INSPECTA- Kraftvärme Stockholm, Sweden 23. October Author: Dr. Manfred Möller

Similar documents
INTEC Engineering GmbH Energy systems

Image_engl_08:Image-engl-RZ :55 Uhr Seite 1. INTEC Engineering GmbH Energy systems

BORSIG WASTE HEAT BOILERS FOR NITRIC ACID, CAPROLACTAM AND FORMALDEHYDE PLANTS PROCESS HEAT EXCHANGER. A Member of KNM Group Berhad

INTEC Engineering GmbH Energy systems

Steam Trap BK 45 BK 45-U BK 45-LT BK 46

WOOD CHIP HEATING HPK-RA

WOOD CHIP HEATING HPK-RA

25 Years IBS GmbH. Innovative and taylormade burner systems

UV - flame detector dual fuel burners for intermittent burner operations

DK-HEAT RECOVERY FOR TRANSCRITICAL CO 2 REFRIGERATION SYSTEMS

Wide Band Flame Detector KLC 20 for all kind of oil flames with intermittent burnerr operations

Conductivity Electrode LRG Original Installation Instructions English

from ENGINEERING up to the complete PLANT, ALL from a single SOURCE MULTI Kühlsysteme GmbH Zschorlauer Straße Aue/Saxony GERMANY

VIESMANN. Service instructions VITOLADENS 300-T. for contractors. Vitoladens 300-T Type VW3B Inox-Radial heat exchanger for oil fired condensing Unit

Schwank Burners and Ceramic Burner Tiles. Innovative Technologies and Efficient Heat Generation

Our. Heaters. for your Projects

Flame Monitor for Multiple Burner Furnaces D-LE 603 D-UG 660

Level Electrode NRG NRG Original Installation Instructions English

Protect human life against hazards at refineries and other sensitive. Complete cabin protected against blast, gas, fire and smoke

New generation heat exchanger improves industrial energy efficiency

CTS Your Partner for Customised Technical Solutions

Renewable energies. Ready-made OEM systems for manufacturers of Solar thermal systems Solid fuel boilers (pellets, split logs, wood chips ) Heat pumps

Waste/Multi Oil Boilers from Flexiheat

ASH MEASUREMENT AT NRG HUNTLEY USING HIGH TEMPERATURE STRAIN GAUGES

OUR APPLICATION EXPERTISE PNEUMATICS IN HYGIENIC DESIGN

BOILER CLEANING SYSTEMS. for Improved Availability of Waste Incineration Boilers

CLEANING STARTS WITH

Köllemann GmbH Page 1 / 16

Flame detector. The QRA4.U is for use with the following types of burner control:

UV - flame detector KLC 10 for oil -, gas- and dual fuel burners for intermittent burner operations

The Tube Heater Principle

Operating Instruction Centrifugal fans without scroll (Translation of the Original) BA-RLE-AC /2014 RLE RLA

INSTALLATION AND OPERATION MANUAL

The kit contains messages on the following products: Ball valve BR26 CERA SYSTEM and Pfeiffer Chemie-Armaturen develop innovative ball valve

Centrifugal Fans. for Cement Plants. TLT-Turbo GmbH

QAiST WP2 and 6 A status report

Bosch Greentherm Series

TFI Report Classification

Heat exchangers in Thermo Plate-design Type XPT. + variable + cleanable + efficient + safe FULLY WELDED

Fire Risks and Safety Standards

DUOPEX WATER MANUAL mm

PURION UV plants for disinfection

Erhitzer_engl_3:Wärmeträger :43 Uhr Seite 1. INTEC Engineering GmbH Thermal oil heaters

Descaler & Prevention

BENSON Boilers Experience in Nearly 1000 Plants and Innovative Design Promise Continuing Success Manfred Klein, Rudolf Kral, Eberhard Wittchow

INLINE CENTRIFUGAL FAN. Centro-M OPERATION MANUAL

JCD Jog Conveyor Dryer

LONGEVITY SOLUTIONS FEEDWATER HEATERS CONDENSERS HEAT EXCHANGERS PRESSURE VESSELS AIR PREHEATERS ISOLATION DAMPERS AFTERMARKET SERVICES AND PARTS

Curriculum Vitae. Eckhard Hörner-Marass. Executive Interim Management GmbH

Bosch Uni 7000F Cast Iron Hot Water Boiler

TopLine Safety and reliability right down the line

1.03 DELIVERY, STORAGE, AND HANDLING Heater will be stored to secure against damage and handled per manufacturer s recommendations.

o Clear instruction for operation o Measurement and control of o Stationary sensor for o Programming capabilities of o Countdown timer selectable

AGRICULTURE AND FORESTRY CONSTRUCTION AND MINING AUTOMOTIVE, COMMERCIAL VEHICLES AND RAILWAYS INDUSTRIAL EQUIPMENT

TEPZZ 87_ 6A_T EP A1 (19) (11) EP A1 (12) EUROPEAN PATENT APPLICATION

Model IVSI Positive Pressure Venting Systems

Installation & Operating Instructions

Standard automatic switch 1.1 m, Standard automatic switch 2.2 m

Application of electroadhesive grippers for automated handling of semi-finished composites

Skyddshandskar för svetsare. Protective gloves for welders

VIESMANN. Installation instructions VITOMAX 200-HW. for contractors

Mobile measurement technology for HV components

Evaluation Report, Test Run 2 (Action C2)

LÖDIGE ALWAYS THE RIGHT MIX

Tips & Technology For Bosch business partners

WÜRTH GROUP DIRECT SELLING IN THE DIGITAL WORLD COMPANY PRESENTATION

Level Electrode NRG Original Installation Instructions English

Company Presentation. Karl Klein Ventilatorenbau GmbH Waldstr Aichwald Aichschiess

Heated tools. Semiconductor equipment

Procedure for the Approval of New Fire Detection and Alarm Technologies

QRA10... QRA53... QRA55...

Smoke extraction duct of sheet steel

Technical Guidance CE Marking of Metal Chimneys and Flues

RADIANT HEAT. Construction Automotive Industry

AQ Group Company presentation. AQ Group AB

WASTE HEAT RECOVERY BY ROTAMILL INTELLIGENT ENERGY RECOVERY AND USE OF PROCESS HEAT

Lignite fired power station in Romania fits FGD with Wet Booster Fans and Pennguard lined Concrete Chimneys for maximum Efficiency

H E A T I N G E L E M E N T S

RADIANT HEATING AND COOLING SYSTEMS Produced by FRENGER SYSTEMEN BV

GESTRA Steam Systems DK 45. English. Installation Instructions Steam Trap DK 45

Madhu Honap HONEYWELL THERMAL SOLUTIONS INTRODUCTION

BHEL Steam Generators Material Selection Overview by Veerendar Aluvala DM/BHEL/Trichy

Assembly instructions and instructions for use for electric sauna oven with evaporator. Bi-O-Mat W MADE IN GERMANY IPX en / -44.

ISO INTERNATIONAL STANDARD

Efficiency & Savings through On-Line Chemical Cleaning

Efficient and economical solutions for water heating and air conditioning - Wieland Thermal Solutions at Mostra Convegno

Medupi Unit 6 ACC hot cleaning: Method and results

User Manual. If you have any issues or questions, please contact us via

VIESMANN. Service instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

Temperature Sensor TRG Original Installation Instructions English

AXIS-QA G TUBO-M/MZ AXIAL FANS. Axis / Tubo OPERATION MANUAL

Originators of the Flexible Water Tube design

Güntner Info. finoox technology. fin and tube heat exchangers. Tailor-made solutions!

Explosiv atmosfär Trycktålig utrustning. Explosion resistant equipment

a new generation of tilting kettles Quality and ergonomics with no compromises Tilting kettles and accessories

ACO Marine Advanced wastewater solutions for the marine and offshore market

Amec Foster Wheeler- Fired Heater Division

Innova new M2 and M3 series

Trends for Radiant Tube Heated Strip Lines

MARUYASU INDUSTRIES CO.,LTD.

Transcription:

1 INSPECTA- Kraftvärme Stockholm, Sweden 23. October 2014 Author: Dr. Manfred Möller Jünger+Gräter GmbH Robert-Bosch-Straße 1 68723 Schwetzingen Germany Tel: +49-6202-944-0 Fax: +49-6202-944-194 www.jg-refractories.com

2 J+G Tiles in incinerators - JuSyS - Standard / JuSyS - Air - Advantages of a rear-ventilated System - Experience with JuSyS - Air History of Air protected superheater projects - ZAS Schwandorf - MVA Rosenheim - MVA Stuttgart Conclusion

3 J+G is successfully operating in new projects worldwide, especially with engineering & project management. and continuously family owned from 1936 on. J+G is growing with lasting effect in the European market in the field of service & maintenance. Turnover > 60 Mio. EUR p.a. total J+G Group Staff Certificates > 220 Employees in the J+G Group approx. 40 Engineers approx. 85 Supervisors & skilled Refractory Workers + approx. 70 skilled Refractory Workers in CH/D/F/A Quality Management DIN EN ISO 9001 since 1995 SCC** (Health Safety & Environment Certificate for Contractors) since 2000

Necessary Properties of any J+G Tile Material High thermal Conductivity for a very good heat transfer through the tile Very good Thermo Shock Resistance (TSR) Against Crackformation under practical loads 18-25 W/mK >100 Shocks DIN 51068 Low thermal Expansion against thermal stress and strain between tube wall and the tile 0,47 mm/m*100k Very good Oxidationresistance Against growing in oxidizing condition <1,3 Vol. % (@500h; 1000 C) ASTM C 863

5 Is a closed System which by design does not have any openings into the Boiler. Does effectively protect the tube walls from corrosion by means of sealing air in a gap between the tiles and steel. Does mainly transport the heat by radiation to the tube wall. Is flexible connected to the wall, because it is installed without any mortar on the tube wall. Is a patented, proven system by Jünger + Gräter for more then 15 years.

6 Tube Wall JuSyS - Air Tile No direct contact of tiles and the tube wall Anchors in 1.4828 or Inconel Air Gap Welded holder and retainer Small openings like joints and fissures do not corrupt the system Allows the easy transversal transfer of sealing air The system allows online water cleaning Air Box

7 Demand of air: appr. 10 Nm³/h, m² Sealing Air pressure: appr. 8-22 mbar Resulting pressure in the gap: appr. 2-12 mbar above combustion Shematic Air distribution

8

9 Partners: Martin (former Alstom) / ZMS Total Area: app. 7 m² Position: Front wall Year of start up: 2000 Steam - Parameter: T = 470 C Duration of the test: 22.000 h

10

11 The design process parameters could be well achieved The quality of the air supply to the system is of outstanding importance A contact between ceramic and superheater tubes has to be avoided very strictly The temperaturloss between the superheater tubes and the tube wall can not be ignored

12 CheMin GmbH

13 Temperature of the radiant-superheater of app. 400-450 C Resulting steam pressure 40 bar Diameter of the superheater tubes 38 mm Length of app. 4.200 mm Width of app. 1.400 mm 5 tube coils are freely hanging into the boiler (12,3m² ceramic surface)

14 The heatflux through the system is comparable to JuSyS Air. The refractory can independently move to the tubes The special shapes are connected to the cooled steam tubes instead of the uncooled air tubes to avoid excessive expansion Every tube set (steam / air / Steam) is individually protected Improvement of heating surface Reducing the risk of vibration The connection of the special shapes is made by the well experienced JuSyS Air concept. The air distribution is made with a protected manifold main to the farest possible point

15

16 Steamtube Airtube Protection of the superheater steam- and air tubes with JuSyS Air

17 KRW78/42-02 u. -03 Finished Installation of the JuSyS Air - system

18

19 After 4,000 operating hours After 8,000 operating hours After 12,000 operating hours Fouling pattern: sandy deposits slightly encrusted deposits stick loosely to surface

20 Temperature: 320 C Temperature: 420 C Temperature: 450 C No corrosion after 12.000 operational hours

21 No corrosion after 16.000 operational hours

22 The heatflux through the system is comparable to JuSyS Air. The refractory behaves like a JuSyS Air wall The connection of the special shapes is made by the well experienced JuSyS Air concept. The air distribution is made with manifold mains in vertical direction

23

24 Year of comissioning 2014 Temperature of the radiantsuperheater of app. 480-490 C Diameter of superheater tubes 32 mm Length of appr. 11.000 mm Width of appr. 1.440 mm 32 m² ceramic surface Temperature difference compared to a standard patch solution only 5K

All you need is

26 Thank you for your attention www.jg-refractories.com Jünger+Gräter GmbH Robert-Bosch-Straße 1 D-68723 Schwetzingen Telefon +49 (0) 62 02 944 0 Telefax +49 (0) 62 02 944 194