Bonaventure Project Full Submission. TAC 2018 Sustainable Urban Transportation Award

Similar documents
Principal development issues

Integration of Trees into Roads Policy - the road to success -

Route 347. New York State Department of Transportation Region 10, Long Island. THE GREENING of ROUTE 347

Former Rockcliffe Airbase Community Design Plan Guiding Design Vision and Principles December 4, 2013

THE GARDEN CITY PLAN. City of St. Catharines Official Plan. City of St. Catharines

appendix and street interface guidelines

2002 TAC Sustainable Transportation Award

TRANSPORTATION ELEMENT

Transformation of the Bonaventure Expressway at the Downtown Gateway Public art: at the heart of the Quartier Bonaventure Development Plan

COMPLETE GREEN STREET CHECKLIST

MOBILITY HUB GUIDELINES 2012 TAC Sustainable Urban Transportation Award Submission BACKGROUND MOBILITY HUB GUIDELINES

ITEM #8. Regional Smart Growth Program. Regional Smart Growth Program. Presentation Overview. Coast Highway Vision and Stategic Plan.

The Project. In 2013, construction was completed between 100 Street and 102 Street.

DRAFT Subject to Modifications

Chris Gent Landscape Studio

Subarea 5 Southern Gateway. Vision. Mobility The proposed street network will create developable blocks that are scaled appropriately for the area.

Welcome! MILLENNIUM LINE BROADWAY EXTENSION. Over the next 30 years, Metro Vancouver will welcome 1 million new residents and 600,000 new jobs.

The Lower SaLuda Greenway

Redevelopment of Ajax Plaza Area Public Open House Meeting February 19, 2015 Questions and Answers

DUBLIN DOCKLANDS MASTER PLAN AND RELATIONSHIP WITH OTHER PLANS

1.4 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community design

Toronto Complete Streets Guidelines

Report to: Development Services Committee Report Date: April 24, 2017

Wayfinding. North Gateway: Integrate a vertical gateway marker on the west side of Ward Street at the south corner of Vernon Street.

TransitSupportive. Guidelines GHD. Canadian Institute of Planners 2012 Awards for Planning Excellence Award Category: Planning Publications

38 Queen s University Campus Master Plan Part 1

3. Endorse the LRT vision in transforming Surrey into Connected-Complete-Livable communities, and more specifically, the official vision statement:

Making TOD Work in the Heart of Suburban Sprawl

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

Public input has been an important part of the plan development process.

Johnson Street Bridge Public Realm Update

Wasatch CHOICE for 2040

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

Lambeth Main Street Streetscape Improvements

2007 TAC SUSTAINABLE URBAN TRANSPORTATION AWARD SUBMISSION. Bridge Over Highway 401 for Pedestrians and Cyclists in Waterloo Region

History: a Grand Urban Boulevard

Implementation Guide Comprehensive Plan City of Allen

Streets for People, Place-Making and Prosperity. #TOcompletestreets

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

7Page 91 CLEMMONS COMMUNITY COMPASS 7 COMMUNITY CHARACTER

Route 1 Corridor Study

Shima Hamidi, PhD Director

Update. What is the Osborne Bridge Rehabilitation project all about and how is it being planned? Neighbourhood Advisory Committee (NAC)

SUMMARY. An Attractive, Competitive and Sustainable GREATER MONTREAL. Draft Metropolitan Land Use and Development Plan. April 2011

2.0 PURPOSE AND NEED. 2.1 Purpose. 2.2 Need Traffic Congestion in and around Downtown Derry

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

Complete Streets Guidelines & Implementation Strategy. Public Open House #2 June 12, :30-8:00 pm

Issues Requiring Future Study

Today Land & People. Northeast Nampa Gateway District. Employment. Land Use Characteristics. Demographics. Current Zoning

STAFF REPORT Agenda Item: J.4 To: Mayor and City Council Date:

TORONTO COMPLETE STREETS GUIDELINES

North Commuter Parkway and Traffic Bridge Project Market Sounding

Posted by Calgary Public Library on November 1, 2012

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

STREETSCAPE MANUAL ONLINE TRAINING SESSION 1: Background

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

THE CIVIC DISTRICT DEVELOPMENT OPPORTUNITIES

Chapter 7: Streetscape & Design Elements

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

FDOT D4 Complete Streets

Attachment 1 TOWN OF NEW TECUMSETH. Manual for the Preparation of an Urban Design Report

2.4 Dynamic, accessible and diversified

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

Corridors. Re-vitalize our Corridors and Gateways

ANCHOR TO ANCHOR. Rescale the street to create an iconic boulevard.

Welcome to the Oakridge Centre Open House

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Executive Summary. NY 7 / NY 2 Corridor

CITY COUNCIL AGENDA REPORT

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Part D. College Avenue Campus PAGE 121 UNIVERSITY OF REGINA / CAMPUS MASTER PLAN 2011

master plan of highways bus rapid transit amendment

Urban Planning and Land Use

quarters Building Our Cultural Quarters Together

About Momentum Midland

SPRINGHILL LAKE TRANSIT VILLAGE

Bridgeland-Riverside

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

9 North Downtown Master Plan & Saskatchewan Polytechnic

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Transportation Research Center

Municipal Development Plan 2013

The Chinese University of Hong Kong Campus Master Plan Stage 3 Stakeholders' Engagement Report

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

Project Profile BAR HARBOR

URBAN MOBILITY PLAN PERSPECTIVES FOR APPROVED BY THE COMMUNITY COUNCIL MEETING ON 20 JUNE 2011

Route 5 Corridor Land Use and Transportation Plan

1.3 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community planning

Q:%4~ Memorandum CITY OF DALLAS

Supporting our communities. Bridges

New Stanton Project Update July 3, 2012

Appendix H: Easement cross sections

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting

Lesson 6. Corridor Planning

Energy Efficient Strategies for Urban Transportation Planning

Main Street Streetscape Plan. Downtown Redevelopment Plan Phase One

Roanoke Rapids Streetscape Master Plan. City Council Presentation

CHAPTER 7: Transportation, Mobility and Circulation

GO Station Mobility Hubs: Draft Precinct Plans. Committee of the Whole July 12, 2018

Transcription:

Bonaventure Project Full Submission TAC 2018 Sustainable Urban Transportation Award

1) Developing and Improving Sustainable Urban Transportation The Bonaventure Project is a series of strategic undertakings aimed at providing userfriendly, functional and safe mobility options to all users. The Bonaventure Project Vision includes three main objectives: Create a prestigious, functional and user-friendly gateway into the downtown core. Facilitate the re-weaving of the urban fabric through the removal of an elevated highway structure in the urban environment. Support private sector driven urban development through the implementation of key strategic initiatives in the downtown core. To achieve these objectives, project authorities focused on the specific nature of the proposed development and the interaction between available modes of transportation in the area. Specific initiatives contributing to the area s development, improvement of sustainable urban transportation and creation of a lively and dynamic local environment include: demolition of an 850 m section of highway, replaced with an at-grade urban boulevard; implementation of 24-hour bus only lanes to accommodate the daily 1,900 crosstown bus movements along the boulevard and ensure the timely flow of bus traffic; implementation of user-friendly and safe bus stations along the boulevard; development of wide, linear sidewalks separated from the roadway by rows of trees and street furniture to enhance the pedestrian environment and make it safer; installation of push-button activated signalled pedestrian crossings at all intersections; development of 1.6 km of new cycling facilities aimed at creating a safer and more user-friendly cycling environment, enhancing the offer of active transportation options and improving access to adjacent neighbourhoods; and development of over 24,000 m 2 of new public open spaces in the downtown core, to meet the needs of area residents and workers.

The replacement of a section of elevated highway by an at-grade urban boulevard will greatly improve traffic flow and safety in the area, especially for pedestrians and cyclists. In keeping with its goal of optimizing the project s social impact, city authorities have included several features which were identified and requested by local residents. For example, based on the results of consultations with adjacent neighbourhood residents, a new outdoor fitness area and children s playground were added to the final plan. These facilities will play a key role in helping various users adopt these new public spaces. The project team developed a straightforward and functional concept that will stand the test of time. By implementing strategic undertakings that put public and active transportation at the forefront, this project makes a significant contribution to the advancement of sustainable urban transportation. 2) Degree of Innovation The Bonaventure Project is characterized by the innovative nature of approaches developed in relation to the interaction between various modes of transportation, the development of public spaces in a downtown setting, the inclusion of public art in major infrastructure projects and project management methods. Interaction Between Modes of Transportation The detailed modelling of traffic flows, using PTV Vissim and Aimsun software, played a key role in ensuring the project s technical feasibility by providing the information required to develop the best possible configuration for the main roadway and adjacent city streets to accommodate the intense traffic flow along this axis. Bus-only lanes were built on Bonaventure Boulevard between Duke Street and Nazareth Street. This eliminated problems associated with over 1,900 bus movements crossing this residential area on a daily basis, an issue that had gone unresolved for the last 10 years.

The addition of an intelligent transportation system (ITS) facilitates the coordination of traffic movements, which improves the safety of all users. The ITS system played a major role in resolving signal timing issues for the flow of traffic between the Ville-Marie Freeway off-ramp tunnel and the new at-grade urban boulevard. The following features were implemented to ensure the safe and smooth flow of traffic: message boards informing users of the risk of congestion and collisions in the tunnel, beyond the visibility distance; automatic surveillance and response to incidents occurring in the tunnel; and automatic adjustment of signal timing along the boulevard when congestion occurs in the tunnel. This was the first implementation of this type of system in the Montreal metropolitan area. Development of Public Spaces The analysis work conducted by the multidisciplinary team responsible for implementing this project helped identify a severe lack of public spaces in a radius of 800 m, notably in two up-and-coming neighbourhoods, Faubourg des Récollets and Griffintown. As a result, 24,000 m 2 of new public open spaces have been added to the downtown core, greatly enhancing the urban experience for a broad range of users. These new features include a linear public bench stretching over six city blocks, 12 permanent lawn chairs, 8 picnic tables, two ping-pong tables, a children s play area, an outdoor fitness area and a dog park. Public Art To mark the creation of this distinctive and symbolic urban space, the City placed major works of public part at each end of the boulevard. The north end features a piece entitled Dendrites by artist Michel De Broin. This winning entry from a national public art competition bears testimony to the nearby headquarters of the International Civil Aviation Organization, an important United Nations agency. The south end features a piece entitled Source, created by the Spanish artist Jaume Plensa. It is a long-term loan from Montreal-based philanthropists, the first of its kind for the city. The national public art competition bears witness to the growing recognition of public art as a key component of

infrastructure projects. Project Management Given the complex nature of the project, the project team was called upon to deliver the project on time and on budget while managing a number of risks and unexpected situations. The team implemented a thorough project monitoring system, including, among others, weekly progress meetings. In addition, project management staff conducted frequent site visits to ensure compliance with the original concept, from earliest planning stages to final completion of the construction work. This intensive monitoring program resulted in various initiatives, including the recycling and re-use of the elevated highway structure. Within the project, 95% of the 47,000 tonnes of concrete from the demolished structure was crushed and reused. The re-use of existing materials generated savings of $450,000, contributing to the completion of the project within the $147 million budget. In addition, the city s sustained effort to engage stakeholders throughout the project largely contributed to its success. 3) Transferability to Other Communities and Organizations across Canada At a time when we are collectively questioning the place of the automobile in the urban environment, Montreal has chosen to demolish a large section of elevated highway in an effort to revitalize and reinvigorate a broad area of its downtown core. This can potentially inspire other Canadian urban centres to undertake similar major projects. In addition, the instantaneous appropriation of the newly developed public spaces provides a tangible measure of the project s success. As such, the project has offered lessons that could potentially apply to similar projects. These include: 1. Ensuring efficient coordination among stakeholders will help minimize projectrelated risks and concerns, and makes it easier to take advantage of all possibilities. 2. Providing quality facilities that are in line with user needs will help create functional spaces that will stand the test of time.

3. A well-designed planning phase will help reduce unwanted impacts on adjacent neighbourhoods, in addition to providing better control over costs and deadlines. 4) Added Value Added value activities include: improved integration of regional through traffic on the Bonaventure Freeway and local traffic on adjacent neighbourhood streets; unchanged travel times for dozens of crosstown bus routes connecting the South Shore and the downtown core; aesthetically pleasing and comfortable wider sidewalks for all user groups; creation of 24,000 m 2 of new public spaces of local and regional interest; greening of the area with 300 new trees and 15,000 shrubs and perennials in addition to the reduction of hard surfaces; coordination with the provincial government s work on the Turcot Interchange Project and the federal government s work on the Bonaventure Freeway south of the Lachine Canal; and active involvement of numerous stakeholders.

Appendix 1 Project Photos

Legend Bonaventure 1A: View along Nazareth Street, looking south, 2014 Bonaventure 1B: View along Nazareth Street, looking south, 2017 Bonaventure 2A: View from the Duke Ramp, looking north, 2014 Bonaventure 2B: View from the Duke Ramp, looking north, 2017 All photos are property of the City of Montreal.

Bonaventure 1A: View along Nazareth Street, looking south, 2014

Bonaventure 1B: View along Nazareth Street, looking south, 2017

Bonaventure 2A: View from the Duke Ramp, looking north, 2014

Bonaventure 2B: View from the Duke Ramp, looking north, 2017

Appendix 2 Project Photos

Legend Bonaventure 3A: View from the median area looking north, 2014 Bonaventure 3B: View from the median area looking north, 2017 Bonaventure 4A: View from the median area looking south, 2014 Bonaventure 4B: View from the median area looking south, 2017 All photos are the property of the City of Montreal

Bonaventure 3A: View from the median area looking north, 2014

Bonaventure 3B: View from the median area looking north, 2017

Bonaventure 4A: View from the median area looking south, 2014

Bonaventure 4B: View from the median area looking south, 2017