Narrative History of Belknap Place. Oldest Existing Concrete Road in Texas (1914) San Antonio, Texas. Jan R. Prusinski, P.E.

Similar documents
PennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project

RECEIVE AN UPDATE ON THE ALMOND GROVE PHASE II PROJECT

North Loop Paving. December 18th, Street Reconstruction Project. Forrest Hardy, Transportation Planner Minneapolis Public Works

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE

CURRICULUM VITAE. James J. Valenta, PE, MSCE, FITE 8463 Shield Road Dexter, MI (734)

FHWA INVEST. And the Harbor Bridge Project

SMSHE Southeastern Michigan Society for Healthcare Engineering

Form DOT F (8-72) Technical Report Documentation Page 2. Government Accession No. 3. Recipient's Catalog No.

City of Ketchum P.O. Box East Ave. N. Ketchum, ID 83340

Local Technical Assistance Program. FREE Road Maintenance and Safety Training for Municipal Employees

P ROGRESS. Wisconsin Village Nears 100% Concrete Roadways CONCRETE PAVEMENT. Quarter ALSO IN THIS ISSUE:

Signature Required: Chairperson, Annual Conference Commission on Archives & History. Office Use Only

TxDOT Experience with Long-Term Private Maintenance Agreements

TOD 101 CREATING LIVABLE COMMUNITIES WITH TRANSIT

Local Municipal Forecast. OPAC Partners in Quality Road Tour Ottawa April 19, 2018

HARBOR BRIDGE. Randall C. Grones, PE - SPD. US 181 Harbor Bridge October

I-70/71 Innerbelt Project

FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

Two-Lift Concrete Paving & Use of Geotextiles as a Bond Breaker

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN

WEST LOOP DESIGN GUIDELINES CHECKLIST

FOSTER COMPREHENSIVE PLAN UPDATE CIRCULATION

Local Municipal Forecast. OPAC Partners in Quality Road Tour Sudbury April 17, 2018

WURZBACH PARKWAY WURZBACH PARKWAY

Ken Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA

FIRST COCONUT GROVE SCHOOLHOUSE

AGENDA ITEM # 13A/B. AGENDA ITEM EXECUTIVE SUMMARY Village Board Meeting December 10, 2018

New Braunfels Growth & Development. Garry Ford, Jr., P.E., PTOE City Engineer City of New Braunfels

Valley Line LRT. Project Update & Citizen Working Groups Overview Public At Large Recruitment Meeting Citizen Working Group A Downtown

Request for Proposals: Architectural/Design Guidelines

Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project

FDOT D4 Complete Streets

REQUEST FOR PROPOSALS. Preparation of National Register of Historic Places. Nominations for the following:

2017 Asphalt Contractors Association of Florida Pavement Awards

The George Washington University Streetscape Concept Plan. May 6 th 2009 Public Presentation for Discussion EHRENKRANTZ ECKSTUT & KUHN ARCHITECTS

Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP)

BE IT ORDAINED BY THE COUNCIL OF THE CITY OF NORWICH

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Leadership This is currently a multi-disciplinary effort, led by the following students:

The Ambassador Bridge/ Gateway Project

Spring 2018 Construction Update

d Escoto, M. City of Chicago Streetscape and Urban Design Program, Chicago Department of Transportation. (2003). Streetscape Guidelines.

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Trans-Texas Corridor Chip Seals for Higher Volume Roads

Acknowledgments. City of East Peoria. City of Washington. Aldermen. Commissioners. Staff. Staff. Planning Consultant. David Mingus, Mayor

VILLAGE OF MOUNT PROSPECT 2016 STREET RESURFACING PROGRAM Frequently Asked Questions (FAQ s)

Analysis of Environs of 1000 New York Street, German Methodist Episcopal Church

The Auburn Plan Designing the Future of Auburn February 28, 2005

Village of Pentwater Street Improvements. David Bluhm, PE Don DeVries, PE

Title 11 Streets and Sidewalks

Extending Pavement Life Through Pavement Preservation Techniques, Strategies, and Preventative Maintenance

MINNESOTA HISTORIC PROPERTY RECORD PART I. PROPERTY IDENTIFICATION AND GENERAL INFORMATION

CAPA ASPHALT & AIRPORT PAVEMENT MARCH 27, 2019

Transportation Systems and Utility Infrastructure

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

Description. Summary. MCPB Item No. Date: 01/17/13. Bethesda Crescent, Limited Site Plan Amendment, A, A

Streets for People, Place-Making and Prosperity. #TOcompletestreets

City Center Specific Plan Amendments And Background Report City of Richmond. PLANNING COMMISION FINAL DRAFT January, 2001

ORDINANCE AN ORDINANCE TO ADD A NEW SECTION 4.N. IN THE ZONING CODE FOR THE TOWN OF MIDDLETOWN, RELATING TO MIXED-USE DEVELOPMENT

2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director

TH 169/1 1B 265 City/Township. Soudan, City of St. Louis Acres 3.5. Soudan Z15 E N Not Eligible, see Statement of Significance

FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 28, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

Building Great Neighbourhoods LAURIER HEIGHTS

P A V E R S Are they really the same? The 3-P s and how they relate to storm water management

Oroville Area Urban Greening Plan. Joint Meeting of the Oroville Planning, Park, and Arts Commissions October 12, 2015

MINNESOTA ARCHITECTURE - HISTORY INVENTORY FORM

NOT FOR PUBLICATION: N/A VICINITY: N/A STATE:Texas CODE: TX COUNTY: Bexar CODE: 029 ZIP CODE: 78205

SANTA CLARA COUNTY FIRE DEPARTMENT CENTRAL FIRE PROTECTION DISTRICT INTRODUCTION

PLANNING COMMISSION Work Session Meeting Agenda

Downtown Cleveland Alliance/Tremont

Planning and Design: Applied LID Techniques Redevelopments, Housing, Mixed Use, Infrastructure

DRIVEWAY APRON REPLACEMENT WITH STREET RECONSTRUCTION

One said, without a clear understanding of what will be annexed, this is an exercise in futility.

CITY OF MINNEAPOLIS. Street Paving History. 8th Avenue North Washington Avenue to 3rdStreet N..creosoted wood block

INTRODUCTION EXISTING CONDITIONS

4.500 Preston Road Overlay District

UNIVERSITY OF NORTHERN IOWA

BEST PRACTICES FOR PROJECT NOMINATIONS TA Set-Aside Program

SECTION 4(f) DE MINIMIS DOCUMENTATION

C h a p t e r 3 E V A L U A T I O N A N D D E S I G N A T I O N. Background

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208)

Downtown / Ballough Road Redevelopment Board

5.1 Commercial and Industrial Development. (Effective April 1, 2006)

Transportation Improvements

CITY of RIDGEFIELD TYPE I DECISION SITE PLAN REVIEW (SPR 99-10) PDM MOLDING INC. PHASE II EXPANSION

Priorities. Public Communication & Transparency Website, CM Public Updates, Magic City Newsletter

This Review Is Divided Into Two Phases:

CHAPTER 12 IMPLEMENTATION

From: Director, Community Planning, Scarborough District. Ward 40 Scarborough-Agincourt

Fall 2017 Construction Update

3.13. Development Guidelines

Proposed Walkability Ordinance for City of Knoxville (6/16/17)

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

ARLINGTON COUNTY PLANNING COMMISSION SITE PLAN REVIEW COMMITTEE SITE PLAN CHAIR GUIDE

REQUEST FOR QUALIFICATIONS

A Healthy Future Walkability Through Community Design. Fit Families North Carolina October 18, 2004

HISTORIC SITE AND MONUMENT COMMISSION (HSMC) Instructions for Historical Markers, Monuments, and Public Art Application

Transcription:

Narrative History of Belknap Place Oldest Existing Concrete Road in Texas (1914) San Antonio, Texas Jan R. Prusinski, P.E. Executive Director, Cement Council of Texas Donald Taubert Director of Promotion, Capitol Cement (ret.) I. Context and Significance: Belknap Place, a street in San Antonio, is a significant civil engineering achievement: It is a 0.7 mile long concrete pavement that, in 2014, marks its centennial. There are few streets in the United States reaching this milestone. a. In the late 19 th and early 20 th centuries, the U.S. was quickly changing from a rural-dominated country, to an urbanized/industrial country; motorized vehicles were putting great strains on dirt, gravel and macadam roads, and a more durable paving material was needed. 1 In 1891, the City of Bellefontaine constructed the first concrete street in the U.S. 2 It was a development of George Bartholomew and James C. Wonders. Bartholomew learned about cement production at the San Antonio Cement Co (aka Alamo Roman and Portland Cement Co.). This pavement used a two-layer concrete system; it was so advanced and revolutionary, that it won the First Place for Engineering Technology Advancement in Paving Materials at the Chicago International Exposition of 1893. Between then and 1915, only 1,764 miles of concrete roads were constructed in the U.S. However, concrete road construction increased exponentially after that, with 2,963 miles constructed in 1915 alone. 1 The

development of concrete pavement in the early 20 th century was an important process that helped facilitate the transition to motorized vehicles and a more urban/industrial society, and the 1914 construction of Belknap Place pavement was at the forefront of the new technology. b. Belknap Place is one of the few still-existing examples of the original generation of concrete streets placed in Texas and the U.S. Belknap Place was constructed with an innovative patented process, called Granitoid, which used a two-layer (or two-course) placement 3. A number of Granitoid roads across the U.S. and Texas 4 were constructed in the same time period, some of which still exist in places such as Calumet, MI (c. 1906) 5, and Grand Forks, ND (c. 1911). 6 Twocourse technology is only now being rediscovered by the Federal Highway Administration and State DOTs, including TxDOT, as a potentially greener and less expensive way to build certain concrete highways and roads. 7 c. Belknap Place has lasted 100 years, most of it without resurfacing. It has provided an incredibly durable and cost-effective pavement for the citizens of San Antonio and particularly the residents of the Tobin Hill and Monte Vista Historic Districts. It is in good to excellent condition, and should continue to provide excellent performance for years to come. d. San Antonio is recognized as the birthplace of the portland cement industry West of the Mississippi, and the City has a history of preserving this history. The first cement plant in the West was built in 1880 in San Antonio by the Alamo Roman and Portland Cement Company (subsequently the San Antonio Cement Company, and now Alamo Cement). 8 That first plant and quarry were transformed into

Brackenridge Park, where the Japanese Tea Gardens now stands. The remains of the original kiln are the subject of a Texas Historic Commission marker. The second plant, constructed in an area near Alamo Heights called Cementville, was where the portland cement for Belknap Place was manufactured. The stacks from this plant now serve as a recognizable landmark for the modern mixed-use development, the Alamo Quarry Market. II. Overview: San Antonio constructs a concrete pavement for Belknap Place. a. July 1, 1914: A city ordinance is approved appropriating recently-approved bond funds, to pay Texas Granitoid Company to construct Belknap Place. 9 b. August 1, 1914: The City issued a contract for the construction of Belknap Place (from Dewey Place to Agarita Ave) to Texas Granitoid, approved by the City Engineer, and signed by Mayor Clinton S. Brown. The contract included the concrete pavement, curbing, and a five-year warranty for maintenance. 10 c. October 5, 1914: The City passed an ordinance that split the cost of the construction, totaling $37,685.66, between the City ($18,349.85) and property owners ($19,335.35). 11 A special assessment was levied on the property owners. Prominent property owners included: i. Mr. Altee Ayers, designer of the Municipal Auditorium, the Smith-Young Tower (now the Tower Life Bldg.), and the Taj Mahal entrance to Randolph AFB. ii. Mr. Otto Koehler, a brewing pioneer who was head of the San Antonio Brewing Association (now Pearl Brewing Company). iii. Mr. Vorios P. Brown, a prominent sheep rancher.

iv. Mrs. Roxana Gunter, widow of Jot Gunter, who built the Gunter Hotel, Gunter Office Building, Gunter Ranch, and for whom the City of Gunter was named. v. Mr. Jno. A Kerr, president of the Somerset Oil and Gas Co. vi. Christ Episcopal Church, est. 1907, and designed by Atlee B. Ayres. d. August to December 1914: Concrete pavement was constructed and completed. e. December 7, 1914: Final payment of $5,000 was authorized by City Council to Texas Granitoid Co. for successful completion of the project. 11 III. Historical Marker Proposed Text: Belknap Place, from Dewey Place to West Agarita Ave. in San Antonio, was constructed in 1914. It is the oldest surviving concrete road in Texas, and one of the oldest in the United States. On August 1, 1914, the City of San Antonio issued a construction contract to the Texas Granitoid Company at a cost of $37,685.66, split by the City and property owners. The road was completed by December 1914. The road employed an innovative, patented process called Granitoid that consisted of a two-layer system: A lower lift with large coarse aggregate, and a denser surface course utilizing a hard granite aggregate that imparted excellent wearing characteristics. The aggregates were mined in Knippa, TX. The unhardened surface of the pavement was brushed to improve traction, and scored in a 4 by 9 inch pattern (resembling bricks), to provide a non-slipping foothold for the calks of horseshoes.

Belknap Place remains as a still-functioning example of concrete that used portland cement from San Antonio s second cement plant located in an area known as Cementville (near Alamo Heights, the site of Alamo Quarry Market). San Antonio itself is considered the cradle of the cement industry West of the Mississippi, where, in 1880, the Alamo Roman and Portland Cement Co. built its first quarry and kiln, now the sites, respectively, of the Japanese Tea Garden and Baumberger Plaza in Brackenridge Park. IV. Discussion of Texas Historical Commission Scoring Criteria: a. Age: 100 years old (in 2014) b. Historical Significance: As noted above it is the oldest concrete street still existing in Texas and is an excellent example of an innovative, patented process known as Granitoid. It is one of the oldest existing examples of concrete pavement in the U.S. Belknap Place is located in the Monte Vista Historic District in San Antonio, which is on the National Register of Historic Places. The durable nature of the process and materials used to make the concrete has allowed the street to maintain its functional integrity for 100 years. The National Register of Historic Places (NRHP) provides a method of evaluating roads for historic significance. One of the four criteria is Criterion C, Transportation Engineering where significance is exhibited by early or innovative engineering methods or experimental programs. 13 Additionally, the NRHP recognizes specific road subtypes that include County and local roads in the 19 th and early 20 th centuries. The period of significance of these roads is limited to pre-1916 (prior to passage of the Federal Aid Road Act of 1916). 13

c. State of Repair/Integrity: Good to Excellent. The road is a fully-functioning street that receives daily traffic in the Monte Vista District. Most of the road provides a smooth, comfortable ride. The surface is completely intact (though in some locations a worn-off asphalt overlay is visible). There is no need for repair or resurfacing. Cracks in the concrete are expected to occur (because of initial material shrinkage) and have existed in their present state for likely near 100 years (shrinkage cracks generally occur very early in concrete). d. Diversity of topic for addressing gaps in historic marker program: This marker adds to the diversity of the program by including a long-lived, innovative example of public infrastructure. It provides a perspective of the Monte Vista Historic District that evokes a time when horses and carriages were more prevalent than cars and trucks. The surface, specifically, was engineered to allow horses with shoes to keep from slipping (i.e. the stamped brick pattern in the surface). e. Value of topic as an undertold or untold aspect of Texas history: Few roads in Texas have been cited for their historical significance because of the engineering, material and construction process used to construct them. That is because most roads have a physical life cycle between 20-50 years, and are often overlaid or reconstructed during this time. Belknap Place provides an outstanding, historic example of one of the most visible elements of public infrastructure: streets and highways. Additionally, the principal aggregating ingredient in concrete is portland cement. San Antonio is known as the birthplace of the portland cement industry West of the Mississippi, with the opening of the

Alamo Roman and Portland Cement Company in 1880. This road is one of the few visible existing examples of concrete made from Alamo s second cement plant (now the site of San Antonio s Alamo Quarry Market). The site of the first cement plant (where portions of the kiln still exist) has a Texas State Historical Marker, and is located below the Japanese Tea Garden in Brackenridge Park. f. Endangerment level of property, site, or topic: Belknap Place, though generally in good repair, is on a public right-of-way owned by the City of San Antonio. It has already (10-15 years ago) received a thin asphalt overlay in some areas, that has partially or completely worn off (the overlay did nothing to improve the functionality of the street, and it is questionable as to why it was ever placed). However, there is always a chance that the street may again fall within a maintenance program of the city and be overlaid or even reconstructed. Additionally, utility cuts (which have occurred in a few places) could potentially damage the street s historic materials further. Historic designation will help alert the City, the Monte Vista Historic District, and other stakeholders that any change or rehabilitation proposed for this street should be carefully scrutinized. g. Available documentation and resources: Please see above sections and references below. h. Diversity among this group of candidates: N/A as we do not know the other candidates submitted for historic marker approval. i. Relevance to other commission programs: Historic Texas Highways program. In 2009, House Bill 2642 established the Texas Historic Roads and Highways

Program. This program s goal is to identify, designate, interpret, and market historic roads and highways in Texas. j. Relevance to the commission s current thematic priorities: Unknown References 1. Portland Cement Association, Facts Everyone Should Know about Concrete Roads, April 1916. 2. Snell, L. and Snell, M., Oldest Concrete Street In The United States, Concrete International, pp. 72-74, March 2002. 3. U.S. Patent No. 856105 A, Pavement Method and Making of the Same, U.S. Patent Office, June 4, 1907. 4. Green, R., and Kemp, L., Bulletin of the Agricultural and Mechanical College of Texas, p. 24, Agricultural and Mechanical College of Texas, Vol. 6, No. 6, May 1, 1920. 5. Mailloux, L, Peterson, K, Ellis, K., King, M., and Van Dam, T., The Granitoid Concrete Pavement of Calumet Michigan Over One-Hundred Years of Service, 9 th International Conference on Concrete Pavements, International Society for Concrete Pavements, 2008. 6. Hoffbeck, S., Press Release: Granitoid Pavement in Grand Forks North Dakota, Grand Forks Historic Preservation Commission, 1990. 7. Texas Department of Transportation, Meeting Summary: Two Lift Concrete Paving Workshop, May 24, 2013

8. National Park Service, Historic American Buildings Survey Alamo Roman and Portland Cement Company (San Antonio Portland Cement Company), Department of the Interior, Washington, DC, 1983. 9. City of San Antonio, Ordinance, July 1, 1914 10. City of San Antonio, Contract for Paving, Curbing, Etc., August 1, 1914. 11. City of San Antonio, Ordinance, October 5, 1914. 12. City of San Antonio, Ordinance, December 7, 1914. 13. Jensen, B., Historic Road Infrastructure of Texas, 1866-1965, Section F, Page 7-8; National Register of Historic Places Multiple Property Documentation Form, submitted by Texas Department of Transportation, 1992.

Belknap Place, oldest existing concrete street in Texas Stamped concrete pattern helped horses maintain traction Inlaid marker showing Granitoid construction, placed in 1914 Core taken of the two course Belknap Place Granitoid Pavement

Belknap Place Oldest concrete road in Texas (1914). Limits are from W Dewey Place to W Agarita Ave. Texas Historic Commission Marker is proposed to be placed near Southeast corner of Belknap Pl. and W Mistletoe Ave. on City of San Antonio greenway between curb and sidewalk. This is next to parking lot of Laurel Heights United Methodist Church. A is proposed location of historical marker. GPS Coordinates, approx: 29.453731, 98.49735

Proposed marker to be located on Southeast corner of Belknap Pl and W Mistletoe Ave. Proposed sign placement is on City of San Antonio Greenway between curb and sidewalk. Approx. location will be between the two trees where truck is parked. GPS: 29.453731, 98.49735

Belknap Pl road condition is excellent at the proposed marker location (looking West, across Belknap Pl). In some areas a worn asphalt overlay exists, but not here. View (looking Southeast) of proposed marker location (behind truck) from across Belknap Pl.

View of street (looking North) along Belknap Pl near proposed marker location (right of truck) View (looking South) along Belknap Pl sidewalk near proposed marker location (left of truck). Laurel Heights United Methodist Church is in background. Church parking lot is to left.