Daylighting Madrona Creek. It takes a neighborhood

Similar documents
Balancing Conservation and Development on the Jordan River

Restoration of Richmond Beach Saltwater Park, Shoreline, WA

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

Anheuser Busch River Cleanup/Infiltration Garden Project Summary

UPPER SLIGO CREEK: FLORA LANE TRIBUTARY- AMERICAN EEL HABITAT RESTORATION PROJECT

Panther Pond Conservation Project Phase II

Stream Restoration: Working with Nature?

Stream Restoration: Working with Nature? Greg Jennings, PhD, PE

Silverwood Masterplan Kickoff Meeting. Jim Neidhart Dane County Parks Planning

Two Sides of the Green Infrastructure Coin. Jaren Hiller, PE, LEED AP Nathan Guequierre

Weston s Wetlands, Stormwater, & Open Space

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015

Mendota Heights 2040 Comprehensive Plan Draft Vers

Is a Riparian Restoration Still Viable After 100-year Storm Events Alter the Original Design?

The scope of the plan will focus on the Prospect Heights Slough and Hillcrest Lake as one entity.

City of Tacoma Planning and Development Services

2011 ASLA Design Awards. Westside Creeks Restoration Plan Merit Award AECOM, Fort Collins. Planning & Urban Design

Lake and Stream Restoration Project

March 30, 2017

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

Errol Heights Park and Community Garden Frequently Asked Questions March 22, 2018

PICTURE CANYON Planning Riparian-Wetland Refugia in an Urban Setting

2011 ASLA Design Awards. Coyote Gulch Honor Award and Land Stewardship Designation Valerian LLC. Environmental Restoration and Reclamation

Level 1 Downstream Analysis

Introduction to the Seahurst Park Ecosystem Restoration Project: A Process of Transformation. Presented by Peter Hummel, ASLA, LEED AP

A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region

RAIN TO RECREATION CASE STUDY

Pittsfield Action Plan (West Branch of the Housatonic River)

Information for File # ARC

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

The Napa River Flood Protection Project

319 Grant: Baker Creek & Centenary Creek Restoration Initiative

Hidden Pointe Landscape Master Plan. June, archi terra

Natural Shoreline Landscapes on Michigan Inland Lakes. Introduction. Workshop for Property Owners. Photo by Jane Herbert

SF RECREATION & PARK DEPARTMENT URBAN TRAILS PROGRAM

Pine Flat Lake Master Plan Update FACT SHEET September 2014

Long Branch-Wayne Local Park Renovation Project

Tips for Maintaining and Enhancing Stormwater Management Areas

ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI

Introduction to the Shoreline Master Program (SMP) Update. City of Bellingham Planning Department 2005

Client #: Dawson /91. NRCS Tract #(s): Location: Fleming Memorial Park Field #(s): Program(s): Urban Project Name: Date:

2011 ASLA Design Awards. Redefining Family Landscape Honor Award Three Sixty Design. Residential Design Under $100,000 Construction Budget

Nine Mile Creek Regional Trail Update. Edina City Council Workshop March 4, 2014

Ponds of. Ballantrae

2017 Summer Projects

Public Meeting May 20, 2014

Lake Nokomis Shoreline Enhancement Project

No updates. NEON s work completed throughout July Notify MPRB for tree marking/stump removal

Kazoo school students are presenting a research project on Japanese Knotweed in collaboration with researcher, Joe Dauer, from MSU.

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015

Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

Restoring Water Ecosystems in NYC Parks

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total

Turkey Creek Streamway Corridor

Action Item Recommend Initiation of Public Art Project at Bishop Arts Station. Kay Kallos, Public Art Program Manager

Pike River Restoration Adaptive Design: Restoring Structure and Function in an Urban Floodplain - from cabbages to cordgrass

Landowner's Guide to the Lower St. Croix Riverway. Protect. Restore. Celebrate. stcroixriverassociation.org

Sustaining Historic Public Landscapes Preservation & Sustainability for Our Shared Heritage To Enhance Quality of Life & Experience of Place

Master Plan Objectives and Policies

Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE

The Brooks Estate Master Plan Summary

Libby Zemaitis October 18, 2017 Climate Outreach Specialist, NYS DEC Hudson River Estuary Program

COLLIER BOULEVARD (CR 951) CORRIDOR

Support for Walnut Creek Watershed Council. Adopt resolution of support for the newly formed Walnut Creek Watershed Council.

Maintaining Your Neighborhood Stormwater Facilities

Workshop Overview. 5:10 5:20pm City Permit Requirements Gary Wittwer, City Of Tucson, Dept. of Trans

VALLEY VIEW POND Q&A. This item will be discussed under the First Reading portion of the agenda at the July 17, 2012 Village Council meeting.

DRAFT SCOPE OF SERVICES PEER REVIEW OF BAKER PARK. Request for Qualifications (RFQ)

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

2008 Combined Clean Water Legacy Grant Application Id#: Use TAB key to move from field to field

Restoration of Riparian Buffer at the Former Smelt Hill Dam Site, Falmouth, Maine

Natural Shorelines. for Inland Lakes. A Landowner s Guide to using. to STABLIZE SHORELINES, Michigan s inland lakeshore.

Bristol Marsh Heritage Conservancy

Retrofitting Low Impact Development (LID) for Stormwater at Sacramento State. City of Sacramento Sacramento State Facilities Management

RESPONSES TO PUBLIC CONCERNS AND QUESTIONS

Conservation in South Jersey Being Creative with Restoration

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation

PUBLIC MEETING SEPTEMBER 19, 2012

HIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL

City of East Point Comprehensive Floodplain Management Program

& SUSTAINABILITY PLAN

Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018

Section 3 Non-Structural BMPs

CITY OF LONDON COVES ESA CONSERVATION MASTER PLAN COMMUNITY WORKSHOP #1

Town of Corinth Road Erosion Inventory Report

OYSTER LAKE RESTORATION PROJECT

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

SITE INTRODUCTIONS AND OVERVIEW

Project. Project Type:

WEFTEC.06. ** City of Caldwell, Idaho

Funding, Designing, and (eventually) Building Miles of Shoreline and Acres of Wetlands and Oyster Reefs on an Urbanized River!

Carrboro Greenways Commission January 9 th, 2007

Farmers Investment Co. (FICO) Sahuarita Farms Specific Plan & Minor General Plan Amendment Community Meeting July 1, 2014

Southeast Michigan Council of Governments

STORM WATER POLLUTION PREVENTION TRAINING. For Officials and Residents of Doylestown Township

TOPS K-8. Teacher Guide. CONTENTS Stormwater in the Schoolyard Lesson 3

Portage County Parks, Trails and Greenways Plan

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION

Transcription:

Daylighting Madrona Creek It takes a neighborhood

Madrona Park 9 wooded hillside acres above Lk Wa, 2 creeks, (~) 30 mature conifers, lots of ivy, blackberry, 200 vertical feet sloping up from lake. Very little conifer regeneration (as in other city natural areas) Before FOMW: The Woods had long been neglected. It was full of eroded social trails, invasive plants, and at times some sketchy activity.

Madrona Park: on either side of Lk Wa Blvd due east of downtown.

Streets get weird near the lake due to hills

Trail Repair above very steep chute

Newly cleared and planted in foreground. Still bad in background.

Friends of Madrona Woods We are a subcommittee of the Madrona Community Council (a 501 c3) 1997-8: formation, public input phase 1999: master use action plan (Peggy Gaynor), trail repair/construction, begin restoration 2000-2006: environmental education program 2005-2009: Madrona Creek daylighting project 2008-2010: Daylighting proj. maintenance 2005- : further restoration with help of Green Seattle Partnership

Neighborhood Support Initial public review was positive. About $50K in total contributions Neighbors (other than core volunteers) occasionally join in our work parties. People like to use well-maintained natural spaces. Our treasurer recently retired, a new neighbor has stepped up. We can always use more help. We re a victim of our own success.

Help From Stewardship Community GSP: don t just count volunteer hours, measure results. Prioritize work. Work on a larger scale. Maintenance is vital. Erosion control workshop. Seattle Urban Nature (SUN): vegetation survey, monitoring protocols, prioritize removal of worst invasive plants. WNPS: botany, plant id, plant habitats, propagation techniques, how to run a work party.

Oceanspray

Goat s Beard

Trillium

Ninebark

Daylighting Project Overview Main funding motivation: fish habitat. Before: Madrona Creek exists only in pieces and is submerged (twice!) west of Lk Wa Blvd. Before: The lakeshore consists of grass sloping down to a seawall. After: The creek flows aboveground (2 culverts) on public land ¼ mile from source to lake. After: At its mouth the seawall is replaced by a wetland; park users can observe the creek in a 2/3 acre lakeside natural area. 8,000 plants planted by volunteers.

Daylighting Construction Construction began at the lakeshore. First phase connected lower Madrona Creek across Lk Wa Blvd to the lake not enough water for year-round flow. Second phase connected upper creek, resulting in full flow to lake. Fundraising and grant proposals done continuously for 4 years. Money went out as fast as it came in. No cost overruns (from bid), but project was well over original budget.

Peggy Gaynor Landscape architect: Gaynor Inc No Peggy no daylighting. Has worked with FOMW for 10 years. Managed all design, permitting, construction, grant proposals, plant layout. Huge amount of pro-bono hours. Other projects: Ravenna, Meadowbrook.

Project Timeline (Green: good Red: not so good) Year(s) Tasks Grants 2005 Project survey and design Starflower, King Co Waterworks 2006 Parks Dept approval, permitting (Army Corps Eng, Seattle DPD) 2007 Phase 1 construction (culvert across Lk Wa Blvd, lakeside grading). Planting. 2008 Planting. Phase 2 construction (culvert across 38 th ). 2009 Bridge construction, final planting. Seattle AHMG, King Co WW NOAA, King Cons Dist, Fish America, AHMG Seattle DON, AHMG Seattle DON 2008-10 Maintenance/monitoring Seattle AHMG

Madrona Creek emerges from the steep hillside. There is no stormwater runoff in Madrona Creek. This means its water is cleaner, and its flow is more consistent.

Removing catch basin above 38th

Culvert trench under 38 th. Notice how sandy the soil is here.

Madrona Creek above 38 th (during construction)

Rock feature below 38th

Below rock feature.

Creek crosses under (red) trail, runs along Spring St.

Leveling a log weir.

Looking upstream.

Phase 1 Construction creek channel is all new

Enjoying lakeside trail.

The cove in autumn.

Monitoring Program Plots, database, and protocols provided by SUN 6 2-person teams of volunteers monitor a total of 15 24 sq meter plots. Estimate % cover of all shrubs and herbaceous plants. Measure/estimate all trees and shrubs. Runs through summer 2010.

Plots are in all three habitat types.

A fine day in January.