TECHNICAL SPECIFICATION Lighting Systems. Festival Theatre

Similar documents
Technical Information Pack

TECHNICAL SPECIFICATIONS

Technical Rider Preliminary, version 1.0 April 2018

The SEC Armadillo CDM Information

GAIETY TECHNICAL SPECIFICATION

RIVERSIDE THEATRES Corner Church St & Market St Parramatta NSW PO Box 3636 Parramatta NSW

GAIETY TECHNICAL SPECIFICATION

V-PIX Vision Bar LED Pixel Bar Light. User Manual KEEP THIS MANUAL FOR FURTURE NEEDS

PARK CENTER SENIOR HIGH

The Basement Risk Assessment Form

EPAR TRI. install guide. ELATION EPAR TRI install guide

Notes on Stage Map Page 18. DOn t glue it in YET

Bush House buildings. Contractor Site induction

ARCSYSTEM. Fully-dimmable LED lighting for auditoriums, retail and commercial installations

BUSINESS PLAN CEN/TC 433 ENTERTAINMENT TECHNOLOGY EXECUTIVE SUMMARY

VENUE INFORMATION FOR SCHOOLS

Projecteur bain de pieds LED - Blanc variable LED - Variable White Footlight. Model Length Power S

TECHNICAL INFORMATION PACK. Main Auditorium. Carrick Street Ayr KA7 1NU TEL:

FOS Lifting Ball DMX 1

FOS Strobe Light Bar 1

PRODUCTION MANUAL 2017

Whaleys School Stage Set Up Guide

Emergency Response. Types of Emergencies

PRODUCT SPECIFICATIONS

Custom Stage Curtains Theatrical Lighting Rigging Design/Installation/Inspection Since 1856

Spier Conference Centre

Bloomsburg University of Pennsylvania Hot Work Safety Program Effective Date: July 1, 2015

INSTALLATION INSTRUCTIONS NeoSol DS LED Horticulture Fixture

INDUCTION MANUAL CONTRACTORS & SERVICE PROVIDERS. Convention Square, 1 Lower Long Street, Cape Town 8001, South Africa

The Bridgewater Hall

Event Management CHECKLIST

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

FRIDAY, NOVEMBER 23, WORKPLACE SAFETY AND HEALTH (APPROVED CODES OF PRACTICE) NOTIFICATION 2018

EVENT SAFETY INFORMATION Name of Event: Date of Event: Name of Main Function Room: Contact Name: Contact Telephone Number:

OPERATION GLOW. Effects. THIS IS THE SIGNATURE MISSION OF OPERATION GLOW! For Outdoors and Outdoors

Diva Acoustical Shell

Fire Risk Assessment

HWD DRILLING RIG PRE-SPUD SAFETY INSPECTION-HWD 1000 RIGS

CONTRACTOR GUIDELINES

USER MANUAL Table of Contents

Lindsey Beane. Executive Summary

Contractor Site Induction. Hampstead Residence London NW3 7ST

LightStation by SENNA

LYRA DMX Lyra Bi-Color Studio Light with DMX Control

EXAMPLES ONLY EVENTS SAFETY MANAGEMENT PLAN (RISK ASSESSMENT) (APPENDIX C)

PLANNING AND MANAGEMENT GUIDE for PUBLIC ASSEMBLY EVENTS

GENERAL STAND BUILDING REGULATIONS AND INFORMATION

Grand Auditorium of the Maison De La Radio By AS Architecture Studio

Technical Information Handbook

USER MANUAL Table of Contents

Oil Sands Safety Association (OSSA) Regional Orientation Program

Appendix 29. Mount Emerald Wind Farm Fire Management Plan Prepared by RATCH Australia Corporation Limited

dmx traits MODE / CHANNEL BASIC STAND EXTEND

Great Dover Street London SE1 4XA Directorate of Estates & Facilities - Document No. HS30 V2.1 Dated November 2014

Operation & Maintenance Manual

Iroquois theatre, Chicago, The fire in this newly opened but badly planned theatre in Chicago in January 1904 caused 572 deaths

Underfloor Air Distribution:

Director, Community Planning, North York District

Kam StarWash Multicolour wash effects with green & red star cluster laser

Accessibility Statement

Table of contents 2 / 8

INTRODUCTION TO PERFORMING ARTS TERMINOLOGY

Sports Grounds Directorate of Estates & Facilities - Document No. HS33 V2.1 Dated December 2014

Fire Risk Assessment. A safety guide for users of the hall

LYRA DMX Lyra Bi-Color DMX Flat Panel Light

USER MANUAL Table of Contents

CHRISTMAS 2017 AT. The Postal Museum TECHNICAL PRODUCTION PACKAGES

Lake Macquarie Performing Arts Centre Operating Manual

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau. Permit fees shall be assessed in accordance with the Permit Fee Schedule

Guy s Campus Directorate of Estates & Facilities - Document No. HS16 V4 Dated January 2014

Plan GRAND RENEWABLE WIND LP HALDIMAND COUNTY ONTARIO AUG 26, 2013

TX1 ArcMesh transmitter

FURNISHINGS FOR WINDOWS OR DOORS (concerned with the functioning of the door or window E05; roller blinds E06B)

Event Safety Check List

Risk Management for an Event example

Carbon Film Installation Instructions

NOTE TO SPECIFYING ARCHITECT REGARDING SECTION PERFORMANCE LIGHTING SYSTEM (24 DIMMERS)

Par 16 with GU10 Socket

Residential Life Guide

GZ3584. Gazebo Curtain Installation Instructions. Systems Trading Corporation Customer service: (877)

TOUR-HAZER II Short manual

UNIVERSITY COLLEGE LONDON PREMISES FIRE SAFETY HANDBOOK. Regulatory Reform (Fire Safety) Order 2005 DARWIN BUILDING

Fantastic Laser SPECIFICATIONS. Mains Input: Total Power: Laser Power:

MONRO PAVILION RISK ASSESSMENT FORM. Date(s) Monday 1 Wednesday 3 July. External Contact & Nos Sarah Taylor - Venue Information

Building Consent Application Compliance Schedule Information

W-715X... Fog machine FLC liter container of water-based fluid for W C Cleaning solution

Fire Alarm System Accessories

ISD 279 Osseo Area Schools Park Center Senior High School. Auditorium Handbook

PATRICIA GEORGE DECIO MAINSTAGE THEATRE

Event Production Tutorial

B. It is recognized that these standards are updated irregularly and lighting technology is changing rapidly.

Chandler City Hall Chandler, Arizona

ENCORE BURST 200. user manual

Chapter 14, Problem 27.

Unison Echo Room Controller

Stone rose. Zaha Hadid s pebble-inspired. opera house blossoms in Guangzhou

Altman Lighting Spectra Cyc UV 50 Specification

EXHIBIT. PUD Written Description

I. It shall be the responsibility of the department officers to implement this operating guideline.

User Manual LIGHTMEN.COM. Apollo A75050

Transcription:

TECHNICAL SPECIFICATION Lighting Systems Festival Theatre Introduction & Orientation 1. INFRASTRUCTURE 2. HOUSE RIGS 3. RIGGING 4. ACCESS 5. SPECIAL EFFECTS Updated On 03 07 2018 1

INTRODUCTION AND ORIENTATION The lighting control position is at the rear of the auditorium in a semi soundproof box. The DSM position is in the same room. Adjacent is a second box for sound with our sound desk and outboard permanently installed. It is not possible to open the windows of the control box on the lighting side. There is an area to the auditorium right of the control box which can be used for visiting sound or lighting deskshowever seats need to be taken off sale to do this so please discuss requirements asap. The cable run distances from normal/touring desk positions are; Gallery Upstage Left is approx Upstage Right is approx Scene Dock is approx 60m/60m 70m/70m 80m/100m 95m/115m House lighting desk can be moved to the auditorium for plotting if required but this is a time consuming process so allowance should be made in the production schedule to do this particularly prior to opening the house Standard position for touring dimmers is Upstage Right ideally on gallery level, touring sound is Upstage Left. Temporary power for lighting or motors is on the gallery upstage centre- 200A TPNE on powerlock, 63A TPNE Ceeform, 32A TPNE. Get in is via a scenery lift in the scene dock immediately upstage of the stage. There is limited storage for equipment in the scene dock, to be negotiated with other departments. It is usually not possible to leave a trailer outside the dock door for longer than a day unless arranged in advance. CFT has a fixed rig with no flying facilities, please see details below. Updated On 03 07 2018 2

1. Infrastructure 1.1 Control desk ETC EOS programming console, can be installed in the auditorium for programming. Playback via ETC Gio. ETC RPU backup 1.2 Network Fully patchable Cat5e network with substantial facility panel distribution across the grid, gallery, stage and sub stage. A variety of network nodes available on the ETC Net3 protocol 1.3 DMX Fully patchable DMX network to substantial facility panel distribution across the grid, gallery, stage and sub stage. 1.4 Dimmers 450 ways at 3K and 5K dimmers and non dims, ETC Sensor 3 with RCD protection. 1.5 Distribution Hard wired system terminating at facility panels either on socapex or 15A outlets feeding a flexible system of IWB s. 1.6 Temporary power 3 facility panels- Substage, Scene dock and Gallery. Each panel has 200A TPNE powerlock with adjustable RCD, 63A and 32A TPNE ceeform. CFT has a variety of further power distro available upon request. ****PLEASE DISCUSS YOUR ADDITIONAL POWER REQUIREMENTS PRIOR TO VISIT**** 1.7 Overhead rig Fixed rig, please see plan for bar heights and layout. All kit must be rigged by rope Rig accessed from overhead catwalks and crawl spaces Rig distributed by mixture of IWB outlets and temporary socapex cabling all on 15A Moving lights are rigged via block and tackle as required. ***ONLY TRAINED AND STAFF INDUCTED IN CFT WORKING AT HEIGHT PRACTICES MAY*** ACCESS THE GRID. Updated On 03 07 2018 3

2. House rig Due to the nature of Chichester s fixed lighting rig and in an effort to reduce rigging time there is a permanent house rig. Please see details below for the focus of this and see the focus schematic at the bottom of the house plan Visiting equipment for rigging must have suitable suspension devices, be PAT tested and be in serviceable condition. Please note the CFT uses 15A and socapex multicore cabling. All in house DMX is 5 pin, and data is Cat5 standard. 2.1 House rig Focus Full stage wash from both sides lit with Source 4 pars wearing 21 frame scrollers. This is a fixed focus wash. 2 FOH bars with source 4 15/30 zooms to provide various FOH covers as required by individual productions Equivalent advance bar/lx1 of profiles for specials 30 x 2KW Fresnels. These can be refocused as per your requirements. They are capable of providing a full stage O/W top light coverage, or as a 3 colour wash from top and both sides or as required. They are in fixed positions Backlight parcans overhead for localized top lights Source 4 LED LUSTR 2 profiles in voms and balcony front providing a low side and pit rail style coverage as required. (Please note that as the Festival stage is a thrust/ arena format it is not possible to achieve a full stage side light as you will blind the opposite seating banks.) There is additional house equipment that can be rigged in addition to the basic rig covers- being a non-flying house this is time consuming so a pre rig may be advisable. 2.2 Followspots There are 2 follow spot positions in the roof of the theatre with Robert Juliat Lucy 1.2K HMI fixtures. Only in house trained staff can access and use these positions. It is not possible for visiting company members to use these spots. Updated On 03 07 2018 4

3 Rigging 3.1 Overhead rigging of additional kit can only be undertaken by house staff that have been trained and inducted in work practices 3.2 In some circumstances visiting companies representatives may be inducted in working at height in the spaces but they must sign and adhere to the theatres policies, risk assessments and method statements at all times 3.3 Items required to be flown during the performance must be discussed prior to your arrival and ideally following a site visit. The CFT has no fly tower in either performance space so is very limited in its flying capabilities. 3.4 If you intend to suspend truss or use motors you must discuss this with CFT technical staff prior to your arrival. 4 Access 4.1 Roof access is via catwalk primarily using harnesses, work positioning lanyards and fall arrest systems 4.2 Additional access is via Tallescope, genie lift, scaff tower or a variety of ladders and A-frames 5 Special effects 5.1 CFT does not possess a fire curtain so comes under far greater scrutiny from licensing bodies and fire departments than most regional venues. CFT must be advised of the intention to use special effects including smoking on stage so that relevant permissions can be sought at least 2 weeks in advance 5.2 Smoke, pyrotechnic and strobe effects must be discussed with theatre staff at least 2 weeks in advance 5.3 House machines 2 x MDG atmosphere ATMe haze machines (permanently installed) 1 x Look viper 2.6 with switched fan outlet 1 x Le Maitre freezefog for use with above (ducting, fans etc available) 1 x Look Viper NT 2 x Look Power Tiny 2 x Look tiny FX 2 x radio remote units for tiny machines *Please note you will be recharged for the cost of smoke fluid if using in-house machines* 5.4 Pyro There is secure registered storage on site for a limited number of pyrotechnics. 5.6 Smoke detection The CFT has an addressable smoke detection system. Please inform the house personnel before activating any effects that produce smoke so that detectors can be isolated. Updated On 03 07 2018 5

5.7 Strobes Strobe use must be demonstrated and approved by house staff before use, and must fall within legal limits. CFT has 3 dataflash units. Notice required of any intention to use them. 5.8 Signage Appropriate signage must be put at all doors for audience information of any special effects. The theatre can produce and post these please advise of your requirements ***PLEASE NOTE THE VENUE RESERVES THE RIGHT TO LIMIT, ALTER OR*** REMOVE FROM USE ANY SPECIAL EFFECTS THAT CONTRAVENE THE TERMS OF ITS LICENCE 6. Site visits We would strongly recommend you have a site visit prior to your arrival at the CFT. The CFT and Minerva studio are very unique spaces with a number of challenges. The CFT has a lot of experience in adapting proscenium based shows to its thrust stage and our staff will be very happy to assist and advise on the best way of adapting your production to fit into our venues. 6.2 Contacts: Stage Door 01243 784437 Box Office 01243 781312 Fax- 01243 787288 Brasserie 01243 782219 Technical- 01243 812921 Theatre Manager Janet Bakose ext 2166 House manager- Ben Geering ext 2211 Marketing- Lydia Cassidy ext 2206 Tech Director Sam Garner-Gibbons ext 2156 Head of Stage Karl Meier- ext 2205 Head of Sound Mike Keniger ext 2183 Head of Lighting- Graham Taylor ext 8547 Education - ext 2121 Updated On 03 07 2018 6