Communicate the results of the EIA for the proposed development;

Similar documents
NATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) CHAPTER 1: INTRODUCTION

ENVIRONMENTAL IMPACT ASSESSMENT

M07/11 CURRICULUM VITAE Kelly Tucker

BASIC ASSESSMENT PROCESS

Cape Environmental Assessment Practitioners(Pty)

RIVER MAINTENANCE MANAGEMENT PLAN APPLICATION

TSHWANE STRENGTHENING PROJECT PHASE 1, GAUTENG PROVINCE: Draft Scoping Report: Apollo - Verwoerdburg July 2009

ENVIRONMENTAL IMPACT ASSESSMENT

BACKGROUND INFORMATION DOCUMENT (BID) AND INVITATION TO PARTICIPATE

Presented by: Remy Norbert DUHUZE Director/ER&PC REMA

A.3. Preliminary Environmental Information Report. Riverside Energy Park EN STATEMENT OF COMPETENCY. June 2018 Revision 0

Appendix A: The EIA Team

Reg. No. 2008/004627/07 VAT No Facsimile: (044) Progress Street, George Web:

EIA process in Malaysia. Approaches and Strategies. Way Forward

ENVIRONMENTAL IMPACT ASSESSMENT

Published in March 2005 by the. Ministry for the Environment. PO Box , Wellington, New Zealand ISBN: X.

CURRICULUM VITAE MAGNUS VAN ROOYEN

Environmental Impact Assessment

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017

Environmental Impact Assessment. York Glasgow Edinburgh

CHAPTER 4: CONTEXTUALISING THE PROPOSED PROJECT ENVIRONMENT WITHIN THE NATIONAL AND LOCAL

APPENDIX D PUBLIC NOTIFICATIONS

A global view of integrated closure and legacy planning

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager

For Registration or any Inquiries. Date: November 2017 (3-Day) Time: 8:00 am - 4:00 pm Venue: Manama, Kingdom of Bahrain

Environmental Impact Assessment (EIA) Training Session

VCA Guidance Note. Contents

REDZ & POWER CORRIDOR GAZETTING. 25 July Environmental Advisory Services

BASIC ASSESSMENT PROCESS THE PROPOSED CANELANDS EXTENSION, KWAZULU-NATAL KZN DAEA REF NO: DM/0031/2012 BACKGROUND INFORMATION DOCUMENT AUGUST 2012

Progress on implementation of the REDZs and Power Corridors SAPVIA Protea Hotel Balalaika 25 November 2016

AUCKLAND DESIGN OFFICE. Terms of Reference: Auckland Urban Design Panel

AUCKLAND DESIGN OFFICE. Terms of Reference: Auckland Urban Design Panel 2017

Sustainability Statement. Whitby Business Park Area Action Plan

Vietnam Scaling up Urban Upgrading Project (SUUP)

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

Our Constitutional imperative

MEETING HELD AT THE EDTEA OFFICES (ethekwini) ON 03 July 2018 AT 10h00. Ms. Naadira Nadasen (NN) Mrs Chen read (CR) and Mrs Tejal Singh (TS)

Living with World Heritage in Africa

TOPIC PAPER 2: Links to other sustainability tools

SINGITA SWENI LODGE EXPANSION: SUMMARY REPORT - BAR

Environmental Impact Assessment for Waterway Restoration Projects. Chris John, Technical Director Ecus Ltd.

PROPOSED GARDEN CITY NEW TOWN DEVELOPMENT, KRAAIFONTEIN DRAFT ENVIRONMENTAL IMPACT REPORT Summary Document

CORRECTIONS WITHIN DESIGN MANUAL FOR ROADS AND BRIDGES AUGUST 2009

SUSTAINABLE REGIONAL DEVELOPMENT MASTER OF SCIENCE (RESEARCH)

Road Safety Impact Assessment

ENVIRONMENTAL ISSUES and TEN-T PROJECTS Key elements for a sustainable network development

Proposed Shell Filling Station Parklands, Western Cape. Visual Impact Assessment

Harbour-front Enhancement Committee. Wan Chai Development Phase II. Planning and Engineering Review

STANDARDS OF INTERNATIONAL CULTURAL AND FINANCIAL INSTITUTIONS FOR CULTURAL HERITAGE PROTECTION AND MANAGEMENT

Stephen Berrisford Planning law and policy consultant Concise CV

Fabriek Street 45 Paarl. P.O. Box 2632 Paarl Tel: Cell:

Longbridge Town Centre Phase 2 Planning Application

AILA CPD TREE OF KNOWLEDGE DESIGNING AND CONSTRUCTING

ENVIRONMENTAL ASSESSMENT (EA) AS A PLANNING TOOL FOR SUSTAINABLE DEVELOPMENT- THE CASE OF BOTSWANA

Spatial / Land Use Planning System in Slovakia

My role and specialisms. Worked at spawforths for nearly 13 years. Worked on EIA projects for approx. 10 years and had co-ordinator role for approx.

Local Growth Planning in North Central Green Line Communities

volume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments

BUSINESS PLAN CEN/TC 250 STRUCTURAL EUROCODES EXECUTIVE SUMMARY

University Park, Worcester Non Technical Summary December 2011

Draft Resolution XII.10

Enclosures Appendix 1: Draft Golders Green Station Planning Brief. Summary

U N. United Nations Decade on Biodiversity. Convention on Biological Diversity. Ref.: SCBD/SPS/DC/SBG/JL/JA/ November 2017

Velindre Cancer Centre Environmental Statement Vol.1: Environmental Statement Text. Chapter 1: Introduction

Planning Proposal Concurrent DA/LEP Amendment for Belmont North Pharmacy Amendment No. 24 to Lake Macquarie Local Environmental Plan (LMLEP) 2014

BASIC ASSESSMENT REPORT. Background Information Document

BACKGROUND INFORMATION DOCUMENT

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08

WOKING DESIGN SUPPLEMENTARY PLANNING DOCUMENT (SPD)

Application of traffic impact studies as part of the EIA process: a case study as applied to the extension of a mineral processing plant

Fire prevention and protection

1.4 To establish opportunities for local pride in public open spaces. 1.5 To clarify Council s role as an enabler and supporter of this policy.

Amendment C146 Melton Planning Scheme Expert Evidence Statement Traffic & Transport Beattys Road, Plumpton

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

Resolution XII NOTING also that with the increasingly rapid urbanization, wetlands are being threatened in two principle ways:

IUCN World Heritage Advice Note Environmental Assessment & World Heritage

COMMISSION DELEGATED REGULATION (EU) /... of

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

BOARD OF ADVISORS Biographies

FIRE SAFETY MANAGEMENT PLAN

DATE OF BIRTH : 23 October 1971 YEARS EXPERIENCE : 21

BACKGROUND INFORMATION DOCUMENT:

Fire prevention and protection

Fabriek Street 45 Paarl. P.O. Box 2632 Paarl Tel: Cell:

Local Authority Involvement in the Historic Environment

DSO Compliance Report 2009

Urban Green Space Management (Horticulture) FdSc Course outline

TRANSPORT & INFRASTRUCTURE

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT PLACERVILLE OFFICE:

7. The Landscape. 7.1 Introduction. Environmental Impact Statement (EIS) Scoping Report

Archaeology and Planning in Greater London. A Charter for the Greater London Archaeology Advisory Service

Spatial and Economic Master Planning. Resilient, healthy and happy places to live, work and learn

Implementing sustainable water strategy through development industry engagement

Recommendations regarding legislative amendments

Awarding body monitoring report for: Institute of Legal Executives (ILEX) February 2008 QCA/08/3734

PURPOSE OF MEETING MEETING GUIDELINES PROJECT BACKGROUND ESKOM CLOCOLAN-FICKSBURG 88 KV POWERLINE, FREE STATE

Cotswolds AONB Landscape Strategy and Guidelines. June 2016

ROLE OF EIA PRACTITIONERS IN IMPROVING EIA REPORTING QUALITY - CHALLENGES AND SOLUTIONS: A CASE STUDY OF EIA SYSTEM IN PUNJAB PAKISTAN

Proposed Variation to the Midleton Town Development Plan 2013

Transcription:

1 INTRODUCTION Burgan Cape Terminals (Proprietary) Limited hereafter referred to as Burgan Oil, appointed Environmental Resources Management Southern Africa (Pty) Ltd, hereafter referred to as ERM, as independent Environmental Assessment Practitioners (EAPs) to undertake the Environmental Impact Assessment (EIA) process for the proposed development of an oil and fuel storage and distribution facility (the facility) at the Eastern Mole, Port of Cape Town, Western Cape. 1.1 PURPOSE OF THIS REPORT Fundamental to an environmental assessment is the identification, prediction and evaluation of the actual and potential environmental consequences of an activity and the options for mitigation of negative impacts and enhancement of positive impacts (DEAT, 2003). It is often possible to introduce measures to avoid, mitigate or compensate for many of the negative environmental impacts of storage facilities. It is important to identify these potential impacts early in the planning process in order to ensure that environmental impacts are avoided, minimised or mitigated (DEAT, 2003). The objectives of this report are to: Communicate the results of the EIA for the proposed development; Ensure that the impacts identified during the EIA process are adequately addressed; Provide a record of comments and responses received from Interested and Affected Parties (I&APs) during the process; and Facilitate an informed, transparent and accountable decision-making process by the relevant authorities. The initial Draft Environmental Impact Report (DEIR) was available for public comment (see Section1.5). Comments and responses received during the 40 day commenting period were incorporated into the released Draft EIR Revision 2. These comments raised new issues not previously mentioned in comments made in the scoping phase of the project. These new issues required substantive responses, which took the form of amended or supplemented specialist studies. Comments and responses received during the released Draft EIR Revision 2 commenting period have been incorporated into this Final EIR and submitted to the relevant authority, namely, the 1-1

Department of Environmental Affairs and Development Planning (DEA&DP) to inform their decision on environmental authorisation. 1.2 BRIEF DESCRIPTION Transnet National Ports Authority has identified the establishment of a coastal fuel storage facility on a portion of land measuring 30,452m² in the Port of Cape Town as a strategic business opportunity and released a tender for the establishment of such a facility (Figure 1.1). Burgan Oil was nominated as the preferred bidder and has subsequently been awarded the tender to develop the facility. Burgan's objective is to be an industry leader in the field of oil and fuel storage and related services, through employing the best skills and ensuring the company has appropriate capital support to deliver a professional and "best practice" service to the South African Oil Industry. The proposed facility is expected to have a total working volume tank capacity of approximately 109,400m 3 with the following tankage capacities: Diesel (AGO): 4 x 13,000m 3 + 3 9,000m 3 tanks Petrol (ULP): 3 9,000m 3 tanks Ethanol: 1 x 1,700m 3 service tank Bio Fame: 1 x 1,700m 3 service tank The associated drainage systems will consist of storm water, sewer and three oil-water separators. Other on site infrastructure will include access roads, an office block, six bay road loading gantry, pump station, water reservoir and associated infrastructure. A detailed project description is described in Chapter 4. 1-2

Figure 1.1 Location of the Proposed Facility

1.3 PROJECT PROPONENT Burgan Cape Terminals (Pty) Ltd is an independent South African oil storage and distribution company that provides fuel storage solutions to a range of petrochemical companies. Registered Address: Burgan Oil Services 2nd Floor Icon Building Cnr Hans Strijdom & Long St Cape Town, 8000 Tel: +27 (0) 21 431 1000 Fax: +27 (0) 21 425 8951 1.4 DETAILS OF ENVIRONMENTAL ASSESSMENT PRACTITIONER 1.4.1 ERM Southern Africa ERM was appointed by Burgan Oil to undertake the EIA for the proposed establishment of a coastal oil and fuel storage facility on a portion of land measuring 30,452m² in the Port of Cape Town. ERM and the specialists appointed by ERM during the course of this EIA have no financial ties to nor are they a subsidiary, legally or financially, of Burgan Oil. Remuneration for the services by the Applicant (Burgan Oil) in relation to this EIA is not linked to approval by any decision-making authority and ERM has no secondary or downstream interest in the development. ERM is a global environmental consulting organisation employing over 4700 consultants in over 145 offices in more than 41 countries. Founded in 1971, ERM has built an organisation based on the supply of a full range of environmental and social policy, scientific, technical, and regulatory expertise. Our primary focus is to provide quality work and service to our clients in these areas. From a regional perspective ERM has been involved in numerous projects in Africa over the past 30 years and in 2003 established a permanent presence in Southern Africa to meet the growing needs of our clients. The Southern African ERM offices are based in Cape Town, Johannesburg, Durban and Maputo. The Southern African Operating Company has a staff complement of over 180 dedicated environmental professionals offering expert skills in EIA, Environmental Management Plans (EMPs), Environmental Management Systems (EMSs), risk assessment, Environmental, Health and Safety (EHS) management and auditing, corporate social responsibility and socio-economic impact assessment, climate change services, specialist groundwater services as well as contaminated site management. 1-4

1.4.2 Project Team The project team will include ERM consultants and support staff and external specialists. Details of ERM s core project team are provided below. Table 1.1 ERM Core Project Team Partner in Charge Principal Consultant Project Manager Project Consultant Facilitator Stuart Heather-Clark BSc Civil Eng (Hons), MPhil Environmental and Geographical Science, Registered EAPSA Practitioner Tania Swanepoel B.Sc (Hons) (Geology); B.Sc (Hons) (Engineering & Env Geology) Dean Alborough MSc Environmental Science and Biotechnology, University of Cape Town Stefan Milandri MSc Environmental Management Liza van der Merwe BA (Hons) Development Studies, BA Development Studies, Sociology, Business Psychology The Partner in Charge, Stuart Heather-Clark, is a certified environmental assessment practitioner and the project has been and will be conducted in terms of the code of ethics promulgated by the Certification Board for Environmental Assessment Practitioners of South Africa (EAPSA), which includes a requirement for independence. Stuart has overall responsibility for the team and delivery of the EIA study. Stuart has more than 18 years experience in the field of Impact Assessment in South Africa, and is the Practice Leader for the Impact Assessment and Planning Team in ERM Southern Africa. Tania Swanepoel is a Principal Consultant in the Impact Assessment and Planning team based in Cape Town, South Africa. Tania has over 16 years of broad based environmental experience. In the last seven years Tania has focused predominantly on environmental permitting projects in South Africa. She therefore remains abreast of legislation revisions in South Africa enabling her to provide ERM s multinational clients with ad hoc advice and guidance with regards to South African environmental and waste management legislation. The Project Manager, Dean Alborough is a Senior Consultant with more than five years direct experience in integrated environmental management, having worked on projects in the oil and gas, renewable energy and mining industries, and more than seven years experience in Environmental Science. His work experience has included ESIAs, EIAs, EMPs, environmental auditing and risk assessments. 1-5

Stefan Milandri is a consultant within ERM s Impact Assessment and Planning (IAP) team based in Cape Town, South Africa. Stefan has a background in Environmental Management and Horticulture and obtained an MSc in Environmental Management from the University of Cape Town. His research focused on the design of environmentally sustainable systems, and involved a large-scale experiment which tested the ability of vegetation (biofilters) to treat polluted urban runoff. Prior to that, Stefan completed a BSc (Hons) in environmental management focusing on environmental and social management processes, environmental law, conflict resolution, water demand management and GIS. During the course of his studies, Stefan published three papers in accredited journals. Since joining ERM, Stefan has been involved in on- and off-shore oil and gas projects, and renewable energy projects, including a scoping report for the Mulungushi Hydropower Plant in Zambia, and the Environmental Impact Assessment Report for a Solar Power Plant in South Africa. Liza van der Merwe is a Principal Consultant based at the ERM Southern Africa Cape Town office. Liza is part of the Southern Africa Impact Assessment Planning team. She has more than 23 years of consultancy experience and provides specialist land acquisition and resettlement support as well as stakeholder engagement experience in the environmental and social impact assessment process to ensure sustainable project development. In recent years Liza focussed her attention on extensive stakeholder engagement with project affected land owners as well as developing land acquisition, resettlement and compensation strategies on mega-infrastructure projects for clients in mining, petroleum and water supply industries in South Africa. Her approach is characterised by integrated objectives based planning and implementation within the broader project context. 1.4.3 Specialists Specialist studies identified during the Scoping Phase and EIA Phase were undertaken to assist in assessing the potential impacts associated with the Project. Specialist s details are provided in Table 1.2 below. Table 1.2 Specialist studies and specialist qualifications Specialist Study Name and Organisation Qualifications Traffic Impact Assessment Bernard Phillips Kantey and Templer Masters in Transportation Planning & Engineering Bachelor of Architectural Studies Diploma in Civil Engineering Certificate in Business Communication Economic Assessment Hugo van Zyl Independent Economic Researchers BSc., BCom. Honours (Economics), Mcom. (Economics), PhD. (Economics) 1-6

Specialist Study Name and Organisation Qualifications Industry Assessment Paul Buley Independent BSc (Chem Eng) PMD UCT School of Business Management Air Quality Impact Assessment Demos Dracoulides DDA Environmental Engineers Quantitative Risk Assessment Tim Price and Gary McFadden ERM Contaminated Site Assessment Ken King ERM Diploma in Mechanical Engineering, M.Sc. in Engineering and Energy Studies BEng Honours (Chemical), MEng (Chemical) BSc Honours (Geology), MSc (Geology) Specialist reports and declarations of independence are included in Annex F-J. 1.5 COMMENTING ON THE EIR The initial Draft EIR was made available for a 40-day commenting period to I&APs and commenting authorities in order to provide I&APs and commenting authorities with an opportunity to comment on any aspect of the EIA. A copy of the Draft EIR was also lodged at the City of Cape Town Central Public Library and made available on the Project website http://www.erm.com/burganoil for the 40-day commenting period. The Draft EIR Revision 2 was made available for a 21-day commenting period to I&APs and commenting authorities in order to provide I&APs and commenting authorities with an opportunity to comment on any aspect of the EIA and in particular, on new information proved in response to comments received on the earlier version. Changes from the initial DEIR were underlined. A copy of the Draft EIR Revision 2 was also lodged at the City of Cape Town Central Public Library and made available on the Project website http://www.erm.com/burganoil. This released Final EIR has been made available to I&APs for a 21-day commenting period and commenting authorities in order to provide I&APs and commenting authorities with an opportunity to comment on any aspect of the EIA. A copy of the Final EIR has been made available on the Project website http://www.erm.com/burganoil. Any comments should be forwarded to ERM by 12 September 2014 at the address, telephone/fax numbers or e-mail address shown below. Att: Tougheeda Aspeling ERM Southern Africa (Pty) Ltd Postnet Suite 90, Private Bag X12, Tokai, 7966 Tel: (021) 681 5400; Fax: (021) 686 0736 E-mail: burganoil@erm.com 1-7

1.6 STRUCTURE OF THIS REPORT The structure of this EIR is presented in Table 1.3 below: Table 1.3 Structure of the Environmental Impact Report Chapter Chapter 1 Introduction Chapter 2 Administrative Framework Chapter 3 Approach and Methodology Chapter 4 Project Description Chapter 5 Needs and Desirability Chapter 6 Biophysical Baseline Chapter 7 Socio-economic Baseline Chapter 8 Impact Assessment Chapter 9 Conclusions and Recommendations Chapter 10 References Contents Contains a brief description of the proposed activity, the Project team and an outline of the report structure. Outlines the legislative, policy and administrative requirements applicable to the proposed development. Outlines the approach to the EIA study and summarises the process undertaken for the Project to date. Includes a detailed description of the proposed activities and the alternatives. Describes the need and desirability of the Project. Describes the receiving biophysical baseline environment. Describes the receiving socio-economic baseline environment Describes and assesses the potential impacts of the proposed development on the biophysical and socioeconomic baseline, describes relevant mitigation measures and discusses decommissioning and cumulative impacts. Summarises the key findings of the EIA and provides recommendations for the mitigation of potential impacts and the management of the Project. Contains a list of references used in compiling the report and specialist studies. In addition, the report includes the following annexures: Annex A: Annex B: Annex C: Annex D: Annex E: Annex F: Annex G: Annex H: Annex I: Annex J: Annex K: Burgan Oil HSE Policy Photographs Public Participation Documentation Comments and Responses Report Authority Communications Air Quality Specialist Report Traffic Specialist Report Quantitative Risk Assessment Specialist Report Economic Specialist Report Contaminated Site Assessment Environmental Management Programme (EMPr) 1-8