Lead Remediation/Abatement at Forest Blvd., Hugo, MN

Similar documents
BID PROPOSAL-REVISED

SPECIFICATIONS FOR TENDER # SUPPLY OF A FIRE ALARM SYSTEMS SERVICE AGREEMENT FOR WESTERN HEALTH

COUNTY OF ROCKLAND Department of General Services Purchasing Division

ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS

Cohoes Housing Authority 100 Manor Sites Cohoes, NY P: F:

REQUEST FOR PROPOSALS CLEANING SERVICES

SMALL WORKS PROJECT REQUEST FOR SEALED BIDS

Egress Window. Requirements for Building Permit Application

NOTICE TO CONTRACTORS

STATEMENT OF WORK ELECTRICAL REPAIR / MAINTENANCE BUILDING PROJECT FDC RACCOON CREEK STATE PARK (BEAVER COUNTY)

DOCUMENT ADVERTISEMENT FOR BIDS

FRONT PORCH SUNSHINE REQUEST FOR QUOTATIONS CONTRACTOR AND SYSTEM QUALIFICATIONS

cbever LY) \HILLS/ AGENDA REPORT

CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S.

Majis Industrial Services SAOC TENDER NO. MISCP/09/2014

ASBESTOS AND LEAD-BASED PAINT SURVEY 696/698 Hawthorne Avenue St. Paul, Minnesota. Prepared for:

Lead-Based Paint XRF Test Cover Sheet

Jefferson Cocke County Utility District Marketing Plan (July 1, 2008 through June 30, 2019) Revised effective July 01, 2016 A) Identify commercial

Addendum # 2 Wicomico County Circuit Court Second Floor Renovations Date of Addendum: 2/6/2017

COMMERCIAL (IBC) FIRE ALARM SUBMITTAL GUIDE

SPECIFICATIONS FOR TENDER # SUPPLY OF DUCTLESS MINI-SPLIT AIR CONDITIONING SYSTEMS FOR WESTERN HEALTH

REQUEST FOR PROPOSAL. Grounds Maintenance

Ada Township is soliciting bids for the following commodity or service:

APPENDIX A - TECHNICAL SPECIFICATIONS HEAT TRACE INSTALL ON OIL PIPING BETWEEN TURBINE BLDG AND VALVE FARM NORTHSIDE GENERATING STATION (NGS)

Contact Phone Number: (609) Fax: (609)

INVITATION TO BID. Allendale Elementary School 3670 Penniman Avenue, Oakland, CA 94619

ROSWELL INDEPENDENT SCHOOL DISTRICT P.O. Box 1437 Roswell, New Mexico General Bid Conditions

INVITATION TO BID SUPPLY OF VARIOUS PORTABLE FIRE EXTINGUISHERS

CITY OF LOCKPORT FIRE SPRINKLER & FIRE ALARM SYSTEM INSTALLATION ASSISTANCE PROGRAM

MUNICIPALITY OF GREENSTONE BOX 70, 1800 Main Street Geraldton, Ontario P0T 1M0 Telephone Facsimile

Mr. Burke presented the Airport and Boeing s badging process and public safety issues as outlined in the attached meeting agenda.

Section 8 Housing Choice Voucher Program. Housing Quality Standards (HQS) Inspection Checklist

DEPARTMENT OF PUBLIC SAFETY DIVISION OF FIRE PREVENTION AND CONTROL

SUWANNEE RIVER WATER MANAGEMENT DISTRICT REQUEST FOR BID NO. 15/16-003AO FIRE ALARM SYSTEM INSTALLATION AND MONITORING.

Housing Authority of the City of Perth Amboy

BUILDING, FIRE, AND LIFE SAFETY CODE ENFORCEMENT AND CERTIFICATION OF INSPECTORS FOR HEALTH FACILITIES LICENSED BY THE STATE OF COLORADO

PIKES PEAK REGIONAL BUILDING DEPARTMENT Fire Alarm Contractor License Application

Request for Bid Proposal For Repair of Sprinkler Systems Iowa Veterans Home Marshalltown, Iowa

Sidney, Ohio 1204 FORMAL ISSUANCE OF CERTIFICATE OF SUBSTANTIAL COMPLETION... ON OR BEFORE JULY 30, 2015.

Montgomery County Land Bank 130 West 2nd Street, Suite 1425 Dayton, OH PRE SALE INSPECTION REPORT

REQUEST FOR QUOTATIONS. Janitorial Services

REQUEST FOR PROPOSALS

Round Rock Independent School District

1. Delete BID FORM in its entirety and replace with the BID FORM attached to this Addendum.

Campus Wide Fire Alarm Repairs

SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

Cherokee Nation

Request for Proposals (RFP) for: Columbia County Facilities Fire Detection and Security Improvements

OUTDOOR FIREWORKS DISPLAY

YEAR ONE COST PER MONTH COST PER YEAR ONE 6, YEAR TWO COST PER MONTH

COUNTY OF ROCKLAND Department of General Services Purchasing Division

Montgomery County Land Bank PRE SALE INSPECTION REPORT

CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU FIRE ALARM / ELECTRICAL FIRE PLAN REVIEW CHECKLIST

FAIRA TRANSPARENCY REPORTS th Ave NE B-3, Kenmore, WA March 28 th, 2017

DESCRIPTION OF WORK. The bidder shall provide adequate proof of licensure and insurance.

ROSWELL INDEPENDENT SCHOOL DISTRICT P.O. Box 1437 Roswell, New Mexico General Bid Conditions

Inspection Report. Cheri Maisonneuve. Property Address: 103 Dogleg Dr Moultrie GA. Welcome Home! Premier Home Inspections of Valdosta, LLC

IOWA STATE FIRE MARSHAL DIVISION Attn: Licensing Administrator

COMMISSION ORDER. IT IS FURTHER ORDERED that the Request for Bid and Notice to Bidders be displayed on the Franklin County website.

Montgomery County Land Bank 130 West 2nd Street, Suite 1425 Dayton, OH PRE SALE INSPECTION REPORT

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

Minimum Standards for Engineers Practicing Fire Protection Engineering in the State of Oklahoma September 14, 2016

CITY OF DANIA BEACH Local Business Tax Receipt Division 100 W Dania Beach Blvd. Dania Beach, FL Phone: ext 3644 / Fax

BOARD OF EXAMINERS OF LANDSCAPE ARCHITECTS

Bid Response: Formal Sealed Bid

Residential Sound Insulation Program Historic Homes Pilot Program. October 21, 2015

SECTION SECURITY TESTING AND COMMISSIONING

CITY OF MEDINA OFFICE OF THE HEARING EXAMINER

DEPARTMENT OF PUBLIC SAFETY. Division of Fire Prevention and Control 8 CCR

BID FORM CITY OF BEVERLY HILLS. The undersigned, having carefully examined the site conditions and the Contract Documents for

REBATE. Ductless Mini-Split Heat Pump

Save energy at home residential natural gas rebate form

APPLICATION DIRECTIONS Minor Exterior Alterations to Existing Home

Certificate of Inspection CHECKLIST

City of Philadelphia

Save energy at home residential natural gas rebate form

MOSS HANGING BASKETS 2014 REQUEST FOR OFFERS NO. 1491

FAIRA TRANSPARENCY REPORTS Country Club Dr, B-203, Mill Creek, WA April 5 th, 2017

Norfolk Fire Department Fire Prevention & Information

radon Keeping your home safe from radon

CCDC EXPANSION PROJECT

Invitation to Bid WATER HEATER HHS & WHH

इ ड यन ओव रस ज ब क Indian Overseas Bank. क ष त र य क य ऱय, Regional Office, Chandigarh

Cleaning Contract Maintenance Specifications General Information

City of Placerville SALE NOTICE. Baltic Lookout Tower

FORM A: PROPOSAL (See B10.2) 1. Contract Title INTEGRATED SOLID WASTE COLLECTION IN THE CITY OF WINNIPEG

Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ)

Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors

Request For Quotations. For The. Fire Sprinkler Retrofit Program For Licensed Small Or Rural Retirement Homes. October 11, 2017

Center for Life Safety Education

RW West Consultants. Property Inspection Report NE 199th St, Kenmore, WA Inspection prepared for: FAIRA/ Chris Ellis Real Estate Agent: -

Project phasing plan (if applicable) 12 copies of site plan

Annual Fire Systems and Backflow Preventers Testing

UNIVERSITY OF TOLEDO

CITY OF MILTON INVITATION TO BID (THIS IS NOT AN ORDER)

Marketing to Builders and Homeowners

47 Levencourt Way London SW8 1HR

Item No. Description 1. BID PROPOSAL FORM Make the following revisions: a. Replace the BID PROPOSAL FORM with the attached BID PROPOSAL FORM.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SPE Exhibitor Appointed Contractor Manual

Transcription:

Request for Bids for Lead Remediation/Abatement at 14383 Forest Blvd., Hugo, MN This Request for Bids ( RFB ) is for the services of a qualified and licensed contractor to provide remediation/abatement of lead contamination at 14383 Forest Blvd., Hugo, MN (hereinafter referred to as the Building") a property owned by The Church of St. Genevieve of Hugo, Minnesota, 7087 Goiffon Rd Hugo, Minnesota 55038 (hereinafter referred to as the Church ). Project Description The Church, in partnership with St. Andrew s Evangelical Lutheran Church (hereinafter referred to as St. Andrew s ) intends to remodel the Building for use as a temporary shelter for families in the northern Washington County area. Preparation for this remodeling project includes the identification and remediation/abatement of lead. Floor plan drawings of the first and second floors of the Building are attached to and made a part of this RFB as Attachment A. In advance of the commencement of the remodeling, an inspection of the Building for the presence of lead was conducted for St. Andrew s by an outside consultant, and that inspection identified areas where lead exists. The consultant s report is attached to and made a part of this RFB, as Attachment B. By issuance of this RFB, the Church is seeking a qualified contractor to perform the remediation/abatement work identified in this RFB. Bidding Process 1. Questions- Questions pertaining to this RFB and requests for on-site visits shall be submitted in writing to Paul Kirkwold by email to PLKconsulting@comcast.net, no later than Wednesday, June 7, 2017. Answers to emailed questions and information regarding on-site visits will be sent to all holders of this document. 2. Bid Contents: In order to be considered, a bid must include all of the following: A. Completed Bid Form ; B. A profile of the bidder s experience and qualifications to provide the required services, including any licenses held; C. Certificate of Insurance or a statement of the ability to provide such a Certificate, showing the following: a. Workers compensation coverage in accordance with Minnesota statutes and rules. b. Commercial General Liability with a rider specifically including the exposure to, remediation and abatement, and the handling and disposal of hazardous materials, including lead and lead-containing materials. D. Signatures of individuals authorized to bind the bidder to the terms of the bid.

3. Last Day of Submittal - Complete bids must be delivered to the Church no later than 3:00 PM, Friday June 9, 2017. Bids not submitted by this deadline will not be considered. By submission of a bid, a bidder agrees that it will comply with the requirements of this RFB and will provide services in accordance with the provisions of this RFB. 4. Contract Award - While cost will be a contributing factor in selection of a bidder, the Church reserves its right to consider additional criteria in making its selection. Paul: or we could say lowest, responsive, responsible bidder. Scope of Services 1. The Bid for Services shall include all remediation/abatement services set forth in this RFB, including the attachments. 2. Locations where services shall be provided are listed in the tabulation attached to and made a part of this RFB as Attachment C. 3. In the performance of services under the resulting contract, the contractor shall: A. take all necessary and required precautions to protect uncontaminated areas from possible contamination as a result of the remediation/abatement process; B. ensure and provide documentation that all removed materials are disposed of in a manner that is consistent with state requirements and accepted industry standards; C. properly clean all impacted areas and securely cover all openings created by the remediation/abatement process with a minimum of 1/4 plywood or chipboard sheeting. 4. Remediation/abatement work provided under the terms of the resulting contract will not be considered complete until after a re-inspection by the St.Andrew s consultant and confirmation that all lead contamination has been mitigated. 5. Additional Work - During the course of the Project remodeling work, the Church may identify the need to obtain additional services from the contractor regarding additional lead remediation in the Building. The bid form includes a space for the contractor s hourly rate for these additional services. Additional Work not described in this RFB must be authorized in writing prior to the commencement of the additional work. The written authorization will include a description of the additional work, the cost for the work, and the completion date. The authorization must be signed by both parties representatives. Upon execution by both parties, the written authorization will automatically be incorporated into and made a part of the resulting contract without further action by the parties.

Contract Terms and Conditions The resulting contract will include: 1. The provisions of this RFB, including all attachments. 2. The successful bidder s bid. To the extent there are inconsistencies between this RFB and the bid, the provisions of this RFB shall prevail. Payment - Within 14 days of receipt of an invoice from the contractor, the Church will pay the contractor as follows: A. No more than 60% of the contract amount will be paid when 100% of the work has been completed and the Church representative agrees that all debris and removed material has been removed from the Building site and properly disposed of. B. the final payment of 40% will be paid with confirmation by the St. Andrew s consultant that all identified lead contamination has been mitigated. Schedule/Completion Date - All work shall commence on or before June 30, 2017, and shall be completed no later than July 15, 2017.

Attachment A-1st floor HWY 61 - Side A Side D Side B DR-D BathR-B Side C

Attachment A-2nd floor HWY 61 - Side A HALL BR-DA BR-AB Side D Side B BR-CD BathR-C BR-BC Side C

Attachment B Lead Remediation Locations Hugo Rectory Room Wall Item Remediation First Floor Rooms DR-D A Wall Board Remove wall board and dispose DR-D B Wall Board Remove wall board and dispose DR-D D Window Remove window and cover with sheeting BathR-B B Window Remove window and cover with sheeting Second Floor Rooms BR-AD A Window Remove window and cover with sheeting BR-AD D Window Remove window and cover with sheeting HALL A Wall Remove moldings and cover wall with 3/8 sheetrock. HALL A Window Remove window and moldings and cover with sheeting HALL B Steps to Attic Remove stair treads and moldings BR-AB A Window Remove window and cover with sheeting BR-AB B Window Remove window and cover with sheeting BR-BC B Window Remove window and cover with sheeting BR-BC C Window Remove Door and and moldings and cover with sheeting BathR-C C Window Remove window and moldings and cover with sheeting BR-CD C Wall Remove moldings and cover wall with 3/8 sheetrock. BR-CD D Wall Remove moldings and cover wall with 3/8 sheetrock. BR-CD C Window Remove window and moldings and cover with sheeting BR-CD D Window Remove window and moldings and cover with sheeting BR-CD D Heat radiator Remove BR-CD A Wall Remove all moldings, lathe and plaster BR-CD B Wall Remove all moldings, lathe and plaster BR-CD AB Door & wall Remove Door, all moldings, lathe and plaster HALL C Wall Remove all moldings, lathe and plaster HALL CD Wall Remove all moldings, lathe and plaster 1

Attachment C-1 Thermo Fisher Scientific 2 Radcliff Road Tewksbury, MA 01876 USA Index Time Trim Piece Room Side Floor Component Site Inspector Results Action Level PbC 1 2017-05-03 10:06 Interior Wall Bedroom DA D Second Window 14363 Forest Blvd Dan R Negative 1.00 0.30 +/- 0.18 2 2017-05-03 10:06 Interior Trim Bedroom DA D Second Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.60 3 2017-05-03 10:06 Interior Sill Bedroom DA D Second Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.50 4 2017-05-03 10:06 Interior Sash Bedroom DA D Second Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.17 5 2017-05-03 10:07 Trough Bedroom DA D Second Window 14363 Forest Blvd Dan R Positive 1.00 20.80 +/- 12.80 6 2017-05-03 10:10 Trough Bedroom DA A Second Window 14363 Forest Blvd Dan R Positive 1.00 25.90 +/- 14.70 7 2017-05-03 10:11 Interior Wall Hall A Second Window 14363 Forest Blvd Dan R Positive 1.00 2.60 +/- 1.10 8 2017-05-03 10:11 Interior Wall Hall A Second Window 14363 Forest Blvd Dan R Positive 1.00 1.70 +/- 0.60 9 2017-05-03 10:12 Interior Wall Bedroom AB A Second Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.90 10 2017-05-03 10:13 Interior Trim Bedroom AB A Second Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.23 11 2017-05-03 10:13 Interior Sill Bedroom AB A Second Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.38 12 2017-05-03 10:13 Interior Sash Bedroom AB A Second Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.17 13 2017-05-03 10:13 Trough Bedroom AB A Second Window 14363 Forest Blvd Dan R Positive 1.00 < LOD: 34.50 14 2017-05-03 10:14 Trough Bedroom AB B Second Window 14363 Forest Blvd Dan R Positive 1.00 23.90 +/- 14.00 15 2017-05-03 10:15 Trough Bedroom B Second Window 14363 Forest Blvd Dan R Positive 1.00 < LOD: 29.10 16 2017-05-03 10:16 Trough Bedroom CD C Second Window 14363 Forest Blvd Dan R Positive 1.00 20.70 +/- 7.90 17 2017-05-03 10:16 Trough Bedroom CD D Second Window 14363 Forest Blvd Dan R Positive 1.00 17.90 +/- 11.50 18 2017-05-03 10:18 Interior Trim Bedroom DA D Second Baseboard 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.27 19 2017-05-03 10:18 Interior Trim Bedroom DA A Second Baseboard 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.21 20 2017-05-03 10:18 Interior Trim Bedroom DA B Second Baseboard 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.26 21 2017-05-03 10:18 Interior Trim Bedroom DA C Second Baseboard 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.29 22 2017-05-03 10:19 Interior Trim Bedroom DA D Second Crown 14363 Forest Blvd Dan R Null 1.00 < LOD: 2.10 23 2017-05-03 10:19 Interior Trim Bedroom DA D Second Crown 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.30 24 2017-05-03 10:19 Interior Trim Bedroom DA A Second Crown 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.22 25 2017-05-03 10:20 Interior Trim Bedroom DA B Second Crown 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.34 26 2017-05-03 10:20 Interior Trim Bedroom DA C Second Crown 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.31 27 2017-05-03 10:21 Interior Wall Bedroom DA D Second Wall 14363 Forest Blvd Dan R Null 1.00 0.28 +/- 0.13 28 2017-05-03 10:21 Interior Wall Bedroom DA D Second Wall 14363 Forest Blvd Dan R Negative 1.00 0.17 +/- 0.07 29 2017-05-03 10:21 Interior Wall Bedroom DA A Second Wall 14363 Forest Blvd Dan R Negative 1.00 0.22 +/- 0.10 30 2017-05-03 10:21 Interior Wall Bedroom DA B Second Wall 14363 Forest Blvd Dan R Negative 1.00 0.11 +/- 0.06 31 2017-05-03 10:22 Interior Wall Bedroom DA C Second Wall 14363 Forest Blvd Dan R Negative 1.00 0.08 +/- 0.05 32 2017-05-03 10:22 Interior Trim Bedroom DA B Second Door casing 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.49 33 2017-05-03 10:23 Interior Trim Bedroom DA C Second Door casing 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.60 34 2017-05-03 10:23 Jamb Bedroom DA B Second Door casing 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.45 35 2017-05-03 10:24 Jamb Bedroom DA C Second Door casing 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.39 36 2017-05-03 10:24 Ceiling Bedroom DA Second Ceiling 14363 Forest Blvd Dan R Negative 1.00 0.10 +/- 0.06 37 2017-05-03 10:25 Bedroom DA A Second Radiator 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.05 38 2017-05-03 10:26 Int Door Surface Bedroom DA B Second Hinged Door 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.38 39 2017-05-03 10:26 Ext Door Surface Bedroom DA B Second Hinged Door 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.18 40 2017-05-03 10:26 Interior Wall Hall A Second Wall 14363 Forest Blvd Dan R Positive 1.00 2.20 +/- 0.40 41 2017-05-03 10:27 Interior Wall Hall B Second Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 1.22 42 2017-05-03 10:27 Interior Wall Hall C Second Wall 14363 Forest Blvd Dan R Positive 1.00 3.00 +/- 1.30 43 2017-05-03 10:28 Interior Wall Hall B Second Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 1.16 44 2017-05-03 10:28 Interior Wall Hall D Second Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 1.03 45 2017-05-03 10:29 Interior Trim Hall A Second Baseboard 14363 Forest Blvd Dan R Positive 1.00 2.90 +/- 1.00 46 2017-05-03 10:29 Interior Trim Hall B Second Baseboard 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.33 47 2017-05-03 10:29 Interior Trim Hall C Second Baseboard 14363 Forest Blvd Dan R Positive 1.00 2.20 +/- 1.20 48 2017-05-03 10:30 Interior Trim Hall D Second Baseboard 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.21 49 2017-05-03 10:32 Interior Trim Hall Second Newcl post 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.26 50 2017-05-03 10:32 Interior Trim Hall Second Newcl post 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.17 Page 1 of 6 05/07/17 20:55:31

Attachment C-2 Thermo Fisher 2 Radc Tewksbury, MA 01 Index Time Trim Piece Room Side Floor Component Site Inspector Results Action Level PbC 51 2017-05-03 10:33 Interior Trim Hall Second Railing 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.47 52 2017-05-03 10:33 Interior Trim Hall Second Railing 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.24 53 2017-05-03 10:34 Interior Trim Hall B Second Door casing 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.17 54 2017-05-03 10:34 Interior Trim Hall C Second Door casing 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.17 55 2017-05-03 10:35 Int Door Surface Hall C Second Door casing 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.27 56 2017-05-03 10:36 Interior Wall Bedroom AB A Second Wall 14363 Forest Blvd Dan R Null 1.00 < LOD: 1.00 57 2017-05-03 10:36 Interior Wall Bedroom AB A Second Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.16 58 2017-05-03 10:36 Interior Wall Bedroom AB B Second Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.30 59 2017-05-03 10:36 Interior Wall Bedroom AB C Second Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.60 60 2017-05-03 10:36 Interior Wall Bedroom AB D Second Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.39 61 2017-05-03 10:37 Interior Trim Bedroom AB A Second Baseboard 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.12 62 2017-05-03 10:37 Interior Trim Bedroom AB B Second Baseboard 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.32 63 2017-05-03 10:37 Interior Trim Bedroom AB C Second Baseboard 14363 Forest Blvd Dan R Null 1.00 0.70 +/- 0.40 64 2017-05-03 10:37 Interior Trim Bedroom AB C Second Baseboard 14363 Forest Blvd Dan R Negative 1.00 0.40 +/- 0.20 65 2017-05-03 10:38 Interior Trim Bedroom AB D Second Baseboard 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.26 66 2017-05-03 10:38 Interior Trim Bedroom AB A Second Crown 14363 Forest Blvd Dan R Negative 1.00 0.50 +/- 0.30 67 2017-05-03 10:38 Interior Trim Bedroom AB B Second Crown 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.32 68 2017-05-03 10:39 Interior Trim Bedroom AB C Second Crown 14363 Forest Blvd Dan R Negative 1.00 0.50 +/- 0.30 69 2017-05-03 10:39 Interior Trim Bedroom AB D Second Crown 14363 Forest Blvd Dan R Negative 1.00 0.40 +/- 0.20 70 2017-05-03 10:40 Interior Trim Bedroom AB D Second Door casing 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.21 71 2017-05-03 10:40 Interior Trim Bedroom AB C Second Door casing 14363 Forest Blvd Dan R Negative 1.00 0.60 +/- 0.30 72 2017-05-03 10:40 Jamb Bedroom AB C Second Door casing 14363 Forest Blvd Dan R Negative 1.00 0.60 +/- 0.30 73 2017-05-03 10:40 Jamb Bedroom AB D Second Door casing 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.60 74 2017-05-03 10:41 Int Door Surface Bedroom AB D Second Hinged Door 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.36 75 2017-05-03 10:41 Ext Door Surface Bedroom AB D Second Hinged Door 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.21 76 2017-05-03 10:41 Radiator Bedroom AB A Second 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.10 77 2017-05-03 10:43 Stairs Attic A Second Treads 14363 Forest Blvd Dan R Positive 1.00 5.30 +/- 2.90 78 2017-05-03 10:44 Interior Wall Bedroom BC A Second Wall 14363 Forest Blvd Dan R Negative 1.00 0.40 +/- 0.20 79 2017-05-03 10:44 Interior Wall Bedroom BC B Second Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.31 80 2017-05-03 10:45 Interior Wall Bedroom BC C Second Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.43 81 2017-05-03 10:45 Interior Wall Bedroom BC D Second Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.40 82 2017-05-03 10:45 Interior Trim Bedroom BC A Second Baseboard 14363 Forest Blvd Dan R Negative 1.00 0.60 +/- 0.30 83 2017-05-03 10:45 Interior Trim Bedroom BC B Second Baseboard 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.17 84 2017-05-03 10:46 Interior Trim Bedroom BC C Second Baseboard 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.12 85 2017-05-03 10:46 Interior Trim Bedroom BC D Second Baseboard 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.11 86 2017-05-03 10:46 Interior Trim Bedroom BC A Second Crown 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.45 87 2017-05-03 10:47 Interior Trim Bedroom BC B Second Crown 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.23 88 2017-05-03 10:47 Interior Trim Bedroom BC C Second Crown 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.27 89 2017-05-03 10:47 Interior Trim Bedroom BC D Second Crown 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.30 90 2017-05-03 10:48 Interior Trim Bedroom BC A Second Door casing 14363 Forest Blvd Dan R Negative 1.00 0.50 +/- 0.30 91 2017-05-03 10:48 Interior Trim Bedroom BC C Second Door casing 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.33 92 2017-05-03 10:48 Interior Trim Bedroom BC D Second Door casing 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.27 93 2017-05-03 10:48 Jamb Bedroom BC D Second Hinged Door 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.47 94 2017-05-03 10:49 Jamb Bedroom BC A Second Hinged Door 14363 Forest Blvd Dan R Negative 1.00 0.50 +/- 0.30 95 2017-05-03 10:49 Jamb Bedroom BC C Second Hinged Door 14363 Forest Blvd Dan R Positive 1.00 23.40 +/- 14.10 96 2017-05-03 10:49 Threshold Bedroom BC C Second Hinged Door 14363 Forest Blvd Dan R Positive 1.00 < LOD: 29.25 97 2017-05-03 10:50 Int Door Surface Bedroom BC D Second Hinged Door 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.22 98 2017-05-03 10:50 Ext Door Surface Bedroom BC D Second Hinged Door 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.35 99 2017-05-03 10:51 Radiator Bedroom BC C Second 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.06 100 2017-05-03 10:53 Ceiling Bedroom Second Ceiling 14363 Forest Blvd Dan R Negative 1.00 0.50 +/- 0.10 Page 2 of 6 05/07/17 20:55:31

Attachment C-3 Thermo Fisher Scientific 2 Radcliff Road Tewksbury, MA 01876 USA Index Time Trim Piece Room Side Floor Component Site Inspector Results Action Level PbC 101 2017-05-03 10:53 Ceiling Bedroom AB Second Ceiling 14363 Forest Blvd Dan R Negative 1.00 0.30 +/- 0.08 102 2017-05-03 10:55 Cabinets Shed Dormer C Second 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.12 103 2017-05-03 10:55 Cabinets Shed Dormer C Second 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.07 104 2017-05-03 10:56 Interior Sill Bathroom C Second Window 14363 Forest Blvd Dan R Positive 1.00 1.70 +/- 0.70 105 2017-05-03 10:56 Interior Sash Bathroom C Second Window 14363 Forest Blvd Dan R Null 1.00 0.50 +/- 0.20 106 2017-05-03 10:56 Interior Sash Bathroom C Second Window 14363 Forest Blvd Dan R Negative 1.00 0.60 +/- 0.20 107 2017-05-03 10:57 Trough Bathroom C Second Window 14363 Forest Blvd Dan R Positive 1.00 4.40 +/- 2.00 108 2017-05-03 10:58 Interior Wall Bedroom CD A Second Wall 14363 Forest Blvd Dan R Positive 1.00 3.70 +/- 1.20 109 2017-05-03 10:58 Interior Wall Bedroom CD B Second Wall 14363 Forest Blvd Dan R Positive 1.00 2.60 +/- 1.30 110 2017-05-03 10:58 Interior Wall Bedroom CD C Second Wall 14363 Forest Blvd Dan R Positive 1.00 3.00 +/- 1.50 111 2017-05-03 10:58 Interior Wall Bedroom CD D Second Wall 14363 Forest Blvd Dan R Positive 1.00 1.50 +/- 0.50 112 2017-05-03 10:59 Interior Trim Bedroom CD A Second Door casing 14363 Forest Blvd Dan R Positive 1.00 3.20 +/- 1.10 113 2017-05-03 10:59 Interior Trim Bedroom CD B Second Door casing 14363 Forest Blvd Dan R Positive 1.00 2.80 +/- 1.00 114 2017-05-03 11:00 Interior Trim Bedroom CD A Second Baseboard 14363 Forest Blvd Dan R Positive 1.00 2.60 +/- 0.40 115 2017-05-03 11:00 Interior Trim Bedroom CD B Second Baseboard 14363 Forest Blvd Dan R Positive 1.00 2.70 +/- 0.40 116 2017-05-03 11:00 Interior Trim Bedroom CD C Second Baseboard 14363 Forest Blvd Dan R Positive 1.00 1.90 +/- 0.60 117 2017-05-03 11:01 Interior Trim Bedroom CD D Second Baseboard 14363 Forest Blvd Dan R Positive 1.00 1.80 +/- 0.60 118 2017-05-03 11:02 Interior Trim Bedroom CD D Second Crown 14363 Forest Blvd Dan R Positive 1.00 2.10 +/- 0.70 119 2017-05-03 11:03 Interior Trim Bedroom CD A Second Crown 14363 Forest Blvd Dan R Positive 1.00 2.30 +/- 0.80 120 2017-05-03 11:03 Interior Trim Bedroom CD B Second Crown 14363 Forest Blvd Dan R Positive 1.00 1.60 +/- 0.60 121 2017-05-03 11:04 Interior Trim Bedroom CD C Second Crown 14363 Forest Blvd Dan R Positive 1.00 2.00 +/- 0.80 122 2017-05-03 11:04 Int Door Surface Bedroom CD C Second Hinged Door 14363 Forest Blvd Dan R Positive 1.00 2.40 +/- 1.40 123 2017-05-03 11:04 Ext Door Surface Bedroom CD C Second Hinged Door 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.18 124 2017-05-03 11:05 Ceiling Bedroom CD Second Ceiling 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.41 125 2017-05-03 11:06 Radiator Bedroom CD C Second 14363 Forest Blvd Dan R Positive 1.00 2.00 +/- 0.70 126 2017-05-03 11:07 Ceiling Hall Second Ceiling 14363 Forest Blvd Dan R Negative 1.00 < LOD: 1.22 127 2017-05-03 11:13 Interior Wall Rec Room DA D First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.08 128 2017-05-03 11:13 Interior Wall Rec Room DA A First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 129 2017-05-03 11:14 Exterior Sash Rec Room DA D First Window 14363 Forest Blvd Dan R Negative 1.00 0.60 +/- 0.30 130 2017-05-03 11:14 Exterior Trim Rec Room DA D First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.19 131 2017-05-03 11:14 Exterior Wall Rec Room DA D First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.45 132 2017-05-03 11:14 Exterior Sash Rec Room DA A First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.60 133 2017-05-03 11:15 Exterior Trim Rec Room DA A First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.32 134 2017-05-03 11:15 Exterior Wall Rec Room DA A First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.23 135 2017-05-03 11:15 Exterior Wall Rec Room DA A First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 136 2017-05-03 11:16 Exterior Wall Rec Room DA B First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 137 2017-05-03 11:16 Exterior Wall Rec Room DA C First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 138 2017-05-03 11:16 Exterior Wall Rec Room DA D First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 139 2017-05-03 11:17 Interior Wall Bedroom AB A First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 140 2017-05-03 11:17 Exterior Sash Bedroom AB A First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.45 141 2017-05-03 11:17 Exterior Trim Bedroom AB A First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.60 142 2017-05-03 11:18 Exterior Wall Bedroom AB A First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.36 143 2017-05-03 11:18 Interior Wall Bedroom AB A First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.06 144 2017-05-03 11:19 Interior Wall Bedroom AB B First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 145 2017-05-03 11:19 Interior Wall Bedroom AB C First Wall 14363 Forest Blvd Dan R Null 1.00 < LOD: 0.03 146 2017-05-03 11:19 Interior Wall Bedroom AB C First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 147 2017-05-03 11:19 Interior Wall Bedroom AB D First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 148 2017-05-03 11:20 Interior Wall Computer Room B First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 149 2017-05-03 11:20 Exterior Sash Computer Room B First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.26 150 2017-05-03 11:21 Exterior Trim Computer Room B First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.60 Page 3 of 6 05/07/17 20:55:32

Attachment C-4 Thermo Fisher Scientific 2 Radcliff Road Tewksbury, MA 01876 USA Index Time Trim Piece Room Side Floor Component Site Inspector Results Action Level PbC 151 2017-05-03 11:21 Exterior Wall Computer Room B First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.22 152 2017-05-03 11:22 Interior Wall Computer Room A First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 153 2017-05-03 11:22 Interior Wall Computer Room B First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 154 2017-05-03 11:22 Interior Wall Computer Room C First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 155 2017-05-03 11:23 Interior Wall Computer Room D First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 156 2017-05-03 11:23 Ceiling Computer Room First Ceiling 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.08 157 2017-05-03 11:24 Radiator Computer Room B First 14363 Forest Blvd Dan R Null 1.00 < LOD: 0.49 158 2017-05-03 11:24 Radiator Computer Room B First 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.38 159 2017-05-03 11:25 Interior Wall Kitchen B First Window 14363 Forest Blvd Dan R Negative 1.00 0.80 +/- 0.20 160 2017-05-03 11:26 Exterior Sash Kitchen B First Window 14363 Forest Blvd Dan R Negative 1.00 0.70 +/- 0.20 161 2017-05-03 11:26 Exterior Trim Kitchen B First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.60 162 2017-05-03 11:27 Exterior Wall Kitchen B First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.24 163 2017-05-03 11:27 Interior Wall Kitchen A First Wall 14363 Forest Blvd Dan R Negative 1.00 0.70 +/- 0.10 164 2017-05-03 11:28 Interior Wall Kitchen B First Wall 14363 Forest Blvd Dan R Null 1.00 0.90 +/- 0.10 165 2017-05-03 11:28 Interior Wall Kitchen B First Wall 14363 Forest Blvd Dan R Null 1.00 0.80 +/- 0.10 166 2017-05-03 11:28 Interior Wall Kitchen B First Wall 14363 Forest Blvd Dan R Null 1.00 < LOD: 1.50 167 2017-05-03 11:29 Interior Wall Kitchen B First Wall 14363 Forest Blvd Dan R Null 1.00 1.00 +/- 0.10 168 2017-05-03 11:29 Interior Wall Kitchen B First Wall 14363 Forest Blvd Dan R Null 1.00 1.00 +/- 0.40 169 2017-05-03 11:30 Interior Wall Kitchen B First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.04 170 2017-05-03 11:30 Interior Wall Kitchen C First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 171 2017-05-03 11:30 Interior Wall Kitchen D First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 172 2017-05-03 11:31 Ceiling Kitchen First Ceiling 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 173 2017-05-03 11:31 Interior Wall Stair Landing A First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 174 2017-05-03 11:32 Interior Wall Stair Landing B First Wall 14363 Forest Blvd Dan R Null 1.00 < LOD: 0.03 175 2017-05-03 11:32 Interior Wall Stair Landing B First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 176 2017-05-03 11:32 Interior Wall Stair Landing C First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 177 2017-05-03 11:33 Ceiling Stair Landing First Ceiling 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 178 2017-05-03 11:33 Interior Wall Bathroom B First Window 14363 Forest Blvd Dan R Negative 1.00 0.50 +/- 0.10 179 2017-05-03 11:33 Interior Trim Bathroom B First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.14 180 2017-05-03 11:34 Interior Sill Bathroom B First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.38 181 2017-05-03 11:34 Interior Sash Bathroom B First Window 14363 Forest Blvd Dan R Null 1.00 < LOD: 1.11 182 2017-05-03 11:34 Interior Sash Bathroom B First Window 14363 Forest Blvd Dan R Null 1.00 < LOD: 0.90 183 2017-05-03 11:34 Interior Sash Bathroom B First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.46 184 2017-05-03 11:35 Trough Bathroom B First Window 14363 Forest Blvd Dan R Positive 1.00 < LOD: 26.55 185 2017-05-03 11:35 Interior Wall Bathroom A First Wall 14363 Forest Blvd Dan R Negative 1.00 0.40 +/- 0.10 186 2017-05-03 11:36 Interior Wall Bathroom B First Wall 14363 Forest Blvd Dan R Null 1.00 0.60 +/- 0.10 187 2017-05-03 11:36 Interior Wall Bathroom B First Wall 14363 Forest Blvd Dan R Negative 1.00 0.60 +/- 0.10 188 2017-05-03 11:36 Interior Wall Bathroom C First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.19 189 2017-05-03 11:37 Interior Wall Bathroom D First Wall 14363 Forest Blvd Dan R Negative 1.00 0.60 +/- 0.10 190 2017-05-03 11:38 Cabinets Bathroom A First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.06 191 2017-05-03 11:38 Cabinets Bathroom A First Wall 14363 Forest Blvd Dan R Negative 1.00 0.60 +/- 0.30 192 2017-05-03 11:38 Ceiling Bathroom A First Ceiling 14363 Forest Blvd Dan R Negative 1.00 0.40 +/- 0.10 193 2017-05-03 11:39 Interior Wall Back Entry D First Hinged Door 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 194 2017-05-03 11:39 Jamb Back Entry D First Hinged Door 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 195 2017-05-03 11:40 Exterior Trim Back Entry D First Hinged Door 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.21 196 2017-05-03 11:40 Exterior Wall Back Entry D First Hinged Door 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.33 197 2017-05-03 11:42 Interior Wall Dining Room A First Window 14363 Forest Blvd Dan R Null 1.00 < LOD: 1.47 198 2017-05-03 11:42 Interior Wall Dining Room A First Wall 14363 Forest Blvd Dan R Null 1.00 < LOD: 0.60 199 2017-05-03 11:42 Interior Wall Dining Room A First Wall 14363 Forest Blvd Dan R Positive 1.00 2.30 +/- 1.00 200 2017-05-03 11:42 Interior Wall Dining Room B First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.35 Page 4 of 6 05/07/17 20:55:32

Attachment C-5 Thermo Fisher Scientific 2 Radcliff Road Tewksbury, MA 01876 USA Index Time Trim Piece Room Side Floor Component Site Inspector Results Action Level PbC 201 2017-05-03 11:43 Interior Wall Dining Room C First Wall 14363 Forest Blvd Dan R Null 1.00 1.80 +/- 0.90 202 2017-05-03 11:43 Interior Wall Dining Room C First Wall 14363 Forest Blvd Dan R Positive 1.00 1.80 +/- 0.70 203 2017-05-03 11:43 Interior Wall Dining Room D First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 204 2017-05-03 11:44 Interior Wall Dining Room D First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 205 2017-05-03 11:44 Exterior Sash Dining Room D First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.37 206 2017-05-03 11:44 Exterior Trim Dining Room D First Window 14363 Forest Blvd Dan R Negative 1.00 0.26 +/- 0.11 207 2017-05-03 11:45 Interior Wall Bedroom D First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 208 2017-05-03 11:46 Exterior Sash Bedroom D First Window 14363 Forest Blvd Dan R Negative 1.00 0.30 +/- 0.10 209 2017-05-03 11:46 Exterior Trim Bedroom D First Window 14363 Forest Blvd Dan R Negative 1.00 0.60 +/- 0.30 210 2017-05-03 11:46 Interior Wall Bedroom D First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 211 2017-05-03 11:47 Interior Wall Bedroom A First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.10 212 2017-05-03 11:47 Interior Wall Bedroom B First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.13 213 2017-05-03 11:47 Interior Wall Bedroom C First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.23 214 2017-05-03 11:48 Radiator Bedroom D First 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.09 215 2017-05-03 11:49 Radiator Bathroom B First 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.27 216 2017-05-03 11:49 Radiator Back Entry C First 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.15 217 2017-05-03 11:50 Exterior Sash Back Entry D First Window 14363 Forest Blvd Dan R Positive 1.00 1.20 +/- 0.20 218 2017-05-03 11:51 Exterior Trim Back Entry D First Window 14363 Forest Blvd Dan R Null 1.00 1.00 +/- 0.10 219 2017-05-03 11:51 Exterior Trim Back Entry D First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.60 220 2017-05-03 11:51 Exterior Wall Back Entry D First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 1.52 221 2017-05-03 11:52 Interior Wall Hall A First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 222 2017-05-03 11:52 Interior Wall Hall B First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 223 2017-05-03 11:52 Interior Wall Hall C First Wall 14363 Forest Blvd Dan R Null 1.00 < LOD: 0.03 224 2017-05-03 11:52 Interior Wall Hall C First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 225 2017-05-03 11:53 Interior Wall Hall D First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.07 226 2017-05-03 11:53 Ceiling Hall D First Ceiling 14363 Forest Blvd Dan R Null 1.00 < LOD: 0.06 227 2017-05-03 11:53 Ceiling Hall D First Ceiling 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.03 228 2017-05-03 11:54 Ext Door Surface Front Entry D First Hinged Door 14363 Forest Blvd Dan R Negative 1.00 0.50 +/- 0.30 229 2017-05-03 11:54 Jamb Front Entry D First Hinged Door 14363 Forest Blvd Dan R Negative 1.00 0.60 +/- 0.30 230 2017-05-03 11:55 Exterior Trim Front Entry D First Hinged Door 14363 Forest Blvd Dan R Null 1.00 0.70 +/- 0.30 231 2017-05-03 11:55 Exterior Trim Front Entry D First Hinged Door 14363 Forest Blvd Dan R Null 1.00 < LOD: 0.31 232 2017-05-03 11:56 Exterior Trim Front Entry D First Hinged Door 14363 Forest Blvd Dan R Negative 1.00 0.80 +/- 0.10 233 2017-05-03 11:56 Exterior Wall Front Entry D First Hinged Door 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.60 234 2017-05-03 11:59 Exterior Sash Back Entry CD C First Window 14363 Forest Blvd Dan R Negative 1.00 0.70 +/- 0.20 235 2017-05-03 11:59 Exterior Trim Back Entry CD C First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.53 236 2017-05-03 11:59 Exterior Wall Back Entry CD C First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.60 237 2017-05-03 11:59 Exterior Sash Office C First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.12 238 2017-05-03 12:00 Exterior Trim Office C First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.33 239 2017-05-03 12:00 Exterior Wall Office C First Window 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.45 240 2017-05-03 12:01 Exterior Wall Whole bldg A First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.29 241 2017-05-03 12:01 Exterior Wall Whole bldg A First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.17 242 2017-05-03 12:01 Exterior Wall Whole bldg A First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.14 243 2017-05-03 12:02 Exterior Wall Whole bldg B First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.18 244 2017-05-03 12:02 Exterior Wall Whole bldg B First Wall 14363 Forest Blvd Dan R Negative 1.00 0.17 +/- 0.09 245 2017-05-03 12:02 Exterior Wall Whole bldg B First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.22 246 2017-05-03 12:02 Exterior Wall Whole bldg C First Wall 14363 Forest Blvd Dan R Negative 1.00 0.50 +/- 0.30 247 2017-05-03 12:03 Exterior Wall Whole bldg C First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.60 248 2017-05-03 12:03 Exterior Wall Whole bldg C First Wall 14363 Forest Blvd Dan R Negative 1.00 0.60 +/- 0.30 249 2017-05-03 12:03 Exterior Trim Whole bldg C First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.60 250 2017-05-03 12:03 Exterior Wall Whole bldg D First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 2.62 Page 5 of 6 05/07/17 20:55:32

Attachment C-6 Thermo Fisher Scientific 2 Radcliff Road Tewksbury, MA 01876 USA Index Time Trim Piece Room Side Floor Component Site Inspector Results Action Level PbC 251 2017-05-03 12:04 Exterior Wall Whole bldg D First Wall 14363 Forest Blvd Dan R Negative 1.00 0.05 +/- 0.03 252 2017-05-03 12:04 Exterior Wall Whole bldg D First Wall 14363 Forest Blvd Dan R Negative 1.00 < LOD: 0.18 Page 6 of 6 05/07/17 20:55:32

Attachment E - Bid Form Contractor: Address: Telephone: Contact: 1. Qualifications. Provide, on a separate sheet(s), a summary of past similar work performed, a minimum of three references for similar services within the last three years, and licenses held. 2. Attach a certificate of Insurance showing compliance with the insurance requirements included in the RFB or a statement that the contractor will be able to provide a certificate of insurance showing coverage required by this RFB within 3 business days of notification of award of contract. Bid Prices Scope of Services 1-4 at a fixed bid of $.00 Scope of Services 5 Additional Work: Labor at a cost of $.00 per hour disposal cost of $.00 per 100 lbs of additional material. Certification Statement By signing this bid form, the bidder agrees to complete the work identified in the RFB at the stated price and under the terms and conditions set forth in the RFB, and to complete the work described by July 15, 2017 By: Its: Signature (s) by Bidder s Authorized representative(s) Date: