ATTACHMENT 2 DEVELOPER'S NAME: PRINTED COMPANY NAME THIS PLAN IS FOR TREE PROTECTION/ FOREST CONSERVATION PLAN PURPOSES ONLY

Similar documents
CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION

Town of Essex Small Site Erosion Control Guide

Tree Pits Construction Guide

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Silva Cell 2 Installation Guidelines

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

CITY OF SOUTH BURLINGTON, VERMONT SOUTH BURLINGTON CITY OFFICE STORMWATER IMPROVEMENTS JUNE 2014

Reevesland (ca.1900) 400 N. Manchester Street, Arlington, VA Clarendon Blvd., Suite 400, Arlington, VA See below

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

A0.1 TITLE SHEET. Santa Barbara, CA Suite C. 156 West Alamar Ave. 21 E. VICTORIA STREET ste 200 SANTA BARBARA, CA (805)

Information for File # ARC

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

39 N. B Street San Mateo, California Construction Tree Protection Plan

WATER QUALITY IMPACT ASSESSMENT (WQIA) FORM

PLANT MATERIAL AND PLANTING. C. Maintaining and replacing plants for completed planting work.

Erosion Control for Home Builders in the. City of Jacksonville

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

DARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES

Town of Fuquay-Varina

Analyzing the Bioretention Construction Sequence

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

Guidelines for planting within the 100 Ft. Buffer

C7.1 PUBLIC ROADWAY PLAN TRILLIUM AVENUE RESOURCE INTERNATIONAL INC. Description. Issued By Drawing Issue & Revision Status. Date.

Local Stormwater Retrofit Case Studies. Westmoreland County Conservation District Updated 11/2011

STREAM ALTERATION PRACTICES

Wisconsin Contractors Institute Continuing Education

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

Installation Manual May 9/14 No revision

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary

TREE PLANTING AND ESTABLISHMENT. Keith Wood Colorado State Forest Service

ACTIVITY: Tree Preservation & Maintenance TP 01

WMU Tree Care Plan and Policies

Preventing Storm Water Pollution: What We Can Do

G-2 SOUTHWEST WATER RECLAMATION FACILITY 15 MGAL REJECT STORAGE TANK APRIL 23, 2014 GENERAL NOTES ST. PETERSBURG PROJECT NO.

V-5 TREE PROTECTION AND LANDSCAPING REQUIREMENTS

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.


ISSUANCES FINAL 4.1 SITE PLAN SUBMISSION

A. Contractor shall provide product data for each type of product indicated.

BUSINESS PARK TOWN OF OKOTOKS

ACADEMY OF MONTESSORI EXPANSION CONSTRUCTION PLANS

FHWA 534_J031. TEA-5A01(833) EN , P101,M501 See Tabulation Below for Section Numbers

815 NE 172 nd Avenue Vancouver, WA Installation Manual

VICINITY MAP 1" = 1000'

5000 Acres Initiative at PCC Sylvania in Portland OR

Milpitas College Extension Milpitas Dry Landscape

The following general requirements will be met for all planter box installations:

Request for Approval of Design Modification

EROSION & SEDIMENT CONTROL

APPLICATION FOR A TREE REMOVAL PERMIT. (Please print clearly) Signature of property owner or provide letter of authorization:

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

Case Study Bioretention Installation and Maintenance

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

5.0 Storm Water Landscape Guidance Introduction

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 1 ITEM 709 TRIANGULAR FILTER FABRIC FENCE


Austin, Texas GENERAL LEGEND SYMBOL ABBREVIATIONS DESCRIPTION DETAIL REFERENCE MATERIAL OR FINISH REFERENCE SYMBOL SECTION CUT REFERENCE

ABBREVIATIONS. Dwg LID of 1. Abbreviations

UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN

Specimen trees are those that are either of a larger grade than normally planted or have been specified as such by the Engineer.

SELECTING THE RIGHT TREE FOR THE RIGHT LOCATION and how to properly plant that tree!


LOT 66 VACANT Ca (4) 3 BICYCLE PARKING SPACES. REFER ARCH. CANOPY ABOVE (SHOWN DASHED) REFER ARCH.

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

LANDSCAPE PLAN CHECK COMMUNITY FACILITY DISTRICT (CFD)/HOA PERFORMANCE

Appendix E Preliminary Design

BREWSTER SR173 PROPOSED: OKANOGAN RIVER PADDLERS CAMPGROUND WATERBODY: OKANOGAN RIVER NEAR: BREWSTER COUNTY: OKANOGAN STATE: WASHINGTON

Applicant Submittal HWANG HOSPITALITY, LLC ARCHITECTS OVERLAND PARK, KANSAS 6470 W. 151ST STREET FIRST FLOOR PLAN A NEW MULTIFAMILY DEVELOPMENT FOR:

Low Flow Rates Low Filtration Sandy Soils Medium Flow Rates Medium Filtration Clayey Soils [1] High Flow Rates High Filtration Polluted Soils

University of Delaware

Appendix N. Preliminary Design

EZ Base is a high-density panel base system that replaces traditional compacted aggregate-base installations.

City of Sheridan Landscape Plan Checklist


Sec Development Standards in the Environmental Overlay (EO) District

DISCOUNT TIRE - IAD 10739

EROSION & SEDIMENT CONTROL

Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures

FIRST SISTER LAKE STORMWATER RETROFIT

BIOBARRIER. Geosynthetics you can trust

Van Buren Bridge Project. IFB # VBB Attachment K PROVISIONS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS

TOWN OF HILLSBOROUGH SAN MATEO COUNTY

Dan, this is a list of the items included in the submittal package for the Plan Commission Public Hearing on May 24, 2018:


ROADWAY SECTION PRINCIPAL ARTERIAL 2-01

SUPPORTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WORKSHEET

Section 815. LANDSCAPING

THE GUTHRIE TRACT 2 - PROGRESS SET

2-B-18-UR. Revised: 3/27/2018

Sanitation District No. 1 Stormwater Best Management Practices (BMPs) Good Housekeeping Practices (GHPs)

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS

SECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents.

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

EnkaTech Note. Installation Guide for Enkamat Slopes and Channels. Site Preparation. Anchor Trench. Enkamat Installation

Transcription:

ATTACHMENT 2 Kim ing SCALE: 1"=2000' PROPERTY INFORMATION: (FOR SUBJECT PARCELS) FCP NUMBERS SPECIMAN (30" & GRATER) TREE REPLACEMENT MITIGATION REQUIREMENTS LEGEND DEVELOPER'S NAME: CONTACT PERSON OR OWNER: ADDRESS: PHONE AND EMAIL: SIGNATURE: Expiration NRI/FSD NUMBER FC1.1 GENERAL NOTES

LEGEND Rockville, MD 20852 7939 Norfolk Avenue, Suite 200, Bethesda, MD 20814 Kim ing Pine & Swallow DEVELOPER'S NAME: CONTACT PERSON OR OWNER: ADDRESS: PHONE AND EMAIL: SIGNATURE: Expiration FC1.2

Kim ing LEGEND MATCH LINE - SEE FC1.4 DEVELOPER'S NAME: CONTACT PERSON OR OWNER: ADDRESS: PHONE AND EMAIL: SIGNATURE: Expiration MATCH LINE - SEE FC1. 5 MATERIALS LEGEND FC1.3

7939 Norfolk Avenue, Suite 200, Bethesda, MD 20814 Kim ing Pine & Swallow LEGEND Rockville, MD 20852 DEVELOPER'S NAME: CONTACT PERSON OR OWNER: ADDRESS: PHONE AND EMAIL: SIGNATURE: Expiration FC1.4

LEGEND Rockville, MD 20852 Kim ing 7939 Norfolk Avenue, Suite 200, Bethesda, MD 20814 Pine & Swallow MATERIALS LEGEND DEVELOPER'S NAME: CONTACT PERSON OR OWNER: ADDRESS: PHONE AND EMAIL: SIGNATURE: Expiration 3/19/2015 FC1.5

SEQUENCE OF CONSTRUCTION TRUNK 2" MIN. CLOSED CELL FOAM ROPE OR STAP MAIN TRUNK OF TREE INSTALL A 2"x4" MIN. BOARD WITH FOAM TIED ON WORK SIDE OF TREE MACHINERY AND STOCKPILING PROHIBITED EXTEND STONE 6" BEYOND PAVING NATURAL GROUND 6" KBI FLEXI-PAVE HD2000 FLEXIBLE POROUS PAVING OR APPROVED EQUAL SEE SITE PLAN FOR WIDTH Kim ing MIN. 12 FIBER/NYLON ROPE OR STAPS. MIN. 3 PLACES OR AS DIRECTED BY THE ARBORIST 2" NOMINAL PAVING THICKNESS 6" COMPACTED #57 STONE BACKFILLED PLANTING SOIL GEOGRID GEOTEXTILE FABRIC EXISTING UNDISTURBED SOIL STEEL "T" BAR OR "U" CHANNEL POST 6" ATTACH THE SIGN TO POST WITH HEAVY-DUTY ZIPTIES TYP. 3 PLACES EXTEND GEOTEXTILE FABRIC 6" PAST THE TOP OF THE WOOD MULCH AND ATTACH TO THE WELDED WIRE MESH FENCE EVERY 24" O.C. TYP. 14 GAUGE 2" X 4" WELDED WIRE FENCE 1/3 HEIGHT OF STAKE ROOT PROTECTION ZONE AS SHOWN ON PLANS MIN. 15" Machinery, dumping or storage any materials prohibited. Violators are subject to fines as imposed by the Maryland Forest Conservation Act 1991 INSTALL ANCHOR POSTS TO A DEPTH OF NO LESS THAN 1/3 OF THE TOTAL HEIGHT OF POST UNDISTURBED GROUND 8 mm GEOTEXTILE INSTALLED BETWEEN THE UNDISTURBED GROUND AND MULCH 5' TALL HARD WOOD STAKE Do not work or place materials beyond this tree protection fence 12" MIN. THICK LAYER OF WOOD CHIP MULCH REPLENISHED AS NEEDED DURING THE CONSTRUCTION PERIOD 20 " MIN. SECURE GEOTEXTILE FABRIC WITH LANDSCAPE STAPLES EVERY 12-24" O.C. TYP. MIN. 11" METAL T-STAKES LOCATED 8-10' O.C. ADJACENT WORK AREA HIGHLY VISIBLE FLAGGING MAX. 10 FEET WELDED WIRE MESH FENCE FLEXI-PAVE ABOVE GRADE NOTES: 1. ATTACHMENT OF SIGNS TO TREES IS PROHIBITED. 2. SIGNS SHOULD BE PROPERLY MAINTAINED. 3. AVOID INJURY TO ROOTS WHEN PLACING POSTS FOR THE SIGNS. NOT TO SCALE DEVELOPER'S NAME: CONTACT PERSON OR OWNER: ADDRESS: PHONE AND EMAIL: SIGNATURE: Expiration HEIGHT AS DIRECTED BY THE ARBORIST Do Not Disturb Seedlings, Shrubs or Trees FOREST CONSERVATION DETAILS 2"x4" MIN. BOARD FC5.1

Kim ing DEVELOPER'S NAME: CONTACT PERSON OR OWNER: ADDRESS: PHONE AND EMAIL: SIGNATURE: 03/19/15 Expiration FOREST CONSERVATION DETAILS FC5.2