Enabling Works Fox Primary School, Kensignton, London. Presentation for Drop-in Session for Fox Primary School Staff & Parents

Similar documents
GROUNDS SERVICES COVERING EVERY ASPECT OF GROUNDS MAINTENANCE, LANDSCAPING AND DESIGN.

GROUNDS SERVICES COVERING EVERY ASPECT OF GROUNDS MAINTENANCE, LANDSCAPING AND DESIGN.

REFERENCE: 15/01661/FUL Registered: 16 March 2015 Expiry date: 25 October 2016

Millfield Schools Fire Risk Prevention Policy

FIRE SAFETY POLICY. This policy document replaces any previously published documents and comes into effect September 2018.

UCL PRINCIPAL CONTRACTOR SITE FIRE SAFETY RISK REVIEW & MITIGATION MEASURES

JOB DESCRIPTION. Job Ref. No: Directorate: Community & Resources

Wylfa Newydd Project Site Preparation and Clearance

Accreditations. Who are Burleys? Who are TCL Group?

FIRE SAFETY POLICY LEEDS METHODIST MISSION. Oxford Place Centre

H&S Forum. Fire Safety Policy Glascote Academy

Departure from the Development Plan. Town Council objection to a major application. DETERMINE

Soft Landscaping. Soft Landscaping. Solutions

Slough International Freight Exchange Proposals, Colnbrook+

Background Information

HEALTH AND SAFETY FIRE SAFETY POLICY Putnoe Primary School

Fire Safety Policy 29/09/2017. Holme Grange School Whole School Policy Including EYFS. Fire Safety Policy

Temporary Bridging. Issue 2

Welcome to our exhibition

A21. Start of works exhibition Tonbridge to Pembury. Welcome. Dualling Scheme

Chapter 10 Route window W17 Middlegreen Road, St Mary s Road and Trenches bridges. Transport for London

Final Revisions: Reason: For the avoidance of doubt and in the interests of proper planning.

Haydock Point. Welcome

Longbridge Town Centre Phase 2 Planning Application

Moston Vale Project development images

E16: MAINTENANCE OF LANDSCAPED AREAS

Welcome to the community information evening about Taylor Wimpey Central London s proposed development of Mount Pleasant.

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

For the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire Alarm Systems

- CONSTRUCTION FIRE SAFETY STANDARDS

New School Construction: Safe School Opening. OAR and IOR Joint Training February 17, 2005

For the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire Alarm Systems

Outstanding outdoor spaces for public parks

- CONSTRUCTION FIRE SAFETY STANDARDS

INDUCTION MANUAL CONTRACTORS & SERVICE PROVIDERS. Convention Square, 1 Lower Long Street, Cape Town 8001, South Africa

TRANSPORT & INFRASTRUCTURE

Fire safety procedure

Royal Borough of Greenwich Construction Skills Centre

Canal & River Trust response to the Consultation on the Working Draft Environmental Impact Assessment Report

Fire Safety Management

Grounds Management Solutions

Award winning security you can trust

Notting Hill Housing & The Development Team

Contractors Site Induction

New Build Depot, Ashford

LOS ANGELES UNIFIED SCHOOL DISTRICT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY PROCEDURE

Please take time to view our latest plans, speak to the development team and ask any questions you may have. EALING BROADWAY A4020

The London Borough of Lewisham hereby accepts that the amendment(s) described in the schedule below is (are) non material.

The 20 Bedford Way Masterplan

Radon Survey Final Report

Access to Health. Complete door and architectural ironmongery scheduling and project management solutions for the healthcare industry.

Chapter 27 Route Window SE7 Church Manorway Bridge. Transport for London

Heating Ventilation Electrical Building Services

HS2 Environment. Protecting the environment

PROJECTS & REACTIVE MAINTENANCE SPECIALISTS

A1 Scotswood to North Brunton Public Information Exhibition Executive Summary

Plumstead Temporary Railway Sidings and Associated Permanent Works

an Inspector appointed by the Secretary of State for Communities and Local Government

Annington Property Limited

Great Dover Street London SE1 4XA Directorate of Estates & Facilities - Document No. HS30 V2.1 Dated November 2014

Has there been interest in the site from other parties since St. Modwen owned it? No

Fire Evacuation Procedure WISE Campus

STATEMENT OF THE HEALTH AND SAFETY STRATEGY FOR THE SYDNEY RUSSELL SCHOOL

Visitors to Police Premises Standard Operating Procedure

The Association for Specialist Fire Protection. Understanding Best Practice in passive fire protection

SECTION 13 LANDSCAPING & TREE PROTECTION

DONCASTER METROPOLITAN BOROUGH COUNCIL. PLANNING COMMITTEE 3 rd May Expiry Date:

Site guidance for working in root protection zones

Your specialist partner for total electrical compliance. Electrical Testing

here today Public exhibition

Loss Prevention Standard

Health and Safety Policy. Version Author Revisions Made Date 1 Colin Campbell First Draft March 2014

49 Broughton Avenue London N3 3EN

A16 Ecology: Application 2 - LBHF

A NEW ALDI FOOD STORE FOR KINGSWINFORD

Wylfa Newydd Project Site Preparation and Clearance Application


T CLASS SECURITY COMPANY OVERVIEW POWERED BY PEOPLE

Stanryck House, 38 Totteridge Village, London, N20 8JN

Fire safety and high rise student accommodation

In your area. Ravenfield to Clayton LA13. June Introduction

Fire Risk Management Policy. UK September 2017

A GUIDE TO THE REGULATORY REFORM ORDER (FIRE SAFETY) 2005 (RRO)

Welcome to our public exhibition

Introduction Oakleaf Grounds Services

Fire Risk Assessment - HMO (including accommodation with integrated fire systems)

Refurbishment of Purple Car Park

Peponi House Preparatory School Nairobi, Kenya. Peponi House Fire Risk Prevention Policy

39 N. B Street San Mateo, California Construction Tree Protection Plan

an Inspector appointed by the Secretary of State for Communities and Local Government

Professional & Qualified Tree Surgeons, Landscapers & Forestry Contractors

POTTERSPURY PARISH COUNCIL Grass Mowing and Tree & Shrub Maintenance Tender 2017

Contractors Site Induction

BEVERIDGE ASSOCIATES PARTNERSHIP LIMITED CAPABILITY STATEMENT CATERING AND RETAIL

PORTOBELLO PAVILION DESIGN CHARRETTE REPORT

Peter Brett Associates LLP (PBA) act on behalf of db symmetry ltd in respect of the proposed symmetry park, Kettering development (the Site).

PLANNING STATEMENT. Market House Market Place Kingston upon Thames KT1 1JS

12. Environmental baseline and assessment of impacts: Southeastern section

Specialists in bespoke furniture and interiors

REFERENCE: 16/8568/ENQ Received: 25 October 2016 Accepted: 26 October 2016

Transcription:

Enabling Works Fox Primary School, Kensignton, London Presentation for Drop-in Session for Fox Primary School Staff & Parents

Presentation Contents 1. Who s Who 2. Where are the works to be undertaken 3. Preparatory works 4. How will it be done 5. Control of dust and noise 6. Control of Lorry Movements 7. Site Safety

1. Who s Who? The Royal Borough of Kensington & Chelsea (RBKC) school owner and employer Soilfix Specialist Remediation Contractor established in 2004 covering England & Wales from bases in Avonmouth, Bristol and Rayleigh, Essex Golder Associates (UK) Ltd. Environmental consultants supervising works on behalf of RBKC Who are Soilfix? Celebrated their 10 year anniversary in Jan 2015. Soilfix are an Award-winning specialist remediation contractor working from offices in Avonmouth, Bristol and Rayleigh, Essex. Our core business is Remediation & Enabling Works. Proven track record of success in public, residential, commercial and industrial sectors. Soilfix staff has extensive experience in undertaking projects in highly sensitive locations, including previous contracts with RBKC and remedial works to occupied residential housing estates.

2. Areas of working

3. Preparatory Works Erect timber hoarding / safety fencing with safety signage clearly displayed and viewing panels Implement a traffic management system to allow access to plant, materials & site personnel Establish alternative serviced facilities for school reception & children s toilets within front playground Enabling works to allow demolition of boundary wall to Kensington Place along with both Fox Cottage and children's toilet block Establishment of Site Compound with welfare / storage facilities in the front playground Clearance of existing vegetation & furniture etc. to both embankment & rear playgrounds to facilitate ongoing works Arboricultural works to vegetation & trees along embankment & rear playgrounds

4. How will it be done? Mechanical demolition of boundary wall to Kensington Place and both Fox Cottage & children s toilet block Specialist arboricultural contractor to fell & log existing trees, chip and remove small trees, shrubs & vegetation from raised embankments & playground areas Excavator to gain access into raised embankment to commence excavation works, then establish loading area for HGV s transporting soils for off-site disposal Controlled & sequenced excavation of soils from raised embankment along western boundary with accredited operatives and supervisors. Installation of propping systems along boundary wall with Palmerston House to maintain structural integrity at all times Excavation works will continue, loading HGV s that will access from Kensington Place fully compliant with traffic management plan

4. How will it be done? (contd) Excavation of raised beds within quiet area transporting soils to enable mechanical loading from raised embankment. This will be completed with rubber tracked mini-diggers and personnel with wheelbarrows Clearance works to rear playgrounds (shrubs, vegetation & tress) then excavation as per front raised beds with mini-diggers and wheelbarrows. This will be completed sequentially to minimise disruption to staff, parents and children along a segregated and managed route In certain areas operatives will be required to wear protective equipment (half face masks and blue overalls) similar to that below Soilfix will implement environmental monitoring to ensure the soils are excavated and disposed off-site under controlled and monitored conditions at all times with any potential nuisances (dusts, noise) managed at all times Works will be securely segregated at all times with either solid timber hoarding or screened temporary safety fencing