IAQ: Re-tuning Commercial Buildings

Similar documents
Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

HVAC Controls Upgrades: Requirement Details ( )

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

HVAC Controls Upgrades: Requirement Details ( )

Improving Performance with a Building Tune-Up. Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks

ASHRAE JOURNAL ON REHEAT

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

Dehumidifying with Dedicated Outdoor Air

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS

BES-TECH TECHNOLOGY & SYSTEM INTEGRATION

SEQUENCE OF OPERATION GUIDELINE. AIR TERMINAL UNITS SINGLE DUCT VARIABLE AIR VOLUME with HOT WATER REHEAT or ELECTRIC HEAT

Paul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA

DIGI-VAV APPLICATIONS

City of Duluth Festival Center 04/25

Zone. In the. Contractors and technicians may often find themselves. In today s wired world, zoning has evolved from wired to wireless.

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

BAS Point Trend Data Guidance

Designing Energy Efficient Outdoor Air Systems

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

BUILDING VENTILATION GUIDE

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

Selected Laboratory Energy Efficiency Measures

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM

BUILDING VENTILATION GUIDE FOR LG HVAC SYSTEM INSTALLATION

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

REPRODUCTION/DISTRIBUTION IS PROHIBITED. Energy-Savings Strategies for. Rooftop

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

SECTION FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION

Job Name Control Systems Description Date

control sequences model QST / EST Series Table 47: QST / EST Analog Electronic Control Strategies Fan Powered Air Terminals

SESSION Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE ( ) ASHRAE Detroit Members:

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings

Submitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner

Technical Assignment 3 11/15/04. Executive Summary

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

I N STALL AT ION & O PERATIO N MANUAL TA 1/ TA 2 CONTROLLER. Redefine your comfort zone.

OSU Alumni Center Phase I Implementation Review. Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon

1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is.

TESTING, ADJUSTING AND BALANCING

SYNOPSIS. Part-Load Control Strategies for Packaged Rooftop Units. In this issue... Bin Hour Profile Charlotte, NC

Case Study: Furman University Charles H. Townes Center for Science. Michael K. Mantai, PE, CCP President System WorCx

The M & V Guided Recommissioning Process. Energy & Water Conservation Program. September 2015 MOO

How to Take Basic Readings to Show Energy Efficiency

HATCHERY. ROSS TECH Hatchery Maintenance. August 2011

Technical Reference Manual Design and Application Guide for Honeywell Economizer Controls

Capt. Tim s s Duct Design Mythbusters. The bitterness of poor quality is remembered long after the sweetness of low price is forgotten!

10+ HVAC Troubleshooting Tips for Healthcare Facilities Jerry Hirsch JCI Facility O&M Performance Development Manager.

Verasys System Operation Overview Technical Bulletin

b.) Technical Information:

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

D-PAC. Digital Precise Air Control System. Functionality Factory Testing Ease of Installation Ease of Maintenance Energy Efficiency

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria

THE IMPACT OF FACILITY HVAC SYSTEMS ON BIOLOGICAL SAFETY CABINETS

Modular Active. Chilled. Beams

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

Prescriptions for Critical Healthcare Cx. John D. Villani, P.E. Associate Grumman/Butkus Associates

2006 Washington State Nonresidential Energy Code Compliance Form Washington State Nonresidential Energy Code Compliance Forms Revised July 2007

Supplement A- Improving Forced Air Heating Systems

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012

DADANCO Technical Paper

LABORATORY DESIGN HANDBOOK

Chilled beam technology overview John Woollett 1, Jonas Åkesson 2 Swegon AB 1,2

Florida Department of Transportation

York 25-Ton VAV Rooftop Unit

Hello, my name is Audra Benzschawel and I m a marketing engineer in the C.D.S. Slide 1 TRACE 700

Union County Vocational - Technical Schools Scotch Plains, New Jersey

HOME PERFORMANCE ENERGY ANALYSIS

Coolingtechnology. Thermal Shock

Application of Direct Digital Temperature Control Systems for Maximum System Efficiency on VAV Systems

HVAC OUTDOOR AIR VENTILATION STANDARD. ASHRAE Standard ASHRAE Standard

Chilled Beams. Getting a Warmer Reception

AirTrak. Digital Control System. User Manual. Touchscreen Systems

Custom Air Handler Solutions Custom Units to Meet Your Unique Design Needs

High-Performance VAV Systems

TEC Controller VAV 0-10V Fan Control with Hot Water Heat, Application Application Note Building Technologies

EarthWise System Seminar

Civil Engineering Building

IAQ Building Education and Assessment Model (I-BEAM)

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:

HVAC Design Overview of Variable Air Volume Systems

Residential Air Leakage (Blower Door) Testing for Florida Code Compliance

Strategies for Building Energy Efficiency

4. OVERVIEW OF MECHANICAL SYSTEM

BOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

Effects of Kitchen Ventilation on Residential Dwellings

Welsh Commissioning Group, Inc.

HAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001

RoofPak Applied Rooftop Systems

ASHRAE Guideline 36P: High Performance Sequences of Operation for HVAC Systems

Physical Plant Complex

Christchurch. Skills. Rebuilding. An earthquake-proof HVAC retrofit. FEATURE Duct troubles. WORKSHOP Managing condensate for condensing boilers

DEHUMIDIFICATION: Ice Arena Application & Product Guide. Design, construct and operate to control indoor humidity in ice rinks

HVAC Mandatory Provisions Part II, Page 1

Clearing the Air: Ventilation. RESNET Building Performance Conference San Diego, CA February 17 th, 2015

Transcription:

IAQ: Re-tuning Commercial Buildings A low-cost path to improved air quality and energy efficiency. B y S c o t t G o r d o n, C M All images courtesy of Johnson Controls Service. 10 RSES Journal FEBRUARY 2012 Qualified technicians frequently use a digital manometer to take static-pressure profile readings when tracking down air-flow restrictions that have a negative impact on maintaining proper building ventilation rates. As more companies install sophisticated energy-management and control systems to manage a wide range of building systems, the need to regularly re-tune systems, components and controls to ensure efficient operation and planned outcomes becomes increasingly more important. Among those outcomes is proper ventilation, which contributes to the health, safety and comfort of building occupants. Ventilation is the process of supplying air to or removing air from a space for the purpose of controlling air containment levels, humidity or temperature within the space. Commonly referred to as outside air or ventilation air, it is the process of diluting contaminants within a building s inside air by introducing fresh outside air into an air-handling unit to mix with the recirculated air inside. Effectively doing so requires that the proportion of outside air to inside air be closely monitored and controlled so that good IAQ can be maintained. It is important that outdoor air is introduced through a building s mechanical system, where the air can be properly filtered and conditioned to provide a comfortable and safe environment for the building occupants.

Optimizing reset temperatures at AHUs has an energy impact all the way back to the chillers in the central plant. Here, a technician is measuring water flow through a chiller during a kw/ ton efficiency test in the field. Proper building air pressure also must be controlled to achieve high IAQ. Outdoor air leaking into a building through infiltration does not allow the AHU to properly treat the air, which can cause IAQ and comfort-related issues. Controlling building pressurization so that inside air pressure is 0.03 in. wc 0.05 in. wc higher than outside air pressure helps prevent leakage of untreated outside air into the building. Yet controlling building pressurization is not always easy and is subject to multiple factors, including weather conditions, partially connected internal spaces with various uses and the building s mechanical ventilation system, which has the potential for uneven distribution of ventilation air within the building. Uneven distribution of ventilation air is a common problem, especially with VAV systems prevalent in commercial office buildings (refer to ASHRAE Standard 62.1-2010 for additional information on this subject). In addition to unfiltered and unconditioned outside air introducing contaminants into a building, infiltration of outdoor air as a result of poor pressurization control can result in high energy use, comfort complaints, drafts, noisy air flow, difficulty opening and closing exterior doors and, eventually, structural deterioration. Re-tuning can be an important tool to prevent poor IAQ and building pressurization issues. Re-tuning includes reprogramming and otherwise enhancing the capability of building systems to run mechanical systems more efficiently. In most cases, the re-tuning process can be implemented through the Circle Reader Service No. 20? FEBRUARY 2012 RSES Journal 11

There are several methods of calculating the volume of outdoor air that enters an air-handling unit, including use of the building-automation system. building control system at little or no cost and typically entails inexpensive repairs and identifying opportunities for operational improvements. In the case of building pressurization, the re-tuning process checks that certain building pressurization controls are calibrated correctly and pressure sensors that monitor the indoor-outdoor pressure differential are adjusting dampers and fan speed as required to properly ventilate the building. Some common building pressurization problems discovered in the control re-tuning process are: incorrect location and calibration of pressure sensors; damper linkages that are not properly adjusted; air-flow measuring stations in need of calibration; poor tracking of supply- and return-air fans; and improperly set up air-side economizers. Using Standard 62.1 ASHRAE Standard 62.1 Ventilation for Acceptable Indoor Air Quality is the standard for ventilation requirements and, consequently, for re-tuning efforts with respect to ventilation systems. Standard 62.1 defines minimum breathingzone ventilation rates for multiple occupancy categories, and A technician is measuring fan performance to verify proper building ventilation rates. 12 RSES Journal FEBRUARY 2012 provides a calculation to find the minimum intake air flow needed for different types of spaces and ventilation systems. Standard 62.1 was written for new construction; however, it is intended for guidance in the process of improving IAQ in existing buildings, so some elements can be applied to existing buildings. ASHRAE states that adoption of the standard as a whole for existing buildings can impose requirements that were not considered, some of which might be impractical or unreasonable. As an example, when equipment in an existing building is upgraded or replaced, the new equipment must comply with the standard. In other cases, in which the equipment is not capable of performing to the standard s requirements, it is best to get as close to the performance standards as possible. This may require working with a design engineer that is familiar with Standard 62.1. There are several methods of calculating the volume of outdoor air that enters an air-handling unit, including use of the building-automation system. By using the BAS and calibrated averaging temperature sensors for mixed and return-air streams and an accurate outdoor-air temperature sensor in a good location, the percentage of outdoor air can be calculated. The following formula can be programmed into the BAS to continually monitor the percentage of outdoor air for each AHU: % outdoor air = mixed air db indoor air db outdoor air db indoor air db Another method employs air-flow measuring stations in a process known as volumetric fan tracking. As an example, if the air handler is supplying air flow at 20,000 cfm and the return fan is returning air at 15,000 cfm, the differential of 5,000 cfm represents the volume of outside air coming into a building and mixing with the return air. This measurement method requires that air-flow measurement stations be located in the inlet of the supply-air and return-air fans. An air-flow measuring station also can be located in the outside-

Affordable Thermal Imaging Now More Powerful than Ever Starting at $1,195 Leaky ducts, missing insulation, energy leaks and failed radiant floors are no match for FLIR s new, upgraded i-series cameras. Now with up to 19,600 pixels of resolution, HVACR problems can t hide. Model FLIR i3 FLIR i5 FLIR i3 IR Resolution 60x60 (3,600px) 100x100 (10,000px) 140x140 (19,600px) Thermal Sensitivity <0.15 C @25 C <0.10 C @25 C <0.10 C @25 C Field of View 12.5 x 12.5 17 x 17 25 x 25 Price $1,195 $1,595 $1,995 Visit www.flir.com/breakthrough for a complete video demonstration of the new i3, or call 866.477.3687 today. Quality Innovation Trust NASDAQ: FLIR The thermal images shown are for illustrative purposes only. Circle Reader Service No. 21

The AHU was not able to handle the additional cooling and heating load from the outdoor air, so the outdoor-air intake was blocked off, laying the foundation for a building to have IAQ problems. air intake louver/damper assembly, where the station can directly measure and control the proper amount of ventilation air into the building. Additional strategies A number of re-tuning strategies can be used individually or in combination to optimize building ventilation systems. The first strategy involves making certain the air volume matches Standard 62.1 requirements with respect to the building type, space use and occupancy. This strategy requires the building owners and engineer to understand the building occupancy schedule and to determine whether the proper amount of outside air is entering the building to match the building occupancy, and then make the necessary adjustments to the air handler to ensure that proper ventilation is occurring. A second strategy demand-controlled ventilation is a control strategy that monitors the level of CO 2 inside a building. As the occupancy rate increases, the CO 2 level rises as well, indicating that more outside air is required. A combination of occupancy and CO 2 sensors throughout the building control the outside air dampers to bring in more outside air as necessary. In the re-tuning process, technicians use a handheld CO 2 meter to calibrate sensors to ensure their proper operation and identify areas that are potentially under- or over-ventilated. 14 RSES Journal FEBRUARY 2012 Due to their low cost, occupancy sensors are often used instead of CO 2 sensors in small areas such as offices. These sensors can be used to turn off lights and place VAV boxes in the unoccupied mode, while triggering the control sequence of resetting ventilation air volume down at the air-handling unit level. Another strategy that is simple to implement and has the potential to generate significant savings involves keeping outdoor air dampers closed in the early morning as the building warms up or cools down, depending on the time of year. This process can occur before a building is occupied and, therefore, during a time when ventilation is not required. Dampers can be opened slowly as building occupants begin to arrive, saving 10 15 hours a week of having to bring in outside air, cool/warm it and dehumidify/humidify the air. The potential energy savings make it important to check damper operation as part of the re-tuning process. Finally, the re-tuning process can be helpful in making sure that exhaust fans are interlocked with the associated air handlers. In cases where fans are not interlocked, exhaust fans continue to run, even when air handlers are shut off. The result is a building that receives no outside air for ventilation purposes, even as negative pressure is created, providing opportunities for unfiltered and unconditioned air to enter the building through cracks around doors and door thresholds, windows and weather stripping.

Efficiency/cost savings Re-tuning should not be limited to strategies for ventilation optimization. In addition to IAQ, the re-tuning process also can impact energy-efficiency goals and cost savings, as the following measures indicate: g Optimized scheduling: Adjusting equipment start/ stop times so that morning warm-up/cool-down periods are no longer than necessary can contribute to additional energy savings. Schedules can be created or adjusted to match building occupancy. g Unoccupied hour setback: During the heating season, lowering the zone temperature setpoint when the building is unoccupied can result in energy savings. The size of the savings depends upon a number of factors, including the number of heating hours and temperature each year (weather bin data); the extent of setback in terms of time and degrees; the thermal efficiency of the building envelope (U-value); and energy consumption without setbacks. Although savings also can be associated with the cooling season, savings at this time of year will likely be less due to a lower temperature difference between indoor and outdoor air. g Supply-air temperature reset: Paying close attention to supply-air temperature as part of the re-tuning process can significantly impact energy costs. That is because supply-air temperatures are the most important control parameter for air-handling units, and have a direct energy impact all the way back to the chiller and boiler at the central plant. If the supply-air temperature is too low, the terminal boxes must reheat the over-cooled air before sending it to each zone. If the supply-air temperature is too high, the zone(s) may lose comfort and humidity control. Adjustments to the supply-air temperature should be made so that the temperatures run as high as possible, while still meeting the cooling needs of the zone. g Discharge static-pressure reset: Most VAV systems operate at a fixed static-pressure setpoint, regardless of the load on the air-handling unit. However, it should be noted that higher-than-required discharge static pressure causes high noise levels in VAV boxes or diffusers and puts an extra load on the AHU. In addition, wear on the fan and belts increases, as does the cost of energy to operate the fan. Re-tuning can prevent some of these negative and costly side effects associated with high discharge static pressure, by providing an opportunity to reset (lower) the pressure as the building load falls below full design conditions. g Improve economizer operation and control: The economizer should control the supply-air temperature by modulating the outdoor air damper when the temperature outside is lower than the supply-air temperature setpoint. However, economizer control often is implemented to maintain discharge-air temperature at 55 F a control strategy that is far from optimum. This can be improved by integrating economizer operation with supply-air temperature reset. This action will increase the number of hours each year that the air-handling unit can operate in the economizer mode and conserve energy associated with reheating the air. As these measures indicate, re-tuning offers building owners the opportunity to examine a number of control strategies within a building to identify operational problems and ensure optimal building performance. By having their facilities retuned and making adjustments to poorly tuned or underutilized systems, building owners are better positioned to help facilities meet energy-efficiency goals and satisfy the comfort and safety requirements of building occupants. Scott Gordon, CM, is the Energy & Sustainability Product Technical Support Manager for Johnson Controls Service. He has more than 30 years of experience in the mechanical contracting and engineering industry. Gordon holds a number of certifications from the Association of Energy Engineers; is a NEBB-certified testing and balancing supervisor and RCx Authority. Additionally, he is a Class-A licensed air-conditioning contractor in the state of Florida, and is a member of ASHRAE committee GPC 0.2, The Commissioning Process of Existing Buildings and Assemblies, and GPC 1.2, the Technical Requirements to Commission Existing HVAC&R Systems. For more information, visit www.johnsoncontrols.com. FEBRUARY 2012 RSES Journal 15