Background on LID in Western WA

Similar documents
5/22/2012. Low Impact Development through NPDES Permits TAKE AWAY MESSAGES. Municipal Stormwater NPDES Permits

New Development Stormwater Guidelines

2/10/2017 INSTRUCTORS WESTERN WASHINGTON. REBECCA DUGOPOLSKI, PE Senior Engineer Key project experience: Stormwater monitoring,

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

Annual Reporting for FY Regional Supplement for New Development and Redevelopment

STORMWATER PERMIT SUBMITTAL REQUIREMENTS

SITING CONSIDERATIONS

Low Impact Development Short Course for Developers and Builders

Stormwater Drainage Assessment For Single Family Residence

SITING CONSIDERATIONS

Low-Impact Development Code Update. Thurston County Community Stakeholder Group June 25, 2015

Appendix D - Technical Design Criteria for BMPs

Stormwater Management Guidance Manual: Customizing and optimizing stormwater requirements for port-specific land uses and customers.

1/31/2017 INSTRUCTORS AGENDA. introduction. hydrologic modeling basics. performance standards. BMP modeling specifics. wrap up

Community LID Workgroup Issue Paper #6

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

New Tools/Resources for

Public Works Department 104 W. Magnolia Street, Suite 109 Bellingham, WA (360)

Stormwater Control Plan: Small (Tier 1) Land Development Project

Directors Rules for Seattle Municipal Code, Chapters Stormwater Code

ANSWER KEY MGSFlood v WWHM2012 (released 5/15/2015)

Appendix I. Checklists

CHAPTER 5 - STORMWATER "URBAN SERVICES STANDARDS AND GUIDELINES" CITY OF PORT ANGELES - PUBLIC WORKS & UTILITIES DEPARTMENT

03/10/2015 PROGRAM OVERVIEW OVERVIEW OF PROGRAM

SUPPORTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WORKSHEET

Update on Homeowner BMPs

My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda

City of South Portland Stormwater Manual

3. Are there any projects exempt from the definition of Regulated Projects?

Guidelines and Princi les FINANCIAL ACTION SUMMARY

Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

C.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Draft Rhode Island Stormwater Design and Installation Standards Manual

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

Session 1E Non-Structural BMPs. Chesapeake Bay Stormwater Training Partnership 1

Lesson 2: Stormwater Best Management Practices (BMPs)

Presentation Outline

Standards Manual. RIDOT Workshop. Design Strategies: How to Meet Minimum Standard No. 1 July 13, 2011

LID Permit Requirements. Lisa Austin. Geosyntec Consultants

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects

Salmon Safe and Stormwater LID Practices

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA

Rhode Island Stormwater Design and Installation Standards Manual

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

Planning the BMP. Region 2000 Planning District Commission Lynchburg, VA December 13, 20013

Chapter 4 - Preparation of Stormwater Site Plans

Stormwater Technical Guide

Appendix E: Illustrative Green Infrastructure Examples

WHATCOM COUNTY LID CODE INTEGRATION PROJECT WCC (DEFINITIONS)

Example Stormwater Control Plan For a Commercial Project 123 Main Street Anytown, USA. February 21, 2018

DEPARTMENT OF PUBLIC WORKS & UTILITIES

Introduction Post-Construction Stormwater Management Performance Requirements

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan

Selecting Appropriate Stormwater Control Measures for Your Development Project

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

The Green Infrastructure Plan Requirement: shifting from gray to green infrastructure June 14, 2016

BASMAA Development Committee. Guidance for Identifying Green Infrastructure Potential in Municipal Capital Improvement Program Projects May 6, 2016

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

Use of Best Management Practices

Christopher J. Webb, PE. Chris Webb & Associates, Inc., PS, Bellingham, WA

Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE

Rain Gardens Water Quality the Way Mother Nature Intended

Low Impact Development a great program that helps make the best use of something we re all familiar with - rainwater. practices.

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach

J. Paul Guyer, P.E., R.A.

BIORETENTION HYDROLOGIC PERFORMANCE OF TEN FACILITIES LOCATED THROUGHOUT THE PUGET SOUND BASIN

Time Value of Money and Optimization Process

Michael Clark, P.E. & Michael Moonan, RLA Weston and Sampson Engineers & David Lachance Woodbury Ridge Developer

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

APPENDIX G: TOWN ORDINANCE REVIEW

Kearney Post-Construction Stormwater Program

Structural Stormwater Best Management Practices

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2007 SESSION LAW SENATE BILL 1967

PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA Inspections Office Fax

Why and How to Evaluate the Feasibility of Infiltrating or Harvesting and Using Stormwater. Laura Prickett, EOA, Inc.

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

West Virginia Stormwater Management Manual: Methods.

4/4/2012. Topics. Soil mixes for bioretention areas need to balance three primary design objectives for optimum performance: Bioretention Soil Mixes

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Post - Construction Hydromodification Development Requirements

Low Impact Development Code Update and Integration Training

ORDINANCE NO WHEREAS, the City provided the proposed code amendments to the Washington State Department of Commerce on September 20, 2017; and

Homeowner BMP Crediting Policy

Types and Basic Design of Post-Construction BMPs

6.2 Flow-Through Planter

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

Controlling Urban Stormwater at the University of Wisconsin - Madison

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

Article 20 Stormwater Management

Part 4: CRS Stormwater Management Activity (450) and Urban Flooding Best Practices

What Are We Inspecting? Stormwater Treatment Measure Type and Design

Example Stormwater Control Plan For a Commercial Project 123 Main Street Anytown, USA

Alternative Uses of Compost: Rain Gardens and Green Solutions for Stormwater Management

Background / Regulatory Requirements

Preparing Permit Application Submittals

Transcription:

Low Impact Development Process (MR #5) Douglas C. Howie, P.E. Department of Ecology Background on LID in Western WA PCHB Requirements from 2007 Permits Two LID Advisory Committees Expanded MR #5 LID Performance Standard List Option More than just on-site BMPs Evaluate Site Conditions (Vol. I, 3.1.1) Survey Site Layout Soils Report Infiltration Rate(s) Soil Suitability Criteria Distance to Ground Water 2 3 1

Recommended Infiltration Testing Small PIT Test Large PIT Test Grain Size D 10, D 60, D 90 Local jurisdictions can accept other Permanent Stormwater Control Plan (Vol. I, 3.1.5) Level of detail depends on MRs Specific Discussion on items to include in submittals for review LID Water Quality Flow Control 4 5 http://www.ecy.wa.gov/programs/wq/stormwater/municipal/workshopppts/lidflowchart.pdf6 2

Paths to Requirements Flow Control Exempt Basins Small Projects MR #1 - #5 only Large Projects MR #1 - #9 Inside UGA Outside UGA < 5 acres => 5 acres 7 Flow Chart for Determining LID MR #5 Requirements REQUIRED: Implement the following BMPs where feasible: BMP T5.13: Post-Construction Soil Quality and Depth BMP T5.10A, B, or C: Downspout Full Infiltration, Downspout Dispersion Systems, or Perforated Stubout Connections BMP T5.11 or T5.12: Concentrated Flow Dispersion or Sheet Flow Dispersion NOT REQUIRED: Achievement of the LID Performance Standard. Applying the other BMPs in List #1 or List #2. Flow Control Exempt Waters Does the project discharge to Flow Control Exempt Waters (per Minimum Requirement (MR) #7)? No Does the project trigger only MRs #1 - #5? (Per Figure 3.2 or Figure 3.3 in Appendix 1 of the 2013-2018 WWA Phase II Permit & Phase I Permit.) No, the project triggered only MR #2 No, the project triggered MRs #1 - #9. No additional requirements 8 Paths to Requirements Flow Control Exempt Basins Small Projects MR #1 - #5 only Large Projects MR #1 - #9 Inside UGA Outside UGA < 5 acres => 5 acres 9 3

Flow Chart for Determining LID MR #5 Requirements No, project developer chose List #1. Projects subject only to MR #1 - #5 Does the project trigger only MRs #1 - #5? (Per Figure 3.2 or Figure 3.3 in Appendix 1 of the 2013-2018 WWA Phase II Permit & Phase I Permit.) Did the project developer choose to meet the LID Performance Standard? REQUIRED: For each surface, consider the BMPs in the order listed in List #1 for that type of surface. Use the first BMP that is considered feasible. NOT REQUIRED: Achievement of the LID Performance Standard. REQUIRED: Meet the LID Performance Standard through the use of any BMP(s) in the 2012 SWMMWW or the LID Technical Guidance Manual for Puget Sound except for Rain Gardens (the use of Bioretention is acceptable). REQUIRED for Projects Triggering MR #1-9*: Apply BMP T5.13 Post-Construction Soil Quality and Depth. NOT REQUIRED: Applying the BMPs in List #1 or List #2. 10 Lawn and landscaped areas: Glacial till: high in runoff and poor turf quality Photos: UW Test Plots List #1 Soil Quality and Depth Same soil with 30% compost added. Up to 50% less runoff. Turf still healthy 4 years later 11 A Brief Interlude on Infeasibility Criteria BMP Specific Listed with BMP Design Criteria Applicable to List Options Only 12 4

Roofs: Consider in order listed; use first feasible List #1 Full Dispersion or Downspout Full Infiltration Rain Gardens or Bioretention > 5% of drainage area Downspout Dispersion Systems Perforated Stub-out Connections Other Hard Surfaces (driveways, roads, patios, walks, parking lot) consider in order listed; use first feasible List #1 Full Dispersion Permeable pavement, or Rain Gardens, or Bioretention > 5% of drainage area Sheet Flow Dispersion, or Concentrated Flow Dispersion Paths to Requirements Flow Control Exempt Basins Small Projects MR #1 - #5 only Large Projects MR #1 - #9 Inside UGA Outside UGA < 5 acres => 5 acres 13 14 15 5

Flow Chart for Determining LID MR #5 Requirements Is the project inside the UGA? REQUIRED: Meet the LID Performance Standard through the use of any BMP(s) in the 2012 SWMMWW or the LID Technical Guidance Manual for Puget Sound except for Rain Gardens (the use of Bioretention is acceptable). REQUIRED for Projects Triggering MR #1-9*: Apply BMP T5.13 Post-Construction Soil Quality and Depth. NOT REQUIRED: Applying the BMPs in List #1 or List #2. Projects subject to MR #1 - #9 inside the UGA or outside the UGA on < 5 acres Does the project trigger only MRs #1 - #5? (Per Figure 3.2 or Figure 3.3 in Appendix 1 of the 2013-2018 WWA Phase II Permit & Phase I Permit.) List #2 Did the project developer choose to meet the LID Performance Standard? No, the project triggered MRs #1 - #9. No, project developer chose List #2. REQUIRED: For each surface, consider the BMPs in the order listed in List #2 for that type of surface. Use the first BMP that is considered feasible. NOT REQUIRED: Achievement of the LID Performance Standard. 16 Lawn and landscaped areas: Glacial till: high in runoff and poor turf quality Photos: UW Test Plots Soil Quality and Depth Same soil with 30% compost added. Up to 50% less runoff. Turf still healthy 4 years later 17 Roofs: Consider in order listed; use first feasible List #2 Full Dispersion or Downspout Full Infiltration Rain Gardens or Bioretention > 5% of drainage area Downspout Dispersion Systems Perforated Stub-out Connections 18 6

Other Hard Surfaces consider in order listed; use first feasible List #2 Full Dispersion Permeable pavement, or Rain Gardens, or Bioretention > 5% of drainage area Sheet Flow Dispersion, or Concentrated Flow Dispersion Paths to Requirements Flow Control Exempt Basins Small Projects MR #1 - #5 only Large Projects MR #1 - #9 Inside UGA Outside UGA < 5 acres => 5 acres Flow Chart for Determining LID MR #5 Requirements No, the project is outside the UGA Is the project inside the UGA? Projects subject to MR #1 - #9 outside the UGA on a parcel 5 acres Does the project trigger only MRs #1 - #5? (Per Figure 3.2 or Figure 3.3 in Appendix 1 of the 2013-2018 WWA Phase II Permit & Phase I Permit.) Is the project on a parcel of 5 acres or larger? No, the project triggered MRs #1 - #9. REQUIRED: Meet the LID Performance Standard through the use of any BMP(s) in the 2012 SWMMWW or the LID Technical Guidance Manual for Puget Sound except for Rain Gardens (the use of Bioretention is acceptable). If the project can t meet the LID Performance Standard, it must be redesigned to meet the LID performance standard or an exception / variance must be approved. REQUIRED: Apply BMP T5.13 Post-Construction Soil Quality and Depth. 19 20 NOT REQUIRED: Applying the BMPs in List #1 or List #2. 21 7

Projects Triggering MR #1 - #9 Project Type & Location Development (new or redevelopment) on any parcel inside the UGA, or development outside the UGA on a parcel less than 5 acres Requirement LID Performance Standard and BMP T5.13 OR List #2 (applicant option) LID Performance Standard vs Flow Control Standard LID Performance Standard addresses the lower, more frequent stormwater flows (8% of 2-year through 50% of the 2-year) Flow Control Standard addresses the higher, less frequent stormwater flows (50% of the 2-year through the full 50-year) LID Std: Control durations from 8% of 2-yr through 50% of 2-year Flow Control Standard MR #7 LID Standard MR #5 Development (new or redevelopment) outside the UGA on a parcel of 5 acres or larger LID Performance Standard and BMP T5.13 22 23 24 8

Don t forget Minimum Requirements #6 (Water Quality Treatment) and #7 (Flow Control) during the review Additional Jurisdictional Requirements Inspections and Maintenance Covenants for On-site BMPs Right-of-entry for O&M Tracking of new BMPs Training on Manual by Ecology is Coming 25 26 27 9

Q & A 10