Information for File MMJ Main Stem Bassett Creek Restoration Project

Similar documents
Information for File # SEK

Information for File # JTF

Information for File # MVP MMJ; Elim Care

Information for File # MMJ; Methodist Hospital Flood Storage Mitigation and Wetland Enhancement Project

Information for File MVP MMJ; CSAH 10 Reconstruction (Waconia and Watertown Townships)

Information for File # MVP MMJ

Information for File # ARC

Information for File # ARC

Information for File # ARC

Information for File # MHK

Information for File # RMM

Wisconsin NRCS Direct Volume Method Bank Recession Rate Categorizations

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total

A Field Guide to Common Aquatic Plants of Pennsylvania

Information for File # MMW

Stream Restoration: Working with Nature?

Stream Restoration: Working with Nature? Greg Jennings, PhD, PE

Information for File #MVP MVM

17 Jul 2002 PUBLIC NOTICE

Lake Nokomis Shoreline Enhancement Project

Section 3 Non-Structural BMPs

MINNEHAHA GLEN FEASIBILITY STUDY

WETLAND SOD u Bare Root Wetland Plants u Deep Rooted Willows u Coir Logs u Native Trees & Shrubs u Habitat Islands u Custom Growing

Information for File # KDZ

Vegetating Disturbed Road & Stream Banks. By Mike Fournier NRCS Resource Conservationist

STORM SEWER OUTFALLS AND CONNECTING OUTFALL CHANNELS. General Submission Requirements

NATURAL LAKE & STREAMBANK PROTECTION & NATURAL BUFFERS. By Sam Martin, Water Management Specialist, Pine SWCD

Bio-Engineering Techniques to Revegetate Streambanks

Stop Losing Ground to Erosion. Kimberly Laframboise Ecologist Michalski Nielsen Associates limited

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

Stormwater Low Impact Development - A Natural Solution

Juneau Watershed Partnership

Pittsburgh District Pittsburgh, PA Notice No Closing Date: May 29, 2015

Pike River Restoration Adaptive Design: Restoring Structure and Function in an Urban Floodplain - from cabbages to cordgrass

2011 ASLA Design Awards. Coyote Gulch Honor Award and Land Stewardship Designation Valerian LLC. Environmental Restoration and Reclamation

PROPOSED DRAINAGE PATTERNS

Bassett Creek Valley Working Group. October 4, 2017

Biotechnical streambank stabilization

FirstLight Power Shoreline Management Manual Sustainable Shoreline Designs: From Long Island to Lake Erie Webinar Series

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

Monitoring and Maintenance Permit Process

Joint Public Notice. Public Notice Date: February 9, 2015 Expiration Date: March 11, 2015

USING PLANTS TO STABILIZE STREAM BANKS

Presentation to Parks and Open Space Advisory. Committee September 22, 2016

City of Shady Cove Riparian Ordinance Ordinance XXX

Soil bioengineering and ecological

A comparison of Traditional and Prefabricated Encapsulated Soil Lifts

STREAM ALTERATION PRACTICES

Riparian Restoration Plan for the Quiet Waters Homeowners Association Reach of the Yachats River. Site Overview

TRCA Field Staking Protocol December 2016

Applied Ecological Services, Inc. Sustainable Solutions for Over 30 Years.

Working Group Meeting

Natural Shorelines. for Inland Lakes. A Landowner s Guide to using. to STABLIZE SHORELINES, Michigan s inland lakeshore.

Meeting Agenda. City of Guelph. River Systems Advisory Committee. Agenda Items. Item 1, 2 and 3. Item 4 Ward to Downtown Pedestrian Bridge

VEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages

Balancing Conservation and Development on the Jordan River

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION

The Toe Wood Structure

Illinois Urban Manual

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana

319 Grant: Baker Creek & Centenary Creek Restoration Initiative

STREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA

Shoreline Master Program Town of La Conner, Washington

Chapter 131 GENERAL REFERENCES

Monica Smith, PE President Robinson Engineering Company

Information for File #MVP DAS

Habitat Improvements to the Motor Island Shoreline in the Upper Niagara River, NY: A Collaborative Approach

HAZARD MITIGATION GOALS AND OBJECTIVES

PICTURE CANYON Planning Riparian-Wetland Refugia in an Urban Setting

LICENSES FOR UTILITY CROSSINGS OF PUBLIC LANDS AND WATERS ACCORDING TO MINNESOTA RULES CHAPTER [Rules Effective July 1, 2004]

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

Zoning Ordinance Article 3

The Napa River Flood Protection Project

Planning Considerations for Wildlife Passage in Urban Environments. (Prepared by Tony Clevenger, PhD)

Corridor Management Committee. September 29, 2017

DEVELOPMENT PERMIT SENSITIVE ECOSYSTEMS

Is a Riparian Restoration Still Viable After 100-year Storm Events Alter the Original Design?

APPENDIX A 6 CONCEPTUAL PRELIMINARY PLAN GUIDE AND CHECKLIST FOR MAJOR SUBDIVISIONS CARRBORO DEVELOPMENT GUIDE APPENDIX A

Principles for Ecological Landscape Design in Brownfield Business Parks

Northern Branch Corridor SDEIS March 2017

Lake and Stream Restoration Project

Environment and Natural Resources Trust Fund 2009 Phase 2 Request for Proposals (RFP)

MUCKLESHOOT INDIAN TRIBE Fisheries Division nd Avenue SE. Auburn, Washington

Jill Stachura STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. October 2013 Southeast Stormwater Association Annual Conference, Charlotte, NC

STREAM BUFFERS

ANDERSON RIVER PARK SIDE CHANNEL HABITAT RESTORATION PROJECT. Public Outreach Meeting June 5, 2017

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP)

Understanding Drainage Options What s Feasible and Legal. February 2019

Stream Corridor Management Plan

ENVIRONMENTAL / OPEN SPACE

Use of Best Management Practices

Shared History, Shared Future

Weston s Wetlands, Stormwater, & Open Space

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. September 14, 2018.

Riparian Buffer on the Bushkill Creek. Policies

Guidelines for planting within the 100 Ft. Buffer

Corridor Management Committee. April 14, 2016

Chapter 5: Natural Resources and Environment

Transcription:

Information for File 2013-03866-MMJ Main Stem Bassett Creek Restoration Project Applicant: Minneapolis Park and Recreation Board (MPRB) Corps Contact: Melissa Jenny Address: Corps of Engineers, St. Paul District, Regulatory Branch (Attn: 2013-03866- MMJ), 180 East Fifth Street, Suite 700, St. Paul, MN 55101-1678 E-Mail: Melissa.m.jenny@usace.army.mil Phone: 651-290-5363 Primary County: Hennepin Section, Township, Range: 17 & 20, T. 29 N., R. 24 W. Information Complete On: October 17, 2013 Posting Expires On: October 27, 2011 Authorization Type: Section 404 Letter of Permission (LOP-05) This application is being reviewed in accordance with the practices for documenting Corps jurisdiction under Sections 9 and 10 of the Rivers and Harbor Act of 1899 and Section 404 of the Clean Water Act identified in Regulatory Guidance Letter 07-01. We have made a preliminary determination that the aquatic resources that would be impacted by the proposed project are regulated by the Corps of Engineers under Section 404 of the Clean Water Act. Our jurisdictional review and final jurisdictional determination could result in modifications to the scope of the project s regulated water body/wetland impacts and compensatory mitigation requirements identified above. An approved jurisdictional determination will be made prior to reaching a permit decision, and will be posted on the St. Paul District web page at http://www.mvp.usace.army.mil/. Project: The proposed Main Stem Bassett Creek Restoration Project would involve bank stabilization and native vegetation restoration activities along selected areas of an approximately 15,000 linear foot portion of Bassett Creek. The project corridor would begin at Golden Valley Road and run south to Irving Avenue, spanning two cities, Golden Valley and Minneapolis. A portion of the project is located in Theodore Wirth Park. The proposed project would stabilize approximately 5,400 linear feet of stream bank, at nine separate locations. The project would include both soft and hard bank stabilization techniques including: slope shaping, bio-logs, live fascines, vegetated reinforced slope stabilization (VRSS), root wads, rock vanes, live stakes and riprap. The project would also include the installation of fishing piers, and reestablishment of native vegetation at all of the work sites. 1

Bassett Creek from Medicine Lake to the Mississippi River is listed as an impaired water on the State list for Aquatic Recreation Fecal Coliforms and for Aquatic Life Fish Bioassessments and Chloride. The proposed project should not increase any of the impairments on the main stem of the creek, and it should reduce sedimentation and increase the stream s biological capacity to filter and clean water. Various alternatives were considered, and the proposed project is a combination of measures intended to minimize environmental impacts, increase the aesthetics of the project area, and maximize water quality and other environmental benefits. Other alternatives would have either reduced the restored area or increased the area of hard bank protection (primarily riprap). The project should avoid or minimize adverse wetland impacts. No wetlands would be drained or inundated by the project. However, the banks of the creek would be reshaped and altered, and some of this work may regrade small portions of the adjacent wetland. The existing creek banks and adjacent areas are dominated by a mix of native and nonnative tree and shrub species, including invasive buckthorn. Some trees and shrubs would be removed, and many native species would be planted along the banks, including various grasses, wildflowers, trees, and shrubs. Within a few years, the woody vegetation should be reestablished. The shallow, relatively narrow creek (at most points around 10 to 15 feet wide) would not be adversely affected, apart from the disturbances during construction, and the area is expected to have greater habitat value once the plantings establish. The total area of stream bed disturbed during the project would be approximately 0.40 acre. This bank stabilization project is intended to improve the resource. The project would not result in the loss of wetland functions, and the stream banks would be enhanced with the planting of native vegetation. Compensatory mitigation would not be required for this project. No threatened or endangered species would be affected by the project. No tribal trust resources would be affected. The Corps will review information on known cultural resources and/or historic properties within and adjacent to the project area. The Corps will also consider the potential effects of the project on any properties that have yet to be identified. The results of this review and the Corps determination of effect will be coordinated with the State Historic Preservation Officer independent of this public notice. Any adverse effects on historic properties will be resolved prior to the Corps authorization, or approval, of the work in connection with this project. Drawings and Other Information. See the attached figures labeled as 2013-03866- MMJ, Posting figures 1-3. Also see the public notice for Corps of Engineers file 2009-01655-JJY, for the Bassett Creek Resource Management Plan (RMP), which was issued September 3, 2009. The Main Stem Bassett Creek Restoration Project is one of the projects identified in the RMP and that notice. 2

2013-03866-MMJ, Posting figure 1

2013-03866-MMJ, Posting figure 2

2013-03866-MMJ, Posting figure 3