Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total

Similar documents
Hudson Raritan Estuary (HRE) Ecosystem Restoration Feasibility Study Tentatively Selected Plan

Restoring Water Ecosystems in NYC Parks

STREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA

Lake and Stream Restoration Project

Stream Restoration: Working with Nature?

Stream Restoration: Working with Nature? Greg Jennings, PhD, PE

Jill Stachura STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. October 2013 Southeast Stormwater Association Annual Conference, Charlotte, NC

Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. July 2013 Jill Stachura

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES

North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015

The use of low head weirs to. perennial streams with their floodplains:

Restoration of Riparian Buffer at the Former Smelt Hill Dam Site, Falmouth, Maine

Homeowners Guide to Stormwater BMP Maintenance

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Information for File MMJ Main Stem Bassett Creek Restoration Project

Use of Best Management Practices

M-231 and Water Quality. Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT

BASS PONDS, MARSH, & WETLAND HABITAT RESTORATION PROJECT

Town of Essex Small Site Erosion Control Guide

C-12. Dry Pond. Design Objective

SECTION 5: REACH RECOMMENDATIONS/MAPS

Post Construction BMPs

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

PICTURE CANYON Planning Riparian-Wetland Refugia in an Urban Setting

Executive Committee Meeting Addendum. #7/15 July 3, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members:

Kootenai River Habitat Restoration Program June 18, 2018 Kootenai Valley Resource Initiative Update

Stormwater BMP and Stream Restoration in a City Park. Jeff Herr P.E., D.WRE Jill Stachura

GUIDELINES FOR ECOLOGICAL PERFORMANCE

Hunts Point Landing, Bronx, New York

WET PONDS INSPECTION & MAINTENANCE CHECKLIST

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

The Napa River Flood Protection Project

Is a Riparian Restoration Still Viable After 100-year Storm Events Alter the Original Design?

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

OPERATIONS & MAINTENANCE MANUAL FOR POST CONSTRUCTION MEASURES

APPENDIX C NATURAL RESOURCES MANAGEMENT PLAN: ACTIONS AND PRIORITIES

River Corridor Overlay Zone (RCOZ) Article 5

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

17 Jul 2002 PUBLIC NOTICE

4.6. Low Impact and Retentive Grading

RECONNECTING A COMMUNITY TO THE CREEK

Attention: Ray Tardiff,

North Carolina Coastal Federation

Beyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management

Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011)

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

URBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION

Town of Corinth Road Erosion Inventory Report

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

Weston s Wetlands, Stormwater, & Open Space

MINNEHAHA GLEN FEASIBILITY STUDY

319 Grant: Baker Creek & Centenary Creek Restoration Initiative

Alternatives Analysis Summary Memorandum

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept

10.14 ERRATA UPDATE SHEET 3

Managing Shorelines: Control Erosion and Protect Water Quality. Ben Powell Clemson Extension

Ponds of. Ballantrae

Vegetated Filter Strips and Buffers

SECTION 6. Routine Maintenance Activity Details

Chagrin River Watershed Partners, Inc. Local Regulations. Amy H. Brennan (440)

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Tips for Maintaining and Enhancing Stormwater Management Areas

Natural Shorelines. for Inland Lakes. A Landowner s Guide to using. to STABLIZE SHORELINES, Michigan s inland lakeshore.

Urban Stormwater Retrofit Program Highlights

Old Mill Community Association Bioretention Facility

FirstLight Power Shoreline Management Manual Sustainable Shoreline Designs: From Long Island to Lake Erie Webinar Series

Rule D Wetland and Creek Buffers

Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County

Just The Basics: Illicit Discharge. What does it mean to me?

Options for Managing Coastal Erosion. Presentation by: Ashley Sprague

2014 HDR 2014 Architecture, HDR, Inc., all all rights reserved. reserved.

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

Design Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield

Zoning Ordinance Article 3

Samuel E. Paul War Memorial Recreation Area Natural Resource Inventory

Boardman River Watershed VILLAGE OF KALKASKA. WATER QUALITY ACTION PLAN Fall 2009

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

Town of Vershire Road Erosion Inventory Report

Draft Rhode Island Stormwater Design and Installation Standards Manual

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

SOUTH FOX MEADOW STORMWATER IMPROVEMENT PROJECT

Urban Water Management and Soils (ESRM 311 & SEFS 507)

BIORETENTION FACILITY

Green Infrastructure Recommendations For Parks and Public Spaces

Best Management Practices

Working Group Meeting

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

STREAM ALTERATION PRACTICES

Understanding Drainage Options What s Feasible and Legal. February 2019

Win 3! Basic Guidelines for Successful Roadside Ditch Management

Summary of Changes in the DRAFT Rivers Project Natural Resource Master Plan from the 2001 approved plan to 2014 plan

Habitat Improvements to the Motor Island Shoreline in the Upper Niagara River, NY: A Collaborative Approach

Green Infrastructure. NYS Department of Environmental Conservation

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013

When planning stormwater management facilities, the following principles shall be applied where possible.

Vegetated Filter Strips and Buffers

Town of Hague Stormwater Outfall Evaluation Report

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

Transcription:

HARLEM RIVER, EAST RIVER AND WESTERN LONG ISLAND SOUND PLANNING REGION Flushing Bay and Creek Ecosystem Restoration Source Feasibility Study Background Study Resolution (1994), Reconnaissance Report (1996), & Feasibility Study Cost Share Agreement executed with NYCDEP and PANYNJ (1996). Twelve (12) alternative/sites screened for consideration resulting in two (2) restoration alternatives recommended and evaluated for full feasibility analysis. Seventeen (17) alternatives were then developed varying in amounts of dredging, capping and adjacent habitat restoration. 2007 Selected Plan focused on Flushing Creek dredging and adjacent marsh restoration for one (1) site. Plan optimized through the development of three (3) new alternatives to better coordinate with NYCDEP Long Term Control Plan efforts. Bronx River Basin Ecosystem Restoration Source Feasibility Study Background Study Resolution (1998), Reconnaissance Report (1999) & FCSA executed with NYCDEP and Westchester County Department of Planning (2003). Restoration opportunities report identified 330 potential sites. Twenty-three (23) sites were considered for further evaluation. Ten (10) sites were selected based on their potential to contribute to restoration of the watershed and non-federal sponsor acceptability and two (2) of these sites were combined resulting in a total of nine (9) sites. Restoration Site Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region Measures/Target Ecosystem Characteristic First Level Costs Federal Non-Federal Total Non-Federal Sponsors (Congressional Representatives) Baseline Conditions and Water Resource Problems Densely populated urban area Limited or fragmented habitat and disturbed natural areas Poor benthic habitat Dense invasive vegetation Continuing shoreline erosion Armored and/or eroded shorelines Canada Geese fecal matter, Confined Sewer Overflows (CSOs) and sewage odors Poor water quality and heavy sediment loads Dams, weirs and anthropogenic debris impede fish passage High flows during storm events Flushing Creek Wetlands; Forest preservation $3,835,000 $2,065,000 $5,900,000 Bronx River Park/West Farm Rapids Park Bronx Zoo and Dam Shoreline softening; Emergent wetlands; Bed restoration; Invasive removal/native plantings; Riverbed restoration Invasive removal/native plantings; Fish ladder; Sediment trap; Emergent wetlands $2,600,000 $1,400,000 $4,000,000 $2,502,500 $1,347,500 $3,850,000 Stone Mill Dam Fish ladder $468,000 $252,000 $720,000 Shoelace Park Muskrat Cove Bronxville Lake Crestwood Lake Garth Woods/Harney Park Westchester County Center Channel realignment w/in-stream structures; Bank stabilization; Invasive removal/ native plantings; Sediment load reduction/ rain gardens/bioretention basins Channel modification; River bank stabilization; Installation of sediment basins for load reduction; Invasive removal/native plantings Native plantings; Rip rap forebay; Channel bed restoration; Emergent wetlands; Forested scrub/shrub wetlands; Modification of rock weir for fish passage; Invasive removal and native plantings; Sediment dredging; Sediment load reduction/ vegetated swales/ retention; Basins/rain gardens Modification of existing rock weir for fish passage; Creation of emergent wetlands; Channel realignment, bed material construction, 11 instream cross vanes; Two (2) riprap forebays; Invasive removal/ native planting Modification of weir for fish passage; River channel modification (15 in-stream cross vanes); Shoreline softening; Rain gardens/ bioretention area; Invasive removal/native planting; Emergent wetlands Garth Woods: forested scrub/shrub; Wetlands Emergent wetlands; Bank stabilization; In-stream structures; 10 cross vanes and six (6) J-hooks; channel modification; Invasive species removal/ native planting $16,256,500 $8,753,500 $25,010,000 $5,096,000 $2,744,000 $7,840,000 $10,094,500 $5,435,500 $14,530,000 $17,946,500 $9,663,500 $27,610,000 $4,680,000 $2,520,000 $7,200,000 $9,438,000 $5,082,000 $14,520,000 Total $72,917,000 $39,263,000 $111,180,000 NYCDEP (Meng, NY- 6/Crowley, NY-14) NYCDEP, NYC Parks (Crowley & Serrano, NY-15) NYCDEP, NYC Parks (Engel, NY-16 & Crowley) NYCDEP, NYC Parks (Crowley & Serrano) Westchester County Planning (Engel) Westchester County Planning (Lowey, NY-17) Restoration Opportunities/Measures Invasive species removal and native plantings Channel modifications/realignment with instream structures Wetland creation River bed restoration Sediment load reduction Fish ladder installation Public access Weir modification (fish passage) Debris and snag removal Shoreline softening and bank stabilization Secondary benefits of water quality improvements

FLUSHING CREEK RESTORATION SITE Flushing Creek Tentatively Selected Plan Design: Re-grade existing common reed-dominated areas to create low salt marsh consisting of saltmarsh cordgrass (2.42 ac). Preserving ephemeral pond (0.28 ac). Preserve existing upland forest with no re-grading or replanting proposed (6.56 ac). PROJECT FIRST COST (Oct 2016): $5,900,000 Bronx River Park/West Farm Rapids Park Tentatively Selected Plan Design: Creation of woodland area along the east side of the site with native upland trees and shrubs (~0.59 ac). Shoreline softening on the east and west channel banks (~0.31 ac) using boulders and facultative plants between the dam and 180th Street, stacked rock walls with brush layers along the east bank, and drilling with native plant materials along the west bank down stream of 180th Street. Creation of emergent wetlands (~0.04 ac). Bed restoration between the dam and 180th Street (0.47 ac). Removal of invasive vegetation and replacement with native upland shrubs and herbaceous vegetation upslope from both banks of the river down stream of 180th Street (~0.20 ac). Removal of debris from river bottom downstream of 180th Street (0.36 ac). Restoration of river bed by substrate excavation and replacement with bedding stone (~0.36 ac). Improvement of public access to the river. PROJECT FIRST COST (Oct 2016): $4,000,000 Bronx Zoo and Dam Tentatively Selected Plan Design: Removal of invasive vegetation and native planting (0.56 ac) along both banks, on the upland island upstream of the dams, and additional location downstream of the dams. Installation of a fish ladder (0.04 ac) to link the excavated channel area upstream of the dams to the river channel below the dams. Creation of emergent wetlands (0.54 ac) along both banks upstream of the dams, and along the west bank downstream of the dams. Debris removal between the dams (0.09 ac). Installation of a sediment trap to reduce sediment loads reaching the river. Improved public access. PROJECT FIRST COST (Oct 2016): $3,850,000

Stone Mill Dam Tentatively Selected Plan Design: Installation of a fish ladder to link the slow-flowing pool upstream of the dam and the fasterflowing channel downstream of the dam. Placement of clay-pipe fish attractors at both the upstream and downstream ends of the fish ladder to function as refuge habitats for fish. Planting of native vegetation along the east bank of the river, abutting the fish ladder (0.03 ac). Removal of invasive vegetation from a small area along the west bank, immediately downstream of the dam, and replacement with native vegetation PROJECT FIRST COST (Oct 2016): $720,000 Shoelace Park (North and South) Tentatively Selected Plan Design: Restoration of Bronx River reach to pre-industrialization conditions: realigns channel with natural meanders and restores large tracts of forested wetlands along the banks. Entire channel modification with instream structures (6,680 linear ft.): restoration of natural pools, thalweg, riffle complexes, etc., resulting in a substantial increase of aquatic habitat value. Bank stabilization with environmental engineering techniques that provide vegetation coverage along the banks (11,620 linear ft., on both sides). Select native plantings (6.5 ac) would provide a wooded riparian corridor along the banks of the entire reach. The riparian woodlands and restored forested wetlands would provide habitat resources that are currently very limited in the Bronx urban environment and reduce nutrient inputs to the water. Sediment load reduction with bank stabilization and installation of rain gardens, bioretention basins, etc. Invasive removal and select native plantings. Public access to the river would be maintained. PROJECT FIRST COST (Oct 2016): $25,010,000

Muskrat Cove Tentatively Selected Plan Design: Invasive species removal with native plantings on the upland slopes and along both banks throughout the length of the site (~0.49 ac ). River bank stabilization between Nereid Avenue and the rail line bridge over the river, construction of vegetated cribwalls, softening using drilling with native plant materials (1,350 linear ft.). Removal of debris and log jams from the river (1.24 ac). Channel modification along two segments (1.24 ac), excavation and replacement of bed material, and construction of instream cross vanes and J-hooks. Installation of a sediment basin at an existing outfall to reduce sediment loads. PROJECT FIRST COST (2016): $7,840,000 Bronxville Lake Tentatively Selected Plan Design: Channel bed restoration with excavation and bedding stone installation (~1.28 ac). Creation of emergent wetlands in narrow strips along the banks of the lake (0.59 ac). Creation of forested and scrub/shrub wetlands around sections of lake perimeter and in filled areas (2.90 ac). Modification of the existing rock weir at the southern end of the lake to facilitate fish passage. Removal invasive vegetation and replacement/addition of native species (1.40 ac). Sediment dredging in two small sections of the channel. Sediment load reduction with installation of vegetated swales, bioretention basins, and rain gardens at three locations (0.24 ac). PROJECT FIRST COST (Oct 2016): $14,530,000 Crestwood Lake Tentatively Selected Plan Design: Native planting of upland trees and shrubs at three location in the western portion of the site along the Bronx River Parkway areas. Invasive species removal and native planting along the lake shore and at two other locations near the weir (1.3 ac). Channel realignment, replacement of bed material and construction of 11 instream cross vanes (1.2 ac). Creation of emergent wetlands (4.8 acres) between the channel and the lake banks. PROJECT FIRST COST (Oct 2016): $27,610,000

Garth Woods/Harney Road Tentatively Selected Plan Design: Modification of the existing weir at the southern end of the site to promote fish passage. Modification of 0.85 acres of the river channel upstream of Harney Road and a short off-site section of river channel downstream of the weir by replacing the bed material and construction of approximately 15 instream cross vanes. Creation of 0.79 acres of emergent wetlands along both shores of the river. Installation of native upland trees and shrubs between the created emergent wetlands on the east shore and the paved path. Construction of three culverts under the southbound lanes of Bronx River Parkway to transfer river water to emergent cattail-dominated wetlands created throughout most of the maintained lawn area on the west side. Removal of 0.03 acres of invasive Japanese knotweed from the west bank of the river, just north of Harney Road, and replacement with native, upland, or wetland shrubs and herbaceous vegetation. Installation of a raingarden/bioretention area at the upstream end of the buried storm drain. Softening a segment (190 linear feet) of the west bank of the river, down of the weir, by constructing a stacked rock wall with brush layers. Creation of forested and scrub/shrub wetlands along the west bank of the river at the upstream end of the site (0.03 ac ). Select native plantings in the adjacent lawn, on both sides of the paved path (0.14 ac). Removal of invasive species near the northern border of the site and replacement with native upland or wetland shrubs and herbaceous vegetation (0.02 ac). PROJECT FIRST COST (Oct 2016): $7,200,000 Westchester County Center Tentatively Selected Plan Design: Channel modification (0.83 ac), excavation and replacement of bed material, and installation of 10 in-stream cross vanes and six (6) J-hooks Creation of emergent wetlands along both shores of the Bronx River and Manhattan Brook. Construction of in-stream sediment basins in Manhattan Brook and at the Fulton Brook confluence with the Bronx River. Construction of channel plugs at the upstream and downstream ends of the channel on the west side of the island will shift the Fulton Brook confluence to the east. Native planting of upland trees and shrubs along the west side of the Bronx River Parkway northbound lanes (~3.7 ac). Removal of invasive vegetation at two locations along the eastern boundary of the site and Manhattan Brook. Native planting along channel (0.28 ac). Creation emergent wetlands along the east and west banks of the channel. Construction of a 500-foot-long paved path to divert pedestrian traffic away from emergent wetlands creation. Bank stabilization on the west bank with a tiered rock slope, and on the east bank with a stacked rock wall (285 linear ft.). PROJECT FIRST COST (Oct 2016): $14,520,000