Welcome Middle School, School Ground Amenities, & Future Fire Station Location
LAND DEVELOPMENT PROCESS MUNICIPAL DEVELOPMENT PLAN The Municipal Development Plan is a broad, long range land use planning framework that guides the City s growth and physical development and deals with land use, physical form and future growth. AREA STRUCTURE PLAN An Area Structure Plan (ASP) is a statutory plan that outlines land uses and establishes the general planning framework to guide the growth of future development in matters such as: transportation, servicing networks, schools, parks, commercial locations, bikeway and pathway systems and potential population density. OUTLINE PLAN An Outline Plan identifies specific locations of land uses and local road networks to support subdivision and rezoning for portions of new developments. The Plan satisfies goals identified in the City s Land Development process by creating a unique vision and developing an area concept and infrastructure. The Outline Plan amendment allows for changes to be considered as new markets emerge and landowner concepts develop.
NEXT STEPS REZONING OF LAND The rezoning process changes the activities that are allowed to occur on a parcel of land by approval of a bylaw by City Council. The rezoning process includes a public hearing with City Council where the public can lend support or express concerns for any changes. SUBDIVISION & ROAD PLAN The Subdivision process creates new parcels of land by plan of survey including parcels for underground and overhead utilities that are called public utility lots or right of ways. Road plans are also created for new or altered roadways by survey. Both of these processes are required to conform to the statutory plans above and other approvals. DEVELOPMENT & BUILDING PERMITS The final steps in the land development process involve the approval of development and building permits. The development permit authorizes the use of the land or activity to occur. The development permit must conform to the zoning bylaw approved by City Council. The building permit is approved afterwards and follows the requirements of the Alberta Building Code.
ivil\20083663-01-fig-1-1.dwg IF NOT 25 mm ADJUST SCALES IDGE EAST BOUNDARY COUNTRY MEADOWS GARRY DRIVE WEST HIGHLANDS UNIVERSITY DRIVE SCALE(S) SHOWN ARE INTENDED FOR TABLOID (11X17) SIZE DRAWINGS UNLESS NOTED OTHERWISE LOCATION MAP HERITAGE HEIGHTS RIDGEWOOD HEIGHTS 25 mm THIS DRAWING IS FOR THE USE OF THE CLIENT AND PROJECT INDICATED - NO REPRESENTATIONS OF ANY KIND ARE MADE TO OTHER PARTIES GARRY STATION INDIAN BATTLE HEIGHTS WEST LETHBRIDGE METIS TRAIL CROSSINGS WHOOP UP DRIVE COPPERWOOD VARSITY VILLAGE UNIVERSITY DRIVE MACLEOD DRIVE MOUNTAIN HEIGHTS ROCKY MTN BLVD RIVERSTONE 25 ST W WATERMARK SUNRIDGE SUNRIDGE BLVD CHINOOK TRAIL
METIS TRAIL COLLECTOR 'B' COLLECTOR 'A' LAND USE CONCEPT P:\20083663\01_Prelim_Design_OLP\Working_Dwgs\100_Civil\20083663-01-FIG-3-1.dwg DATE: 2017-03-23, Nancy Green LEGEND OUTLINE PLAN BOUNDARY LOW DENSITY RESIDENTIAL MEDIUM DENSITY RESIDENTIAL COMMERCIAL OPEN SPACE SCHOOL SITE SS NEIGHBOURHOOD NODE NON-CREDIT OPEN SPACE FIRE/EMS STORMWATER MANAGEMENT AREA EXISTING UTILITY SUBSTATION U SIMON FRASER BLVD SCALE(S) SHOWN ARE INTENDED FOR TABLOID (11X17) SIZE DRAWINGS UNLESS NOTED OTHERWISE IF NOT 25 mm ADJUST SCALES 25 mm THIS DRAWING IS FOR THE USE OF THE CLIENT AND PROJECT INDICATED - NO REPRESENTATIONS OF ANY KIND ARE MADE TO OTHER PARTIES OUTLINE PLAN STATISTICS HECTARES % OF OPA % OF NDA OUTLINE PLAN AREA 140.80 100 OPEN SPACE 16.15 11.54 SCHOOL SPACE (MR) 6.09 0.43 PARK SPACE (MR) 10.06 7.14 STORM WATER MANAGEMENT 6.01 4.27 U MACLEOD DRIVE CIRCULATION 39.29 27.83 NON-CREDIT PATH 0.23 0.16 COMMUNITY ENTRANCE ROAD MACLEOD DRIVE ROADS/LANES 39.06 27.74 NET DEVELOPABLE AREA 79.35 56.36 100 NET DEVELOPABLE AREA 79.35 56.36 100 LDR 68.77 48.84 86.66 ROCKY MOUNTAIN BLVD MDR 8.52 6.05 10.74 FIRE/EMS 1.11 0.79 1.40 COMMERCIAL 0.95 0.67 1.20 COMMUNITY ENTRANCE ROAD CASCADE BLVD WINDOW STREET WINDOW STREET SS COMMUNITY ENTRANCE ROAD SUNRIDGE BLVD SUNRIDGE BLVD CHINOOK TRAIL 0 250 500 Meters FIGURE 3-1 CITY OF LETHBRIDGE WATERBRIDGE OUTLINE PLAN
SCHOOL GROUNDS LAYOUT
MINI SKATE PARK & BMX PUMP TRACK
FITNESS & CLIMBING AREA