Miniature Steam Custom Steam Plant Kit

Similar documents
8 LITRE INSTANTANEOUS HOT WATER SYSTEM

Clean Water Made Easy

Installation Manual Chevrolet Vehicles

1/2 CONDENSATE TRAP INDEX

CERALIS GAS FIRE CERALIS XE GAS FIRE

Chiltern Model Steam Engines

Wall Mountable Electric Fireplace with remote control

TRENCH HEATING LIMITED

PEDO Bench Includes Models: PB4000 & PB4001

TECHNICAL INSTRUCTIONS

Chair Side Unit (CSU) Includes CSU Models: 320, 351, 356, 362, 370, 3351 & AP 11

INSTALLER: PLEASE LEAVE THIS MANUAL FOR THE OWNER S USE. Condensate Return Systems General Installation, Operation, & Service Instructions !

INSTALLATION INSTRUCTIONS MODELS JR-1 & JR-2 240/208 VOLTS 1 PHASE

Series 300 VTB. Installation Instructions

THE THOMPSON MODEL A STEAMER NEW UNIT ASSEMBLY INSTRUCTIONS

BALANCED FLUE ROOM SEALED GAS FIRE

Important safety instruc ons. Read carefully to reduce the risk of personal injury or damage to appliance.

Quick Start Guide X2

SAN JUAN FRESH WATER COOLING SYSTEMS

1. AirTop Air Heater. 2. AirTop Heater Kit. 3. AirTop Evo Air Heater. 4. ThermoTop Water Heater. 5. Isotemp Water Heaters

TEMPERATURE CONTROLLERS

215 Gallon Waste Oil Tank With Bypass Regulator Installation Instructions

J SERIES. Technical Specifications. Centrifugal Pumps for J Series Condensate & Boiler Feed Pumps. Features

INSTRUCTIONS WATER CHILLERS. Active Aqua Chiller, 1/10 HP. Active Aqua Chiller, 1/4 HP. DISTRIBUTED BY

Armstrong J Series Float, Thermostatic Steam Traps, Condensate Controllers & Liquid Drainers Installation and Maintenance Manual

Portable Air Conditioners

TECHNICAL INSTRUCTIONS

Portable Garment Steamer User Manual

TECHNICAL INSTRUCTIONS

Assembly and Running Instruction for Steam engine

TECHNICAL INSTRUCTIONS

Bosch Non-Pressurized Flow Centers

POWERED ANODE SYSTEM

Pizza Oven with Stand

Design and Construction Standards SECTION PLUMBING EQUIPMENT

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-214(C) Series 61 Low Water Cut-Off OPERATION

SECTION PLUMBING EQUIPMENT

Installation, Operation, and Troubleshooting Manual1. Bill Wallace By Wallace Marine Services, Inc.

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL

Installation Instructions

Emergency Action Plan Office of Emergency Services University of California, Santa Cruz. Building Department Name Procedure Last updated

Installa ons will not be scheduled un l this form is returned to Service.

ASSEMBLY and INSTALLATION INSTRUCTIONS. Pipe wrench Ratchet 3/8 socket 9/16 socket 11/16 socket 3/16 Allen key 3/32 Allen key 9/64 Allen key

DEMON SALT WATER RANGE STORM 415V SALT WATER STORM 415V SALT WATER CABINET HURRICANE D1 SALT WATER. Declara on of Conformity (E.H.S.

Series 47 and 247 Mechanical Water Feeders. Series 47-2 and Combination Mechanical Water Feeder/Low Water Cut-Off ! WARNING

Vanity Installa on Guide Model: AACCS-3001

FP EZ4F 4 Zone Controller

Contents. Commissioning 6 Operation 6 Routine Preventative Maintenance 6 Fault Finding 7 Spares Parts 8 Technical Support 9

Cameo White January (first two digits indicate the month of expiration, 01 12)

Kidde Ba ery Carbon Monoxide Alarms

LP GAS PIZZA OVEN USER MANUAL

Mikrofill Ethos Condensing combination boiler. Maintenance Instructions 24cc

Product Guide. Fiberglass Specialties Incorporated

Residential Atmospheric Gas Water Heater with the Flammable Vapor Igni on Resistant Safety System

Audi-Larm Audible Alarm

SPARE PARTS EXPLODED VIEW GAS WALL BOILERS Model MICROGENUS PLUS. R EN - Edition 02-01/04/2007

Installation Manual KS8-LCP 0-10 C0 2 TRANSMITTER. Instructions for :- KS8-LCP0-10 C02 Sensor

ColorMax Cyclone Cleaning Kit

Models: GW/R-T GW/R-2-T GW/R-3-T

Installation Instructions Part No , Part No Part No

TRIO TV SERIES VERTICAL IMPACT CRUSHERS. Highly Efficient Crushing Solutions.

Cable Drain & Cable Drain Trim Kit

SAFETY AND OPERATING MANUAL

Wireless bedwe ng alarm system

Vacmobile 20/2. Instruction manual OPERATION & SERVICE

Steele Extrusion Machinery

Kitchen Care Guide. HomePro. connect with the best. The kitchen is the heart of the home - we want to help you look a er it. Wri en on March 14, 2017

Kallista Bath Flip Drain

INSTALLATION INSTRUCTIONS

MOHICAN. MOHICAN 4-Pass Water Boiler, HP, PSI Section

INSTALLATION INSTRUCTIONS MODELS SG-9, SG-14, SG-18, SG-23, SG-27, & SG-36 COMMERCIAL STEAM GENERATORS

LATTNER BOILER COMPANY 9.5 HP Low-NOx Installation and Start-Up Checklist for Dry Cleaners

Direct Vent Tankless Water Heater Installa on and Opera on Manual

ATD Gallon Parts Washer Owner s Manual

Kidde Ba ery Carbon Monoxide Alarms

INTRODUCTION. NOTE: Read the entire instruction manual before starting the installation. FIRE, EXPLOSION, ELECTRICAL SHOCK HAZARD

INSTALLATION INSTRUCTIONS

Heat Exchanger Block Replacement Instructions

Owner s Manual. FMI BRANDS INC Avenue Surrey, B.C. Canada V3Z 3V7 Toll Free Fax Model number FMPPC2E-1

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-315(C)

Glass Vessel Sink Installation

OWNER'S SERVICE MANUAL NO INSPECTION, MAINTENANCE AND RECHARGE

INSTALLATION AND OPERATING INSTRUCTIONS. Ariterm 60+

Niles Steel Tank Hot Water Generator Installation and Operation Manual

Cast Iron Commercial Hot Water Or Steam Boiler

SHURFLO BLASTER II MARINE WASHDOWN PUMP PRODUCT TECHNICAL DATA SHEET

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVO-400 INDIRECT FIRED SPACE HEATERS

Series 1140 and 1141 Temperature Regulators

TECHNICAL INSTRUCTIONS

by PRIMUS Portable Buddy Compact Propane Heater User Manual and Product Specifications

INSTRUCTION MANUAL BREAD MILL MODEL MPAL

Domestic Pump Vacuum and Boiler Feed Units Series VCMD TM INSTRUCTION MANUAL DN0137 REVISION F

INSTALLATION GUIDE Novitherm TM heat reflector panels

Page 1 of 18. Part# /5/2013

ALDRICH COMPANY THREE PASS FIRETUBE BOILER CLASSIC SERIES OPERATING & MAINTENANCE MANUAL

AWEIS Troubleshooting Guide Table of Contents

Model K 5800 G Part No

Commercial, Residential & Institutional Pumps, Tanks, & Accessories

USER S GUIDE FOR DEEP FRYER

Residential Electric Water Heater

Transcription:

Miniature Steam Pty Ltd. Bringing the Highest Quality Standards to Model Engineering Miniature Steam Custom Steam Plant Kit for self assembly in Caldercra Joffre Tyne Tug 2 Horizontal Boiler with Avon Twin Cylinder Oscilla ng Steam Engine Kit Assembly Instruc ons

Caldercra Joffre With Miniature Steam Custom Steam Plant Whether fi ng the steam plant to a new or established Joffre model it is important that the centerline of the bulkhead (159) is precisely 415mm from the p of the stem. Access to run the plant through openings in the deck, to fit the propeller drive sha and the pre formed steam line depend on this dimension being exact. This datum is also important for posi oning the boiler and engine wooden moun ng blocks. Do not proceed un l the bulkhead is correctly posi oned. The kit is delivered in six boxes as follows: Refillable gas tank P/N 4271 2 Horizontal boiler P/N 4058 2 Ceramic burner P/N 4016 less gas pipe. Oil trap P/N 4062 Avon Oscilla ng Engine Self Assembly Kit P/N 5027K Accessories: Includes propeller universal drive sha P/N 9461 X 2, short propeller drive sha P/N 5357, 40mm propeller P/N 1067M or 1068M, moun ng blocks P/N 3001/3002, moun ng trays P/N 2884/2885, steam pipe P/N 3020, gas pipe P/N 3021, pipe fi ngs, exhaust port bush, moun ng screws Assembly Instruc ons: Step 1. Fit the tray moun ng blocks Posi on the Boiler Moun ng Tray Block, oriented as shown above, and gently align it to the centreline of the hull with the rear end of the block square against the bulkhead. Place a mark on the hull 40mm from the a er edge of the Boiler Block to establish the correct posi on of the Engine Tray Moun ng Block as illustrated. Using Epoxy 2 Pack adhesive set the blocks in place and put aside to allow the adhesive to set.

Step 2: Assembling the Boiler Moun ng Trays: Lay out the screws and nuts. There should be at least 4 wood screws for securing the trays to the moun ng blocks, 4 x 6 mm screws for securing the oil trap to its tray, 8 x 8 mm screws to secure the boiler and engine to their respec ve trays and 4 x 12 mm screws to establish a removable fixing for the gas tank. With the excep on of the la er it is recommended that the screws be inserted from the top of the tray with the nuts on the underside of the tray. (You may find we have supplied surplus nuts or screws just in case some get lost!) The 12 mm screws for the gas tank should be inserted from the underside and the nuts ghtened from the top before placing the tank on the screw ends (see picture opposite). This provides for easy removal and reinser ng the tank during refilling opera ons. Filling instruc ons are detailed in a facts sheet supplied with the tank DO NOT EVER BE TEMPTED TO REFILL THE TANK WHILE IT IS IN POSI- TION IN THE BOAT YOU RUN A SERIOUS RISK OF TRIGGERING AN EXPLOSION WHEN RESTARTING THE BOILER. Assemble the engine as set out in separate instruc ons supplied with the engine. The lubricator is a ached to the engine using two addi onal fi ngs illustrated in the picture below. Make sure the engine is spinning freely before and a er screwing it to the tray. If there is any uneven ghtening the engine may s ffen and may no longer run efficiently. Secure the oil trap to the tray with the screws and nuts noted above. The plan view opposite illustrates the plumbing required to deliver the steam to the engine as well as the piping involved in exhaus ng it away from the engine. The exhaust steam is delivered through silicone fuel tubes pressed on to the appropriate fi ngs. Vent the cleaned steam to the atmosphere by connec ng the clean steam exhaust line to the brass nipple (exhaust port) fi ed through the hull. The fi ngs between the displacement lubricator and engine are supplied in the accessories box. Be careful not to over ghten the threads. Sealants should not be required to obtain a sa sfactory seal.

Step 3: Star ng up the plant: A separate document OPERATION OF Miniature Steam PRODUCTS IN A STEAM PLANT is included in the accessories box to guide commissioning of the plant. It is recommended that the calibra on and engine run in be completed before final fi ng of the assembly in the boat hull Place the two trays on a flat wooden surface and connect the steam line to both units. Using the wood screws supplied, lightly screw the two trays to the surface. Calibrate the Ceramic Burner as per the instruc on sheet supplied in the burner box: Running the Boiler Remove the safety valve and, using the syringe supplied, fill the boiler with clean water to approximately 75% of full volume. The water level in the water level sight glass should be visible close to the top. Make sure you can see the water level in the sight glass. The boiler requires space above the water level to accumulate steam. If you can t see the actual water level remove some water with the syringe un l you can. Replace the safety valve and lightly ghten. Check that the steam stop cock on the boiler is closed. If the boiler is cold, remove the gas tank from its moun ng pins and the burner from the boiler, turn on the gas valve a li le, light the burner directly with a gas gun, reinsert the burner while it is burning into the boiler, replace the gas tank onto its moun ng pins. Ensure the knurled nut connec ng the gas pipe to the gas tank is firmly ghtened before opening the gas valve fully. If the boiler is warm, open the gas valve a li le and hold a gas gun (NOT a lighted match or the sparking type of gas gun) to the top of the stack. When the burner ignites open the gas valve fully. It can seem noisy but this is normal. (A suitable gas lighter can be purchased at most Supermarkets) The boiler should reach its maximum working pressure of 40 psi (2.8 bar) in about 5 to 6 minutes. If it is filled with warm water this me can be reduced to 3 to 4 minutes. When the pressure gauge reaches recommended opera ng pressure fully open the steam cock on the boiler and adjust the steam cock on the lubricator to allow some steam to flow through to the engine to heat the steam pipe and the engine cylinders. When these are cold some condensate will blow out when the steam reaches the cylinders. This is normal. Adjust the lubricator steam cock to produce the power required for the engine. This se ng can be retained for future running since the boiler steam cock is used as a Start/Stop valve. If the safety valve blows off a er the engine reaches the desired opera ng speed adjust the gas valve to reduce the gas supply as well. Note that in the early stages of running up the boiler, the rate of gas consump on will cause the gas tank to cool down possibly to the point where frost will appear on the outside of the tank. This is normal and in prac ce will cause a reduc on in burner performance at the me. Don t worry the boiler is mounted close to the gas tank and it will soon warm sufficiently to keep the tank delivering maximum gas to the burner. To stop the boiler, turn off the gas cock and wait for the steam pressure to drop to zero before closing the boiler steam cock ready for the next run. The lubricator steam cock should remain as set to provide the same opera ng power on the next run. Before fi ng the assembly in the boat hull run the plant for at least six boiler fills to remove any s ffness in the engine. This is a good opportunity to prac ce controlling the engine speed and boiler power adjustments.

Fi ng of the tray assemblies in the boat hull: Locate the boiler tray to bu up against the bulkhead on its moun ng block. The nuts and screw heads on the underside of the tray should match the recessed holes in the moun ng block. Do not secure the tray at this me. Posi on the engine tray so that it fits neatly on its moun ng block. Connect the steam pipe from the boiler to the engine. It should allow precise matching of the nuts into the recessed holes in the engine moun ng block. If there is a mismatch please make correc ons as appropriate. Using the wood screws supplied, secure the trays to their moun ng blocks and loosely a ach the propeller sha coupling and its related fi ngs to the engine drive sha. If working with a new boat kit the standard propeller sha tube (4) should be discarded and replaced with the special propeller sha and propeller supplied with the steam plant. If retro fi ng the plant carefully remove the exis ng propeller tube and proceed as follows. Fit the propeller supplied to the propeller sha and pass the sha through the stern such that the propeller thrust will be taken up by the propeller sha thrust bearing and there is some longitudinal slack between the propeller sha and the propeller sha coupling. Secure the propeller sha with epoxy pu y and when set, ghten the grub screws on the propeller sha components. RC Controls & Ballast: Before installing the deck, fit all the RC components (ba ery, servos & links, & wiring ) in place, and conduct a buoyancy balance test. Glue appropriate ballast in posi ons to provide even displacement of the loaded hull. Some fine adjustments can be made later but it is be er that this process is undertaken before gluing the deck in place. Refilling the gas tank: Disconnect the gas pipe from the gas tank and remove the tank from the moun ng tray before filling as instructed in the Test Cer ficate. When refilling the gas tank it is normal for the tank to cool down. This may aggravate the condi on noted above when star ng the boiler. In very cold condi ons it may be necessary to warm the filled tank to room temperature preliminary to re fi ng it into the tray. Test cer ficates for each pressure vessel: Formal Test Cer ficates, general safety recommenda ons and filling instruc ons for the boiler and gas tank are enclosed in each pressure vessel box. These should be read carefully and stored in a safe place for future reference. Recommended Propellers & Drive Sha s: To obtain maximum performance from your plant we strongly recommend you avoid using fabricated propellers. Precision cast Caldercra / Miniature Steam propellers and matching propeller sha s will deliver top performance from your steam plant.