Cottage Grove Road Reconstruction. City of Madison Engineering

Similar documents
IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

Prince William Street Project (Grant Avenue to Wellington Road)

Project will Replace: Utilities Curb Pavement Lighting. City of Madison

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Citizen Information Meeting

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

Fall 2017 Construction Update

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

2018 Woodhill Road Improvements Public Informational Meeting. September 28, :00 pm

Spring 2018 Construction Update

US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

Open House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK

Project Overview. Get Involved. Public Information Meeting. Contact Information

SUMMARY Downtown Malabar Meeting on July 30, 2013 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study

Chain Bridge Road Sidewalk Improvements Citizen Council Work Session

RECEIVE AN UPDATE ON THE ALMOND GROVE PHASE II PROJECT

PROJECTS UNDER CONSTRUCTION

Victoria Bridge Municipal Class EA Civic Works Committee

Access Management: An Overview

LOCATION AND DESIGN DIVISION

Monroe Street Reconstruction. Final Corridor Design Presentation & Open House August 16, 2017

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

Route 9 Gateway Project. October 9, 2014 Informational Meeting

Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m.

Improve the appearance of off-street parking areas, vehicular use areas, and property abutting public and private roads;

Red Fox Commercial Outline Plan

Executive Summary. NY 7 / NY 2 Corridor

Construction Engineering & Inspection

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

5-Year Street Reconstruction Plan ( )

2017 General Obligation Bond

Monroe Street Reconstruction. Business Roundtable March 29, 2017

Construction and Landscaping on Public Property

SECTION 4(f) DE MINIMIS DOCUMENTATION

Glencoe Elementary School Parking Lot Retrofit 825 SE 51 st Street

4.1 Build Alternative 1 Construction Phasing

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

COLLIER BOULEVARD (CR 951) CORRIDOR

PennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project

Design Services for Wiles Road Broward County Project #104026

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

Princess Anne Road. Phase VII (CIP 2-195) Citizens Information Meeting

PDR /21/15 Noah Beals 1/7/15 xx

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

Getting Started On Your Green Infrastructure (GI) Plan

RESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE

SEWRPC. Joint Meeting of the Advisory Committees on Regional Land Use Planning and Regional Transportation Planning APRIL 26, 2018

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

CITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details

City of Bonita Springs Driveway Permit Information Packet

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

Description of Preferred Alternative

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

Public Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE

Public Information Centre. Welcome

Capital Projects in and near Odenton Town Center

Highway 15 Project - Hutchinson

2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects

Rezoning Transportation Analysis Petition Number: General Location Identifier: , ,

DESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

Pennsy Greenway Trail

Public Works Project Delivery Report

STANDARD DETAILS QUICK REFERENCE

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

Public Meeting May 20, 2014

SAINT CHARLES COUNTY ROAD BOARD Minutes of June 15, 2016

LITTLE ELM CAPTIAL IMPROVEMENT BOND STREET PRESENTATION

Town of Windham. Planning Department 8 School Road Windham, ME voice fax

Johnson Street Bridge Public Realm Update

Capital Projects impacting Odenton Town Center

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

Location. Served. Category. Units Start Year. Previous Appropriations

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM

Moving The Metro. A special construction update for the metro Omaha area.

STORMWATER - GENERAL NOTES

BOISE, IDAHO COUNCIL WORK SESSION AGENDA September 19, :00 PM City Hall - Council Chambers

3.0 master plan concept

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Reconnecting New Haven: Downtown Crossing

2040 Long Range Transportation Plan

Welcome to the. Open House

Berkshire Regional Planning Commission Clearinghouse Review Report

Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project

Olde Towne Vision Plan

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

AGENDA ACTION ITEMS INFORMATION ITEMS

PROPOSED IMPROVEMENTS

SUBDIVISION, PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL, REZONING & SIDEWALK WAIVER STAFF REPORT Date: February 7, 2013

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

Transcription:

Public Informational Meeting Cottage Grove Road Reconstruction October 8, 2015

Presentation Outline Introduction Project Purpose & Need Proposed Design Overview Environmental Concerns Pedestrian Needs Project Funding Questions/Comments

Project Location FUTURE PROJECT 2018 CONSTRUCTION

Project Purpose & Need Replace deteriorating asphalt pavement Reduce traffic congestion and improve safety at intersectionsi Construct sidewalk in areas where it currently does not exist Provide continuous bike lanes throughout project limits Address storm water control and treatment issues

Design Overview Provide two through lanes and on-street bike lanes in each direction throughout project limits Add turn lanes for improved safety at intersections New Storm Sewer and Water Main Sidewalk Construction ti and Repair as necessary Update Signals & Add Street Lighting as necessary

Phase One - 2018 Construction Phase One limits are from approximately 350 feet east of I-39/90 to Sprecher Road

Phase Two Interstate Bridge Replacement Overpass Design Will Depend on the Outcome of WisDOT It Interstate tt Corridor Std Study

Environmental Concerns Erosion New curb and gutter will help prevent roadside slope erosion Storm Water Treatment swales and a storm water retention pond will be constructed with project

Storm Water Management Improvements Storm Water Retention Pond Construct New Storm Sewer System Throughout Project Limits Designed for 10-Year Storm Event Construct Storm Water Treatment Swales in Areas With New Curb and Gutter Construct Storm Water Retention Pond in Southeast Quadrant of Cottage Grove Rd / Sprecher Rd Intersection

Street Trees Approximately 25 trees and shrubs will need to be removed for construction of the project Efforts will continue to be made to minimize i i tree removals Trees will be replanted in terrace areas at the completion of the project

Pedestrian Needs: Add Missing Sidewalk on Both Sides of Cottage Grove Road

Street Lighting Upgrades Continue KIM Street Lighting Fixtures in Medians to Match Developed Areas

2018 Construction Start Construction Spring of 2018 Complete by Mid-Summer of 2018 Utility Relocations Summer 2017 Traffic maintained during construction, one lane in each direction Keep access to businesses at all times Keep access to all homes except when driveway is being poured. Alternate parking area will be provided when access cannot be maintained.

Project tfunding &Assessment Policy The project is funded by Federal and Local Sources Estimated Project Costs: Roadway Items $5.5 Million (50% Federal/50% Local) Local share is further divided between City of Madison, Dane County and adjacent property p owners Water main $0.5 Million (100% City Funding) Total Project Estimate: $6.0 Million

Project Funding & Assessment Policy Assessment Policy for Roadway Items: Only properties that have vehicular access to Cottage Grove Road are assessed. The Local Share of roadway items is divided between the City, Dane County and Adjacent Property Owners per City Assessment Policy For unimproved streets the adjacent property is assessed for the Local Share of costs for construction of curb & gutter, 4-Feet of pavement width, drive aprons, sidewalk,,private storm sewer and street lighting. g A Typical Assessment for roadway items for a property with 60 feet of frontage on Cottage Grove Road would be approximately $3000 Assessment Policy for Local Utilities: (Water Main) Funding for Local Utilities is 100% by Local Sources No Sanitary Sewer Work is planned for this project Water Main is funded 100% by City

What s next? 2016 2017 Complete Environmental Documents Complete WisDOT Project Approvals Prepare Right of Way Plat Complete Plans Prepare Bid Documents Final Plans Due August 2017 Private Utility Relocations and Construction Right of Way Acquisitions Spring and Summer 2018 Roadway Construction (Phase 1) o Anticipated i t to begin in Spring of 2018 o Expected Completion by end of August, 2018

More Information Project Website http://www.cityofmadison.com/engineering/projects/cottage-grove-road provide comments in contact us button Subcribe to MyAccount email list to receive project updates https://my.cityofmadison.com/ This project located under heading Transportation Projects

Questions or Comments Please Complete and Return the Comment Form By October 30, 2015 Project Contacts: Glen Yoerger P.E. 261-9177 gyoerger@cityofmadison.com Scott Langer P.E. City Traffic Engineering 266-5987 slanger@cityofmadison.com