Includes Mech Piping Insulation, VAT removal+ newvct Flooring. 77,000 Central Elementary Intercom System: Remove existing system and replace with new. 39,000 Central Elementary Restrooms rehabilitation and ADA improvements 121,000 795,000

-~), Greater GREATER ALBANY PlJF3L.IC SCHOOLS Albany Public s Critical Facility Upgrades: Clover Ridge Elementary Clover Ridge Elementary Roofing 85,000 85,000

PlJBL!C SCHC)()LS Greater Albany Public s Critical Facility Upgrades: District Office District Office existino fire alarm devices and cablino. District Office Sidewalk in front of building is failing. 22,000 District Office Roofing 370,000 District Office Seismic brace ornate features over exit doors with Heli-Ties. 53,000 475,000

PUElUC SCHOOLS Greater Albany Public s Critical Facility Upgrades: Facilities Project Cost($) Facilities Replacement Weld shop and storage (meet OSHA Requirement) 632,000 Facilities Roofing 279,000 911,000

Pt)13L!C SCHO()L ~; Greater Albany Public s Critical Facility Upgrades: Fairmount Fairmount existinq fire alarm devices and cablinq. Fairmount Replace older classroom unit ventilators with new gas furnaces. 63,000 Fairmount Remove all existing pneumatic controllers, actuators and thermostats if 51,000 existing systems remain. Install all electronic devices. If new HVAC systems are installed, new diqital controls to be provided. Fairmount Commission the controls to verify proper operation. 32,000 Fairmount Replacement of Plumbing Fixtures and Piping 13,000 Fairmount Replace all galvanized pipe with copper piping and insulate per code. 32,000 Fairmount Roofing 2 Fairmount Includes Mech Piping Insulation, VAT removal+ newvct Flooring. 12,000 463,000

... Greater GREATER ALBANY f>u[3uc SCHOOLS Albany Public s Critical Facility Upgrades: Fir Grove Elementary Fir Grove Elementary existina fire alarm devices and cablina. Fir Grove Elementary Includes Mech Piping Insulation, VAT removal+ new VCT Flooring. 77,000 107,000

PUBUC c,choo!-s Greater Albany Public s Critical Facility Upgrades: Lafayette Elementary Lafayette Elementary existina fire alarm devices and cablina. Lafayette Elementary Replace Overhead Fire Doors 11,000 Lafayette Elementary Remove all existing pneumatic controllers, actuators and thermostats if 43,000 existing systems remain. Install all electronic devices. If new HVAC svstems are installed, new diaital controls to be provided. Lafayette Elementary Commission the controls to verify proper operation. 39,000 Lafayette Elementary Replace older unit ventilators. 19,000 Lafayette Elementary Replace heat pumps with unit ventilators. 331,000 Lafayette Elementary Replace Gym direct fired units and companion exhaust fans with more 220,000 enerav efficient and areater ventilation capacitv units. Lafayette Elementary Replacement of Plumbing Fixtures and Piping 27,000 Lafayette Elementary Replace galvanized domestic water piping with copper pipe and insulate. 43,000 Lafayette Elementary Restrooms rehabilitation and ADA improvements 316,000 Lafayette Elementary Roofing 1,868,000 Lafayette Elementary Replace clock system. 35,000 Lafayette Elementary Intercom System: Remove existing system and replace with new. 39,000 Lafayette Elementary Includes Mech Piping Insulation, VAT removal+ new VCT Flooring. 396,000 3,417,000

4~ ~). GREATER ALBANY PUi3L!C SCHO()L.S Greater Albany Public s Critical Facility Upgrades: Liberty Elementary Liberty Elementary existinq fire alarm devices and cablinq. Liberty Elementary Replace Overhead Fire Doors 15,000 Liberty Elementary Commission the controls to verify proper operation. 39,000 Liberty Elementary Insulate all steam and condensate return piping, subject to units being 9,000 reolaced with other svstems. Liberty Elementary Chang Steam to 100% Hot Water Heating 79,000 Liberty Elementary Replace the Multizone units with newer more energy efficient systems. Replace HVU and CEU units and the rooftop units with similar new units. 441,000 Liberty Elementary Remove all existing pneumatic controllers, actuators and thermostats if 79,000 existing systems remain. Install all electronic devices. If new HVAC systems are installed, new diaital controls to be orovided. Liberty Elementary The existing parking lot paving is failing. 85,000 Liberty Elementary The concrete along the existing building needs replacement. 28,000 Liberty Elementary The parking lot is too small. 82,000 Liberty Elementary Add parent loop. 194,000 Liberty Elementary Replacement of Plumbing Fixtures and Piping 22,000 Liberty Elementary Restrooms rehabilitation and ADA improvements 140,000 Liberty Elementary Roofing. 1,360,000 Liberty Elementary Includes Mech Piping Insulation, VAT removal+ new VCT Flooring. 346,000 2,949,000

PUBLIC SCHOOLS Greater Albany Public s Critical Facility Upgrades: Memorial Middle Memorial Middle Replace electrical baseboard heat in 813. 9,000 Memorial Middle Remove all existing pneumatic controllers, actuators and thermostats if 205,000 existing systems remain. Install all electronic devices. If new HVAC systems are installed, new diqital controls to be provided. Memorial Middle Commission the controls to verify proper operation. 71,000 Memorial Middle Remove unused control panels and devices. 12,000 Memorial Middle Rebuild Tunnel fan systems in place at 8 ea. locations. 1,196,000 Memorial Middle Replacement of Plumbing Fixtures and Piping 63,000 Memorial Middle Replace galvanized pipe with new copper pipe. 71,000 Memorial Middle Restrooms need finish and ADA improvements. 35,000 Memorial Middle Food Science Classroom Upgrade 366,000 Memorial Middle Replace 250 lockers in PE locker rooms (& refurbish space as needed) 512,000 Memorial Middle Seismic capacity of connections at gyms and cafeteria. 288,000 Memorial Middle Seismically reinforce boiler chimney or demo 29,000 Memorial Middle Reinforce window walls. 477,000 Memorial Middle CORE Network, Infrastructure, Security Cameras, and VOiP upgrades 74,000 Memorial Middle IT wiring in modular. 16,000 Memorial Middle Includes Mech Piping Insulation, VAT removal+ new VCT Flooring. 405,000 Memorial Middle Storm Water Emergency Generator 75,000 3,904,000

PlJF3L!C SCf-. l()ol.s Greater Albany Public s Critical Facility Upgrades: North Albany Elementary North Albany Elementary existino fire alarm devices and cablino. North Albany Elementary Replacement of Plumbing Fixtures and Piping 17,000 North Albany Elementary Roofing. 555,000 North Albany Elementary Intercom System: Remove existing system and replace with new. 39,000 North Albany Elementary Includes Mech Piping Insulation, VAT removal+ new VCT Flooring. 226,000 867,000

., Greater GREATER ALBANY PUE:i!.. IC SCf l()c)ls Albany Public s Critical Facility Upgrades: North Albany Middle North Albany Middle Replace MCC equipment at Boiler Room and Attic with new. 94,000 North Albany Middle existinq fire alarm devices and cablinq. North Albany Middle Replace overhead fire doors 15,000 North Albany Middle Replace hallway heaters with like. 57,000 North Albany Middle Replace the Multizone unit with newer more energy efficient unit. Replace HVU and CEU units with similar new units. To include lower gym units 937,000 North Albany Middle Replace older classroom unit ventilators. 179,000 North Albany Middle Remove all existing pneumatic controllers, actuators and thermostats if 165,000 existing systems remain. Install all digital control devices. If new HVAC systems are installed, new diqital controls to be orovided. North Albany Middle Commission the controls to verify proper operation. 118,000 North Albany Middle Remove abandoned panels and control devices. 12,000 North Albany Middle Hard surface outdoor multipurpose court resurface 54,000 North Albany Middle Replacement of Plumbing Fixtures and Piping 66,000 North Albany Middle Replace all galvanized water piping. 28,000 North Albany Middle Restrooms need finish and ADA improvements. 176,000 North Albany Middle Replace 250 lockers in PE locker rooms (& refurbish space as needed) 510,000 North Albany Middle Food Science Classroom Upgrade 397,000 North Albany Middle Roofing 335,000 North Albany Middle Checking seismic capacity of window wall areas recommended. 198,000 North Albany Middle Seismic reinforce gyms and cafeteria. 310,000 North Albany Middle CORE Network, Infrastructure, Security Cameras, and VOiP upgrades 79,000 North Albany Middle Uninsulated window glazing. unable to obtain repair parts for opening 851,000 hardware North Albany Middle Includes Mech Piping Insulation, VAT removal+ new VCT Flooring. 337,000 4,948,000

PlJEH.. /C SCHOOLS Greater Albany Public s Critical Facility Upgrades: Oak Elementary Oak Elementary ADA Playground 84,000 Oak Elementary existinq fire alarm devices and cablinq. Oak Elementary Replace Overhead Fire Doors 15,000 Oak Elementary Remove all existing pneumatic controllers, actuators and thermostats if 98,000 existing systems remain. Install all electronic devices. If new HVAC svstems are installed, new diaital controls to be orovided. Oak Elementary Commission the controls to verify proper operation. 39,000 Oak Elementary Remove abandoned panels and control devices. 8,000 Oak Elementary Replace classroom unit ventilators with new. 113,000 Oak Elementary Replace Roof Top Unit with like. - Oak Elementary Replace the Multizone units with newer more energy efficient systems. Replace HVU and CEU units and the rooftop unit with similar new units. 275,000 Oak Elementary The original parking lot paving is failing. 91,000 Oak Elementary Replacement of Plumbing Fixtures and Piping 27,000 Oak Elementary Replace galvanized domestic water piping with copper pipe and insulate. 43,000 Oak Elementary Restrooms rehabilitation and ADA improvements 140,000 Oak Elementary Roofing 13,000 Oak Elementary Includes Mech Piping Insulation, VAT removal+ new VCT Flooring. 161,000 1,137,000

,,.I. GREATER ALBANY PUBLIC SCHC)()L.S Greater Albany Public s Critical Facility Upgrades: Oak Grove Elementary Oak Grove Elementary Replacement of Plumbing Fixtures and Piping 16,000 Oak Grove Elementary Roofing Pod and Gym & Existing classrooms 342,000 Oak Grove Elementary Replace (19) Trane units (2) 1-1/2 Ton, (7) 3 Ton, (3) 4 Ton, (3) 5 Ton, (4) 161,000 7-1/2 Ton) and (1) makeup air unit with new package rooftop units. Mixing boxes and duct work for heatinq two classrooms without RTU Oak Grove Elementary Includes Mech Piping Insulation, VAT removal+ new VCT Flooring. 67,000 586,000

PUBLIC SCHOC)LS Greater Albany Public s Critical Facility Upgrades: Periwinkle Elementary Periwinkle Elementary existino fire alarm devices and cablino. Periwinkle Elementary Commission the controls to verify proper operation. 39,000 Periwinkle Elementary Replacement of Plumbing Fixtures and Piping 26,000 Periwinkle Elementary Replace the remaining existing galvanized piping. 43,000 Periwinkle Elementary Restrooms rehabilitation and ADA improvements 211,000 Periwinkle Elementary Roofing. 669,000 Periwinkle Elementary CORE Network, Infrastructure, Security Cameras, and VOiP upgrades 208,000 Periwinkle Elementary Replace clock system. 35,000 Periwinkle Elementary Intercom System: Remove existing system and replace with new. 39,000 Periwinkle Elementary Includes Mech Piping Insulation, VAT removal+ new VCT Flooring. 143,000 1,443,000

PUBLIC SCHOOLS Greater Albany Public s Critical Facility Upgrades: South Albany High South Albany High Replace MCC equipment (some in attic and some on floor) at buildings 1 619,000 thru 10 and Central Plant with new. South Albany High existina fire alarm devices and cabling. South Albany High Replace fiberglass ductwork. 252,000 South Albany High Replace units that are 20 years and older and seismically brace. 2,4 South Albany High Remove all existing pneumatic controllers, actuators and thermostats if 472,000 existing systems remain. Install all electronic devices. If new HVAC svstems are installed, new diaital controls to be provided. South Albany High Commission new controls to verify proper operation. 102,000 South Albany High The pavement between the pool building and the gym/shop area is failing. 142,000 South Albany High The pavement in student parking area is failing. 79,000 South Albany High Replacement of Plumbing Fixtures and Piping 118,000 South Albany High Restrooms rehabilitation and ADA improvements 280,000 South Albany High Replace siding, windows, HVAC and roof on modular building. 138,000 South Albany High Roofing. 2,331,000 South Albany High CORE Network, Infrastructure, Security Cameras, and VOiP upgrades 141,000 South Albany High Improved Safety Through Fencing & KeyScan Door Hardware System 279,000 South Albany High Remove abandoned panels and control devices. 23,000 South Albany High Includes Mech Piping Insulation, VAT removal+ newvct Flooring. 510,000 7,946,000

PUBLIC SCHOOLS Greater Albany Public s Critical Facility Upgrades: South Shore Elementary South Shore Elementary existino fire alarm devices and cablino. South Shore Elementary Replace Overhead fire doors 15,000 South Shore Elementary Replace the Multizone units with newer more energy efficient systems. 386,000 Replace HVU and CEU units with similar new units. South Shore Elementary Remove all existing pneumatic controllers, actuators and thermostats if 71,000 existing systems remain. Install all electronic devices. If new HVAC svstems are installed, new dioital controls to be provided. South Shore Elementary Commission the controls to verify proper operation. 39,000 South Shore Elementary Remove abandoned panels and control devices. 8,000 South Shore Elementary The hard play area asphalt is deteriorating. 386,000 South Shore Elementary The original parking lot paving is failing. 91,000 South Shore Elementary Replacement of Plumbing Fixtures and Piping 29,000 South Shore Elementary Replace galvanized domestic water piping with copper pipe and insulate. 43,000 South Shore Elementary Restrooms rehabilitation and ADA improvements 140,000 South Shore Elementary Replace siding, windows, HVAC and roof on modular building. 550,000 South Shore Elementary Roofing. 349,000 South Shore Elementary Includes Mech Piping Insulation, VAT removal+ new VCT Flooring. 122,000 2,259,000

-~~ Greater Albany Public s GREATER ALBANY PUBLIC SCHOOL.S Critical Facility Upgrades: Sunrise Elementary Sunrise Elementary Old Cutler-Hammer load center (main corridor): Disconnect and remove 32,000 load center. Intercept the existing three branch circuits and backfeed from nearest 2008-vintaoe panel. Sunrise Elementary existino fire alarm devices and cablino. Sunrise Elementary Replace Overhead Fire door 28,000 Sunrise Elementary Change Steam to 100% Hot Water Heating 79,000 Sunrise Elementary Insulate all steam and condensate return piping. 19,000 Sunrise Elementary Remove all existing pneumatic controllers, actuators and thermostats. 87,000 Install new dioital controls for new air handlers. Sunrise Elementary Commission the controls to verify proper operation. 38,000 Sunrise Elementary Remove abandoned panels and control devices. 12,000 Sunrise Elementary Replace classroom unit ventilators with new. 38,000 Sunrise Elementary Replace cafeteria and Gym and other HVU units with new, more energy 441,000 efficient units. Sunrise Elementary Pave existing parking. 139,000 Sunrise Elementary Replacement of Plumbing Fixtures and Piping 33,000 Sunrise Elementary Replace galvanized domestic water piping with copper pipe and insulate. 43,000 Sunrise Elementary Restrooms rehabilitation and ADA improvements 140,000 Sunrise Elementary Roofing. 238,000 Sunrise Elementary CORE Network, Infrastructure, Security Cameras, and VOiP upgrades 40,000 Sunrise Elementary Uninsulated window glazing. 340,000 Sunrise Elementary Includes Mech Piping Insulation, VAT removal+ newvct Flooring. 215,000 1,992,000

.,. Greater GREATER ALBANY PUF3L!C SCHOC)LS Albany Public s Critical Facility Upgrades: Takena Elementary Takena Elementary existinq fire alarm devices and cablinq. Takena Elementary Replace overhead fire doors 15,000 Takena Elementary Replace classroom unit ventilators with new. 57,000 Takena Elementary Replace the Multizone units with newer more energy efficient systems. Replace HVU and CEU units and the rooftop units with similar new units. 386,000 Takena Elementary The stove and ovens in the kitchen should have a hood over them. 13,000 Takena Elementary Remove all existing pneumatic controllers, actuators and thermostats if 74,000 existing systems remain. Install all electronic devices. If new HVAC svstems are installed, new diaital controls to be orovided. Takena Elementary Commission the controls to verify proper operation. 39,000 Takena Elementary Remove abandoned panels and control devices. 8,000 Takena Elementary The original parking lot paving is failing. 100,000 Takena Elementary Replacement of Plumbing Fixtures and Piping 20,000 Takena Elementary Roofing. 164,000 Takena Elementary Includes Mech Piping Insulation, VAT removal+ newvct Flooring. 100,000 1,006,000

df~i\ GREATER ALBANY PU!3L!C SCHC)C)l_S Greater Albany Public s Critical Facility Upgrades: Tangent Elementary Tangent Elementary existino fire alarm devices and cablino. Tangent Elementary Replace the older HV units with new more energy efficient units. 220,000 Tangent Elementary There is no hood over the ovens or over the dishwasher. 13,000 Tangent Elementary Commission the controls to verify proper operation. 32,000 Tangent Elementary Remove unused control panels and devices. 6,000 Tangent Elementary Replace the classroom unit ventilators with new units. 57,000 Tangent Elementary Remove all existing pneumatic controllers, actuators and thermostats if 71,000 existing systems remain. Install all electronic devices. If new HVAC systems are installed, new diqital controls to be provided. Tangent Elementary The pavement near the play shed is uneven and needs repair or 28,000 replacement. Tangent Elementary Replacement of Plumbing Fixtures and Piping 16,000 Tangent Elementary Replace galvanized pipe with new copper pipe. 35,000 Tangent Elementary Restrooms rehabilitation and ADA improvements 140,000 Tangent Elementary Roofing Tangent Elementary CORE Network, Infrastructure, Security Cameras, and VOiP upgrades 38,000 Tangent Elementary Includes Mech Piping Insulation, VAT removal+ new VCT Flooring. 83,000 799,000

~ t\ GREATER ALBANY PUBLIC SCH()()LS Greater Albany Public s Critical Facility Upgrades: Timber Ridge Timber Ridge CORE Network, Infrastructure, Security Cameras, and VOiP upgrades 83,000 83,000

PUf3LIC SCHOOLS Greater Albany Public s Critical Facility Upgrades: West Albany High West Albany High existinq fire alarm devices and cablinq. West Albany High Add 2 ea. New Mini-Boilers to existing Gym and Cafeteria system. Replace 1,109,000 Gym Steam Units to Hot-water Units at 4 ea. Change Steam Coils to Hot Water Coils at Library, Cafeteria, Band and Choir at 6 ea. total. At Classrooms replace steam valves with digital controls 48 ea. Locations. Replace main steam zone valves in Boiler Room. West Albany High Replace units - counseling, matt room, and small theater. 28,000 West Albany High Remove all existing pneumatic controllers, actuators and thermostats if 275,000 existing systems remain. Install all electronic devices. If new HVAC systems are installed, new diqital controls to be provided. West Albany High Commission the controls to verify proper operation. 87,000 West Albany High Remove abandoned panels and control devices. 16,000 West Albany High Replace the tunnel exhaust fans with a new ventilation system. 51,000 West Albany High Football field lighting wiring needs replaced 96,000 West Albany High Concrete at grandstands is deteriorating and railings are damaged. 139,000 West Albany High Improved Safety Through Additional Cameras & KeyScan Door Hardware 184,000 Svstem West Albany High Replace grandstand planking at baseball field 35,000 West Albany High Replace last sewer pump and control panel 71,000 West Albany High Replacement of Plumbing Fixtures and Piping 87,000 West Albany High Restrooms rehabilitation and ADA improvements 281,000 West Albany High Roofing. 1,227,000 West Albany High Intercom System: Remove existing system and replace with new. 39,000 West Albany High Seismic reinforce boiler chimney 29,000 West Albany High Seismic reinforce gyms and cafeteria. 298,000 West Albany High CORE Network, Infrastructure, Security Cameras, and VOiP upgrades 57,000 West Albany High CORE Network, Infrastructure, Security Cameras, and VOiP upgrades 135,000 West Albany High Replace Ceiling Systems in Gyms That Are Too Low 208,000 West Albany High Includes Mech Piping Insulation, VAT removal+ newvct Flooring. 119,000 4,601,000

PUBLI(: SCHOC)LS Greater Albany Public s Critical Facility Upgrades: Waverly Elementary Waverly Elementary Old Cutler-Hammer load center (south corridor): Disconnect and remove 16,000 load center. Intercept the existing three branch circuits and backfeed from nearest 2009-vintaqe panel. Waverly Elementary existino fire alarm devices and cablino. Waverly Elementary Add audible/visual notification appliance in north/south running corridor, 8,000 providina notification coveraae at this area. Waverly Elementary Replace overhead fire doors 15,000 Waverly Elementary Replace the Multizone units with newer more energy efficient systems. Replace HVU and CEU units and the rooftop units with similar new units. 331,000 Waverly Elementary Chang Steam to 100% Hot Water Heating 79,000 Waverly Elementary Remove all existing pneumatic controllers, actuators and thermostats if 79,000 existing systems remain. Install all electronic devices. If new HVAC systems are installed, new diqital controls to be provided. Waverly Elementary Commission the controls to verify proper operation. 39,000 Waverly Elementary Remove abandoned panels and control devices. 8,000 Waverly Elementary Replace classroom unit ventilators with new. 38,000 Waverly Elementary Replace all Kitchen Makeup air unit and Gym unit with package rooftop 110,000 units. Waverly Elementary The parking lot paving is failing. 84,000 Waverly Elementary Replacement of Plumbing Fixtures and Piping 26,000 Waverly Elementary Replace the domestic water piping with copper pipe and insulate. 43,000 Waverly Elementary Roofing. 194,000 Waverly Elementary Uninsulated window glazing. 607,000 Waverly Elementary Includes Mech Piping Insulation, VAT removal+ new VCT Flooring. 77,000 1,784,000