The Duke s River: Revitalising the link between the River Crane and the River Thames

Similar documents
FELTHAM MASTERPLAN CONSULTATION MARCH 2017 RESPONSE BY FRIENDS OF THE RIVER CRANE ENVIRONMENT (FORCE)

CRANE VALLEY PARK FEASIBILITY STUDY FINAL REPORT

Letcombe Brook Project Officer

Chalk, Cherries and Chairs Central Chilterns Landscape Partnership Scheme LANDSCAPE PARTNERSHIP DEVELOPMENT OFFICER JOB INFORMATION PACK

Taking forward the All London Green Grid

Clearwater Photography UK

WADDON PONDS MANAGEMENT AND MAINTENANCE PLAN 2017

COMMUNITY LED REGENERATION CURRENT & FUTURE INITIATIVES FRANK RALLINGS - UNIVERSITY OF BRIGHTON

Pedestrian and Cycle Bridge Feasibility Study Report Summary

Park Development Framework Area Proposals. Context to Area 2 Ruckholt Road to Coppermill Lane

(In relation to the Nature Conservation (Scotland) Act 2004 and the Wildlife and Natural Environment (Scotland) Act 2011)

Landscape Partnership Scheme Summary

Landscape and Heritage A Park landscape that embraces the physical, cultural and social heritage of the area

Thames and Medway Canal

Landscape and Heritage

Streams and Ponds. A few facts A vital resource. Changing environment. Globally rare. Flood plains. Watery wildlife. Water power

Hartest river corridor survey

Andrea Griffiths BSc HONS Partnership Officer Medway Valley Countryside Partnership. Medway Valley Countryside Partnership

Published in March 2005 by the. Ministry for the Environment. PO Box , Wellington, New Zealand ISBN: X.

Upper Dean Landscape Character Area: A1 Landscape Character Type: River Valley

Making the case for Sustainable Transport Project Potential

Scotland s 2020 Biodiversity Challenge: Loch Lomond & The Trossachs National Park Authority Delivery Agreement

Sankey Valley Corridor Enhancement Project Green Infrastructure data Biodiversity and ground nesting bird habitat

Western Sydney Parklands Australia s Largest Urban Park

COMMUNITY GROWN FOOD IN WALES

BEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT

Biodiversity Standard

Overview Report. Proposed Development

Slough International Freight Exchange Proposals, Colnbrook+

Urban runoff in my neighborhood (Capitol Hill) is heavy with trash and other debris.

CSGN DEVELOPMENT FUND Projects Awarded Funding April 2013

AT THE HEART OF LAND & WATER MANAGEMENT ON TWEED. tweedforum.org

Public realm strategy

Frequently Asked Questions

Community Green Spaces: Essential Green Infrastructure

ANNUAL REPORT. Helping people understand, value and care for their local environment

Olympics. Large areas of the Lower Lea Valley have now been taken for the Olympics and surrounded by tall blue fences.

ARCADIAN THAMES WALKS

Alma Road Rain Gardens, London

Welcome to our exhibition

OTHER STATUTORY AND NON-STATUTORY BODIES

Am I at risk of flooding?

Basic Habitat Survey Tabernacle Gardens, Pembroke

Appendix A. Planning Processes. Introduction

Bigger Better and. Giving nature a home in the Trent Valley: Newark to South Clifton Concept Plan

17 NOVEMBER 2015 PLANNING COMMITTEE. on Cttee Day: 73/73. Land To The Rear Of Brook Farm Rickford Worplesdon, Bagshot Road, Woking, Surrey

Reconnecting rivers in urban areas; challenges and considerations

CALA Homes is preparing a planning application for a development of up to 36 new homes, including a mix of properties to meet local demand.

The journey so far. The new masterplan for Dargavel Village

Arkansas River Corridor

Scottish Natural Heritage Sharing Good Practice Programme

Support for Walnut Creek Watershed Council. Adopt resolution of support for the newly formed Walnut Creek Watershed Council.

Morpeth Flood Alleviation Scheme. An Example of Partnership Funding & Community Engagement

Welcome to our public exhibition

OUR DESIGN APPROACH TO THE NATURAL ENVIRONMENT JANUARY 2018

Water Vole (Arvicola terrestris)

NORTH WEST LEEDS COUNTRY PARK AND GREEN GATEWAYS PROJECT. Country Parks Officer Douglas Louis

HS2 Environment. Protecting the environment

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2

Date: 23 January Grange and Riverside Ward. Deputy Chief Executive

Study of the Economic Value of Northern

3. Neighbourhood Plans and Strategic Environmental Assessment

One River Environmental Assessment. Welcome!

Healthy for Bees: Healthy for People. Managing the grounds of public buildings for pollinators

Wildlife and Planning Guidance: Neighbourhood Plans

Local Wildlife Sites in Leicestershire and Rutland

Designing Open Spaces for Recreation

Consultation response to Draft London Economic Development Strategy

CITY OF LONDON COVES ESA CONSERVATION MASTER PLAN COMMUNITY WORKSHOP #1

Good Food Grants Programme Application form. In partnership with

CHESTER ONE CITY PLAN

Keyport. Vision for Keyport

Copyright Nigel Deeley and licensed for reuse under this Creative Commons Licence

ALLERTHORPE NEIGHBOURHOOD PLAN

HALE WHARF INTRODUCTION.

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

Site Allocations. REG 107 Appendix 1 Part B. february 2014

Location: The Wildlife Trust for Bedfordshire, Cambridgeshire and Northamptonshire, Lings House, Billing Lings, Northampton NN3 8BE

Olympic Park, London. SuDS used. 1. Location. 2. Description. Case study

COLORADO S Comprehensive Wildlife Conservation Strategy Linking Conservation and Transportation Planning August 15, 2006

NATURAL KIRKLEES A STRATEGIC ACTION PLAN FOR THE GREEN SPACE NETWORK

Objectives and Strategies for the Integration of Recreation, Parks and Open Space in Regional Plans

Higher Uppacott: A Dartmoor Longhouse

Rural Environment and Conservation

NATURAL AND BUILT ENVIRONMENT BACKGROUND PAPER

Royal Borough of Greenwich Construction Skills Centre

ECOLOGICAL ADVICE SERVICE

Croydon s Future. Councillor Paul Scott Chair Of the Planning Committee Croydon Council

Bitton Village Residents Association Working for an Even Better Bitton

{Best Practices. Summary of Tools, Strategies and Best Practices from 11 Michigan Case Study Communities

INTRODUCTION. Land south of Bishopswood Lane, Tadley

Jewellery Quarter. Regeneration Charter. working towards a World Heritage Site

Manifesto for Heritage National Assembly for Wales election 2016

The Gwennap Parish Vision Statement

WELCOME. ORPINGTON. Welcome to this exhibition of our proposals for the redevelopment of Bassetts Campus.

CSGN Development Fund 2011 Project Achievements

Park Management Plan This version: January 2011

Response to the London Bridge Area Vision and Site Allocations within the New Southwark Plan

Industry Workforce Development Program

Dig it! A Practical Toolkit. Prepared by Herb Barbolet Associate - SFU, Centre for Sustainable Community Development

Transcription:

The Duke s River: Revitalising the link between the River Crane and the River Thames The project The eastern section of the Duke of Northumberland s River runs for approximately four kilometres, from where it leaves the River Crane in Kneller Gardens, Twickenham, to its confluence with the River Thames in Old Isleworth. The river channel was constructed as a mill stream and water supply in the 1500s and remains an important if somewhat neglected feature of the Crane catchment. This project proposes to re-invigorate the access and environmental value of this part of the Duke of Northumberland s River (DNR) as a key link for wildlife and people between the River Crane and the River Thames, two of the most important green corridors in West London. This will be achieved through a series of co-ordinated projects, designed to create a newly coherent access and wildlife corridor for west London, promote its use and provide opportunities for training, education and voluntary work. The DNR near Twickenham Stadium a beautiful but little visited stretch of river The link will also create a new 10km circular walk through Twickenham, Whitton, Isleworth, Brentford and St Margarets, and link together the Crane, DNR and Thames Pathways. This circular walkway already exists in principle but in practice it is not used due to the poor condition of the DNR pathway and the lack of awareness as to its existence.

Map showing the DNR (solid red) and the linkages to the Thames path and Crane Walk (dashed red) Approximately one third of the river is in LB Richmond and the remainder in LB Hounslow. The river bed is owned by the Environment Agency. Richmond Council owns the eastern bank through the borough and Hounslow Council owns various stretches of bankside and surrounding land. Thames Water owns the banks through Mogden Sewage Treatment Works, for which the river serves as a water supply. This project will work on the land in public ownership and build upon the successful partnership between the planning and open space departments of the two boroughs alongside local charity and community groups such as Green Corridor, The Conservation Volunteers (TCV) and Friends of the River Crane Environment (FORCE); this was initiated through the Mayor of London s Priority Parks project in Crane Park in 2009 and continued through the first Big Green Fund project in 2012. The Isleworth Society, Environment Agency and Thames Water are also important partners in this new project. The funds for the project are already in place. Following the public vote in March 2015, the Crane Valley Partnership s project proposal (submitted through Green Corridor) has received 157,500 from the Mayor of London s Big Green Fund, which is helping to deliver the All London Green Grid, the green infrastructure network for London. Section 106 funds from local developments in Richmond and Hounslow and monies from the Big Lottery Fund and SITA Trust for individual projects add up to a budget of over 400,000. Access improvements Built in the 1500s to provide water to mills in Isleworth, the DNR has operated ever since as a water supply and associated walking route, running four kilometres between Twickenham and Isleworth. It has the potential to link these areas and provide them with a valuable new asset and green route. 2

The project will help to link the areas of Twickenham, Whitton, Feltham, Hounslow and the wider Crane Valley at the south western end of the DNR with Isleworth and Brentford at the north eastern end along a green corridor of historical and environmental importance. This will improve links between communities that currently have limited connections, in part as they stretch across the borough boundary. The route has the potential to be used more for leisure, green commuting and school access but this potential is curtailed at present along parts of its length due to its condition. The narrow unsurfaced path along the DNR near Kneller Gardens, Twickenham We will enhance the value of the DNR as a walking route. In Richmond, the aim is to create a natural gravel footpath along the river to improve the physical state of the footpath. We will seek to make the path wider and safer where possible: for example, Richmond Council will be moving the boundary of its Central Depot in order to add a two metre strip of land to the DNR corridor, enabling the new path to wider and slightly set back on this stretch. Minor tree works will be undertaken to increase head height and visibility. In Hounslow there is already a surfaced route but the river and path are separate entities at certain points so the focus will be on improving the links between the two, opening up views, moving the path to follow the river s course more closely if possible, and improving the surroundings through Silverhall Park. The project will also improve the signage along the river link and produce site mapping and leaflets to promote the route. Environmental improvements The DNR is also an environmental feature of considerable importance and potential, formally recognised as a Site of Importance for Nature Conservation at a borough level in both Hounslow and Richmond. The DNR supports fragile populations of water voles and kingfishers. This project can help to support and enhance these populations, a source of great pleasure for local visitors. 3

It will be essential that the environmental value is protected and enhanced even as the route becomes better used as a green thoroughfare. This has been a central requirement of all the projects delivered by the partnership over the last five years. Specific projects have been identified to improve the habitat for water voles and the opportunity will be taken to create new nesting habitat for kingfishers. Kidd s Mill weirs in Isleworth a fascinating historical legacy for the area and a major challenge for fish and eel passage into the DNR and Crane The project will provide key environmental improvements along the length of the river corridor including: selective toe board removal or in-stream works to enhance marginal vegetation and habitat; bat bricks under bridges and other structures for winter and summer roosting by bats; tree works to allow more sunlight into the river bed; and removal of invasive species such as Japanese knotweed and floating pennywort the latter causing particular concern in this part of the river, not least because it is not present elsewhere in the catchment. Furthermore the DNR has the potential to provide an important fisheries link between the River Crane and the River Thames a link that may never have operated in the past due to the active presence of mills from the day the DNR was built and major weir structures that still act as barriers to fish movement even now the mills are long gone. Two new eel passes have already been constructed by the Zoological Society of London as the first part of this project and already eels are being found at monitoring points on the DNR. Training, education and voluntary work The different elements of the project and the site s heritage and wildlife will provide a valuable opportunity for learning of many different types. 4

The project will be linked into ongoing education projects, working with local schools to promote outdoor learning and to engage children and adults with their local environment, history and natural resources. Green Corridor, supported by the Big Lottery Fund, will be training twenty hard to reach young people in practical countryside skills, seeing them gain qualifications and be employment ready. We also expect to deliver around 500 days of volunteer and trainee time on the project to achieve all the planting and associated environmental works, and support contractors on the major construction work. This continues a successful delivery model developed first in the Priority Parks project and which has seen the capacity of the local volunteer sector grow significantly as a result. TCV are already undertaking one or more volunteer days each week in the Crane valley in support of the Big Green Fund and other project works, and are currently surveying the DNR and clearing the river of unwanted rubbish. Local people & groups We will be keeping in touch with the communities and resident groups along the DNR throughout the project. From the successful public vote we know that many people are supportive of the project but it is important that we keep everyone advised of the details. We will maintain links with interested groups, use letterdrops to advise neighbours of particular works and keep updates and current contact details posted on the following websites: www.cranevalley.org.uk/projects/lower-dnr-improvements.html www.richmond.gov.uk/parks_and_open_spaces (go to the Latest information page) There are several Friends and community groups already active along the DNR, including FORCE, Friends of Kneller Gardens, Friends of Silverhall Park and the Isleworth Society. TCV and London Wildlife Trust (LWT) are very active locally and support many of the existing volunteer activities. Green Corridor is closely linked with these groups through the Crane Valley Partnership. Green Corridor s native species nursery will provide locally sourced plants, trained staff and enthusiastic trainees to the project. Efforts are already being made, working with the two boroughs and local councillors, to develop more local friends groups along the DNR and this project will support this process. Timetable The overall timetable is still taking shape but the main delivery of access improvements will take place in stages through to March 2016. Environmental works will start in the coming winter and continue throughout 2016. Maintenance The project works will be incorporated into the open space maintenance programmes for the two boroughs as the key landowners to ensure that the improvements are sustained. 5