Keep low pressure steam system and replace piping, accessories, and insulation as necessary. West Wing and Lobby Distribution

Similar documents
Design Standard Intrusion Detection

CC-280E Thermoelectric Cigar Cooler

Scopes of Work HVAC Heating and Air Conditioning

Product line training. Gregor Vialette June 2016

ELIGIBLE MEASURES (For Program fiscal year July 1, 2017 to June 30, 2018)

Air conditioning can account for up to 50 per cent of your summer electricity bill.

OPERATION AND MAINTENANCE MANUAL

A few important points Please read this completely!

Appendix L: STRUCTURAL ENGINEER S REPORT

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD

Perfekt Glide-24 Perfekt Glide-30 Perfekt Glide-36 Built-in Range Hood Instruction Manual

East Baseline Road Suite 107 Mesa, Arizona Client Name: Address: Home Phone: Cell Phone: Date:

THE MULTIFUNCTION AIR EXCHANGER BOREAL SERIES

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST SHELL BUILDING

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD

Apartment Manager Fire Safety Manual

locatewater Sensor 4. Configuring the locatewater sensor on a sensorprobe unit

STSS CO INC SOLAR, WOOD, RADIANT HEATING STORAGE TANK INSTALLATION GUIDE

Fire Systems. Product Catalogue

Model : SP601-15, 15T, 20, 20T, 30, 30T

Operating Instructions

Marshall County Health Department Food Service Establishment Plan Review Form

Itemized Measures Descriptions and Rates

CITY OF TUCSON, ARIZONA DEPARTMENT OF TRANSPORTATION ENGINEERING DIVISION ACTIVE PRACTICES GUIDELINES

Appendix F. Itemized Measures Descriptions and Rates

Zone monitor with isolator

Istruction Manual OP2

Policy 1.1-a has been omitted for brevity

DIVISION 21 - FIRE SUPPRESSION

The Right Door for Hope, Recovery and Wellness. Adopted 5/13/02. This procedure shall apply to The Right Door for Hope, Recovery and Wellness.

Annual Building Inspection Checklist

PHANTASY ELECTRIC FIRE (TF-1561ERA) FEATURING THE WHISPERGLOW FLAME EFFECT

Operating Instructions

USE AND CARE GUIDE 521N.CJIYSTAL CEILIN8 FAN

PARTNERS FOR GOOD HOUSING

Universal Ventless Hoods. Making the Impossible Possible. WVU Universal Ventless Hoods. 4-Stage Filtration. Filtration Air Flow. Made in the U.S.A.

Red Rose School Fire Risk Assessment

Hot Work Permit Program

PUBLIC WORKS DEPARTMENT. Charles D. Herbertson, Public Works Director/City Engineer

DFR Pre-Incident Planning Form Instructions. Downtown Dallas Inc

AWARENESS ON ELECTRICAL SAFETY. Safety Symposium & Exposition August; ITC Sonar, Kolkata

Instruction manual. Version PRETREATmaker

Bethesda Downtown Plan Design Guidelines Stakeholder Working Group Notes

USERS GUIDE C24, C30. For installation guide see reverse of book

OPERATING INSTRUCTIONS INSTALLING THE WATER BOTTLE

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW SPRINKLER SYSTEM PLAN REVIEW TENANT IMPROVEMENT PER NFPA EDITION

Dissecting Proprietary Stormwater Treatment BMPs to Develop Practical Solutions Unbiased Research and Case Studies

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP

INSPECTION AND TESTING OF FIRE ALARM SYSTEMS

manual Polymount Plate Cleaner installation protocol Setting / maintenance compressed air + pump pg. 16 Maintenance table settings pg.

Operating Instructions. 48L Chest Fridge. Model: GPF48

Electrical devices may only be mounted and connected by electrically skilled persons.

Commercial Burglary Prevention Thomas Protective Service, Inc.

City of Bethlehem Northside and Southside

DX100 Field Maintenance Guide

Dissecting Proprietary Stormwater Treatment BMPs to Develop Practical Solutions Unbiased Research and Case Studies

University of Arkansas for Medical Sciences. Part IV - Fire Prevention & Life Safety Management Plan FY18

! SELECTION SHEET. Homeowner: Address: Lot number: Block number: Community:

CMG GardenNotes #631 Tree Placement: Right Plant, Right Place

PaceSetter Features - Proposed Modular

BTC6750GL/ BTC9750GL Cooker Hood

CMG GardenNotes #264 Irrigation Equipment

FALKNER HOUSE Nursery Year 6 including EYFS FIRE PREVENTION, PRECAUTIONS & EVACUATION PROCEDURES

60-Day Notice of Resident s Intent to Vacate

EQUIPMENT DATA SPECIFICATION AIR CONDITIONER. Telecom & Digital Signage Package NE050

I308. Central Park Precinct

EQUIPMENT DATA SPECIFICATION AIR CONDITIONER. Telecom & Digital Signage Package NE015

Aspect kettle Please read and keep these instructions

VALLEY COLLEGE PRINCETON CAMPUS

YCC205 RFP for Landscape Renewal December 7, Condo Corporation YCC 205 RFP for Landscape Renewal

ATKINSON, NH BULK ITEM PICK-UP GUIDELINES AND INSTRUCTIONS. Pick-up date: Saturday, Sept. 22, 2018

Safe-man Productivity System

2nd Public Meeting Hillside Conservation Areas. From Starting Points to Development Plan Februari 2013

CALLING SYSTEM ITCS designed for CALL FROM HOSPITAL CALL FROM REFRIGERATING ROOM

Content. Support Pack. Support Pack

General Characteristics The general characteristics of the Mixed Use - Gateway Land Use Plan Category are:

Touchless Substation Project. Eric Rosenberger, PE Megan Coyle

AIR CONDITIONER. Owner s Manual

Alder 2694 sq. ft. $374,000

NEWTON CONTROL PANEL-PRO (CP2 & CP7)

EMERGENCY RESPONSE PLAN

USER GUIDE LOGIC COMBI C

CSI-Thermal Multifamily/Commercial. SRCC OG-100 Incentive Calculator Guide

ph REGULATOR INSTALLATION AND MAINTENANCE MANUAL

2 and 4 slice Accents toasters with Pause and Check (certain models only) Please read and keep these instructions

2019 Professional Awards Program Information

Cleaning Glazed Porcelain and Ceramic Standard Cleaning Guidelines for Glazed Products

VALLEY COLLEGE BECKLEY CAMPUS EMERGENCY RESPONSE & EVACUATION PROCEDURES

PANIC EXIT POLICE LOCK

Clothes and shoes in any condition - both good and bad. Don t throw them in the trash! Donate them/recycle them at our event.

Under-Flame Fire Tests on Timber Decks

Fire Prevention Policy

Section K TotalPac 2 Systems

Nortec ME Series Evaporative Humidifier and Cooler. Humidification and Evaporative Cooling. humidity.com

P760SS 60 cm Built-under electric double oven

CMG GardenNotes #723 Growing Vegetables in a Hobby Greenhouse

Technical Documentation Active Chilled Beams Induction Units. Ceiling Installation

City of Duncan Official Community Plan Bylaw 2030, 2007 Development Permit Areas

BRUNETTE RIVER MASTER PLAN Sapperton Reach Case Study and Conceptual Design

2016 Sales per Product

Transcription:

Mem www.integralgrup.cm Prject: UCB Alumni Huse Re: UCB HVAC and Plumbing Recmmendatins Attn: Frederic Knapp CC: J.C. Reyes Date: 8/1/2011 Dear Frederic, The recmmendatins in this mem represent minimum imprvements that shuld be made t the mechanical, electrical, and plumbing systems at the U.C. Berkeley Alumni Huse. These imprvement recmmendatins are based n the replacement f the west wing and minimum upgrades t the east wing. The existing cnditins listed in this mem are based upn the 1953 histrical drawings as well as bservatins made during a site visit n 6/16/2011. HVAC SYSTEM The building s existing heating is prvided by steam frm the central plant. The west wing space heating is prvided by steam cnvectrs, with ne lcated in each ffice. Ventilatin air is prvided t these spaces by an utdr cling nly cndensing unit. The east wing space heating is prvided by a supply fan with steam cil lcated in the attic space abve the restrms. This wing des nt have cling. OPTION 1 Rehab Existing System: Central System Keep lw pressure steam system and replace piping, accessries, and insulatin as necessary. West Wing and Lbby Distributin Replace steam piping, cnvectrs, and accessries with new. The size and quantity will change based n the new west wing plan. Reuse existing cling nly cndensing unit t prvide mechanical ventilatin in basement. Replace steam piping insulatin as necessary. Replace supply and return fans and steam cils with new f equal capacity. All ductwrk and grilles that can be reused shall remain. OPTION 2 Cnvert Existing Steam t HHW: Page 1

Mem www.integralgrup.cm Central System Cnvert the building steam system t hydrnic with steam t heating ht water (HHW) generatrs lcated in the building mechanical rm. West Wing and Lbby Distributin Replace steam piping, cnvectrs, and accessries with hydrnic fin-tube basebard heaters r steel panel radiatrs. Install thermstatic radiatr valves, cpper distributin piping, and new traps at the zne level. If pssible, reuse existing cling nly cndensing unit t prvide mechanical ventilatin in basement. Distributin Replace steam cils, steam piping, and accessries with HHW cils, cpper piping, and HHW accessries. Replace supply and return fans with new f equal capacity. All ductwrk and grilles that can be reused shall remain. PLUMBING The building dmestic ht water is prvided by electric ht water heaters. The restrm fixtures are all the riginal fixtures installed in the 1950 s. The tank type water clsets are all 5 galln tanks and cannt be retrfitted t lw flush/dual flush. The wall munted urinals have a high flush rate and als cannt be retrfitted with lw flw flush valves. The wall munted lavatries d nt have lw flw fixtures but may be retrfitted. If the east wing will nt be mdified, the existing nn-cde cmpliant fixtures may stay. The west wing hwever will need t be upgraded t cde cmpliant fixtures. Nte: Starting n July 1, 2011, the water flw requirements in the Califrnia Cde fr water clsets and urinals change. Single and dual flush water clsets cannt exceed an effective flw rate f 1.28 gpf and urinals cannt exceed 0.5 gpf The maximum flw rate allwances fr shwer heads and faucets remain at 2.5 gpm (@ 80psi) and 2.2 gpm(@ 60psi), respectively. West Wing Water clsets shuld be remved and replaced. The tank type water clsets we recmmend are dual flush with 0.8/1.6 gpf fr liquids and slids, respectively. The urinals shuld be remved and replaced which can be ne f the fllwing. Zer water cnsumptin urinals maximize water cnservatin and these urinals are ur tp pick. If zer water cnsumptin urinals are nt desirable by UCB then we wuld recmmend 1/8 th gpf urinals with an aut flush device. These urinals aid in water cnservatin and functin like an rdinary urinal but use significantly less water. The existing urinals cannt be retrfitted with the 1/8 th gpf flushmeter. Page 2

Mem www.integralgrup.cm The wall hung lavatries are in gd shape and can be reused. The lavatry faucets shuld be replaced with 0.5 gpm faucets. The electric ht water heater serving the west wing lks t be in gd shape and upn further investigatin may be reused. If this unit prves t nt have enugh capacity t serve the new west wing, an electric instantaneus tankless ht water heater may be added t serve ne f the new restrms. The piping material may r may nt be reused. Testing f the cast irn pipe will be required t determine if sme r all f the piping shuld be replaced as part f this scpe f wrk. Since much f the cpper is mst likely reaching its life expectancy, we wuld recmmend the replacement f the cpper pipe. Water clsets shuld be remved and replaced. The tank type water clsets we recmmend are dual flush with 0.8/1.6 gpf fr liquids and slids, respectively. If the water clsets are nt replaced, water savings frm these fixtures will nt be realized as they cannt be retrfitted. The urinals shuld be remved and replaced which can be ne f the fllwing. Zer water cnsumptin urinals maximize water cnservatin and these urinals are ur tp pick. If zer water cnsumptin urinals are nt desirable by UCB then we wuld recmmend 1/8 th gpf urinals with an aut flush device. These urinals aid in water cnservatin and functin like an rdinary urinal but use significantly less water. The existing urinals cannt be retrfitted with the 1/8 th gpf flushmeter. If the urinals are nt replaced, water savings frm these fixtures will nt be realized. The wall hung lavatries are in gd shape and can be reused. The lavatry faucets shuld be replaced with 0.5 gpm faucets. The electric ht water heater serving the lks t be in gd shape and upn further investigatin may be reused. The piping material may r may nt be reused. Testing f the cast irn pipe will be required t determine if sme r all f the piping shuld be replaced as part f this scpe f wrk. Since much f the cpper is mst likely reaching its life expectancy, we wuld recmmend the replacement f the cpper pipe. ELECTRICAL The existing building electrical equipment is the riginal 1953 equipment which has becme bslete and unreliable. Panel bards have a 30 year life span and wiring has a 50 year life expectancy. The receptacle layut is minimal with dghuse type surface bxes in the areas requiring flr utlets. Page 3

Mem www.integralgrup.cm The building was riginally lit with sme flurescent and mstly incandescent surces. It appears that sme f the riginal fixtures have been upgraded, but these newer fixtures are still nt energy efficient, nr are they aesthetically cmpatible with the building. At this pint, we are still determining the adequacy if the lw vltage systems: phne, data, fire alarm, security, etc., but it is assumed any existing systems are bslete. West Wing A new electrical switchbard will be required. The estimated size will be 1000 amps, 208 vlt, 3 phase. The will be withut electrical service during the cnstructin f the new building. Tw branch panel bards will be required n each flr. Each ffice will have a minimum f tw receptacles as apprpriate t supprt tday s technlgy. Cnference rms will have three r mre receptacles, including flush flr receptacles under the table in the large cnference rms. New lighting will include primarily suspended flurescent direct/indirect lighting fixtures with latest generatin T8 lamps and prgram start ballasts. Where dwnlights are apprpriate, they will be cmpact flurescent. It is anticipated that several decrative fixtures will be needed in public spaces, t be crdinated with the architect. Exterir walkway lighting will be installed t match campus standards. Lighting cntrls will include dual switching in ffices with ccupancy sensr verride. Timer switches r ccupancy sensrs will be used in utility spaces and restrms. Architectural dimming systems will be used in the cnference rms. Public and exterir spaces will be cntrlled via a lighting cntrl panel incrprating an astrlgical timeclck. The building will require a new telephne system. In rder t save cabling, it is recmmended t install a VOIP system and perate the telephne thrugh the data system. A new data system will be installed with jacks in ffice and cnference rm. It is recmmended t install Cat 6A rated equipment. A manual fire alarm system will be prvided. An intrusin security system will be installed including mtin detectrs, dr and windw cntacts, keypads and an alarm hrns. Large cnference rms are recmmended t have a multi media system including lighting cntrls, verhead prjectin screen, prjectr, speakers and tie in fr the presenter s laptp. It is recmmended t replace the existing panel bard in the Page 4

Mem www.integralgrup.cm It is recmmended t replace the lighting in the with energy efficient lighting that is apprpriate fr the histrical ambiance f the space. The new phne and data systems will be extended t the as required. The new fire alarm system will be extended t the s the entire building is prtected. The security system will be extended t the. Page 5