Preferred route announcement M25 junction 10/A3 Wisley interchange Improvement scheme

Similar documents
M25 junction 10/A3 Wisley interchange improvement scheme

A1 Scotswood to North Brunton Public Information Exhibition Executive Summary

A46 Coventry Junctions Public information exhibitions

A303 Stonehenge. Amesbury to Berwick Down Supplementary consultation booklet

Scotswood to North Brunton improvement scheme

Birtley to Coal House improvement scheme. Preliminary Environmental Information Report Appendix A. February 2018

Thank you for coming. We want to hear your views on proposed improvements to the A1 between junction 65 (Birtley) and junction 67 (Coal House).

A38 Derby Junctions Scheme. Statutory Public Consultation Share your views

A417. The Missing Link Preferred Route Announcement

M25 junction 28 improvement scheme

Improving the A1 in Northumberland Public consultation. November December Morpeth to Ellingham

A585. Windy Harbour to Skippool scheme Public consultation. Share your views

A21. Start of works exhibition Tonbridge to Pembury. Welcome. Dualling Scheme

Regional Investment Programme M25 J10 / A3 Wisley Interchange Improvements Scheme Assessment Report Side Roads Addendum November 2017

A5-M1 Link (Dunstable Northern Bypass) Successful delivery of a major road improvement

A27 Arundel Bypass. Preferred route announcement

A30 Chiverton to Carland Cross Consultation booklet 29 January - 12 March 2018

Welcome to the Public Consultation Exhibition

Ebbsfleet Development Corporation

WELCOME SMDA

HS2 Interchange Station Design

Linden Homes Proposals for land off Ringwood Road, Verwood

CORRECTIONS WITHIN DESIGN MANUAL FOR ROADS AND BRIDGES AUGUST 2009

Start of works exhibition

We are improving the A69 Styford and Bridge End junctions to cut congestion and journey times for motorists using them and to improve safety.

Mavis Road Class Environmental Assessment

North Somerset Council Local Development Framework

DESIGN AND MANAGEMENT OBJECTIVES PART 5 HA 90/01 PLANNING AND POLICY FEATURES SUMMARY

Wildlife and Planning Guidance: Neighbourhood Plans

Barton-under-Needwood Village Improvement Scheme

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

UTT/16/1466/DFO GREAT DUNMOW MAJOR

HS2 Environment. Protecting the environment

Environmental Impact Assessment

Public Consultation. Land at Monks Farm, North Grove. Welcome

Response by the Wiltshire Archaeological and Natural History Society

LAND EAST OF HORNDEAN. 1. Welcome. Morrisons supermarket. Keydell Nurseries A3(M)

Public Consultation 23 January Peel Hall, Warrington Board 1. A message from Satnam... Site history...

Design Review Report Llanfoist to Abergavenny Footbridge DCFW Ref: 118 Meeting of 10th August 2016

Wildlife and Planning Guidance: Local Plans

Full Name /title*. Address 1. Address 2 Post Code* *.. Phone* *Required fields for draw

PROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM

Making the case for Sustainable Transport Project Potential

Regulatory Committee. Date of Meeting 9 June 2016

A303 Stonehenge. Amesbury to Berwick Down Scheme Assessment Report Appendix D CSR and Policy Assessment. Volume 6

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN

Fixing the Foundations Statement

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

1. Creating a liveable, vibrant, safe and inclusive city centre for the benefit of people of all ages to live, work, learn and enjoy.

Dorenell Wind Farm 132 kv Grid Connection

Copyright Nigel Deeley and licensed for reuse under this Creative Commons Licence

Welcome to our exhibition

A1 in Northumberland Morpeth to Felton scheme. Preliminary environmental information report Non technical summary

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

SH20 Manukau Harbour Crossing Project Notice of Requirement Auckland City Council

Linden Homes Proposals for Havant Retail Park, Portsdown Hill Road, Bedhampton. Welcome

Longbridge Town Centre Phase 2 Planning Application

Land at Rampton Road. Cottenham

High Speed Rail (London- West Midlands)

A1 Scotswood to North Brunton Report on Public Engagement

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

Rannoch 132 / 33 kv Substation Extension

LAND USE SHEET 3 LOWER THAMES CROSSING LOWER THAMES CROSSING STATUTORY CONSULTATION. Main works construction compound

Site Assessment Technical Document Appendix A: Glossary

DESIGN AND MANAGEMENT OBJECTIVES PART 7 HA 92/01 SCHEME DEVELOPMENT, IMPLEMENTATION & MANAGEMENT SUMMARY

WEST BLACKHALL STREET PUBLIC REALM + TOWN CENTRE CONNECTIONS Public Exhibition 28 th June 2018

NEWSLETTER #03 BEAUDESERT ROAD LOGAN MOTORWAY

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

SH1 link to Matakana Road

A38 Derby Junctions. Preliminary Environmental Information Report: Non-Technical Summary

Infrastructure and the environment

INTRODUCTION. Welcome to the third round of information events on the emerging Yorkshire Energy Park proposals. THE CONSULTANT TEAM WHERE IS THE SITE?

volume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments

Notting Hill Housing & The Development Team

Effingham Neighbourhood Plan 1. Basic Conditions Statement

Welcome to this public consultation event for the proposed South Western Relief Road. Thank you for taking the time to come along.

3. Neighbourhood Plans and Strategic Environmental Assessment

EDC 016/004 Annex A. Framework Masterplan Stakeholder and public engagement

Stanton Drew Parish Neighbourhood Plan Landscape and Environment

Town And Country Planning Act 1990 (As Amended) Town And Country Planning (General Development Procedure) Order 1995

CENTRAL BEDFORDSHIRE COMMITTED TO WORKING TOGETHER WITH LOCAL COMMUNITIES

Carmel College Development

BEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT

SOUTH WOKINGHAM STRATEGIC DEVELOPMENT LOCATION PUBLIC CONSULTATION

REPORT ON PUBLIC EXHIBITION - BIRCHFIELD GARDENS

Former Temple Cowley Pools, Oxford TEMPLE COWLEY LIBRARY * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT.

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

Velindre Cancer Centre Environmental Statement Vol.1: Environmental Statement Text. Chapter 1: Introduction

Highways England Environment Fund. Graeme Hull Tyne Tees Catchment Coordinator

WEST HORSLEY PARISH COUNCIL. OBJECTION to Long Reach SANG

Former North Works, Lickey Road, Longbridge, Birmingham

Cotswolds AONB Landscape Strategy and Guidelines. June 2016

LAND EAST OF SUDBURY ROAD, HALSTEAD PUBLIC CONSULTATION. Proposed Residential Development

Kibworth Harcourt. Introduction. Introduction

volume 11 environmental assessment section 2 environmental impact assessment Part 2 ha 202/08 environmental impact assessment

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Transcription:

Preferred route announcement M25 junction 10/A3 Wisley interchange Improvement scheme Winter 2017

Introduction This section of the M25 is of nationally-strategic importance, as it provides vital access to and from Heathrow and is a key route from the Kent ports to much of the rest of the country. In addition, the interchange with the A3 at junction 10 provides a link between London and Portsmouth. This junction has a poor safety record that needs to be addressed. The cost to the economy of ongoing delays here would be considerable if left unchanged. Background We held a public consultation between December 2016 and February 2017 to gather feedback on the proposed plans for the M25 junction 10/A3 Wisley interchange improvement scheme. Find out the results, the preferred option and what happens next in this document. Public consultation Seven public exhibition events were held at venues both north and south of M25 junction 10, in Ripley and Cobham. These events aimed to capture views about the proposals from the public, local councils, businesses, environmental groups and other organisations with an interest. Information and survey questionnaires were available from Highways England s website, at public exhibitions, and at 6 Surrey libraries. This scheme will: Reduce delays at M25 junction 10 Options presented at public consultation Option 9 A 4-level flyover providing dedicated free-flow slip roads for traffic accessing the M25 from the A3, as well as dedicated free-flow movements at the junction removing this traffic from the roundabout. Option 14 An elongated roundabout, which adds more capacity and provides dedicated free-flow left turns for all traffic using the roundabout. Both options require the A3 to be widened to four lanes between Ockham Junction and junction 10, and junction 10 to Painshill Junction. The current A3 bridge over the junction will remain as two lanes in each direction. Widening of the existing road between Painshill Junction and the Seven Hills Road is also included. Rejected Option 16 We also sought views on whether Highways England was right to reject Option 16, which replaced the roundabout with free-flow movements in all directions (dedicated lanes with no traffic signals). Responses to public consultation Results from the 722 questionnaire responses showed: 91% are concerned or very concerned about road safety 29% of people chose Option 14 (the elongated roundabout) as their preferred route. Respondents highlighted the fact that it would have far less environmental impact than Option 9 and there were very few comments made raising concerns about this option. In addition to the completed questionnaires, 39 stakeholders/organisations (local authorities, parish councils, environmental bodies and landowners) chose to send in detailed responses to present their views. Of these responses, 26 chose not to state a preference between Option 9 or 14 as they felt more detail was required on their impacts, particularly on access for side roads to the A3. Delivering a scheme that works for everyone The public consultation feedback showed a higher number of respondents were in support of Option 9, however significant concerns were raised over the potential environmental impact it would cause. As a result, we revisited the designs for both Options 9 and 14 to make sure that the scheme delivers the best possible outcome, to meet everyone s needs. Further design and environmental assessment work has improved the safety performance and operational benefits of Option 14 as well as identifying environmental mitigation for the scheme. Preferred route Option 14 elongated roundabout Highways England has selected Option 14 as the preferred solution for the M25 junction 10/A3 Wisley interchange. Why Option 14? Acting upon the feedback from the consultation and ongoing engagement with a range of stakeholders, design changes have enabled the elongated roundabout to improve safety by removing the need for traffic lights on the slip roads, (as had been included in the designs shown at the non-statutory public consultation). We have the opportunity to provide improved crossing points for pedestrians, cyclists and horse riders on dedicated bridges, separated from the traffic, minimising the risk of collisions. The detail of these will be presented at the Statutory consultation in 2018. Minimising the environmental impact of the elongated roundabout has been a critical factor in choosing the preferred option for M25 junction 10. The area is of significant environmental value and includes scheduled monuments, access land for walkers and horse riders and land that supports rare bird species. Highways England therefore believes the improved Option 14 and its supporting environmental mitigation provides the best solution in terms of meeting safety, traffic and environmental needs. We believe Option 14 offers the best solution to improve safety, reduce congestion and accommodate growth whilst at the same time ensuring the impact on the very sensitive surrounding environment is fully mitigated. Chris Welby-Everard Regional Delivery Director, Regional Investment Programme 2 Smooth traffic flow at M25 junction 10 and the exit and entry roads for the A3 Wisley Improve safety at junction 10 and on the M25 and A3 Address issues at noise important areas where possible Support sustainable travel routes Support economic growth and ensure the junction can accommodate extra traffic. 89% are concerned or very concerned about the ease of making journeys around the junction 84% are concerned or very concerned about accommodating extra traffic from future housing and economic development 64% of people chose Option 9 (the 4-level flyover) as their preferred route, however there was strong concern made that this option would have a negative impact on the surrounding environment. This included the impact on the Thames Basin Heath Special Protection Area, common land and and a Site of Special Scientific Interest This includes the widening of the A3 between Ockham Park Junction and junction 10, and between junction 10 and the Painshill Junction, from 3 to 4 lanes. The A3 bridge over the junction will remain 2 lanes in each direction. Preferred options for side road accesses for properties and businesses who currently have direct access onto the A3, between Ockham and Painshill have also been selected. These options provide new access arrangements via bridges and dedicated side roads which improve safety as well as providing access for vehicles, pedestrians, cyclists and horse riders. 3

Preferred route: Option 14 elongated roundabout A3 A3 increased to 4 lanes from 3 between junction 10 and Painshill Dedicated, free-flow Elongated roundabout sitting at same level as current one To junction 11 towards Heathrow M25 Dedicated, free-flow Dedicated, free-flow, New dedicated facilities for pedestrians, cyclists and horses riders to cross the junction away from traffic A3 increased to 4 lanes from 3 between Ockham and junction 10 A3 Elongated roundabout incorporates additional lanes to improve capacity Dedicated, free-flow, M25 To junction 9 towards Gatwick 4 5

Overall plan showing side road options Map 1 (page 9) Wisley Lane access Map 2 (page 9) Map 3 (page 10) Elm Lane and Pond Farm/ Birchmere campsite Connections to the A3 Northbound (M25 junction 10 to Painshill) and A3 Southbound (Painshill to M25 junction 10) Map 4 (page 10) Painshill Junction/ Seven Hills Road A3 M25 6 7

Side road options Site of Special Scientific Interest (SSSI) Map 1: Wisley Lane access Highways England has undertaken extensive engagement with stakeholders and landowners about the access arrangements on and off the A3, between Ockham Junction and Painshill Junction. A key factor in our decision-making has been the safety of all road users, in particular ensuring there is no conflict between vehicles directly entering and exiting what will be a 4-lane, high speed section of the A3. The land surrounding M25 junction 10 and the A3 presents a number of challenges for developing the scheme, notably the sensitive environmental and heritage features including: Special Protection Area (SPA) Ancient woodland Scheduled monuments Listed building and registered park and gardens Common land and access land Green belt. These constraints make the development of side road access arrangements challenging, but we believe that the preferred options offer the best solution for all users. Two-way access from Ockham Junction Key Bridge accommodating vehicles and non-motorised users New road Widened A3 Existing road No direct access to the A3 Side road preferred routes Option name Description New bridge avoiding SPA and ancient woodland Wisley Lane access (Map 1) Elm Lane (Map 2) Old Lane (Map 2) Access to Wisley Lane will be via a two-way bridge accommodating both vehicles and non-motorised users. There will no longer be direct access on to, or off the A3 from Wisley Lane and this new bridge will replace the existing footbridge. Direct access to Elm Lane from the A3 will be stopped up. Instead residents will use the new road to access Old Lane and the A3 Southbound. Old Lane will be kept open, with direct access onto the A3 southbound via the slip road. There will be safety improvements to the Old Lane junction, including better sightlines and improved slip roads. Map 2: Elm Lane and Pond Farm/Birchmere campsite Access between Ockham and Wisley Commons is provided for pedestrians, cyclists and horse riders Pond Farm/Birchmere Campsite (Map 2) Access via a new bridge connecting the Ockham Common side of the A3 to Pond Farm and the Scout campsite (replacing the existing Cockrow bridge). It also links the Wisley and Ockham Commons for pedestrians, cyclists and horse riders. Current access to be stopped up Old Lane remains open, with safety improvements A3 Northbound (M25 junction 10 to Painshill) (Map 3) A3 Southbound (Painshill to M25 junction 10) (Map 3) Painshill Junction/ Seven Hills Road (Map 4) A new road will provide access to all properties along the northbound side of the A3 to A245/Seven Hills Road. For properties on the A3 southbound whose direct access will be stopped up, a two-way bridge over the A3 close to its slip roads to the M25 junction 10 interchange will be provided. This will accommodate both vehicles and non-motorised users. The bridge links to the new northbound service road. The A245 will be widened, adding an extra lane between the A3 Painshill Junction and Seven Hills Road. New access is provided via the Byway Open to All Traffic, linking Elm Corner to Old Lane Existing Cockrow bridge will be replaced to accomodate the widened A3 This new bridge will provide gated access for vehicles and non-motorised users to Pond Farm and Birchmere Campsite 8 9

Map 3: Connections to the A3 Northbound (M25 junction 10 to Painshill) and A3 Southbound (Painshill to M25 junction 10) New bridge for vehicles and non-motorised users, replacing existing accesses Smart motorway integration Highways England is taking the opportunity to accommodate the M25 junction 10 junction 16 smart motorway programme in this scheme s development and construction. More information The public consultation report is available at: www.highways.gov.uk/m25j10 Key New road Widened A3 Existing road Map 4: Painshill Junction/Seven Hills Road New road links properties on A3 southbound side to A245/Seven Hills Road Better access arrangements for Feltonfleet school New road provides access to all properties on Northbound side of the A3 to A245/Seven Hills Road Improved phasing of traffic signals What happens next? Highways England would like to ensure that the most appropriate solutions for side road access are developed with landowners, residents and key stakeholders. As such we will be working to develop these further over the coming months and presenting these during the statutory public consultation in winter 2017/18. After the statutory public consultation, we will need to apply for a Development Consent Order. The Development Consent Order application will be examined by the Planning Inspectorate, who will ask for representations from interested parties. This will be a further opportunity for you to have your say. After the examination, the Planning Inspectorate will make a recommendation to the Secretary of State for Transport who makes the final decision on the scheme. We will only be given consent to construct the scheme if the Development Consent Order is granted. Consent will also allow compulsory purchase of any land required. If you would like to be kept up to date with progress of the scheme, you can sign up for updates. Contact us If you have any queries please contact our customer contact centre on: 0300 123 5000* (24 hours) or email: info@highwaysengland.co.uk *Calls to 03 numbers cost no more than a national rate call to an 01 or 02 number and must count towards any inclusive minutes in the same way as 01 and 02 calls. These rules apply to calls from any type of line including mobile, BT, other fixed line or payphone. Calls may be recorded or monitored. Next steps When? Widening of A245 to three lanes to provide extra capacity for queuing traffic towards the Seven Hills Road junction Statutory public consultation Early 2018 Development Consent Order submission 2018 Development Consent Order decision 2019 Begin construction 2020/2021 10 11

If you need help accessing this or any other Highways England information, please call 0300 123 5000 and we will help you. Crown copyright 2017. You may re-use this information (not including logos) free of charge in any format or medium,under the terms of the Open Government Licence. To view this licence: visit www.nationalarchives.gov.uk/doc/open-government-licence/ write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email psi@nationalarchives.gsi.gov.uk. This document is also available on our website at www.gov.uk/highways If you have any enquiries about this publication email info@highwaysengland.co.uk or call 0300 123 5000*. Please quote the Highways England publications code PR55/17 Highways England, Creative S170296 *Calls to 03 numbers cost no more than a national rate call to an 01 or 02 number and must count towards any inclusive minutes in the same way as 01 and 02 calls. These rules apply to calls from any type of line including mobile, BT, other fixed line or payphone. Calls may be recorded or monitored. Printed on paper from well-managed forests and other controlled sources. Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ Highways England Company Limited registered in England and Wales number 09346363