Control Panel 2.0 Installation Guide

Similar documents
WARNING. Installation Tip: Try out this unit before installing onto a fire door system. Test and learn the release INTRODUCTION

Joslyn. Installation, Operation and Maintenance Manual. Surge Protective Devices PN B00

MANUAL RESET ALARM RELEASE

Product Bulletin. VeriSafe Absence of Voltage Tester. The Safe Way to Verify the Absence of Voltage.

SLATE. Sub-Base Module INSTALLATION INSTRUCTIONS R8001S9001

ITC 2000 HEATING CONTROL CABINET. Installation & Operation Manual

EMERGENCY POWERHUBB NODE INSTALLATION AND OPERATION GUIDE

Quartzone. Infrared Quartz Tube & Metal Sheathed Electric Heaters. Owner s Manual. File E COMFORT HEATERS for INDOOR* and OUTDOOR** USE

CurrentGuard TM. Installation, Operation and Maintenance Manual. CurrentGuardTM. Flush Mount. Surge Protective Devices A00

Product Bulletin. VeriSafe Absence of Voltage Tester. The Safe Way to Verify the Absence of Voltage.

Easy to use, initiate test with the push of a button No additional tools required Provides visual alert to abnormal power conditions

UltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY

SLATE. Base Module INSTALLATION INSTRUCTIONS R8001A1001

Installation and Operation Manual Low Power (LP) DC Power System

CHROMOPHARE D650, D660, D530, & D540 PREINSTALLATION MANUAL

CSI Master Format 2004 Guide Specification for: Freezer Frost Heave Prevention (Mineral Insulated)

EB-M*-** Midsize Electro-Boiler BL509. EB-S-**/EB-WX-**-2 TS Standard Electro-Boiler BL506. EB-CX-** TS Commercial Electro-Boiler BL508

Power over Ethernet cable Product standards and Installation code Updates. Julian Mereuta - June 1, 2017 Banff, Alberta

elite Model ELN Centralized Emergency Lighting Inverter Systems 550 W to 1.5 KW Systems

MANUAL RESET ALARM RELEASE BOX

DIESEL Engine Fire Pump Controllers Features

Pilz Safety Lockout System (PSLS)

NFPA 70E Edition Update

RELEASE DEVICES RELEASE DEVICE-WPS MODELS A/B INSTALLATION MANUAL U.L. LISTED CANADIAN LISTED CSFM: :100 GENERAL DESCRIPTION:

INSTALLATION INSTRUCTIONS MODEL PA-250 AND PA-500 BOOSTER AMPLIFIER

Installation Instructions

Installation Guide for models:

MANUAL RESET ALARM RELEASE

AUTO RESET ALARM RELEASE BOX MODEL AR-C INSTRUCTION MANUAL

rev3 INSTALLATION & OPERATION MANUAL OIL CIRCULATING HEATING SYSTEM MODEL OSM

Technical Manual. VFD / Cabinet Heater Upgrade 110 VAC Heater to 12 VDC Heater. Provided by: Chart Inc.

Firefly II Multi Voltage RELEASE DEVICES. Firefly II & IIB-MV INSTALLATION MANUAL

ANSUL ANSUL AUTOMAN II-C RELEASING DEVICE

Installation Guide for models:

Installation Instructions

GTD20A Installation Instructions BRANCH CIRCUIT TRANSFER SWITCH/LIGHTING CONTROL DEVICE

Installation Instructions

Check It Panel. 1 Phase Simplex Demand Dose Operation, Maintenance & Installation Manual. Introduction. Safety Guidelines

Installation Instructions

ELECTRONIC FIREPLACE DAMPER

Photovoltaic (Solar) Array Installation Guide

SECTION Power over Ethernet (PoE) Enabled Camera Housing Moog Videolarm SM5, ACH13, FDW75

[Project Location] SECTION FUSION STAINLESS STEEL DOME HOUSING MOOG VIDEOLARM A&E SPECIFICATION SSDP SERIES

DEMA 830 Laundry Master TM Installation Instructions

SOLID STATE SECURITIES, INC. THE "SS90" SERIES RELEASE DEVICES MADE IN THE U.S.A. SS90-WPS MODEL A/B INSTALLATION MANUAL

Handrail Lighting System

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

Albeo TM LED Luminaire Accessory (Emergency Battery Backup Module)

Installation Instructions

ELECTRONIC FIREPLACE DAMPER

PREFACE. Your comments or suggestions are welcome and appreciated. They should be sent to:

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 870 SERIES INDUSTRIAL CONTROL PANELS

MEGA. cal electronic gas alarm. Installation, Operation, and Maintenance Instructions. Part No Rev. D Pg.

Installing the Cisco ONS FAP-4 Fuse Alarm Panel

Installation Instructions

WATLOW IND. WATROD Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2.00

WATLOW ELECTRIC MFG CO. FIREBAR Screw Plug Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 11/25/2013 Rev: 4.

SLATE. Burner Control Module INSTALLATION INSTRUCTIONS R8001B2001

SERVICE BY QUALIFIED PERSONNEL ONLY

Product Instructions. Hydronic Mixing Block Version Wiring Terminal Block Pressure/Temperature Sensor Delivery Fitting (3) Display Screen

PART GENERAL 1.01 SECTION INCLUDES

! The Caution Symbol (exclamation point) alerts you to a "CAUTION", a safety or

PS1240x Series Dual Voltage Access Control Power Supply Systems Operating and Installation Instructions Rev D.01

MADE IN THE U.S.A. ADVANCE FIRE CONTROL MODEL LM21-AFC MANUAL RELEASE DEVICES TEST WEEKLY TO ASSURE PROPER OPERATION OF RELEASE DEVICE/CONTROL PANEL

UHIR Series. Horizontal or Vertical Mounting Industrial / Commercial Electric Unit Heater. Owner s Manual

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

SECTION AUTOMATIC TRANSFER SWITCHES

INSTALLATION & OPERATION MANUAL

INSTRUCTION MANUAL. AlarmGard Chain Operator (Model FCA) AlarmGard Crank Operator (Model FKA)

NEC 2017 Changes and Their Effect Upon the ICT Industry

EOTec 2C32 Installation Guide

Surge Protective Devices Installation, Operation and Maintenance Manual. LowProfile Series: 080 and 120

WATLOW IND. WATROD Circulation Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00

ILB-CP TBTS B MOUNTING DESIGN EMERGENCY LIGHTING EQUIPMENT FOR LED Patented. See iotaengineering.com/patents for more details

ANSUL AUTOMAN II-C EXPLOSION PROOF RELEASING DEVICE Installation, Operation, and Maintenance Manual

Designed for testing three-phase circuits up to 600V Install on line or load side of electrical disconnect Detects absence of AC and DC voltage

Installation Instructions

Booster Power Supply Manual

ONBOARD BOOSTER INSTALL

Staff Alert Panel. Installation Guide. Using the Touchpad Exit Controller B

MODEL LP3 INSTALLATION AND SERVICE INSTRUCTIONS FOR STREAMLINE LP3 STROBE LIGHTS

Models NFPA 1221-A, NFPA 1221-B Public Safety DAS Annunciator Panel. Revision E 61117

MaxLite LED Round Pendant Highbay Series

Installation Instructions

Manifold Installation Controller MIC-180. Installation and Operation Instructions

Cautions and Warnings. Introduction 4009 NAC POWER EXTENDER

diode led 12VDC OMNIDRIVE 2 ELECTRONIC SPECIFICATION SHEET 12VDC OVERVIEW FEATURES DIMMABLE DRIVER

CSI Master Format 2004 Guide Specification for: Flow Maintenance of Above Ground Greasy Waste Disposal Lines

EGPE2 EGPE2. Electronic Grade Panelboard Extension. Installation, Operation and Maintenance Manual PN CURRENT TECHNOLOGY

INSTRUCTION & SERVICE MANUAL

SMPG3 SNOW MELTING AND DE-ICING POWER DISTRIBUTION AND CONTROL PANEL. For three-phase heating cables PRODUCT OVERVIEW

INSTRUCTION MANUAL IMPORTANT SAFEGUARDS. When using electrical equipment, basic safety precautions should always be followed, including the following:

PROTECTING AGAINST ARC FLASH HAZARDS

FLT93 Installation, Operation and Troubleshooting Guide

CSI Master Format 2004 Guide Specification for: Flow Maintenance of Aboveground Fuel Oil Lines

2014 National Electrical Code & NFPA 70E/Arc Flash

Emergency Lighting Transfer System Model: ELTS2 Installation and User Operation Manual

WATLOW IND. FIREBAR Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00

American Dish Service

Transcription:

Control Panel 2.0 Installation Guide Product Description The View Control Panel 2.0 houses the control components and power source that are responsible for the operation of a View Dynamic Glass system. There are two configurations of the panel, one supporting up to 128 window controllers, with eight Class 2 circuit outputs, and the other supporting up to 256 window controllers with sixteen Class 2 circuit outputs. Additionally, each control panel includes a six-port Layer 3 Ethernet switch to allow for interconnection of the panels on a private VLA and support for up to two IEEE 802.3af midspan injectors for connection of View sensors. intelligence Purpose The purpose of this Guide is to provide explanations and procedures for installing, configuring and operating the View Control Panel 2.0 (CP 2.0) Package Includes 1. Control Panel 2.0 2. Four (4) mounting brackets, one for each corner of the Control Panel Scope This Guide provides safety guidelines, detailed planning installation instructions and setup information for installing the View Control Panel 2.0. Determining the location and placement Mounting the Control Panel Adding Power to the Control Panel ote: The Control Panel weighs 60 lbs, recommend 2-person handling (lifting) when moving or installing the Control Panel. 1 of 8

Audience This guide does not provide sufficient information for anyone but a C10 qualified installer to install this product. Installers should be licensed electricians familiar with the hazards of installing electrical equipment. Optional Accessories 1. Pull Box - P: 010-101611 2. PoE Injector PoE 1: 015-101821-01 PoE 2: 015-101821-02 3. Fiber Kits 850 mm P: 015-101844-01 1310 sm P: 015-101844-02 1000 base T P: 015-101844-03 Abbreviations and Acronyms EC - ational Electric Code (FPA 70) FPA79 - Standard for Industrial Control Panels (FPA 79) UL508 - Underwriters Laboratories Standard UL-508 CEC - Canadian Electric Code CSA - Canadian Standards Association DC - Direct Current FCC - Federal Communications Commission FPA - ational Fire Protection Association VAC - Volts AC VDC - Volts DC LOTO - Lock-Out, Tag-Out Additional Supporting Documentation 1. Control Panel 2.0 Data Sheet - QDM-02-000033 2. Pull Box 2.0 Data Sheet - QDM-02-000037 Tools and Materials required 1. Lag screws, 3/8 X 1 2. Flathead screw driver 3. Phillips head screw driver 4. External AC wiring 5. Conduit 1/2 EMT 2 of 8

24.08 21.77 9.68 21.02 8.99 29.96 29.02 intelligence J3 J6 J11 J14 J17 J20 J1 J4 J7 J9 J12 J15 J18 J21 J2 J5 J8 J10 J13 J16 J19 J22 3 of 8

Installation Step 1: Identify installation location 1. The Control Panel should be placed in the location determined by the General Contractor as seen on the Interconnect Drawings (schematics). If there are multiple Control Panels for the installation, they will each be marked on the front panel with their designated location and labeled to coincide with the Interconnect Drawings. 2. Before mounting the Control Panel to the wall, be sure there is enough clearance provided to install the Trunk Line and Power Insert cables as required. 3. Mounting surface must be capable of handling the weight of the unit (60lbs). Recommend mounting surface ¾ Fire Retardant Rated plywood. Securely mount the Control Panel using the 4 mounting tabs onto the wall according to local building code requirements for mounting 60 lb. enclosure. Typically 3/8 x 1 wood screws will be sufficient. 4. The Control Panel should be mounted with sufficient working clearances. Per EC Article 110.26: a) the top of the Control Panel should be no higher than 2m (6.5 ft.), including the pull box if one is used; b) 15 in. of clear space from the vertical center-line of the panel to the sides; c) 36 in. of clearance in front of the panel. Step 2: Connecting Power 1. Refer to the control panel schematic (340-101695) provided in the document pocket on the door of the control panel for details of the AC connections and locations 2. The View Control Panel is rated for 120-240VAC, single phase operation (Line, eutral and Ground). This product cannot be used in 3-phase circuits (e.g. 208VAC wye or delta connections). 3. Installation requires an upstream (facility panelboard) UL-489 branch circuit protection sufficient to provide 20A (at 120VAC, 10A for 240VAC) for the control panel (per EC Article 409.21 A-1), marked as disconnect device for the control panel. This unit can also be installed in jurisdictions that specify IEC 60947-1 and IEC 60947-3 4. Lock-out and Tag the facility disconnect before proceeding 5. Open the front panel to reveal the inside of the Control Panel. 4 of 8

CB1 LABEL L TB1 GD CB1 LABEL L TB1 GD Wiring Instructions: Turn off power before doing any work on panel. Remove AC shield to access main Circuit Breaker and AC Terminals. ISTALLATIO GUIDE 6. Turn CB1 off (lever in the down position ) DOW 7. Remove the protective panel covering CB1 REMOVE USE COPPER CODUCTORS OLY TEMPERATURE RATIG OF THE FIELD WIRIG CODUCTORS: 75 C TERMIAL TIGHTIIG TORQUE: 20 in-lb L G L TB1 CB1 GD SERVICE OLY, 5A MAX. FUSE RATIG OF 250V, 6.3A 5 of 8

8. Install flexible or rigid (EMT) 1/2 conduit (per EC Ch9, Annex C, table C.1) to port shown below. J3 J6 J11 J14 J17 J20 J1 J4 J7 J9 J12 J15 J18 J21 J2 J5 J8 J10 J13 J16 J19 J22 9. Conduit installation should resemble the configuration below EMT 1/2 intelligence 10. Pull Line, eutral, and ground wiring from the upstream panelboard to the CP. Typically this should be 12AWG THH wire per EC table 310.15(B). 6 of 8

11. Connect the facility ground (green or green/yellow wire) to the ground stud designated by the PE ground symbol in the top left of the enclosure. Termination will require a ring terminal for a #10 or M5 stud. 12. Connect Line to the top of CB1, tighten the screw to 20 in-lbs 13. Connect eutral to one of the open positions of TB1- Tighten the screw to 20 in-lbs Ground (Green) Line (Black) eutral (White) CB1 TB1 L TB1 TB2 OFF TB1 TB1 TB2 7 of 8

POWER ISTALLATIO GUIDE 14. Verify there are no shorts between L and, and between L and ground 15. Close the panel door and energize the enclosure by removing the LOTO and switching power on 16. With the appropriate PPE (as specified by FPA 70E) open the enclosure and verify a reading of 120 to 240VAC is present between the line side of CB1 and 17. De-energize the enclosure by reapplying the LOTO 18. Replace the panel removed in step 7 19. Turn CB1 O by moving the lever to the UP position. UP 20. Close the Cabinet door. 21. Remove the LOTO and re-energize the panel. Verify the green light is illuminated on the front of the Control Panel. Once verified, turn the Control Panel off. POWER intelligence 22. Final commissioning to be completed by View FSE only. 8 of 8