Key Principles. 290 Phasing Principles and Programme

Similar documents
SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

Newcourt Masterplan. November Exeter Local Development Framework

Planning and Regulatory Committee 20 May Applicant Local Councillor Purpose of Report

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal

Kibworth Harcourt. Introduction. Introduction

Drainage. Alignment K:\D (D102241) SHERFORD\CONSOLIDATED PLANNING DOCUMENTS\MAIN STREET\SHERFORD MAIN STREET NARRATIVE REVISION

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

Secondary School to Haye Road

WELCOME. North East Haverhill. The Planning Process

Public Consultation 23 January Peel Hall, Warrington Board 1. A message from Satnam... Site history...

1. Welcome. Background

Sherford. Town Code. town code. Sherford

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

DONCASTER METROPOLITAN BOROUGH COUNCIL. PLANNING COMMITTEE - 15th October Expiry Date:

1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham

Main Street: Deep Lane Junction to Stanborough Cross. Sherford. main street. November 2006

SPG 1. * the northern and western sections which are open fields used for pasture and grazing;

8.0 Design and Form of Development 43/

LOW DENSITY RESIDENTIAL

ALLERTHORPE NEIGHBOURHOOD PLAN

6 Growth Management Challenges and Opportunities

Public Consultation. Land at Monks Farm, North Grove. Welcome

WINCHESTER TOWN 3.1 LOCATION, CHARACTERISTICS & SETTING

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

Woodbrook - Shanganagh

Colchester Northern Gateway Master Plan Vision Review Draft. July 2016

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane

Story Homes. Land at Thirsk Road, Kirklevington. An Introduction to Story Homes. Our Foundations. Commitment to Consultation.

BLETCHLEY PARK AREA - DEVELOPMENT FRAMEWORK

Welcome to our public exhibition

Longbridge Town Centre Phase 2 Planning Application

Welford-on-Avon Neighbourhood Plan Consultation Event Sunday, 6 April Your name Your address

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

Oteley Road South Shrewsbury

4 RESIDENTIAL ZONE. 4.1 Background

Land at Rampton Road. Cottenham

Horwood Map of London, Westminster & Southwark First edition

Welcome to our exhibition

Create Policy Options Draft Plan Plan Approval. Public Consultation Events. Phase 2

Welcome to our public exhibition

Application Guide. Should you have any questions on the Outline Application please contact:

Paignton Neighbourhood Plan (Submission version 2017)

A BEAUTIFUL PLACE FOR LIVING

PROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM

FOR SALE RESIDENTIAL DEVELOPMENT OPPORTUNITY BLAIRTUMMOCK EASTERHOUSE

OKEFORD FITZPAINE NEIGHBOURHOOD PLAN

Built Up Area Boundary (BUAB)

CENTRAL BEDFORDSHIRE COMMITTED TO WORKING TOGETHER WITH LOCAL COMMUNITIES

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Welcome to our public exhibition

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

01 the vision NEW LYNN IS WAITING FOR THE GREAT LEAP FORWARD

Making the case for Sustainable Transport Project Potential

Welcome. Proposals for land at Smug Oak Lane BRICKET WOOD

Sustainability Statement. Whitby Business Park Area Action Plan

GREENFORD HALL & ADJOINING LAND

Proposed Amendment to the

Anston House, Brighton

UTT/16/1466/DFO GREAT DUNMOW MAJOR

I615. Westgate Precinct

LITTLE FRANCE PARK, EDINBURGH

1. Welcome. Land at Cribbs Causeway. January The Joint Venture. Today s Exhibition. Project Team.

1. Creating a liveable, vibrant, safe and inclusive city centre for the benefit of people of all ages to live, work, learn and enjoy.

The journey so far. The new masterplan for Dargavel Village

1. Nantwich - Planning for a Sustainable Future

Our City Centre is a vibrant, creative and welcoming destination, with a modern business, cultural, shopping, leisure and residential offer

Elderberry Walk. Developer HAB Housing

Welcome to our public exhibition

Former North Works, Lickey Road, Longbridge, Birmingham

WELCOME TO THE NEW WILTON PARK

Briefing Document of CNP. June 2017

20. Ballysadare Mini-Plan

PLANNING STATEMENT. Market House Market Place Kingston upon Thames KT1 1JS

Reserved Matters application for a site that straddles the boundary between CBC and BBC

Ebbsfleet Development Corporation

LAND EAST OF SUDBURY ROAD, HALSTEAD PUBLIC CONSULTATION. Proposed Residential Development

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

SUB AREA 3 CENTRAL STRATFORD AND SOUTHERN QUEEN ELIZABETH OLYMPIC PARK

EXTRACT FROM THE CUDDINGTON NEIGHBOURHOOD PLAN The Policies

Neighbourhood Planning Local Green Spaces

Taking forward the All London Green Grid

Response to the London Bridge Area Vision and Site Allocations within the New Southwark Plan

LAND OFF TOLLBAR WAY, HEDGE END PUBLIC CONSULTATION. Proposed Residential Development

Test Valley Borough Council Southern Area Planning Committee 8 January 2019

Repton Parish Neighbourhood Development Plan - Consultation March 2017

elbridge Core Strategy

Memorial Business Park Site. Proposed Future Development. Design guidelines. August

RE: THE MALL, WALTHAMSTOW PLANNING APPLICATION REF: 17/1355 RESPONSE TO LBWF NEIGHBOUR CONSULTATION

Stantonbury Neighbourhood Plan

Stratford Neighbourhood Plan Questionnaire

Welcome to the Oakridge Centre Open House

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Contents. Milton Keynes Council Site Allocations Plan, Adoption Version

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

SWLP 42: Worcester City Centre

The Gwennap Parish Vision Statement

Transcription:

4 Phasing principles and programme 4c The aims of the phasing strategy are to satisfy planning policy requirements and create a sustainable, strong and healthy new community where, from the outset, people will choose to live, work and spend their leisure time. To achieve this, Sherford will be phased in order to deliver key transport and community infrastructure from the outset of development. The South Hams District Council (SHDC) Sherford AAP (Policy SNC17) requires that the planning application indicates the detailed phasing arrangements and, thereby, demonstrates the sustainability deliverables. In preparing its phasing strategy, Red Tree has worked closely with SHDC and its partner authorities. The proposals accord with the SHDC Sherford AAP and are consistent with phasing material presented by Red Tree to the SHDC Core Strategy Examination in July 2006. The proposals also accord with the requirements of the North Plymstock AAP as submitted by Plymouth City Council. Key Principles In order to achieve the stated aims, the phasing strategy takes into account the following key principles: create an individual identity for the new community from the outset by establishing a sense of place, focused around the town centre where quality mixeduse public space is established create enclosure around the High Street centre establish early opportunities for onsite retail activity and the creation of a commercial and active heart for the development begin the phasing of each neighbourhood at the key public and community buildings located at the neighbourhood core Arrange highway/footpath diversions and stopping up prior to each phase as required beyond the Main Street, development will progress outwards along other key streets implement efficient sustainable urban drainage systems (SUDS) maximise walkability opportunities at all stages maximise opportunities to build up school rolls in a rapid timeframe, reinforcing the individual identity and personality of each neighbourhood achieve multiple housing character areas in each phase in order to maximise market interest and housing choice deliver the maximum range of community facilities from within the first two major 290 Phasing Principles and Programme

4c Phasing Principles and Programme neighbourhoods before establishing the North East neighbourhood closer to Deep Lane junction establish active frontage to open space in order to enhance surveillance and Secure by Design principles deliver attractive solutions for green and public space within the builtup area accessible to each phase of development create new and exciting sport and recreation facilities accessible to each phase of development deliver a coherent and attractive Community Park accessible to each phase of development These principles will enable Sherford to develop progressively in a logical and coherent fashion. This will have the benefit of extending the sense of place and enable varied character to be achieved. Phasing Increments The Devon Structure Plan requires Sherford to deliver up to 4,000 dwellings by 2016. The phasing strategy responds to this requirement and demonstrates how it can be achieved. Assuming that planning permission will be granted in mid 2007, in accordance with the SHDC AAP, it is anticipated that by the start of 2008 activity on site will commence with the construction of the Main Street and other key infrastructure. It is anticipated that new housing will be available from the second year of construction. As shown on the Figure 1, the overall development is anticipated to be delivered in four (3 year) phases, beginning in 2008. Figure 1 Phasing of dwellings 291

The more detailed phasing is described in the following Tables for each phase, with appropriate triggers identified. These triggers will inform the timing of delivery of the appropriate social and physical infrastructure. Phase 1 (see Table 1) By the end of Phase 1 the first walkable central neighbourhood will have been delivered and an initial identity will have been established for Sherford. At this stage there will be provided a large number of one and two bedroom flats within and above the mixeduse space in the town centre. In order for Sherford to attract the genuine social mix of families with children that is appropriate for a sustainable new community the developer will ensure that the initial phase of construction includes blocks of land that have a high proportion of family homes within them. Whilst this may, in the early years, lead to slightly disjointed development it will ensure that Sherford attracts people from all walks of life and in doing so draw a diversity of employers to the town. With 700 dwellings complete the population is likely to be around 1,500. For initial and future families, the first Primary School will be in place. As part of Sherford s developing relationship with existing communities to the south, it is intended that the south west Sports fields provision will be in place by the end of the phase. The Sports Hall will be operational. In order to deliver with strategic objectives, the Main Street connection will be complete as will the Park and Ride Interchange. A commitment to completing the Park and Ride at an early stage facilitates the initial HQPT and provides for considerable vehicle diversion off the A38. The Town Hall will be operational and its initial profile in terms of asset ownership, staffing and role remit as described in the Community Trust Strategy will be in place. Phase 2 (see Table 2) By the end of Phase 2 Sherford s built form and community will have become established. Schools will be in place, together with facilities for play, sport and young people. Other community facilities will be available and the Main Street, including the Town Centre High Street, will have begun to mature. Fundamental to this phase of development is the delivery of the combined Health and Social Care Centre. The campus, at the very centre of Sherford, will include a Children s Day Care Centre and also provide a rest facility for the emergency ambulance service. The centre, with its whole citizen approach, will allow Sherford to deliver a joinedup service delivery of health and social services to Sherford and the surrounding area, all within easy walking distance of the High Street and the High Quality Public Transport Service. By the end of this phase, some 2,300 new homes will have been built and occupied and the population is expected to be about 5,600. Phase 3 (see Table 3) By the end of Phase 3, 4,000 dwellings will have been built to achieve the requirements of the current Structure Plan period. The population will have increased to about 8,800 people. Two walkable neighbourhoods will have been substantially completed, together with most of the infrastructure required to support the completed development, including the Community Park and all the sports facilities. By this time, it is anticipated that Sherford will have established a very clear identity for itself and, in addition, strong links will have become established with existing communities. 292 Phasing Principles and Programme

Phase 4 (see Table 4) The only other temporary facility of note will be the location of the second (south west neighbourhood) primary school within shared space in the secondary school. The timing for this arrangement has already been described above. As new homes in the Southern neighbourhood are equidistant from all Primary Schools, the third Primary School may be advanced if the first and second schools achieve complete rolls. With the completion of this phase the north east neighbourhood will be completed and the final 1500 homes built. Together with new housing it is anticipated that Sherford will begin to mature as a place to live and work. By the end of this Phase it is expected that regeneration of other areas within Plymouth will have been completed. As a consequence it is expected that the City Council s current growth vision will have contributed towards a much brighter future for the city and a much improved and buoyant economy. Temporary Sites Until the Town Hall is built and completed, local community facilities, such as local government activities, Community Trust offices, Crime Prevention Officer and library, can be accommodated in a number of different ways. The building of the High Street, in order to create a sense of place, will, in itself, create areas of retail and commercial space that will be unlet until greater numbers of residents move to the Town. Further, temporary structures can be used. These have the added advantage of being portable and therefore able to be moved to the areas of need that will change as the Town grows. Finally, if appropriate, unused space within the first primary school can be utilised. This has the added advantage of placing the school firmly at the heart of the community. Monitor and Manage It is anticipated that 5,500 homes at Sherford will be completed by 2020. In advance of that, decisions on future extension into the panhandle north west of Sherford (North Plymstock AAP: Proposal NP16) may be taken by Plymouth City Council. Such decisions may impact upon this phasing strategy. In any event it is expected that delivery of Sherford will be monitored closely and the planmaking strategies of South Hams and Plymouth can take into account any necessary phasing adjustments. In these circumstances it is unlikely that any of the key principles underlying the strategy described will be changed. As implementation proceeds, it may be necessary to adjust this phasing strategy, if unexpected events and/or opportunities arise that necessitate a change. However, any such change will need to be justified, including by reference to the phasing principles described earlier in this strategy. Phasing Principles and Programme 4c When the Town Hall is available this will provide meeting rooms which can be used by local community groups. The Church of England will have access to the Town Hall meeting rooms until Red Tree makes a permanent site available for a meeting facility, possibly a church. 293

Table 1: Phase 1 Category Actions Any Comment or Specific Triggers Dwellings 700 completed Education Build first Primary School with playing fields. Initial classrooms available by 1st dwelling occupation in the central neighbourhood; completed by 100th occupation. Community Establish Town Hall. Temporary offices/meeting rooms within available retail space or, if more appropriate, spare buildings within the first primary school. By the end of phase 1 the Town Hall will be operational. Health Public Space and Sports (for full details reference the detailed Strategy) Establish maintenance depot area and repair/reuse centre. Make available site for Health Care Centre (it is expected that the facility will be open by Year 4). Establish playing fields for the south west Sports provision and Secondary School. Advance planting and defining the necessary wildlife corridors. Establish detailed plan for Community Park and advanced planting. Establish Sports Hall at Elburton Edge. Upgrade Vealeholme Wood to incorporate LEAP and Bowling Green. Initiate development for Organic Farm and allotments. Establish links to National Cycle Network routes. Commercial Establish Retail /MixedUse town centre. Access and Transport Infrastructure Approximately 157 commercial units developed. Arrange necessary highway / footpath diversions Temporary facilities for onsite doctors/ dentist will be available within spare retail space or onsite temporary buildings. Years 2 and 3 Prior to removal of existing Year 1 Complete open area facilities by end of Phase 1 End of Phase 1 Year 1 Complete Main Street Years 1 and 2 Establish Park & Ride Stage 1 improvements to Deep Lane junction, including new westbound slip road. Undertake initial improvements to A379 corridor to identify bus lanes. Gas main and overhead electricity line diverted and buried. Surface water drainage, foul drainage and other utility provision Community Wind Turbines 500 spaces by the 1st dwelling occupation, 1,000 spaces by the end of Phase 1. By end of Year 2 Prior to first occupation. Initial facilities available by the first occupation. Expanding in line with housing completions. First turbine will be operational 294 Phasing Principles and Programme

Table 2: Phase 2 Category Actions Any Comment or Specific Triggers Dwellings 1,600 completed Education Establish Secondary School Initial phase to provide accommodation for 200 pupils Community Health Public Space and Sports Commercial Access and Transport Accommodate the second Primary School temporarily within the Secondary School building. Establish the Youth Centre on edge of Sherford Quarry and the Forest School within the Quarry. Health Centre opens. The Health Centre campus will incorporate areas for a Children s Day Care Centre and an Adult Social Care Centre. Continue the establishment of greenways and wildlife corridors. LEAPS/LAPS are completed within the Phase 1 and Phase 2 areas. Finalise plans and complete works for the Community Park. Complete Sports Hall, including Swimming Pool and all associated sports facilities. Establish south west neighbourhood centre Approximately 186 units developed. Arrange necessary highway / footpath diversions Stage 2 improvements to Deep Lane junction completed. Proposed improvements to Red Lion Hill completed. Improvements west of Stanborough Cross are required. Initial classrooms available by 1st occupation of south west neighbourhood. Years 4 and 5 Year 4 Year 4 Subject to monitoring of traffic flows and HQPT service. Phasing Principles and Programme 4c 295

Table 3: Phase 3 Category Actions Any Comment or Specific Triggers Dwellings 1,700 completed Education Public Space and Sports Commercial Access and Transport Second Primary School established in its permanent location Secondary School fully operational. Establish the site for the third Primary School. Complete West Sherford Wood park and green corridor alongside East Sherford Farm. Initiate the sports facilities in the north of the Community Park. Create the northsouth green corridor between the A38 and the Community Park for the north east neighbourhood. Complete southern neighbourhood core and area north of the town centre which is likely to incorporate business uses. Approximately 207 units developed. Arrange necessary highway / footpath diversions Northern and Southern Avenues built and fully operational providing route alternatives to Main Street and facilitating onsite permeability. High Street HQPT bus may displace parking in the central lane Complete by 100th dwelling occupation in the south west neighbourhood. Year 9 Years 79 Year 7 Subject to monitoring of the HQPT bus speed and reliability. 296 Phasing Principles and Programme

Table 4: Phase 4 Category Actions Any Comment or Specific Triggers Dwellings 1,500 completed Education Complete the third Primary School Initial classrooms available by 1st dwelling occupation of the north east neighbourhood, complete by 100th occupation. Public Space and Sports Commercial Complete sports facilities in the north of the Community Park. Establish the north east neighbourhood centre and business uses along the A38 and around the Park and Ride. Remaining 211 units developed. Infrastructure Community Wind Turbines Second wind turbine will be operational Access and Transport Arrange necessary highway / footpath diversions Year 10 Phasing Principles and Programme 4c 297