NIBE SPLIT HBS 05 Air/water heat pump

Similar documents
NIBE SPLIT ACVM 270 Air/water heat pump

air/water heat pump. NIBE F2040 provides

Air/water heat pump NIBE F2120

NIBE F2120 Air/water heat pump

NIBE F1355. A +++ The system's efficiency class for heating. Speed-controlled ground source heat pump for large buildings. Ground source heat pump

NIBE F470 A + Complete heat pump unit that provides heating, hot water, ventilation, heated supply air and heat recovery. Exhaust air heat pump

NIBE F2026 air/water heat pump. fresh air s free. NIBE F2026. Efficient scroll compressor that operates at temperatures down to -20 C.

Ground source heat pump NIBE F1255

Installer manual SMO 40

Installer manual ELK 213 Immersion heater

Installer manual NIBE VVM 310

Installer manual AXC 30

NIBE F750 A +++ Flexible, high-performance exhaust air heat pump. Exhaust air heat pump

Outline principle. Application Houses with water-borne heating systems. Maximal recommended heating output 13.5 kw. Alternative

Installer manual NIBE VVM 500

NIBE VVM 500 FLEXIBLE INDOOR MODULE INTELLIGENT HOT WATER NIBE VVM 500. Flexible all-in-one indoor module for heating and hot water.

Installer manual SMO 40

Installer manual NIBE F , 12, 16 kw UK 1x230V Air/water heat pump IHB GB LEK LEK LEK

Installer manual SMO 40

Outline principle. Application Houses with water-borne heating systems. Alternative Select the desired configuration by highlighting the boxes below.

NIBE VVM 300. Intelligent hot water NIBE VVM 300. VVM 300 is designed for connection and communication

Outline principle. Application Buildings with water-borne heating systems. Alternative

Installer manual SMO 20

Outline principle. Application Buildings with water-borne heating systems. Alternative

Installer manual AG-AA10. Air/air heat pump IHB GB AG-AA10-30 AG-AA10-40/50

Installer manual AXC 40. Accessories IHB GB LEK

Installer manual NIBE VVM 320

Air/water heat pump NIBE F2120 8, 12, 16, 20

INSTALLATION AND MAINTENANCE INSTRUCTIONS AMB AMB 30 LEK

Planning guide. Atec.

NIBE SPLIT ACVM 270, AMS 10

User manual NIBE F2026

Installer manual AMS 10

NIBE F1245 GROUND SOURCE HEAT PUMP. Heat pump with rock, ground or lake as heat source. NIBE F1245

Heating when you need it Cooling when you don t

INSTALLATION AND MAINTENANCE INSTRUCTIONS F F2025

Teknik Data NIBE F2120 8, 12, 16, 20

Installer manual NIBE F730

NIBE SPLIT ACVM , AMS 10

Technical description. Atec.

Air/water - Heat pumps

User manual JÄSPI Inverter Nordic 8, 12, 16, 20

NIBE SPLIT ACVM 270, AMS 10

PRODUCT DATA COMPACT P - SERIES BY NILAN. Sanitary hot water production. Heating. Ventilation < 300 m 3 /h. Passive heat recovery.

Installer manual NIBE F370. Exhaust air heat pump IHB GB LEK

Installer manual NIBE F1245. Ground source heat pump. UK 1x230V

HT V2 HT Split

Installer manual NIBE F1145. Ground source heat pump. UK 1x230V IHB GB LEK

Installer manual NIBE F1145

Installer manual NIBE F1245. Ground source heat pump. UK 1x230V IHB GB

Advance Split

Installer manual NIBE SPLIT HBS 05

MOS GB SMO INSTALLATION AND MAINTENANCE INSTRUCTIONS NIBE SMO 10

50A KP 70A KP 90A KP 120A KP 150A KP 210A

MOS GB SMO INSTALLATION AND MAINTENANCE INSTRUCTIONS NIBE SMO 10

WHY A MHI HEAT PUMP?

PRODUCT DATA COMFORT 450 BY NILAN. Ventilation & passive heat recovery. Passive heat recovery. < 450 m 3 /h

Installer manual NIBE F470

Installer manual NIBE F2120

Installer manual AG-WL10

Technical Guide. Installation, Operation and Care. EP E series 7 step electric boilers 26 and 42 kw

NIBE Air/water heat pumps CAPTURE FREE ENERGY FROM THE OUTSIDE AIR

Technical data LA 28TBS

User manual. JASPI COMFORT MONO 8 & 12Kw UK 1x230V. Air/water heat pump LEK

Technical specifications

INSTALLATION AND MAINTENANCE INSTRUCTIONS MOS GB NIBE VVM 300 UK NIBE VVM 300 UK 230 V VVM 300 LEK

PRODUCT DATA COMFORT 600 BY NILAN. Ventilation & passive heat recovery. Passive heat recovery. < 800 m 3 /h

High temperature air-to-water heat pumps

Efficient heating that won t cost the earth

ELK 26 INSTALLATION AND MAINTENANCE INSTRUCTIONS ELK 26

User manual NIBE F370

Technical data LA 60TUR+

PRODUCT DATA COMBI 300 POLAR BY NILAN. Ventilation with passive & active heat recovery. Active heat recovery. Passive heat recovery.

EREBA ACCESS. Easy and fast installation Hydronic module available Compact, reliable and efficient USE RANGE CONFORMITY

PHRIE / PHIE InvERTER monoblock air To water HEaT PumP medium TEmPERaTuRE

Installer manual NIBE VVM 310. Indoor module IHB GB

NIBE IT S IN OUR NATURE

Technical data LA 60TU

INVERTER SPLIT - TYPE

User manual NIBE F370 1x230 V

Technical data LA 9S-TU

Installer manual AHP/AHPS

Planning guide. (2010/09) en

Installer manual NIBE VVM 500

Swedish design and manufacture since 1967

SOLAR 42 IHB LEK

Greenline HE C6-C11 E6-E17 Installer Guide

PRODUCT DATA COMFORT 5000 BY NILAN. Ventilation & passive heat recovery. Passive heat recovery. < 5300 m 3 /h

DESIGN & TECHNICAL MANUAL

Installer manual SAM 40. Supply air module IHB GB LEK

TECHNICAL DATA & SERVICE MANUAL

INSTALLATION AND MAINTENANCE INSTRUCTIONS ELK ELK 15 LEK

Installer manual NIBE VVM 310

Sweden s leading air source heat pump

Installer manual NIBE VVM 320. Indoor module IHB GB

AGEO CALEO. Water-to-water high temperature heat pumps USE RANGE DESCRIPTION. Designed to replace a conventional boiler and produce domestic hot water

Do you want a versatile solution

User manual NIBE VVM 320

MOS GB NIBE VVM INSTALLATION AND MAINTENANCE INSTRUCTIONS NIBE VVM 300 VVM 300 LEK

Installer manual NIBE F1245

Transcription:

NIBE SPLIT HBS 05 Air/water heat pump NIBE SPLIT HBS 05 with several possibilities Can be docked with NIBE SMO and NIBE VVM. Customer adapted and cost effective split system. Possible to combine up to eight outdoor modules in one system. Low risk of freezing because no water circulates between the outdoor module and indoor module. Integrated condensation trough heater. Outdoor module with compact dimensions. NIBE SPLIT HBS 05 is available in three sizes The range consists of outdoor modules in three sizes, NIBE AMS 10-8, -12 and -16. With SPLIT box HBS 05, where exchange between the refrigerant and the heating medium liquid occurs, NIBE SPLIT HBS 05 can be connected to NIBE VVM and NIBE SMO. For larger installations where a split system is required, it is possible to combine up to eight outdoor modules with control from SMO 40. There is a wide range of system solutions and accessories available. Visit www.nibe.eu for more information. A +++ The system's efficiency class for heating. A L The product's efficiency class and tap profile for hot water.

This is how NIBE SPLIT HBS 05 works Principle The NIBE AMS 10 outdoor module from thenibe SPLIT HBS 05 series together with NIBE HBS 05 creates a complete heat pump intended for use in combination with one of the NIBE VVM indoor modules or NIBE SMO control modules. The system solution is a split system, where the outdoor module, AMS 10, is connected by refrigerant pipes to HBS 05 which is located indoors. The exchange between the refrigerant and the heating system liquid occurs in HBS 05. Together with an indoor module this creates a complete heating and hot water unit. Our flexible indoor modules give efficient heating and great hot water performance. VVM indoor modules are complete with a smart and user-friendly control system, hot water heater, additional heat, self-regulating circulation pump, etc. The control modules, NIBE SMO, offer a flexible system solution that can be easily customised. For systems with NIBE SMO, different components such as water heaters, additional heat and other accessories can be selected to suit the installation's requirements. Up to eight outdoor air heat pumps can be connected to a NIBE SMO 40. There is a wide range of system solutions and accessories for NIBE's indoor modules and control modules. NIBE SPLIT HBS 05 AMS 10-8 / HBS 05-12 AMS 10-12 / HBS 05-12 AMS 10-16 / HBS 05-16 VVM 310 X X X VVM 320 X X VVM 500 X X X SMO 20 X X X SMO 40 X X X 2 NIBE SPLIT HBS 05

AMS 10 docked with HBS 05 and VVM 320 (floating condensing) -EQ1 -AA25 -GP13 -CP10 -GP12 -EB15 -BT64 -QN12 -EB101 -EZ101 -XL52 -XL53 -EZ102 -BT15 -BP4 -BT12 -QM41 -XL1 -QM40 -HQ1 -XL2 -BT3 -FL10 NOTE This is an outline diagram. Actual installations must be planned according to applicable standards. Explanation EB15 Indoor module (VVM 320) EB101 BP4 BT3 BT12 BT15 EZ101 EZ102 FL10 HQ1 QM40 QM41 XL1 XL2 XL52 XL53 EQ1 AA25 BT64 CP10 GP12 GP13 QN12 NIBE SPLIT HBS 05 Pressure sensor, condenser Temperature sensor, heating medium, return Temperature sensor, condenser, supply Temperature sensor, fluid pipe Outdoor module (AMS 10) SPLIT box (HBS 05) Safety valve, heat pump Particle filter Shut-off valve Shut-off valve Connection, heating medium, flow 1 Connection, heating medium, return 1 Connection, gas line Connection, liquid line Active cooling module (ACS 310) Control unit Temperature sensor, cooling flow line Single jacket accumulator tank, cooling Charge pump Circulation pump, cooling Three way valve cooling/heating NIBE SPLIT HBS 05 3

Good to know about NIBE SPLIT HBS 05 System solution NIBE SPLIT HBS 05 is intended for installation with indoor module (VVM) or control module (SMO) for a complete system solution. Transport and storage HBS 05 should be transported and stored vertically in a dry place. AMS 10 must be transported and stored vertically. NOTE Ensure that the heat pump cannot fall over during transport. Supplied components Particle filter R25 (HQ1). Installation and positioning Place AMS 10 outdoors on a solid level base that can take the weight, preferably a concrete foundation. If concrete slabs are used they must rest on asphalt or shingle. The concrete foundation or slabs must be positioned so that the lower edge of the evaporator is at the level of the average local snow depth, however a minimum of 300 mm. AMS 10 should not be positioned next to noise sensitive walls, for example, next to a bedroom. Also ensure that the placement does not inconvenience the neighbours. AMS 10 must not be placed so that recirculation of the outdoor air can occur. This causes lower output and impaired efficiency. The evaporator should be sheltered from direct wind, which negatively affects the defrosting function. Place AMS 10 protected from wind against the evaporator. Large amounts of condensation water, as well as melt water from defrosting, can be produced. Condensation water must be led off to a drain or similar (see page6). Care must be exercised so that the heat pump is not scratched during installation. LEK Condensation hose (WP3). XX 300 mm mm LEK Do not place AMS 10 directly on the lawn or other non solid surface. LEK Brackets kit If there is a risk of snow slip from roof, a protective roof or cover must be erected to protect the heat pump, pipes and wiring. 4 NIBE SPLIT HBS 05

LEK SPLIT box HBS 05 2 It is recommended that HBS 05 is installed in a room with existing floor drainage, most suitably in a utility room or boiler room. The brackets for HBS 05 are screwed to the wall using the enclosed screws. Mounting template* enclosed. Route pipes so they are not fixed to an internal wall that backs on to a bedroom or living room. Ensure that there is approx. 800 mm free space in front of and 400 mm above the product for any future service. Ensure that there is sufficient space above the machine for pipework and valves. Recommended space to the sides is 200 mm on each side. Mounting the SPLIT box HBS 05* 3 LEK 3. Install HBS 05 on the brackets. Finally, install the cover. 2 1. Position the enclosed mounting template horizontally against the wall. (See the dimensions on the mounting template.) Mark for drilling holes. 3 LEK 2. Screw the brackets to the wall using the enclosed screws. NIBE SPLIT HBS 05 5

Lift from the street to the set up location If the base allows, the simplest thing is to use a pallet truck to move the AMS 10 to the set up location. NOTE The centre of gravity is offset to one side (see print on the packaging). Condensation run off Condensation runs out on to the ground below AMS 10. To avoid damage to the house and heat pump, the condensation must be gathered and drained away. NOTE It is important to the heat pump function that condensation water is led away and that the drain for the condensation water run off is not positioned so that it can cause damage to the house. NOTE To ensure this function, the accessory KVR 10 should be used. (Not included) If AMS 10 must be transported across soft ground, for example a lawn, we recommend that a crane that can lift it to the set up location is used. When the AMS 10 is lifted by crane the packaging must be untouched and the load equally distributed with a boom, as illustrated above. If a crane cannot be used AMS 10 can be transported using an extended sack truck. AMS 10 must be used on the side marked "heavy side" and two people are required to get the AMS 10 up. Lift from the pallet to final positioning Before lifting remove the packaging and the securing strap to the pallet. Place lifting straps around each machine foot. Lifting from the pallet to the base requires four persons, one for each lifting strap. It is not permitted to lift anything other than the machine feet. Scrapping When scrapping, the product is removed in reverse order. Lift by the bottom panel instead of a pallet! NOTE The electrical installation and wiring must be carried out under the supervision of an authorised electrician. NOTE Self regulating heating cables must not be connected. The condensation water (up to 50 litres / 24 hrs) must be routed away by a pipe to an appropriate drain, it is recommended that the shortest outdoor length possible is used. The section of the pipe that can be affected by frost must be heated by the heating cable to prevent freezing. Route the pipe downward from AMS 10. The outlet of the condensation water pipe must be at a depth that is frost free or alternatively indoors (with reservation for local ordinances and regulations). Use a water trap for installations where air circulation may occur in the condensation water pipe. The insulation must be tight against the bottom of the condensation water trough. Drain pan heater, control The drain pan heater is supplied with power when one of the following conditions is met: 1. Operating mode "Heating" or "Hot water" is activated. 2. The compressor has been in operation for at least 30 minutes after last start. 3. The ambient temperature is lower than 1. 6 NIBE SPLIT HBS 05

5 m Installation area Installation area AMS 10 The recommended distance between AMS 10 and the house wall must be at least 15 cm. Clearance above AMS 10 should be at least 100 cm. However, free space in front must be 100 cm for future servicing 150 mm 15 cm Free space behind 300 mm 30 cm Minimum free space 300 mm 30 cm Minimum distance during use of several AMS 10 However, the free space in front must be 100 cm for future servicing At least 100 cm NIBE SPLIT HBS 05 7

Installation HBS 05 Pipe installation Pipe installation must be carried out in accordance with current norms and directives. AMS 10 and HBS 05 work up to a return temperature of approx. and an outgoing temperature from the heat pump of approx. 58. HBS 05 is not equipped with shut off valves on the water side, these must be installed to facilitate any future servicing. When docking with HBS 05 free flow in the climate system is recommended for correct heat transfer. This can be achieved by use of a bypass valve. If free flow cannot be ensured, it is recommended that a buffer tank (NIBE UKV) is installed. Caution Ensure that incoming water is clean. When using a private well, it may be necessary to supplement with an extra water filter. Water volumes H H AMS 10 AMS 10 L L AMS 10 Minimum volume, climate system during heating/cooling Minimum volume, climate system during under floor cooling -8 50 l 80 l -12 80 l 100 l -16 150 l 150 l NOTE The pipe work must be flushed before the heat pump is connected, so that any contaminants do not damage the components. Install the supplied particle filter (HQ1) ahead of the inlet, i.e. the connection (XL2, HM return) on HBS 05. For more information see www.nibe.eu. Pipe dimensions and materials Pipe dimension Connection Material Minimum material thickness Gas pipe Ø15.88 mm (5/8") Flare - (5/8") HBS 05 Liquid pipe Ø9.52 mm (3/8") Flare - (3/8") Copper quality SS-EN 12735-1 or C1220T, JIS H3300 1.0 mm 0.8 mm Connecting refrigerant pipes (not supplied) Install the refrigerant pipes between the outdoor module AMS 10 and HBS 05. Installation must be carried out in accordance with current norms and directives. Parameters AMS 10 Maximum pipe length, AMS 10 (L): 30 m. Maximum height difference (H): ±7m. 8 NIBE SPLIT HBS 05

Electrical connections AMS 10 and HBS 05 must be installed via a circuit breaker with a minimum breaking gap of 3mm.. Disconnect the SPLIT box HBS 05 and outdoor module AMS 10 before insulation testing the house wiring. For fuse ratings, see technical data, Fuse protection. If the building is equipped with an earth-fault breaker, AMS 10 should be equipped with a separate one. Connection must not be carried out without the permission of the electricity supplier and under the supervision of a qualified electrician. Cables must be routed so that they are not damaged by metal edges or trapped by panels. AMS 10-8 is equipped with a single phase compressor. This means that one of the phases will be loaded with up to 16 A during compressor operation. AMS 10-12 is equipped with a single phase compressor. This means that one of the phases will be loaded with up to 23 A during compressor operation. Maximum permitted phase loading can be restricted to a lower maximum current in the indoor module or control nodule. NOTE Electrical installation and service must be carried out under the supervision of a qualified electrician. Cut the current with the circuit breaker before carrying out any servicing. Electrical installation and wiring must be carried out in accordance with the stipulations in force. NOTE Check the connections, main voltage and phase voltage before the machine is started, to prevent damage to the air/water heat pump electronics. NOTE The external control must be taken into consideration when connecting. NOTE If the supply cable is damaged, only NIBE, its service representative or similar authorised person may replace it to prevent any danger and damage. AMS 10-16 is equipped with a single phase compressor. This means that one of the phases will be loaded with up to 25 A during compressor operation. Principle diagram, electrical installation PEN L1 L2 L3 Electrical distribution unitisolator switch Incoming supply *Current sensor Power cable Communication cable HBS 05 NIBE VVM AMS 10 * Only in a 3-phase installation. NIBE SPLIT HBS 05 9

Functions When connection to NIBE indoor module / control module (VVM / SMO) is ready, you can control your unit via the indoor module / control module. Control, general The indoor temperature depends on several different factors. Sunlight and heat emissions from people and household machines are normally sufficient to keep the house warm during the warmer parts of the year. When it gets colder outside, the climate system must be started. The colder it is outside, the warmer radiators and under floor heating system must be. Control of the heat production is performed based on the "floating condensing" principle, i.e. the temperature level needed for heating at a certain outdoor temperature is produced guided by values collected from the outdoor and supply temperature sensors. The room sensor can also be used to compensate the deviation in room temperature. Heat production The supply of heat to the house is regulated in accordance with the heating curve setting selected. After adjustment, the correct amount of heat for the outdoor temperature is supplied. The supply temperature of the heat pump will hover around the theoretically required value. Own curve The indoor module (VVM) and control module (SMO) have pre-programmed non- linear heating curves. It is also possible to create your own defined curve. This is an individual linear curve with a number of break points. You select break points and the associated temperatures. Hot water production Hot water charging starts when the temperature has fallen to the set start temperature. Hot water charging stops when the hot water temperature at the hot water sensor has been reached. For occasional higher hot water demand, there is a function called "temporary lux" that allows the temperature to be raised via one time increase or up to 12 hours (selected in the menu system). Additional heat only The indoor module (VVM), which is connected to NIBE SPLIT HBS 05, can be used with the additional heat alone (electric boiler) to produce heating and hot water, for example before the outdoor module is installed. Alarm indications The status lamp lights red in the event of an alarm and the display shows detailed information depending on the fault. An alarm log is created with each alarm containing a number of temperatures, times and operating status. The display The indoor module (VVM) / control module (SMO) is controlled using a clear and easy to use display. Instructions, settings and operational information are shown on the display. You can easily navigate between the different menus and options to set the comfort or obtain the information you require. The display unit is equipped with a USB socket that can be used to update the software, save logged information and manage the settings in the indoor module / the control module. INDOOR CLIMATE Visit www.nibeuplink.com and click the "Software" tab to download the latest software for your installation. NIBE Uplink Using the Internet and NIBE Uplink, users can obtain a quick overview and the present status of the installation and the heating in their home. They obtain a good overall view where they can monitor and control the heating and hot water comfort. If the system is affected by a malfunction, they receive an alert via e-mail that allows them to react quickly. NIBE Uplink also gives users the opportunity to control the comfort in their homes easily, no matter where they are. Range of services The users have access to different levels of service via NIBE Uplink. There is a basic level that is free and a premium level where they can select different extended service functions for a fixed annual subscription fee (the subscription fee varies depending on the selected functions). NIBE Uplink also available as an app from App Store and Google Play. For further presentation, visit www.nibeuplink.com. Installation and associated equipment requirements The following is required in order for NIBE Uplink to function with the installation: Network cable Cat.5e UTP (straight, male-male), wired network communication. Internet connection (broadband). Web browser that supports JavaScript. If Internet Explorer is used, it should be version 7 or higher. See the help file in the web browser for information on how to activate JavaScript. For further presentation, visit www.nibeuplink.com. HEAT PUMP HOT WATER INFO 10 NIBE SPLIT HBS 05

NIBE Smart Price Adaption Smart Price Adaption is not available in all countries. Contact your NIBE dealer for more information. Smart Price Adaption adjusts the heat pump's consumption according to the time of day when electricity prices are lowest. This allows for savings, provided that the hourly rate subscription has been signed with the electricity supplier. The function is based on hourly rates for the coming day being downloaded via NIBE Uplink. An internet connection and account on NIBE Uplink are necessary to use the function. Smart home When you have a smart home system that can communicate with NIBE Uplink, you can control NIBE SPLIT HBS 05 via an app by activating the smart home function. By allowing connected units to communicate with NIBE Uplink your heating system becomes a natural part of your smart home and gives you the opportunity to optimise the operation. Caution smart home the function requires NIBE Uplink to function. NIBE Smart Energy Source Smart Energy Source prioritises how / to what extent each docked energy source will be used. Here you can choose if the system is to use the energy source that is cheapest at the time. You can also choose if the system is to use the energy source that is most carbon neutral at the time. NIBE SPLIT HBS 05 11

Technical data Dimensions SPLIT box HBS 05 40 315 2 180 110 XL2 XL53 XL1 XL52 405 View from above. XL1 Climate system, flow Ø 28 mm XL2 Climate system, return Ø 28 mm XL52 Gas line refrigerant, flare 5/8" XL53 Liquid line refrigerant, flare 3/8'' Outdoor module AMS 10-8 Terminal Anslutningsplint block Opening Öppning for för pipe rörand wiring och kablage Vätskeledning Liquid pipe Gasledning pipe 188.5 Right Front Dräneringshål Drainage hole (Ø20 x 3) Above 12 NIBE SPLIT HBS 05

Outdoor module AMS 10-12 410 20 40 38 60 190 580 200 60 60 15 103 15 Opening for pipe and wiring 20 40 262 388 Under Drainage hole hole ( Ø20 x 3) Liquid pipe Gas pipe Cable Cable gland gland 845 Cable gland 195 110 10 110 195 242 279 50 52 27 50 Opening for pipe Opening and wiring for pipe and wiring Opening for pipe and Opening wiring for pipe and wiring 970 50 15 50 Left Right Front Gas pipe Liquid Liquid pipe pipe 100 40 36 51 Above Cable Cable gland gland 50 150 70 Opening for pipe and Opening wiring for pipe and wiring 15 40 50 Rear side NIBE SPLIT HBS 05 13

Outdoor module AMS 10-16 Hole Hål för for förankring anchoring 190 580 200 60 20 Opening Öppning för forrör pipe och and kablage wiring Drainage Dräneringshål hole Kopplingsplint Terminal block Liquid Vätskerör pipe Kabelgenomföring Cable gland 1300 Gasrör pipe Cable Kabelgenomföring gland 195 10 195 110 110 612 624 410 370 103 20 40 40 15 60 38 60 15 262 325 Under 50 27 50 Öppning Openingför forrör pipe och and kablage wiring 50 Right 970 Front 50 15 50 Left Liquid Vätskerör pipe Gas Gasrör pipe Above 46 46 113 51 Kabelgenomföring Cable gland 150 50 70 40 Öppning Openingför forrör pipe och and kablage wiring 15 50 Rear side 14 NIBE SPLIT HBS 05

LEK Sound pressure levels AMS 10 is usually placed next to a house wall, which gives a directed sound distribution that should be considered. Accordingly, you should always attempt to find a placement on the side that faces the least sound sensitive neighbouring area. The sound pressure levels are further affected by walls, bricks, differences in ground level, etc and should therefore only be seen as guide values. 2 m Noise, AMS 10-8 Sound power level, according to EN12102 at 7/35 (nominal)* Sound pressure level at 2 m free standing (nominal)* L W (A) db(a) 41 Noise, AMS 10-12 Sound power level, according to EN12102 at 7/35 (nominal)* Sound pressure level at 2 m free standing (nominal)* L W (A) db(a) 58 44 Noise, AMS 10-16 Sound power level, according to EN12102 at 7/35 (nominal)* Sound pressure level at 2 m free standing (nominal)* L W (A) db(a) 58 44 * Free space. Technical specifications NIBE SPLIT HBS 05 (AMS 10 and HBS 05) NIBE SPLIT HBS 05 (AMS 10 and HBS 05) Working range during heating with compressor (ambient temperature) Working range during cooling (ambient temperature) Max temperature flow line, only compressor Max temperature return line Min temperature flow line during heating with compressor and continuous operation Maximum temperature supply during cooling and continuous operation Min temperature flow line during cooling Incoming voltage supply, maximum permitted deviation The water quality, domestic hot water and climate system % -20 +43 +15 +43 58 25 25 7-15 % +10 % EU directive no. 98/83/EF NIBE SPLIT HBS 05 15

AMS 10-8 / AMS 10-12 and HBS 05-12 SPLIT box Min/max system flow, heating operation Min/max system flow, cooling operation Min flow, climate system, 100 % circulation pump speed (defrosting flow) Enclosure class Volume, total Max pressure, climate system Water quality, climate system Max operating temperature Ambient temperature, HBS 05 Height, without pipe/with pipe Width Depth Weight Electrical connections Recommended fuse rating Part no. l/s l/s l/s litre MPa (bar) mm mm mm kg A AMS 10-8: 0.12 /0.38 AMS 10-8: 0.15 /0.38 AMS 10-8: 0.19 HBS 05-12 IP 21 3 l ±5 % 0.25 (2.5) AMS 10-12: 0.15 /0.57 AMS 10-12: 0.20 /0.57 AMS 10-12: 0.29 EU directive no. 98/83/EF 65 5 35, max relative humidity 95 % 463 / 565 404 472 15 230V ~50Hz 6 067 480 16 NIBE SPLIT HBS 05

Outdoor module Max. current Recommended fuse Starting current Compressor Max fan flow (heating, nominal) Fan rating Defrosting Drain pan heater Breaking value high pressure Cut-out value low pressure (15 s) Height Width Depth Weight Colour (two coats powder coating) Refrigerant volume (R410A) CO 2 equivalent Max. length, refrigerant pipe, one way Dimensions, refrigerant pipe Pipe connection option Part no. A A A m 3 /h W W MPa (bar) MPa (bar) mm mm mm kg kg t m AMS 10-8 16 3,000 Integrated 100 750 780 (+67 valve protection) 340 (+ 110 with foot rail) 60 2. 5.32 16 5 Twin Rotary 86 Reversing 4.15 (41.5) 0.079 MPa (0.79) Dark gray 30* AMS 10-12 23 4,380 Integrated 120 845 970 370 (+ 80 with foot rail) 74 2.90 6.06 Gas pipe: OD15.88 (5/8") Fluid pipe: OD9.52 (3/8") Right-hand side 064 033 Bottom / right-hand side / rear side 064 110 *If the length of the refrigerant pipes exceeds 15 metres, extra refrigerant must be added at a rate of 0.06 kg/m. NIBE SPLIT HBS 05 17

AMS 10-16 / HBS 05-16 SPLIT box Min/max system flow, heating operation Min/max system flow, cooling operation Min flow, climate system, 100 % circulation pump speed (defrosting flow) Enclosure class Volume, total Max pressure, climate system Max pressure, cooling system Water quality, climate system Max operating temperature Ambient temperature Height, without pipe/with pipe Width Depth Weight Electrical connections Recommended fuse rating Part no. l/s l/s l/s litre MPa (bar) MPa mm mm mm kg A HBS 05-16 0.25 /0.79 0.32 /0.79 0.39 IP 21 4 l ±5 % 0.25 (2.5) 4.5 EU directive no. 98/83/EF 65 5 35, max relative humidity 95 % 463 / 565 404 472 19.5 230V ~50Hz 6 067 536 18 NIBE SPLIT HBS 05

Outdoor module Max. current Recommended fuse Starting current Compressor Max fan flow (heating, nominal) Fan rating Defrosting Drain pan heater Breaking value high pressure Cut-out value low pressure (15 s) Height Width Depth Weight Colour (two coats powder coating) Refrigerant volume (R410A) CO 2 equivalent Max. length, refrigerant pipe, one way Max height difference, refrigerant pipe Pipe connection option Dimensions, refrigerant pipe Pipe connections Part no. A A A m 3 /h W W MPa (bar) MPa (bar) mm mm mm kg kg t m m inches AMS 10-16 25 25 5 Twin Rotary 6,000 2 x 86 Reversing Integrated 120 4.15 (41.5) 0.079 (0.79) 1,300 970 370 (+ 80 with foot rail) 105 Dark gray 4.0 8.35 30* 7 Bottom / right-hand side / rear side Gas pipe: OD15.88 (5/8") Fluid pipe: OD9.52 (3/8") Flare 064 035 *If the length of the refrigerant pipes exceeds 15 metres, extra refrigerant must be added at a rate of 0.06 kg/m. NIBE SPLIT HBS 05 19

Performance Outdoor module / SPLIT box Heating Output data according to EN14511 ΔT5K Specified/supplied power/cop (kw/kw/-) Outd. temp: / Supply temp. 7/35 (floor) 2/35 (floor) -7/35 (floor) 2/ 7/45 2/45-7/45-15/45 7/ -7/ AMS 10-8 / HBS 05-12 Nominal 3.86/0.83/4.65 5.11/1.36/3.76 6.64/2.48/2.68 4.75/2.07/2.29 3.70/1.00/3.70 5.03/1.70/2.96 6.58/3.06/2.15 5.13/3.03/1.69 3.50/1.17/2.99 5.29/2.68/1.97 AMS 10-12 / HBS 05-12 Nominal 5.21/1.09/4.78 6.91/1.79/3.86 8.98/3.26/2.75 6.42/2.72/2.36 5.00/1.31/3.82 6.80/2.24/3.04 8.90/4.03/2.21 6.94/3.99/1.74 4.73/1.54/3.07 7.15/3.53/2.03 AMS 10-16 / HBS 05-16 Nominal 7.03/1.45/4.85 9.33/2.38/3.92 12.12/4.33/2.80 8.67/3.62/2.40 6.75/1.74/3.88 9.18/2.98/3.08 12.01/5.36/2.24 9.36/5.31/1.76 6.38/2.04/3.13 9.66/4.69/2.06 Cooling Output data according to EN14511 ΔT5K Specified/supplied power/eer Outd. temp: / Supply temp. 27/7 27/18 35/7 35/18 Max 7.52/2.37/3.17 11.20/3.20/3.50 7.10/2.65/2.68 9.19/2.98/3.08 Max 9.87/3.16/3.13 11.70/3.32/3.52 9.45/3.41/2.77 11.20/3.58/3.12 Max 13.30/3.99/3.33 17.70/4.52/3.91 13.04/4.53/2.88 15.70/5.04/3.12 Energy rating, average climate Model Model hot water heater Temperature application Energy efficiency class for space heating Space heating efficiency class of the system 1) Water heating energy efficiency class Declared load profile for water heating AMS 10-8 / HBS 05-12 / VVM 320 VVM 320 35 / A++ / A++ A+++ / A++ A XL AMS 10-12 / HBS 05-12 / VVM 320 VVM 320 35 / A++ / A++ A+++ / A++ A XL AMS 10-16 / HBS 05-16 / VVM 310 VVM 310 35 / A++ / A++ A+++ / A++ A XL 1) Reported efficiency for the system also takes the temperature regulator into account. If the system is supplemented with an external additional boiler or solar heating the total efficiency of the system must be recalculated. 20 NIBE SPLIT HBS 05

Working range, compressor operation - heating AMS 10 Water temperature 65 60 58 50 45 40 35 30 25 20 15-30 -20-10 0 10 20 25 30 40 43 50 Outdoor air temperature Supply temperature Return temp During shorter time it is allowed to have lower working temperatures on the water side, e.g. during start up. Working range, compressor operation - cooling AMS 10 Water temperature 35 30 25 20 Supply temperature Return temp 15 12 10 7 5 0 10 15 20 25 30 35 40 43 45 50 Outdoor air temperature NIBE SPLIT HBS 05 21

Output and COP at different supply temperatures AMS 10-16 AMS 10-8 kw Max avgiven effekt F2040-8 Max. specified power AMS 10-8 12,00 kw Max avgiven effekt F2040-16 Max. specified power AMS 10-16 25,00 20,00 10,00 8,00 6,00 4,00 2,00 0,00-25 -20-15 -10-5 0 T out (kw) 5 10 15 Outdoor temperature 35 45 (kw) 15,00 10,00 5,00 0,00-25 -20-15 -10-5 0 T out 5 10 15 Outdoor temperature 35 45 COP COP COP F2040-8 AMS 10-8 5,00 4,00 3,00 2,00 35 45 COP COP COP AMS F2040-16 10-16 6,00 5,00 4,00 3,00 2,00 1,00 35 45 1,00 0,00-25 -20-15 -10-5 0 T out 5 10 15 Outdoor temperature 0,00-25 -20-15 -10-5 0 T out 5 10 15 Outdoor temperature AMS 10-12 kw 16,00 14,00 12,00 10,00 8,00 6,00 4,00 2,00 0,00-25 -20-15 -10-5 0 T out (kw) Max avgiven effekt F2040-12 Max. specified power AMS 10-12 5 10 15 Outdoor temperature 35 45 Output with lower fuse rating than recommended AMS 10-12 / AMS 10-16 Avgiven effekt F2040-12 vid avsäkring 16A kw 16,00 14,00 12,00 10,00 8,00 6,00 4,00 2,00 0,00-25 -20-15 -10-5 0 T ute (kw) Specified outputams 10-12 fusing 16A 5 10 15 Outdoor temperature 35 45 COP COP COP F2040-12 AMS 10-12 6,00 5,00 4,00 3,00 2,00 1,00 0,00-25 -20-15 -10-5 0 5 10 15 T out Outdoor temperature 35 45 Avgiven effekt F2040-12 vid avsäkring 20A kw 16,00 14,00 12,00 10,00 8,00 6,00 4,00 2,00 0,00-25 -20-15 -10-5 0 T ute (kw) Specified outputams 10-12 fusing 20A 5 10 15 Outdoor temperature 35 45 kw Specified outputams 10-16 fusing 20A Avgiven effekt F2040-16 vid avsäkring 20A 25,00 20,00 (kw) 15,00 10,00 5,00 35 45 0,00-25 -20-15 -10-5 0 T ute 5 10 15 Outdoor temperature 22 NIBE SPLIT HBS 05

APH APH APH Accessories Detailed information about the accessories and complete accessories list available at www.nibe.eu. Indoor module VVM 310 Part no. 069 430 Condensation water pipe KVR 10-10 F2040 / HBS05 1 metres Part no. 067 233 KVR 10-30 F2040 / HBS05 3 metres Part no. 067 235 KVR 10-60 F2040 / HBS05 6 metres Part no. 067 237 Refrigerant pipe kit LEK VVM 310 With integrated EMK 310 12 metres, insulated Part no. 067 032 LEK Part no. 069 084 Stand and brackets Ground stand For AMS 10 VVM320 Part no. 067 033 Copper, 3 x 400 V LEK Part no. 069 108 Stainless Steel, 3 x 400 V Wall bracket Part no. 069 109 Enamel, 3 x 400 V With integrated EMK 300 LEK For AMS 10-8 and AMS 10-12 Part no. 067 034 LEK Part no. 069 110 Stainless Steel, 3 x 230 V Part no. 069 113 Stainless Steel, 1 x 230 V Part no. 069 111 VVM 500 Control module SMO 20 Control module Part no. 067 224 Part no. 069 400 LEK SMO 40 Control module Part no. 067 225 LEK NIBE SPLIT HBS 05 23

Wall bracket For AMS 10 Part no. 067 034 LEK 24 NIBE SPLIT HBS 05

NIBE SPLIT HBS 05 25

26 NIBE SPLIT HBS 05

NIBE SPLIT HBS 05 27

Subject to printing errors and design changes. PBD GB 1639-1 M11999 NIBE Energy Systems Box 14, SE-285 21 Markaryd www.nibe.eu