For Drawing extension See Sheet 2 of 7

Similar documents
LAND USE SHEET 3 LOWER THAMES CROSSING LOWER THAMES CROSSING STATUTORY CONSULTATION. Main works construction compound

A737/A738 Trunk Road (Dalry Bypass)

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

Experiences of dealing with Lesser Horseshoe Bats (Rhinolophus

MILL PONDS. Tel:

NON-TECHNICAL SUMMARY

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

E16: MAINTENANCE OF LANDSCAPED AREAS

8.0 Design and Form of Development 43/

Public Consultation. Land at Monks Farm, North Grove. Welcome

HUNGERFORD SOLAR FARM

7 Scoping and Introduction to the Assessments

Authority. any changes required as a result of the approved CHMP.

University Park, Worcester Non Technical Summary December 2011

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

NON-TECHNICAL SUMMARY

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

Fenstanton. Fen Drayton New A14. Boxworth. Welcome to this A14 Cambridge to Huntingdon improvement scheme public exhibition.

Love them or fear them, bees are awesome little creatures that play an indispensible part in our everyday lives.

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total

SETTLEMENT ASSESSMENT PROFORMA

Cross City Cycling Ditton Lane and Links to East Cambridge Proposed FDPC Response to Consultation for agreement FDPC meeting Feb 2 nd

Rannoch 132 / 33 kv Substation Extension

OPEN SPACE CONDITION ASSESSMENT

ECOLOGICAL ADVICE SERVICE

NORTH WEST SECTOR HORLEY, SURREY

IV. Development in the Rural Overlay District

Green Infrastructure Design for Multiple Benefits

HS2 Environment. Protecting the environment

Chapter 27 Route Window SE7 Church Manorway Bridge. Transport for London

Am I at risk of flooding?

PLANNING COMMITTEE DATE: 07/09/2015 REPORT OF THE SENIOR MANAGER PLANNING AND ENVIRONMENT SERVICE CAERNARFON. Number: 4

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

Town of Essex Small Site Erosion Control Guide

Land North of Sidley between the Bexhill to Hastings Link Road and Watermill Lane

Landscape Guidelines. Landscape type: Valley Pasture Character areas: Frome Valley Pasture Stour Valley Pasture. Landscape change

APPENDIX 4. 5 ST AGNES LOCAL LANDSCAPE CHARACTER ASSESSMENT TABLE ST AGNES BEACON

In Title Your Area 10: Lower Boddington to Southam & Offchurch

Daniels Park Master Plan

A21. Start of works exhibition Tonbridge to Pembury. Welcome. Dualling Scheme

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION

Meeting Agenda. City of Guelph. River Systems Advisory Committee. Agenda Items. Item 1, 2 and 3. Item 4 Ward to Downtown Pedestrian Bridge

STREAM ALTERATION PRACTICES

DESIGN AND MANAGEMENT PART 3 HA 57/92 NEW ROADS INTEGRATION WITH RURAL LANDSCAPES SUMMARY

UNIVERSITY TOWN NEIGHBOURHOODS 5.2 ECO-CORRIDOR MELBOURNE CAMPUS MASTER PLAN 2014

Revetting and Supporting River Banks 4.7 Bank revetment using low steel sheet piling and coir rolls

Bioengineered designs

5.0 Storm Water Landscape Guidance Introduction

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

BATH QUAYS WATERSIDE PROJECT

West Gate Tunnel Project. Incorporated Document May Incorporated document pursuant to section 6(2)(j) of the Planning and Environment Act 1987.

NON TECHNICAL SUMMARY

Victoria Park Health Centre, Leicester

Meridian Water Phase 1 Application

Aberdeen Harbour Expansion Project. Construction Environmental Management Document

Principles for Ecological Landscape Design in Brownfield Business Parks

STILL CREEK CD-1 GUIDELINES (BY-LAW NO. 6654) Adopted by City Council April 24, 1990

LILAC Housing: Site Management Plan

Chapter 2.4. Description of Development

PART 9: PLANTED STORMWATER DEVICES

Water Sensitive Urban Design Site Development Guidelines and Practice Notes. Appendix

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

Grantham Southern Quadrant Link Road Environmental Statement

4. MASTERPLAN FRAMEWORK

Pill Pond Local Area Brief

Preliminary Ecological Appraisal

Public Information Centre. Welcome

RHOSYDD LLANDDONA SITE OF SPECIAL SCIENTIFIC INTEREST CCW

F. Driveways. Driveways which provide access to off-street parking or loading from public streets shall comply with the following:

Overview Report. Proposed Development

Welcome to our public exhibition

Guidance for Developers on the Management of Biodiversity issues in the Planning Process

CHAPTER 18 - Strategy Area: Dundry and River Valleys

Priors Farm Estate SuDS Retrofitting Project, Cheltenham

Severn River Sub-Watershed: BMP 09-Retrofit

Conservation Plan. I. Property Information. II. Objectives. Natural Resource Objectives. Sustainability in Practice (SIP) Certified

Next Steps / Development Process. Structure Plan. June submitted to City of Fremantle. Structure Plan. July supported for advertising

Mapping produced by the Bedfordshire and Luton Biodiversity Recording and Monitoring Centre

Plan Review Checklist

LAND EAST OF HORNDEAN. 1. Welcome. Morrisons supermarket. Keydell Nurseries A3(M)

E. Natural areas include habitats such as wetlands, tidal marshes, waterways, natural drainage-ways, woodlands and grassland meadows.

Contents. Annexes. Annex 1 Process Diagram for the discharge of the DCO Requirements. Annex 2 Design Sheet Power Generation Plant

A38 Derby Junctions. Preliminary Environmental Information Report: Non-Technical Summary

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

Your web browser (Safari 7) is out of date. For more security, comfort and the best experience on this site: Update your browser Ignore

Caledon Villas Corp. c/o Mr. John Spina 55 Blue Willow Drive Woodbridge, ON L4L 9E8 May 14, Floodplain Characteristics, Old Church Road

PLANNING AND ACCESS COMMITTEE

Design considerations

DESIGN & ACCESS STATEMENT

Sandwich Town Tidal Defences Environmental Statement Non Technical Summary

Creating ponds for water voles

Derry City and Strabane District Council Planning Committee Report

Use of Best Management Practices

CHECKLIST FOR DC SUBMISSION PRIVATE / PUBLIC BUILDING DEVELOPMENTS

The Fairfield Association and Flora: Past, Present, Plans and Possibilities. Registered charity number:

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

SNEINTON CITY CENTRE LACE MARKET. 800 m : 10 min walk

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

Transcription:

..\..\..\..\projectwise\arup uk\kieran.reidy\dms988\97-rp-xx-xx-ph-ch-.png..\..\..\..\projectwise\arup uk\kieran.reidy\dms988\97-rp-xx-xx-ph-ch-.png..\..\..\..\projectwise\arup uk\kieran.reidy\dms988\97-rp-xx-xx-ph-ch-7.png..\..\..\..\projectwise\arup uk\kieran.reidy\dms988\97-rp-xx-xx-ph-ch-.png /8, LE6. /9 EF, LE. row to define the edge of new ditch and integrate scheme /6 /7, EFK / EFC LE7. New raised kerb and build outs to calm traffic and discourage vehicular access to bridge. Bollards, surface materials and signs will be carefully selected in agreement between the landscape architect, the heritage consultant and CDW to ensure its design (scale, colour, materials) complements the fabric and historic setting of Pont-ar-Ddyfi and nearby dwellings. / EFC LE7. Fixed and de-mountable bollards would be used to control vehicular access onto Pont-ar-Ddyfi. The bollards would be designed and located in consultation with CDW to ensure their design (scale, colour and materials) complements the fabric and historic setting of Pont-ar-Ddyfi and nearby dwellings. LE. Proposed field gate to proposed turning head to tie into existing boundaries to control access into adjacent field. proof fence to proposed turning head to tie into existing boundaries to control access into adjacent field. /, LE6. /, LE6. fon Dyfi / LE6..6 Proposed pumped drainage system to address existing flooding issues along 9 and at Dyfi Cottages. The existing surface water gravity drainage would be upgraded and a pumped system will discharge to the fon Dyfi during storm events in times of high river levels. Pont-ar-Ddyfi Pen-y-bont Cottages /8 EFF, P. Existing Pont-ar-Ddyfi to be retained /7 LE6.. Catchment outfall via new ditch direct into the fon Dyfi...\..\..\..\projectwise\arup uk\kieran.reidy\dms988\97-rp-xx-xx-ph-ch-7.png pw:\\mccntsi.global.arup.com:pw_rup_uk\documents\\ rup\ld - \DR - Drawing\97-RP-ZZ-ZZ-DR-LD- /, LE6. /6 E.. NTES:. nnotation codes: LE = Landscape elements, EF = Environmental Function.. Unless otherwise stated all proposed embankment slopes have a in. ll planting shall take account of existing and proposed underground and. Sightlines and forward visibility requirements have been accounted for in. For existing utilities see Figure 8.7 (Baseline Environmental Plans), the design shown has taken them into account. P. Date By Chkd ppd /, Proposed drainage ditch. /, LE6.. /, EFE LE. Species rich grassland seeding to island build outs created by reducing width of carriageway. Solihull B9 8E Tel + Fax + LE6. For Drawing extension See Sheet of 7 Existing 87 to be de-trunked / Existing hedgerow to be protected and retained. / EFC, EFK LE7. Fixed and de-mountable bollards would be used to control vehicular access onto Pont-ar-Ddyfi. The bollards would be designed and located in consultation with CDW to ensure their design (scale, colour and materials) complements the fabric and historic setting of Pont-ar-Ddyfi and nearby dwellings.. Sheet of 7 6- : S - Initial non-contractual P. 97-RP-ZZ-ZZ-DR-LD-

..\..\..\..\projectwise\arup uk\kieran.reidy\dms988\97-rp-xx-xx-ph-ch-.png +. For Drawing extension See Sheet of 7 +. NTES: / LE7.7 Existing 87 to be de-trunked / EFC LE7. New permanent kerb line to carriageway. /8 Proposed hedgerow to tie into existing boundaries to screen views and control access under viaduct. /9 / / Proposed post and wire stock proof fencing to tie into existing boundaries to screen views and control access under viaduct., EFK Existing scrub and hedgerow retained. Proposed field gates to tie into existing boundaries to control access under viaduct and to adjacent fields. / proof fencing to tie into existing boundaries to control vehicular access under low end of viaduct.. nnotation codes: LE = Landscape elements, EF = Environmental Function.. Unless otherwise stated all proposed embankment slopes have a in. ll planting shall take account of existing and proposed underground and. Sightlines and forward visibility requirements have been accounted for in. For existing utilities see Figure 8.7 (Baseline Environmental Plans), the design shown has taken them into account. /, LE6. Existing ditch lined with erosion Ditch widened and re-profiled to reduce width of carriageway and drain Scheme to river. / Where possible, existing hedgerow to be protected and retained within Scheme boundary. Some sections of hedgerow may require translocation to allow re-profiling of ditch. /, For Drawing extension See Sheet of 7 /7 Site of temporary construction works area. Works area removed following construction and ground made good, cultivated and seeded with appropriate seed mix to reinstate improved grassland in the first season following construction. open grassland P. Date By Chkd ppd For Drawing extension See Sheet of 7 +. /6, EFK /8, EFK LE7.. Proposed temporary post and access during yr seeding establishment period. Location of temporary field access gates to be agreed with /7 / Native feathered tree planting. / LE6.. Catchment drainage isolation device. / Native feathered tree planting. proof fence to retain field boundary and integrate scheme Solihull B9 8E Tel + Fax + / EF, E.. /9, EFK Proposed field gate to retain field proof fence to define new field +...\..\..\..\projectwise\arup uk\kieran.reidy\dms988\97-rp-xx-xx-ph-ch-.png..\..\..\..\projectwise\arup uk\kieran.reidy\dms988\97-rp-xx-xx-ph-ch-7.png / open grassland / open grassland /6 EF, LE. row with trees to define new field / E.. / Sheet of 7 /, EFK +6. Proposed field gate to retain field E.. /7, EFK LE7.. /6, EFK LE7.. : 6- / proof fence to retain field S - Initial non-contractual P. 97-RP-ZZ-ZZ-DR-LD- pw:\\mccntsi.global.arup.com:pw_rup_uk\documents\\ rup\ld - \DR - Drawing\97-RP-ZZ-ZZ-DR-LD-

..\..\..\..\pr ojectwise \arup uk\kieran.reidy\dm s988\9 7-R P-XX-XX -PH-CH- B C 7.png D E F G projectw ise\arup uk\kiera /, EFK Proposed field gates to tie into existing boundaries and to control access under viaduct n.reidy\ dms98 8\9 7-RP -XX-XX -PH-CH -. png /7, EFC / boundaries to control access under viaduct and to adjacent fields. / proof fencing to control access under viaduct to provide amenity value and integrate the scheme into surrounding countryside. /. + / proof fencing to tie into existing boundaries to control vehicular access under low end of viaduct. to provide amenity value and integrate the scheme into surrounding countryside. /6 LE6.. Catchment drainage. pproximate location of petrol interceptor., EFC LE6.. Catchment drainage. pproximate location of isolation device. /9 /, EFC. + /8 to provide amenity value and integrate the scheme into surrounding countryside...\..\..\..\projectwise\arup uk\kieran.reidy\dms988\97-rp-xx-xx-ph-ch-.png /. + 6 /8 E.. LE6. /8 /9, EFE LE. /, EFE LE. Swathes of native bulb planting (crocus, daffodil, bluebell and snowdrops) at frontage to Dyfi Eco Park. LE.. s indicated by extent of hatch, proposed outward facing slopes of bund to be seeded with pen Grassland seed mix pre-seeded into erosion control coir matting, to stabilise and reinforce flood bunding and to integrate scheme into the Dyfi Eco Park /7 LE6..6 + Machynlleth Train Station. + Catchment outfall to existing stone culvert under railway., EFC, Swathes of native bulb planting (crocus, daffodil, bluebell and snowdrops) at frontage to Dyfi Eco Park. Proposed pumped drainage system to address flooding issues in the vicinity of the railway bridge. The existing surface water drainage would be upgraded and a pumped system added to discharge to catchment outfall during peak storm events. /6 LE6.. Catchment drainage. pproximate location of isolation device. LE6.. /7. / Scattered native standard clear stem trees to enhance the built environment at its interface with the surrounding countryside. 68 6, EFC. Slopes to flood bund to be rounded top and bottom to give a natural appearance. Disturbed ground to be made good and seeded with appropriate species rich grassland + 9 New swale/ditch lined with erosion control coir matting pre-seeded with native aquatic and marginal /, EFE LE. menity grass at frontage to Dyfi Eco Park. / / +. to field Permanent farm access gate added to retain field boundary and integrate scheme into the LE.. Scattered native standard clear stem trees to enhance the built environment at the frontage of the Dyfi Eco Park., EFK LE6. / /, New swale/ditch lined with erosion control coir matting pre-seeded with native aquatic and marginal EF, / s indicated by extent of hatch, proposed outward facing slopes of bund to be seeded with Species Rich Grassland seed mix pre-seeded into erosion control coir matting, to stabilise and reinforce flood bunding and to integrate scheme into the / LE. EF,, EFC with groups of native feathered trees to provide amenity value and integrate the scheme into the surrounding countryside and to filter views from the entrance to Dyfi Eco Park and the adjacent residential property. / / EF, to field Slopes to embankment bund to be rounded top and bottom to give a natural appearance. Disturbed ground to be made good and seeded with appropriate species rich grassland seed mix to integrate scheme. EF, LE7.7 / Proposed wire stock proof fence to field to field /9 /6 Existing hedgerow to be translocated to form proposed boundary to west. EF,, EFE construction to be made good and seeded with open grassland seed mix to mown verges. /8 /7 / EF, to top of embankment to screen views from NMU route and receptors further west and northwest. / Ballast under low section of Viaduct to discourage public and cattle access and reduce maintenance Proposed post and wire stock proof fencing to control access under viaduct. construction to be made good and seeded with appropriate species rich grassland mix to open areas. /9, EFC. +, EFE LE. Existing scrub and hedgerow retained. / s indicated by extent of hatch, proposed outward facing slopes of bund to be seeded with Species Rich Grassland seed mix pre-seeded into erosion control coir matting, to stabilise and reinforce flood bunding and to integrate scheme / EFC LE7. Proposed permanent kerb line to Carriageway. / LE... /6, EFE LE. construction to be made good and seeded with appropriate species rich grassland mix to open areas. / /, EFC Proposed hedgerow to screen views and control access between fields and under viaduct. + /, EFE construction to be made good and seeded with open grassland seed mix to mown verges. Proposed hedgerow to integrate scheme into proof fence to bottom of embankment to define new field boundary and integrate scheme H, EFK / For Drawing extension See Sheet of 7 Proposed field gates to tie into existing..\..\..\..\ For Drawing extension See Sheet and of 7 NTES:.... nnotation codes: LE = Landscape elements, EF = Environmental Function. Unless otherwise stated all proposed embankment slopes have a in ll planting shall take account of existing and proposed underground and Sightlines and forward visibility requirements have been accounted for in For existing utilities see Figure 8.7 (Baseline Environmental Plans), the design shown has taken them into account.. P. Sheet of 7 -- Solihull B9 8E Tel + Fax + Date By Chkd ppd : S - Initial non-contractual 6- P. 97-RP-ZZ-ZZ-DR-LD- pw:\\mccntsi.global.arup.com:pw_rup_uk\documents\\ rup\ld - \DR - Drawing\97-RP-ZZ-ZZ-DR-LD-

..\..\..\..\projectwise\arup uk\kieran.reidy\dms988\97-rp-xx-xx-ph-ch-.png For Drawing extension See Sheet of 7 /. s indicated by extent of hatch, proposed outward facing slopes of bund to be seeded with pen Grassland seed mix pre-seeded into erosion control coir matting, to stabilise and reinforce flood bunding and to integrate scheme into the Dyfi Eco Park /, EFK LE7.. Proposed temporary post and access during seeding establishment period. Location of temporary field access gates to be agreed with /7, EFK Proposed field gate to retain field boundary and integrate scheme / proof fence to reinstate field boundary and integrate scheme / Slopes to flood bund to be rounded top and bottom to give a natural appearance. Disturbed ground to be made good and seeded with appropriate lowland meadow /, EFK LE7.. Proposed temporary post and access during seeding establishment period. Location of temporary field access gates to be agreed with pw:\\mccntsi.global.arup.com:pw_rup_uk\documents\\ rup\ld - \DR - Drawing\97-RP-ZZ-ZZ-DR-LD- Cambrian Line Railway /6 Proposed diversion to Netowork Rail security fence to reinstate field boundary and integrate scheme NTES:. nnotation codes: LE = Landscape elements, EF = Environmental Function.. Unless otherwise stated all proposed embankment slopes have a in. ll planting shall take account of existing and proposed underground and. Sightlines and forward visibility requirements have been accounted for in. For existing utilities see Figure 8.7 (Baseline Environmental Plans), the design shown has taken them into account. P. Date By Chkd ppd Solihull B9 8E Tel + Fax + Sheet of 7 : S - Initial non-contractual 6- P. 97-RP-ZZ-ZZ-DR-LD-

B C D E F G H..\..\..\..\pr ojectwise \arup uk\kieran.reidy\dm s988\9 7-R P-XX-XX -PH-CH- 7.png..\..\..\..\ projectw ise\arup uk\kiera n.reidy\ dms98 8\9 7-RP -XX-XX -PH-CH -. P.., EFE LE...\..\..\..\projectwise\arup uk\kieran.reidy\dms988\97-rp-xx-xx-ph-ch-.png 6/6 /7, LE.8. Riverbank reinstated and stabilised using erosion control coir matting planted with willow scrub where scour pocket has formed immediately downstream of the Millennium Bridge. 6/8... nnotation codes: LE = Landscape elements, EF = Environmental Function. Unless otherwise stated all proposed embankment slopes have a in ll planting shall take account of existing and proposed underground and Sightlines and forward visibility requirements have been accounted for in For existing utilities see Figure 8.7 (Baseline Environmental Plans), the design shown has taken them into account. Solihull B9 8E Tel + Fax + Date By Chkd ppd 6/7 Sheet of 7 E...m high post and wire mesh wildlife proof fencing to discourage mammal access to the highway network. 6/6 to top of embankment to integrate scheme into the landscape 6/ LE.7 6/9, EFC, Mixed native wood scheme into lands P. 6/8, EFC, to prov scheme into the surrounding countrysid 6/ LE6.. Catchment drainage. pproximate location of isolation device. 6/, EFC, EFE, EFF Concrete paved cattle underpass., EFE to enhance the riverside environment and replace trees lost from the river bank. 6/9 NTES:. E.. /6 New Zealand Pigmyweed to be locally treated in. LE6.. 6/7 Catchment drains via existing outfall direct into the fon Dyfi. Temporary crane pad and lay down area removed following construction and ground made good, cultivated and seeded with appropriate open grassland seed mix in the first season following construction., EFE Densely grouped native feathered trees to stabilise the riverbank and replace trees lost from the river bank., EFE, EFK Proposed wildlife proof, self closing field gates on concrete path to enhance the riverside environment and replace trees lost from the river bank. /8 / 6/ 6/ E.. Existing Japanese knotweed along north bank to be treated and controlled as set out in the Invasive Species LE.8 +., EFC, 6/ to provide amenity value and integrate the scheme into the surrounding countryside. Proposed field gate to retain field, rea planted densely with appropriate native riparian mix to stabilise riverbank and prevent scour downstream of new bridge, provide bat foraging habitat and soften views across the river towards the proposed abutment wall. +9. /9 For Drawing extension See Sheet 6 of 7, EFK / LE.8 /, rea planted densely with appropriate native riparian mix to stabilise riverbank and prevent scour downstream of new bridge, provide bat foraging habitat and soften views across the river towards the proposed abutment wall. +8. proof fence to retain field +7. For Drawing extension See Sheet of 7 /, EFE / Densely grouped native feathered trees to stabilise the riverbank and replace trees lost from the river bank. LE7..., EFK 6/ to integrate scheme into the / + to top of cutting to define new field boundary. Ties into existing highway boundary wall along 9 and integrates scheme, EFE Species rich grassland gateway feature to SNP. / with woodland groundflora mix on pre-seeded erosion control hessian matting to enhance the riverside environment and replace trees lost from the river bank. 6/ LE7.., EFE LE7., EFC, EFE, EFF butment and wing walls to be faced with coursed slate masonry to integrate 6/7, EFK 6/ +. / / Existing highway boundary masonry walls retained. +. / Existing highway boundary masonry walls retained. 6/9.m high post and wire me discourage mammal acces the highway network. shallow nutrient poor soils to new cutting and forward visibility splays to rounded to tie naturally into 6/ to top of cutting and to tie into existing woodland boundary to define new field boundary and integrate scheme E.. 6/6.m high post and wire mesh discourage mammal access to the highway network. Fitted with -way mammal gates. 6/8 E.. / to define field boundary and integrate scheme into the 6mm dia. Badger underpass tunnel to provide safe mammal access under road. 6/ LE., EFE shallow nutrient poor soils to new cutting and forward visibility splays to rounded to tie naturally into 6/ /6 EFF Milestone undesignated heritage asset. In order to avoid accidental damage to the milestone, the following avoidance measures are proposed: Photographic and, where appropriate, drawn record of all elevations; Exposure of buried structure through archaeological hand excavation; Cover milestone in protective layer to prevent damage; Removal of milestone by mechanical hoist; ff-site storage until completion of works; and Milestone will be re-erected as close to its original location as possible. /7 to back edge of visibility splay to define field boundary. Ties into existing boundaries and integrates scheme into the png pw:\\mccntsi.global.arup.com:pw_rup_uk\documents\\ rup\ld - \DR - Drawing\97-RP-ZZ-ZZ-DR-LD- LE6.. : S - Initial non-contractual 6- P. 97-RP-ZZ-ZZ-DR-LD-

B C D E F G H E.. 6/ 6mm dia. Badger underpass tunnel to provide safe mammal access under road..m high post and wire mesh discourage mammal access to the highway network. Fitted with -way mammal gates., EFE LE. Species rich grassland to form a landmark gateway feature to SNP., EFK. 6/ 6/, EFE +. 6 +..\..\..\..\projectwise\arup uk\kieran.reidy\dms988\97-rp-xx-xx-ph-ch-.png. Proposed mammal proof field gate to retain field boundary and integrate scheme into the +. Stand of specimen standard oak trees to form a landmark gateway feature to SNP.. + 6/ to integrate scheme into the 6/ 88. +, EFC, LE7. EFE, EFF butment and wing walls to be faced with coursed slate masonry to integrate E.. 6/9.m high post and wire mesh discourage mammal access to the highway network. 6/7 with woodland groundflora mix on pre-seeded erosion control hessian matting to enhance the riverside environment and replace trees lost from the river bank. Ffridd Farm +, EFE LE. shallow nutrient poor soils to new cutting and forward visibility splays to rounded to tie naturally into 6/ E.., EFE 6/ 6/6 6/8 to top of cutting and to tie into existing woodland boundary to define new field boundary and integrate scheme LE., EFE shallow nutrient poor soils to new cutting and forward visibility splays to rounded to tie naturally into 6/, EFC, + 6/ 6/7 LE7.. 6/ EFK Proposed field gate to provide cattle access to adjacent field. 6/ open grassland 6/ Site of temporary construction compound. Compound removed following construction and ground made good, cultivated and seeded with appropriate seed mix to reinstate improved grassland in the first season following construction. Proposed post and rail stock proof fence to prevent cattle egress on to river bank. 6/, EFK Proposed wildlife proof, self closing field gates on concrete path. 6/6 to top of embankment to integrate scheme into the landscape, EFC, to provide amenity value and integrate the scheme into the surrounding countryside. open grassland 6/ to bottom of embankment to integrate scheme into the Existing hedgerow to be translocated where possible. 6/ 6/ LE6.. Catchment drainage. pproximate location of petrol interceptor. 6/ 6/ E.. 6/7.m high post and wire mesh wildlife proof fencing to discourage mammal access to the highway network. to enhance the riverside environment and replace trees lost from the river bank. LE6.. 6/9 LE.7 rea seeded with native woodland ground flora seed mix pre-seeded into erosion control coir matting to stabilise steep riverbank, provide bat foraging habitat and soften views across the river towards the proposed abutment wall.., EFE + LE.. 6/9, EFC, Mixed native woodland planting to intergrate scheme into landscape and improve biodiversity. Catchment drains via existing outfall direct into the fon Dyfi. 6/8 LE6.. Catchment drainage. pproximate location of isolation device. to provide amenity value and integrate the scheme into the surrounding countryside. to enhance the riverside environment and replace trees lost from the river bank. 6/7 6/, EFC,, EFC, EFE, EFF 6/8 6/ LE7.. 6/ Proposed Temporary post and access during yr seeding establishment period NTES:..... nnotation codes: LE = Landscape elements, EF = Environmental Function. Unless otherwise stated all proposed embankment slopes have a in ll planting shall take account of existing and proposed underground and Sightlines and forward visibility requirements have been accounted for in For existing utilities see Figure 8.7 (Baseline Environmental Plans), the design shown has taken them into account. 87 6/8 to top of cutting to define new field boundary and tie into existing hedge to integrate scheme E.. 6/6.m high post and wire mesh discourage mammal access to the highway network. Native bulb planting (crocus, daffodil, bluebell and snowdrops) to form part of a landmark gateway feature to SNP., EFE Concrete paved cattle underpass. 6/6 For Drawing extension See Sheet of 7 6/ E.. Existing Japanese knotweed along north bank to be treated and controlled as set out in the Invasive Species, EFK Proposed wildlife proof, self closing field gates on concrete path LE. +. 6/ +. +9., EFE. to provide amenity value and integrate the scheme into the surrounding countryside. P. Sheet 6 of 7 -- Solihull B9 8E Tel + Fax + Date By Chkd ppd : S - Initial non-contractual 6- P. 97-RP-ZZ-ZZ-DR-LD-6 pw:\\mccntsi.global.arup.com:pw_rup_uk\documents\\ rup\ld - \DR - Drawing\97-RP-ZZ-ZZ-DR-LD-6

..\..\..\..\projectwise\arup uk\kieran.reidy\dms988\97-rp-xx-xx-ph-ch-.png Planning Policy Features P.: Statutory landscape designations (Snowdonia National Park) P..: Important invertebrate area P.. Moss/bryphoyte area P..: ncient Woodland P..: Scheduled Monument P..: Listed Buildings P..: Undesignated heritage asset P..: Undesignated milestone heritage asset P..: Undesignated linear heritage asset P..: Footpath P..: NCN Cycle Path Existing to be retained Tree Hedgerow Woodland menity shrubs Shingle beach fon Dyfi Stone wall Fence and gate Roads Existing to be removed Woodland / scrub Trees Hedgerow Hedgerow to be translocated Environmental Elements Proposed Scheme +. E..: Bat roost E..: Bat flight line E..: Invasive plant species Scheme boundary Highway boundary 87 viaduct Viaduct abutment walls Viaduct columns Earthworks Road chainage Concrete underpass Road sign Proposed Environmental Elements E..: Badger tunnel E..: Mammal proof timber post and wire fence Proposed Landscape Elements Grassland (LE) LE.: menity grass LE.: Grass with bulbs LE.: Species rich grassland LE..: Coir matting pre-seeded with species rich grassland : pen grassland.: Coir matting pre-seeded with open grassland seed mix LE.7: Coir matting pre-seeded with woodland ground flora mix DRWING SHEET LCTIN PLN Vehicle Restraint System (VRS) SHEET F 7..\..\..\..\projectwise\arup uk\kieran.reidy\dms988\97-rp-xx-xx-ph-ch-.png Native Planting (LE) LE..: Mixed woodland and shrub planting : Scattered trees LE.8: Scrub LE.8: Coir matting planted with willow scrub Wetland Drainage (LE6) LE6.: Coir matting pre-seeded with marginal planting to banks and ditches LE6..: Proposed drainage ditch LE6..: Carrier pipe LE6..: Culvert headwall LE6..: Petrol interceptor LE6..: Isolation device LE6..: Drainage outfalls LE6..6: Pumped drainage system..\..\..\..\projectwise\arup uk\kieran.reidy\dms988\97-rp-xx-xx-ph-ch-7.png Hedges (LE) : Native species hedges LE.: Native hedgerows with trees Hard Landscape (LE7) : Stock proof timber post and wire fence LE7..: Temporary stock proof timber post and wire fence LE7..: Timber post and rail fence : Proposed field gate LE7.: Slate masonry faced wall LE7.: Road kerb line LE7.: De-mountable bollards LE7.7: Ballast pw:\\mccntsi.global.arup.com:pw_rup_uk\documents\\ rup\ld - \DR - Drawing\97-RP-ZZ-ZZ-DR-LD-7 ENVIRNMENTL FUNCTINS Taken from Design Manual for Roads & Bridges, Volume Part SHEET F 7 SHEET F 7 SHEET 6 F 7 Ref EF Dataset Visual Screening Core Data s-and-when SHEET F 7 Landscape Integration EFC Enhancing the Built Environment Nature Conservation & Biodiversity SHEET F 7 EFE Visual mentity EFF EFG Heritage uditory mentity Water Quality EFK ccess NTES: Landscape Elements (LE) to be read in conjunction with Design Manual for Roads and Bridges - Volume, Part. P. Date By Chkd ppd Solihull B9 8E Tel + Fax + Sheet 7 of 7 NTS S - Initial non-contractual 6- P. 97-RP-ZZ-ZZ-DR-LD-7