I. Introduction and Arrangement

Similar documents
Technical Assignment 3 11/15/04. Executive Summary

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3

Designing Energy Efficient Outdoor Air Systems

Technical Report #3 Mechanical Systems Existing Conditions Evaluation

Technical Assignment 3. Mechanical Systems Existing Conditions Evaluation

System Components with ` Emphasis on Packaged Rooftop Application and Installation. Jerry Cohen President Jacco & Assoc.

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

TECHNICAL REPORT III Mechanical Systems Existing Conditions

Appendix 13. Categories of Cooling and Heating systems

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

Mechanical Technical Report 3. Mechanical Systems Existing Conditions Evaluation

Pharmaceutical Facility Design

4. OVERVIEW OF MECHANICAL SYSTEM

Christopher Kelly Technical Report Three

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

Appendices. Included in this section are

Mechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation

Computing Services Center

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria

Technical Development Program

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

Technical Assignment 3

C13-Series Engineering Guide

Energy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE

11/2 ORT THREEE. Virtua Repla. acement Hospi. ital. Voorhees NJ. Justin Prior. Mechanical

GARCIA GALUSKA DESOUSA Consulting Engineers

MAC-060HE-01-L High Efficiency Air-Cooled Chiller Air-Cooled Chillers for Global Residential and Light Commercial Micro Climates Rev 1.

National Institutes of Health Building 37 Modernization Bethesda, Maryland MECHANICAL DEPTH EXISTING MECHANICAL SYSTEM

HVAC 101. H V A C S y s t e m s

ASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery. Steven T. Taylor, PE Principal Taylor Engineering

CoolSpot Engineering Guide

HVAC Mandatory Provisions Part II, Page 1

Terminal. Las Vegas, NV. Technical

Job Name Control Systems Description Date

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

WE ARE PLEASED TO PROVIDE THE ENCLOSED SUBMITTAL FOR YOUR REVIEW AND APPROVAL

MAC-036HE-02-L High Efficiency Air-Cooled Chiller Air-Cooled Chillers for Global Residential and Light Commercial Micro Climates Rev 1.

MAC-048HE-01-L High Efficiency Air-Cooled Chiller Air-Cooled Chillers for Global Residential and Light Commercial Micro Climates Rev 1.

Introduction to HVAC. American Standard Inc Air Conditioning Clinic TRG-TRC018-EN

Existing Mechanical System Operation

MT. AIRY MIDDLE SCHOOL CARROLL COUNTY PUBLIC SCHOOLS

EarthWise System Seminar

Technical Investigation, Part Three Elizabeth C. Krauss Mechanical Option September 18, 2013

ENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory

MAC-120HE-03 Air-Cooled Chiller

ENGINEERING. Edition No. 13 October 2002

CHAPTER 4. HVAC DELIVERY SYSTEMS

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

Senior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1

City of Duluth Festival Center 04/25

Mechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013

HVAC 101. The Basics of Heating, Ventilation and Air Conditioning

Multi-Path RTU-TYPE 2


DACC Health Sciences Building Air Handler Assessment/Study

D-PAC. Digital Precise Air Control System. Functionality Factory Testing Ease of Installation Ease of Maintenance Energy Efficiency

VERSECON Indoor Vertical Self-Contained Air Conditioner YSWU Ton Water-Cooled

product application data PERFECT HUMIDITY DEHUMIDIFICATION SYSTEM

Technical Assignment 3 Mechanical Systems Existing Conditions Evaluation

MAC N-407 Air-Cooled Chiller

Summary Comparison of Simulation Program Features

Civil Engineering Building

Architectural Alliance Incorporated MDP CONSULTING ENGINEERS, INC N 11th Street Beaumont, TX 77702

VertiCool Aurora Engineering Guide

CAS. Product Specifications. COMMERCIAL SPLIT SYSTEMS CONDENSING UNITS R 410A, 6 to 12.5 TONS BUILT TO LAST, EASY TO INSTALL AND SERVICE

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

Dehumidifying with Dedicated Outdoor Air

LGH/LCH WARNING. CAUTION Danger of sharp metallic edges. Can cause injury. Take care when servicing unit to avoid accidental contact with sharp edges.

The School District of Philadelphia Administration Headquarters

Liebert PDX and PCW Thermal Management Systems

Product Data. Features/Benefits. OMNIZONE 50BRN,BZN Water-Cooled and Remote Air-Cooled Indoor Self-Contained Systems. 5 to 20 Nominal Tons

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

APPLICATION GUIDE BEAMS

CLIMATAIR PENTHOUSE AIR HANDLING SYSTEMS

COMcheck Software Version Interior Lighting Compliance Certificate

MECCI Engineers. Institute of Engineering Design & Research

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog

Description of All Alternatives Considered-

VariCool VAV. (Variable Air Volume) 9 to 70 tons Variable Air Volume Water-Cooled and Chilled Water. Unique Solutions for All-Indoor HVAC Projects

ASHRAE WILL GIVE YOU THE WORLD. This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee

Service Step by Step Trouble-Shooting Check-List

VertiCool CLASSIC. Engineering Guide. Effective March Air-Cooled, Water-Cooled, Chilled Water and Water Source Heat Pump

RT-OA TM Rooftop Outdoor-Air (DOAS)

The Temperature and Relative Humidity Control in Cushing Library

Temperature. In the HVAC area, we talk about two kinds of temperatures.

Redesign of Bennett Hall HVAC System

Update Dedicated Heat Recovery Chiller Technology. Don Frye. Gulf South

FCC Fan-Coil Units High-Performance, Vertical

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS. HA300, HB360, HB480 & HB thru 50 NOMINAL TONS (50 Hz)

AHRI Certification Program Scopes - COOLING

TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare Center Northfield, Ohio

COMMERCIAL HVAC EQUIPMENT Coils: Direct Expansion, Chilled Water, and Heating

Data Aire Mini Ceiling Systems 1, 1.5, 2, and 2.5 ton capacities R-410A. ISO 9001 Certified

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems

Presented By: John Dolan, P.E.

Design Considerations For Dedicated OA Systems BY HUGH CROWTHER, P.ENG, MEMBER ASHRAE; YI TENG MA, ASSOCIATE MEMBER ASHRAE

Challenges and Methods of Estimating a Conceptual HVAC Design

VariCool VAV Engineering Guide

Transcription:

Joseph Firrantello - Mechanical Option Primary Faculty Consultant: Freihaut Laboratory Facility, Eastern Pennsylvania Mechanical Assignment 3 Existing Conditions Report 11.14.03 Executive Summary The purpose of this report to present a summary of the existing HVAC system conditions in the Laboratory Facility. This summary is intended as an examination of different aspects of the mechanical systems in order to better understand the systems purposes and method of operation. First, design objectives and requirements were looked at. These were broken down into three main issues: occupant comfort, maintaining clean room purity, and first cost minimalization. Energy suppliers and rates for the site were then established. Electricity is provided by PECO under their General Service (GS) tariff. Natural Gas is provided by PGW under an as-yet-undetermined interruptible (IT) rate. The main cost factor, as already stated, is first cost. The firm had decided that utility costs could be passed onto clients, so operational costs were not a large factor. There were no significant site factors that influenced the design. The summer outdoor design conditions meet those in ASHRAE Fundamentals at 93 F DBT and75 F WBT, while the winter outdoor design conditions are quite severe: 0 F compared to ASHRAE s 30 F. The indoor design conditions are not ASHRAE standard. The clean rooms are maintained at 68 F, non- clean labs at 72 F, and office spaces at 75 F. The resulting design heating and cooling loads are 3399 BTUH and 8066 BTUH (672 tons) respectively. The sequence of operations for the process chiller, process boiler (steam), and air side (AHUs, CAV and VAV systems) are examined and listed. Finally, the system was found to adequately meet the design requirements, at an HVAC construction cost of $45/sf for a high technology facility. However, there seems to be room for improvement in operational costs Page 1 of 27

Joseph Firrantello - Mechanical Option Primary Faculty Consultant: Freihaut Laboratory Facility, Eastern Pennsylvania Mechanical Assignment 3 Existing Conditions Report 11.14.03 I. Introduction and Arrangement The purpose of this report to present a summary of the existing HVAC system conditions in the Laboratory Facility. This summary is intended as an examination of different aspects of the mechanical systems in order to better understand the systems purposes and method of operation. It is arranged as follows: I. Introduction and Arrangement II. Design Objectives and Requirements III. Energy Sources and Rates IV. Cost and Site Factors V. Indoor and Outdoor Design Conditions VI. Design Heating and Cooling Loads VII. Description of System Operation VIII. Critique of System Appendix A Schematic Diagrams of Chiller, Boiler, and Air Side Appendix B Schedules of Major Mechanical Equipment Page 2 of 27

Joseph Firrantello - Mechanical Option Primary Faculty Consultant: Freihaut Laboratory Facility, Eastern Pennsylvania Mechanical Assignment 3 Existing Conditions Report 11.14.03 II. Design Objectives and Requirements The design of a laboratory facility needs to address all of the issues that deal with normal commercial spaces, plus some items unique to the laboratory building type. The design of the facility has three main thrusts: occupant comfort, maintaining clean laboratory conditions, and first cost. A. Occupant Comfort Occupant comfort is necessary to ensure the efficiency and productivity of employees. In this case, occupant comfort can be split into three subsections, being thermal comfort, indoor air quality, and safety. 1. Thermal Comfort The HVAC system needs to maintain the thermal comfort of the occupants. In this case, that means dealing with variable occupancy (and therefore variable loads) for spaces such as conference rooms and process rooms. It also means dealing with the substantial heat load that can be generated by laboratory equipment, as well as the large variation in outdoor air conditions that can occur at the building s location (see V. Indoor and Outdoor Design Conditions). 2. Indoor Air Quality The HVAC system needs to maintain indoor air quality. ASHRAE has performed numerous studies indicating that better indoor air quality directly affects occupant comfort and therefore occupant productivity. Along with occupant comfort, bad indoor air quality can begin to adversely affect occupant health. 3. Safety The HVAC system needs to help maintain the safety of the occupants. Since the space is a laboratory with potentially hazardous substances, additional ventilation may be required under the ANSI Lab Safety Standard. B. Clean Room Conditions Due to the biological and semiconductor work that is performed at the facility, clean rooms of class 100,000 and class 10,000 are required. 1 This prevents contamination of whatever product is being worked on in the facility. C. First Cost The firm occupying the facility had decided that first cost was a priority for the HVAC design, as they could pass their utility rates onto the fees they would charge their clients. 1 The class refers to the number of particles greater than or equal to 5 microns (micrometers) per cubic foot of air. (from Energy Efficiency in California Laboratory-Type Facilities, 1996) Page 3 of 27

Joseph Firrantello - Mechanical Option Primary Faculty Consultant: Freihaut Laboratory Facility, Eastern Pennsylvania Mechanical Assignment 3 Existing Conditions Report 11.14.03 III. Energy Sources and Rates The facility has two utility services: electricity and natural gas. Electricity is provided by PECO under the GS (General Service Rider). The rate structure is outlined below. PECO Electricity Charges Fixed Distribution Service Charge for polyphase service $ 23.82 Variable Distribution Service Charge 1st 80 hours use of billing demand $0.0332 per kwh * next 80 hours use of billing demand $0.0156 per kwh for additional use, except $0.0098 per kwh over both 400 hours use of billing demand and 2,000 kwh $0.0043 per kwh Competitive Transition Charge 1st 80 hours use of billing demand $0.0692 per kwh * next 80 hours use of billing demand $0.0332 per kwh for additional use, except $0.0213 per kwh over both 400 hours use of billing demand and 2,000 kwh $0.0100 per kwh Demand Charges Variable Distribution $ 0.85 per kw Competitive Transition $ 1.85 per kw * denotes the during October through May this block is eliminated Ratchet Clause: From October through May the billed demand shall not be less than 40% of the highest billing demand in the previous months of June through September Page 4 of 27

Joseph Firrantello - Mechanical Option Primary Faculty Consultant: Freihaut Laboratory Facility, Eastern Pennsylvania Mechanical Assignment 3 Existing Conditions Report 11.14.03 Natural Gas is provided by PGW (Philadelphia Gas Works) under an interruptible rate tariff. PGW defines its interruptible rates in terms of contracting for the minimum amount of gas to be purchased per year. The rate structure is described below. Estimates for yearly gas use were not available, so an applicable tariff was not chosen. Minimum Dth/year PGW Interruptible Rates Other requirements $ per meter per month Distribution charge ($/Dth) IT-1: 75 n/a if IT-2 through IT-8 do not apply 75 3.81 IT-2: 75 2,500 standby non-gas energy source 75 3.58 IT-3: 150 5,000 standby non-gas energy source 150 1.66 IT-4: 150 5,000 standby No. 4 oil 150 1.23 IT-5: 150 5,000 standby No. 5 or 6 oil 150 0.81 IT-6: 250 80,000 standby non-gas energy source 250 0.80 IT-7: 250 350,000 standby non-gas energy source 250 0.72 IT-8: 250 n/a cogeneration 250 0.73 Dth = Dekatherm = 1,000,000 BTUs IV. Cost and Site Factors First cost was the primary driving force between design decisions (i.e. 15 packaged rooftop AHUs vs. a chiller plant). The firm is capital poor, and can pass on utility and operational costs to its customers. Site factors were not a large consideration for the mechanical design of the project. Although the south face of the facility is noticeably absent of glazing (thereby reducing solar gain), this was purely a coincidence. The rooms that were placed there (i.e. cell production suites) are designed to have no windows. Page 5 of 27

Joseph Firrantello - Mechanical Option Primary Faculty Consultant: Freihaut Laboratory Facility, Eastern Pennsylvania Mechanical Assignment 3 Existing Conditions Report 11.14.03 V. Indoor and Outdoor Design Conditions The cooling load was calculated using outdoor design conditions of 93 F dry-bulb temperature and 75 F wet-bulb temperature, corresponding with ASHRAE 0.4% design conditions for the Philadelphia area. The heating load was calculated using a 0.0 F outdoor dry-bulb temperature, which is well below ASHRAE design conditions for the area, as you can see in Table 1. The indoor design conditions vary a bit from space to space, but some trends are noticeable, as one can see in Table 2. Table 1 - Outdoor Design Conditions Cooling (0.4%) DBT WBT Facility 93 F 75 F ASHRAE 93 F 75 F Heating (0.4%) DBT Wind Speed Facility 0 F n/a ASHRAE 30 F 19 mph The clean rooms all have a design space temperature of 68 F. The relative humidity requirements for those spaces are not specified, but this is because the supply air is cooled to the neighborhood of 47 to 49 F for those spaces, thereby taking care of dehumidification. The office spaces are set to be maintained at 75 F DBT and 50% RH, while the laboratory spaces that are not clean rooms are set at either 72 F and 50% RH or 68 F and 45% RH. AHU-15 seems to be a special case, with some storage and warehouse spaces having design temperatures in the 80s and up to 90 F. Table 2 - Indoor Design Conditions AHU # General Service DBT F RH 1 Clean Room Labs 68 N.L. 2 Clean Room Labs 68 N.L. 3 Clean Room Labs 68 N.L. 4 Clean Room Labs 68 N.L. 5 Clean Room Labs 68 N.L. 6 Clean Room Labs 68 N.L. 7 Clean Room Labs 68 N.L. 8 Clean Room Labs 68 N.L. 9 Clean Room Labs 68 N.L. 10 Office Space 75 50% 11 Labs (not clean room) 72 50% 12 Labs (not clean room) 72 50% 13 Labs (not clean room) 72 50% 14 Labs (not clean room) 68 45% 15 Labs, Storage, Corridors 72, 75, 80, 85, 90 50% N.L. = Not Listed Page 6 of 27

Joseph Firrantello - Mechanical Option Primary Faculty Consultant: Freihaut Laboratory Facility, Eastern Pennsylvania Mechanical Assignment 3 Existing Conditions Report 11.14.03 VI. Design Heating and Cooling Loads The design cooling load, taken directly from the cooling coil loads on the 15 AHUs, amounts to 672 tons. Split up, that comes to 467 tons sensible load and 205 tons latent load. BTUH values can be found in Table 3. Table 3 - Design Cooling Load Sensible Latent Total Tons 467 205 672 BTUH 5605 2461 8066 The heating load, once again taken directly from the design documents, amounts to about 3400 BTUH. The breakdown of the systems supplying the heating and their sources of energy can be found in Table 4. Table 4 - Design Heating Load System Source MBTUH AHUS (Preheat) Gas 6 Duct Heaters (CAV) Electric 3056 VAV boxes Electric 157 Unit Heaters Gas 180 Total 3399 Page 7 of 27

Joseph Firrantello - Mechanical Option Primary Faculty Consultant: Freihaut Laboratory Facility, Eastern Pennsylvania Mechanical Assignment 3 Existing Conditions Report 11.14.03 VII. Description of System Operation The facility has three main HVAC systems that require control: the process chilled water system, the process steam boiler, and the air side conditioning and distribution. The design drawings are not complete control schematics, as the controls are subcontracted out. However, they provide enough information to get a feel as to how the systems work. A. The Process Chiller 1. General The chiller, a packaged rooftop air-cooled unit, is controlled by the integral chiller sequence control panel. The two chiller pumps are controlled by the Building Automation System (BAS), which is subcontracted to a controls contractor. 2. Sequence of Chiller Operations When the chiller is indexed on (by a call for chilled water from the process equipment), the chiller will signal the BAS to start P-CH-1, the first of the two parallel chiller pumps. (see Appendix A - Schematics for the chiller schematic) When the differential pressure switch (DPS) has proof of chilled water flow, the chiller is energized, and the packaged controls are to maintain a supply water set point of 55 F. This supply point is checked through the temperature monitors present on the supply side of the chiller. The DPS monitors the chilled water pumps. If P-CH-1 fails, the BAS shows an alarm condition and starts P-CH-2. So, while upon first glance the pumps look like they are parallel flow, they are in fact redundant. The differential pressure transmitter (DTS) operates to maintain a differential pressure determined during balancing by modulating the bypass valve. B. The Process Steam Boiler 1. General Boilers B-1 and B-2 are controlled by the boiler sequence control panel. Deaerator DA-1 is controlled by the deaerator control panel. The boiler feed water pumps are controlled through the deaerator control panel. The BAS monitors the steam pressure via the two pressure transmitters (PT) located in the steam headers. See Appendix A for the schematics. 2. Sequence of Boiler Operations When B-1 is on, the PT checks steam pressure. Upon a decrease in steam pressure (less than 125psig), the boiler begins operation. The boiler control panel modulates the gas supply to maintain steam pressure, as transmitted by PT. If these is a decrease in steam pressure below 120 psig for 5 minutes, the boiler controls start B-2 in the same manner as B-1. Upon sensing an increase in steam pressure, the boiler control panel de-energizes B-2. 3. Sequence of Deaerator Operations The boiler feedwater pumps (P-BF-1, P-BF-2, P-BF-3) are monitored by the deaerator controls. Upon failure of P-BF-1 or 2, the BAS shows and alarm condition, and starts P-BF-3. Page 8 of 27

Joseph Firrantello - Mechanical Option Primary Faculty Consultant: Freihaut Laboratory Facility, Eastern Pennsylvania Mechanical Assignment 3 Existing Conditions Report 11.14.03 C. The Air Side Upon a decrease in deaerator water level, the control panel will modulate the make-up water valve (not shown) to maintain the set water level. Upon an increase in water level, the control panel will modulate the same valve to maintain water level. If there is an increase in water level for greater than 5 minutes, the BAS will indicate an alarm. 1. General The spaces are conditioned via 15 packaged rooftop AHUs. 14 serve CAV systems (generally laboratory space), and AHU-10 serves the office space through a VAV system. While the AHU systems have certain differences (see Appendix A), their basic sequence of operation in the controls drawings is the same, though vague. The CAV and VAV systems have their own general sequence. Both have fail-safe positions in the event of a power failure. 2. Sequence of Operations - AHUs The units are listed as being controlled via systems supplied by the manufacturer. There is no real sequence, only the minimum variables that must be monitored: supply air temperature for cooling, supply air temperature for heating, airflow, and filter differential pressure. The control drawings also indicate that the AHUs will be connected to the BAS, which is how the AHU controls will be coupled with individual room sensors. 3. Sequence of Operations CAV These are generally the laboratory spaces. Space temperature is maintained through the electric duct heaters (EDH) on the supply side. These are controlled via temperature sensors (TT) on either the return ducts or inside the rooms in order to maintain space temperature. Humidity is monitored via a sensor (H) in the room, and the BAS indicates an alarm upon a variation from the humidity set point. 4. Sequence of Operations VAV The VAV system is composed of 1 AHU (AHU-10) serving all of the general office spaces. The terminal units (TUH) modulate to maintain the space temperature, which is monitored by temperature sensors (TT) in the room. Some contain reheat coils, and some do not. If there is an increase or decrease in space temperature, the first step is to modulate the reheat coils in order to get back to the desired temperature. If there is a further increase or decrease in temperature, then the terminal unit modulates to open. The VAV system does have a night set-back. During that period, the supply dampers will move to the minimum position. During winter warm-up, the reheat coil will operate at capacity with the unit fully open until desired space temperature is achieved. At that point, normal modulating controls will be reinstated During summer cool-down, the unit will operate fully open until desired space temperature is achieved. At that point, normal modulating controls will commence. Page 9 of 27

Joseph Firrantello - Mechanical Option Primary Faculty Consultant: Freihaut Laboratory Facility, Eastern Pennsylvania Mechanical Assignment 3 Existing Conditions Report 11.14.03 VIII. Critique of System A. In Reference to the Design Objectives and Requirements 1. Occupant Comfort The system appears to satisfy occupant comfort. The CAV and VAV systems adequately supply thermal comfort, and the relatively high OA% supplied to the spaces (mostly because of ANSI standards) provide more than acceptable indoor air quality (see technical assignment 1 for more detailed IAQ calculations). There is always the possibility of control and IAQ problems, however, with the VAV system, due to issues such as inadequate supply air during low supply air volume settings. The ability of the HVAC system to ensure the safety of the occupants is not known, as I have yet been unable to get a copy of the ANSI Laboratory Safety Standard. Given the seriousness of the need to meet the standard, it is reasonable to assume that it has been met. If a further analysis is done, it will be posted in an addendum. 2. Clean Room Conditions The clean rooms conditions seem to be adequately satisfied, via filters and a high air change rate. In addition to the 30% and 90% HEPA filters present on each AHU, there is a 99.99% terminal air filter that supplied the air to the clean room spaces. The class 100,000 clean rooms have a displacement rate of 20 ACH, and the class 10,000 clean rooms have a displacement rate of 40 ACH. Additionally, the rooms are strategically pressurized so that the spaces with the most stringent clean requirements have a relatively higher pressure than the spaces around them. 3. First Cost The mechanical construction cost is Table 5 - HVAC Construction Costs estimated at about $90/sf for the clean Square room spaces, and $35/sf for the office $ per sf Feet Cost spaces. This comes to about $46/sf for Office $ 35.00 60,000 $2,100,000 HVAC construction, as in Table 5. Clean Room $ 90.00 15,000 $1,350,000 This appears to be a reasonably low Total $ 46.00 75,000 $3,450,000 number for an attempt at first cost reduction. B. In Reference to Other Issues 1. Operating Cost While hard numbers for the HVAC operating cost of the facility are not available, it is reasonable to assume that the operational costs may be higher than average because of the first cost-driven design. This explains the lack of heat recovery on the significant of exhausted air, and the lack of a (higher cost than AHUs) central plant for space conditioning. 2. Maintainability The plenum infrastructure (i.e. ductwork, piping, terminal units, etc) should not be hard to maintain, as there is a plenum catwalk to permit access for maintenance. This is done in order to maintain both the operation and purity of the clean room spaces. Page 10 of 27

Joseph Firrantello - Mechanical Option Primary Faculty Consultant: Freihaut Laboratory Facility, Eastern Pennsylvania Mechanical Assignment 3 Existing Conditions Report 11.14.03 The rooftop AHUs themselves are standard package units with standard controls, and are located the easy-to-access roof. They should prevent no surprises to either on-site or manufacturer provided maintenance persons. Not enough is known about maintenance issues with boiler and chiller plants in order to make a conclusion about them. Page 11 of 27

Appendix A - Schematic Diagrams of Boiler, Chiller, and Air Side Page 12 of 27

Appendix A - Schematic Diagrams of Boiler, Chiller, and Air Side Page 13 of 27

Appendix A - Schematic Diagrams of Boiler, Chiller, and Air Side Page 14 of 27

Appendix A - Schematic Diagrams of Boiler, Chiller, and Air Side Page 15 of 27

Appendix A - Schematic Diagrams of Boiler, Chiller, and Air Side Page 16 of 27

Appendix A - Schematic Diagrams of Boiler, Chiller, and Air Side Page 17 of 27

Appendix A - Schematic Diagrams of Boiler, Chiller, and Air Side Page 18 of 27

Appendix A - Schematic Diagrams of Boiler, Chiller, and Air Side Page 19 of 27

Appendix B - Schedules of Major Mechanical Equipment REFRIGERATION UNIT DATA (CHILLER) - AIR COOLED Chilled Water Ambient Condenser Fans Electrical Number System Serving Nom Tons Type Air F on Starter GPM EWT F LWT F PD Feet Quant HP FLA V-P-Hz Comp kw FLA LRA V-P-Hz P.F. Unit Type R-1 Process Chilled Water 117 Screw 300 65 55 16.9-20 8 1.5 3.5 460-3-60 136.4 188.2 485 460-3-60 Across Ln 95% Number System Serving gpm PUMP DATA Motor HP RPM V-P-Hz P-CH-1 Process Chilled Water 300 7.5 1750 460-3-60 P-CH-2 Process Chilled Water 300 7.5 1750 460-3-60 Number Max Oper System Serving Boiler HP Type Steam or Water Design PSI PSI BOILER DATA SRV Setting PSI MBH H 2 O B-1 Plant Steam 200 Fire Steam 150 125 150 Gas yes 6695 6900 8369 23 7.3 460-3-60 B-2 Plant Steam 200 Fire Steam 150 125 150 Gas yes 6695 6900 8369 23 7.3 460-3-60 Fuel Fuel/Air Control Capacities MBH Output lbs/hr Steam Gas Firing Rate Natural Gas Press in. Fan HP Electrical V-P-Hz DEAERATOR - BOILER FEED EQUIPMENT DATA Number System Serving Type Max Load Receiver Max Steam Heater Make-up Assembly Design SRV Setting PSI Gallons Gallons Cond Return Allowable O Design psig @ PSI lbs/hr Boiler HP Size Total Mins Stor 2 lbs/hr psi Max GPM Mixing Deaer lbs/hr Avg Temp F Concentratio GPM inlet DA-1 Boilers 1 & 2 Spray 15 50 13,800 400 48x90 317-10.6 4000 180 0.005 1298 125 7 28 40 DEAERATOR - BOILER FEED EQUIPMENT DATA (CONT.) Boiler Feed Pumps Number Quantity GPM per Motors Disch feet Oper Stand pump HP Each RPM V-P-Hz DA-1 2 1 28 357 7.5 3450 460-3-60 PRESSURE POWERED CONDENSATE PUMP SKID Number System Serving Motive Back Actual Capacity Number of Packaged Flash Flash Inlet Pressure lbs/hr Pumps Assembly Receiver Size Vent Size Pressure psig PPC-1 Boiler System 45 10 2400 2 Yes 20 gal 4" BLOWDOWN SEPERATOR Connections Number System Serving Diameter Height Vent Drain Blowdown Quench BS-1 Boiler System 14" 34" 5" 5" 2" 2" Page 20 of 27

Appendix B - Schedules of Major Mechanical Equipment Number System/Serving SP Inches H 2O Supply Air Fan Max OV Number cfm TSP ESP Fan Type Fan RPM FPM HP RPM V-PH-Hz Type Unit Quant HP Each FLA Each kw RLA Each LRA Each Quantity V-PH-Hz AHU-1 Area 1 SF-1-1 9,890 4.41 3.00 AF DWDI 2281 1978 20.0 1800 460-3-60 1000 2 R-22 95 3 1.0 2.0 29.4 - - 3 460-3-60 yes 120-1-60 AHU-2 Area 2 SF-2-1 12,730 3.60 3.00 AF DWDI 867 759 20.0 1800 460-3-60 12730 2 R-22 95 9 1.0 2.0 98.2 39 214 4 460-3-60 yes 120-1-60 AHU-3 Area 3 SF-3-1 7,460 3.88 3.00 AF DWDI 1337 974 15.0 1800 460-3-60 4740 2 R-22 95 4 1.0 2.0 40 17 127 4 460-3-60 yes 120-1-60 AHU-4 Area 4 SF-4-1 7,340 3.76 3.00 AF DWDI 1317 958 15.0 1800 460-3-60 4170 2 R-22 95 4 1.0 2.0 39.6 17 127 4 460-3-60 yes 120-1-60 AHU-5 Area 5 SF-5-1 4,200 3.49 3.00 AF DWDI 1576 840 7.5 1800 460-3-60 1600 2 R-22 95 2 1.0 2.0 16.4 - - 2 460-3-60 yes 120-1-60 AHU-6 Area 6 SF-6-1 4,120 3.48 3.00 AF DWDI 1570 824 7.5 1800 460-3-60 1600 2 R-22 95 2 1.0 2.0 16.4 - - 2 460-3-60 yes 120-1-60 AHU-7 Area 7 SF-7-1 11,500 3.84 3.00 AF DWDI 893 834 20.0 1800 460-3-60 11500 2 R-22 95 8 1.0 2.0 89 71 297 2 460-3-60 yes 120-1-60 AHU-8 Area 8 SF-8-1 17,330 4.50 3.00 AF DWDI 1264 1539 20.0 1800 460-3-60 4000 2 R-22 95 6 1.0 2.0 62.1 17 127 6 460-3-60 yes 120-1-60 AHU-9 Area 9 SF-9-1 7,930 3.84 3.00 AF DWDI 1969 1586 15.0 1800 460-3-60 2000 2 R-22 95 3 1.0 2.0 28.8 - - 3 460-3-60 yes 120-1-60 AHU-10 Area 10 SF-10-1 24,700 5.51 2.00 AF DWDI 1534 2194 40.0 1800 460-3-60 4680 2 R-22 95 6 1.0 2.0 63.9 17 127 6 460-3-60 yes 120-1-60 AHU-11 Area 11 SF-11-1 8,530 4.28 2.00 AF DWDI 1437 1281 10.0 1800 460-3-60 5060 2 R-22 95 4 1.0 2.0 32.2 - - 4 460-3-60 yes 120-1-60 AHU-12 Area 12 SF-12-1 24,480 6.36 3.50 AF DWDI 1201 1600 40.0 1800 460-3-60 8250 2 R-22 95 9 1.0 2.0 99.2 39 214 4 460-3-60 yes 120-1-60 AHU-13 Area 13 SF-13-1 17,900 6.07 3.50 AF DWDI 1446 1686 30.0 1800 460-3-60 5960 2 R-22 95 6 1.0 2.0 63.2 17 127 6 460-3-60 yes 120-1-60 AHU-14 Area 14 SF-14-1 3,890 2.65 2.00 AF DWDI 1388 788 5.0 1800 460-3-60 3890 2 R-22 95 2 1.0 2.0 23.4 - - 2 460-3-60 yes 120-1-60 AHU-15 Area 15 SF-15-1 7,730 4.00 2.00 AF DWDI 1992 1588 10.0 1800 460-3-60 3830 2 R-22 95 2 1.0 2.0 23.2 - - 2 460-3-60 yes 120-1-60 AHU DATA (CONT.) Cooling Coil Heating - Natural Gas Number Max Face Number of E.A.T. F L.A.T. F Mbtu/h PD (wet) in. Air F PD in. Natural Gas Stages Number Rows Fins/in Type Number Type Velocity Coils DB DB WB Total Sensible H 2O L.A.T. H 2O BTUH Input BTUH Output Gas Press in. H 2O AHU-1 CC-1-1 366 1 5 12 71.5 47.0 47.0 336.0 265.1 0.49 DX PH-1-1 - - - - - - - AHU-2 CC-2-1 209 1 5 12 93.0 48.3 48.3 1092.1 622.5 0.23 DX PH-2-1 Preheat 57.7 0.08 1000 800 6.5 20 AHU-3 CC-3-1 276 1 4 10 84.9 46.9 46.9 443.8 309.6 0.22 DX PH-3-1 Preheat 55.5 0.07 315 250 5.5 20 AHU-4 CC-4-1 271 1 3 10 83.2 47.2 46.8 426.5 288.9 0.16 DX PH-4-1 Preheat 54.4 0.03 250 200 4.5 20 AHU-5 CC-5-1 227 1 5 12 78.5 47.3 47.3 210.1 143.3 0.25 DX PH-5-1 Preheat 85.8 0.01 250 200 4.5 20 AHU-6 CC-6-1 223 1 5 12 78.7 47.4 47.4 210.6 141.0 0.24 DX PH-6-1 Preheat 86.1 0.01 250 200 4.5 20 AHU-7 CC-7-1 213 1 5 12 93.0 49.0 49.0 965.7 553.0 0.23 DX PH-7-1 Preheat 51.9 0.36 800 640 7 20 AHU-8 CC-8-1 439 1 5 12 74.8 47.1 47.1 705.8 524.5 0.66 DX PH-8-1 - - - - - - - AHU-9 CC-9-1 293 1 4 8 75.3 47.2 46.8 316.8 243.4 0.20 DX PH-9-1 - - - - - - - AHU-10 CC-10-1 525 1 5 12 78.0 54.3 54.2 803.7 639.4 0.84 DX PH-10-1 Preheat 79.7 0.30 100 800 6.5 20 AHU-11 CC-11-1 363 1 4 10 78.0 51.0 50.7 407.6 289.8 0.33 DX PH-11-1 Preheat 79.7 0.30 500 400 5 20 AHU-12 CC-12-1 442 1 5 12 78.0 50.8 50.7 1116.4 797.9 0.67 DX PH-12-1 Preheat 87.4 0.35 1375 1100 5 20 AHU-13 CC-13-1 403 1 5 12 78.0 51.2 51.1 770.5 556.5 0.58 DX PH-13-1 Preheat 88.7 0.18 1000 800 6.5 20 AHU-14 CC-14-1 213 1 5 12 93.0 53.1 53.1 289.9 172.0 0.23 DX PH-14-1 Preheat 58.2 0.06 315 250 5.5 20 AHU-15 CC-15-1 429 1 5 12 78.0 53.1 53.0 283.5 216.4 0.63 DX PH-15-1 Preheat 96.2 0.23 500 400 5 20 AHU DATA (CONT.) Number Filters Filters Average Average PD in. H Number Type Eff % 2O Number Eff % PD in. H 2O Vibration Isolation (ASHRAE) Initial Final (ASHRAE) Initial Final Type Defl in inches AHU-1 F-1-1 Cartridge 30 0.22 0.44 F-1-2 95 0.49 0.98 Spring 2 AHU-2 F-2-1 Cartridge 30 0.10 0.20 F-2-2 95 0.19 0.38 Spring 2 AHU-3 F-3-1 Cartridge 30 0.15 0.30 F-3-2 95 0.30 0.60 Spring 2 AHU-4 F-4-1 Cartridge 30 0.15 0.30 F-4-2 95 0.30 0.60 Spring 2 AHU-5 F-5-1 Cartridge 30 0.07 0.14 F-5-2 95 0.12 0.24 Spring 2 AHU-6 F-6-1 Cartridge 30 0.07 0.14 F-6-2 95 0.12 0.24 Spring 2 AHU-7 F-7-1 Cartridge 30 0.05 0.10 F-7-2 95 0.25 0.50 Spring 2 AHU-8 F-8-1 Cartridge 30 0.19 0.38 F-8-2 95 0.55 1.10 Spring 2 AHU-9 F-9-1 Cartridge 30 0.15 0.30 F-9-2 95 0.35 0.70 Spring 2 AHU-10 F-10-1 Cartridge 30 0.24 0.48 F-10-2 95 0.72 1.44 Spring 2 AHU-11 F-11-1 Cartridge 30 0.19 0.38 F-11-2 95 0.49 0.98 Spring 2 AHU-12 F-12-1 Cartridge 30 0.14 0.28 F-12-2 95 0.72 1.44 Spring 2 AHU-13 F-13-1 Cartridge 30 0.30 0.60 F-13-2 95 0.55 1.10 Spring 2 AHU-14 F-14-1 Cartridge 30 0.06 0.12 F-14-2 95 0.12 0.24 Spring 2 AHU-15 F-15-1 Cartridge 30 0.16 0.32 F-15-2 95 0.34 0.68 Spring 2 Motor Minimum Outside Air-cfm AHU DATA Refrigerant # of circuits Ambient Air F on Condenser Fan Compressor Crankcase Heater Control Circuit Voltage Page 21 of 27

Appendix B - Schedules of Major Mechanical Equipment Number System Serving cfm FAN DATA SP in. Max Out Motor Vibration Fan Type Class Fan RPM H 2 O Velocity (FPM) HP RPM V-P-Hz Isolation EF-2-1 AHU-2 13410 1.5 centrifugal 1 948 2593 7.5 1725 480-3-60 spring EF-3-1 Cell Culture 4 Room P252 3490 1.2 centrifugal 1 1111 1600 1.5 1725 480-3-60 spring EF-4-1 Cell Culture 3 Room P251 3370 1 centrifugal 1 903 1332 1 1725 480-3-60 spring EF-7-1 AHU-7 / AHU-9 Relief Air 11935 1.5 centrifugal 1 1120 2848 7.5 1725 480-3-60 spring EF-7-2 Rooms P233, P234, P249, P250 3380 1.1 centrifugal 1 2092 2620 2 1725 480-3-60 spring EF-8-1 Rooms P204, P201, P278, P279 1960 1 centrifugal 1 2081 1866 1 1725 480-3-60 spring EF-9-1 Rooms C213 & C214 760 0.5 centrifugal 1 1121 800 0.167 1725 480-3-60 spring EF-1 Mechanical Room P258 3000 0.75 centrifugal 1 883 1205 0.75 1725 480-3-60 spring EF-2 Ceiling Plenum 3000 0.75 centrifugal 1 883 1205 0.75 1725 480-3-60 spring EF-3 Ceiling Plenum 3000 0.75 centrifugal 1 883 1205 0.75 1725 480-3-60 spring EF-4 Ceiling Plenum 3000 0.75 centrifugal 1 883 1205 0.75 1725 480-3-60 spring EF-5 Mechanical Room P258 3000 0.75 centrifugal 1 883 1205 0.75 1725 480-3-60 spring EF-6 Mechanical Room P258 3000 0.75 centrifugal 1 883 1205 0.75 1725 480-3-60 spring EF-7 Mechanical Room P258 3000 0.75 centrifugal 1 883 1205 0.75 1725 480-3-60 spring EF-8 Mechanical Room P258 3000 0.75 centrifugal 1 883 1205 0.75 1725 480-3-60 spring EF-9 Mechanical Room P258 3000 0.75 centrifugal 1 883 1205 0.75 1725 480-3-60 spring EF-10-1 Men & Women Room 670 1.5 centrifugal 1 1700 807 0.5 1725 480-3-60 spring EF-10-2 Men & Women Room 670 1.5 centrifugal 1 1700 807 0.5 1725 480-3-60 spring EF-11-1 AHU-11, AHU-12, AHU-13 18120 4 centrifugal 1 981 2365 20 1725 480-3-60 spring EF-14-1 BL3 Labs 4025 4 centrifugal 1 1952 2163 5 1725 480-3-60 spring EF-14-2 BL3 Labs 4025 4 centrifugal 1 1952 2163 5 1725 480-3-60 spring EF-15-1 Chemical Waste, Medical Waste-2 660 1.5 centrifugal 1 1695 795 0.5 1725 480-3-60 spring EF-15-2 Radioactive Waste 235 0.75 centrifugal 1 1811 359 0.25 1725 480-3-60 spring EF-15-3 Medical Waste, Liquid Nitrogen 770 1.5 centrifugal 1 1763 927 0.5 1725 480-3-60 spring EF-16-1 Men & Women Room 670 1.5 centrifugal 1 1700 807 0.5 1725 480-3-60 spring Page 22 of 27

Appendix B - Schedules of Major Mechanical Equipment TERMINAL AIR FILTER MODULE DATA Number System Serving cfm Average Eff % Cell Size Pressure Drop in. H 2 O (ASHRAE) L (in.) W (in.) Initial Final TAF-1 various lab various 99.99 48 24 0.76 2.5 TAF-2 various lab various 99.99 24 24 0.9 1.8 the two types of TAFs are used repeatedly throughout the facility, cfm depends on supply at diffuser AIR DEVICE DATA Number Type Use Blow Damper AD-1 Louvered Supply Air 1 Way Opp Blade AD-2 Louvered Supply Air Corner Opp Blade AD-3 Louvered Supply Air 3 Way Opp Blade AD-4 Louvered Supply Air 4 Way Opp Blade AD-5 Grille Return Air n/a Opp Blade AD-6 Grille Return Air n/a Opp Blade AD-7 Grille Return Air n/a None AD-8 Egg Crate Return Air n/a None AD-9 Perforated Supply Air n/a None AD-10 Perforated Supply Air n/a None Finish Baked White Enamel Baked White Enamel Baked White Enamel Baked White Enamel Baked White Enamel Baked White Enamel Stainless Steel Baked White Enamel Baked White Enamel Baked White Enamel Page 23 of 27

Appendix B - Schedules of Major Mechanical Equipment ELECTRIC DUCT HEATER DATA Number CFM Max Face Size of Coil Air F Electric Type of Vel. (FPM) LxH E.A.T L.A.T. MBH PD in. H 2 O kw V-P-Hz Control EDH-1-1 3515 1130 28x16 52 75 87 0.06 26 480-3-60 SCR EDH-1-2 6225 1245 36x20 52 75 155 0.07 45 480-3-60 SCR EDH-2-1 1370 825 20x12 52 75 34 0.05 10 480-3-60 SCR EDH-2-2 4080 1214 22x22 52 75 101 0.07 29 480-3-60 SCR EDH-2-3 2640 1173 18x18 52 75 66 0.07 19 480-3-60 SCR EDH-2-4 2640 1173 18x18 52 75 66 0.07 19 480-3-60 SCR EDH-2-5 1460 945 16x14 52 75 36 0.05 11 480-3-60 SCR EDH-3-1 4230 1269 24x20 52 75 105 0.09 30 480-3-60 SCR EDH-3-2 3120 1123 20x20 52 75 78 0.07 22 480-3-60 SCR EDH-4-1 3120 1123 20x20 52 75 78 0.07 22 480-3-60 SCR EDH-4-2 4110 1233 24x20 52 75 102 0.07 30 480-3-60 SCR EDH-5-1 2070 1035 18x16 52 75 51 0.06 15 480-3-60 SCR EDH-5-2 2070 1035 18x16 52 75 51 0.06 15 480-3-60 SCR EDH-6-1 2090 940 20x16 52 75 52 0.05 15 480-3-60 SCR EDH-6-2 1970 1013 20x14 52 75 49 0.06 14 480-3-60 SCR EDH-7-1 1690 951 16x16 52 75 42 0.05 12 480-3-60 SCR EDH-7-2 1690 951 16x16 52 75 42 0.05 12 480-3-60 SCR EDH-7-3 1690 951 16x16 52 75 42 0.05 12 480-3-60 SCR EDH-7-4 1690 951 16x16 52 75 42 0.05 12 480-3-60 SCR EDH-7-5 1690 951 16x16 52 75 42 0.05 12 480-3-60 SCR EDH-7-6 1440 926 16x14 52 75 36 0.05 10 480-3-60 SCR EDH-7-7 1440 926 16x14 52 75 36 0.05 10 480-3-60 SCR EDH-8-1 3230 1165 20x20 52 75 80 0.05 24 480-3-60 SCR EDH-8-2 1120 825 14x14 52 75 28 0.05 8 480-3-60 SCR EDH-8-3 630 755 12x10 52 75 16 0.04 5 480-3-60 SCR EDH-8-4 1360 905 18x12 52 75 34 0.04 10 480-3-60 SCR EDH-8-5 290 650 8x8 52 75 7.2 0.04 2.5 480-3-60 SCR EDH-8-6 9150 1464 30x30 52 75 227 0.11 66 480-3-60 SCR EDH-9-1 1060 780 14x14 52 75 26 0.05 8 480-3-60 SCR EDH-9-2 630 755 12x10 52 75 16 0.04 5 480-3-60 SCR EDH-9-3 2875 1078 24x16 52 75 71 0.07 21 480-3-60 SCR EDH-9-4 2875 1078 24x16 52 75 71 0.07 21 480-3-60 SCR EDH-11-1 4870 1170 30x20 55 72.6 89 0.011 27.5 480-3-60 SCR EDH-11-2 790 815 14x10 55 73.8 15 0.008 4 480-3-60 SCR EDH-11-5 2080 940 20x16 55 72.6 38 0.01 12.5 480-3-60 SCR EDH-12-1 3080 925 24x20 55 72.5 56 0.009 17.5 480-3-60 SCR EDH-12-5 2590 933 20x20 55 73.3 47 0.012 15 480-3-60 SCR EDH-12-6 1610 920 18x14 55 72.2 29 0.008 9 480-3-60 SCR EDH-12-7 4030 1210 24x20 55 72.2 74 0.01 22.5 480-3-60 SCR EDH-12-8 580 745 14x8 55 72.2 11 0.007 3 480-3-60 SCR EDH-12-11 1580 925 16x16 55 72.4 29 0.008 8 480-3-60 SCR EDH-12-13 1320 880 18x12 55 72.6 25 0.007 7 480-3-60 SCR EDH-12-14 1570 884 16x16 55 72.5 29 0.008 8 480-3-60 SCR EDH-12-15 900 750 14x12 55 72 17 0.007 5 480-3-60 SCR EDH-12-16 1450 750 20x14 55 72.5 27 0.012 8 480-3-60 SCR EDH-12-17 840 720 14x12 55 72.5 16 0.007 4 480-3-60 SCR EDH-12-18 740 740 12x12 55 72.5 14 0.007 4 480-3-60 SCR EDH-12-19 1500 905 20x12 55 72 28 0.007 8 480-3-60 SCR EDH-12-20 425 765 10x8 55 72 8 0.006 2 480-3-60 SCR EDH-13-1 4120 990 30x20 55 72.5 75 0.009 22 480-3-60 SCR EDH-13-4 6370 1290 30x24 55 72.5 117 0.007 35 480-3-60 SCR EDH-13-12 2430 1095 20x16 55 72.6 45 0.006 13 480-3-60 SCR EDH-13-14 950 814 14x12 55 72.5 17 0.007 5 480-3-60 SCR EDH-13-15 2545 1018 20x18 55 72 47 0.012 14 480-3-60 SCR EDH-14-1 1625 836 20x14 51 72 37 0.008 11 480-3-60 SCR EDH-14-2 1625 836 20x14 51 72 37 0.008 11 480-3-60 SCR EDH-14-3 285 640 8x8 51 72 6 0.005 2 480-3-60 SCR EDH-15-1 250 600 10x6 55 75 5 0.006 2 480-3-60 SCR EDH-15-2 2940 1060 20x20 55 75 64 0.012 18 480-3-60 SCR EDH-15-3 840 840 12x12 55 75 18 0.007 5 480-3-60 SCR EDH-15-4 400 800 12x6 55 75 9 0.006 3 480-3-60 SCR Page 24 of 27

Appendix B - Schedules of Major Mechanical Equipment ELECTRIC DUCT HEATER DATA Number CFM Max Face Size of Coil Air F Electric Type of Vel. (FPM) LxH E.A.T L.A.T. MBH PD in. H 2 O kw V-P-Hz Control EDH-15-5 570 735 14x8 55 75 12 0.007 4 480-3-60 SCR EDH-15-8 160 480 8x6 55 75 3 0.004 1 480-3-60 SCR EDH-15-10 225 540 10x6 55 75 5 0.006 1 480-3-60 SCR EDH-15-11 200 480 10x6 55 75 4 0.005 1 480-3-60 SCR EDH-15-12 855 715 14x14 55 75 18.5 0.006 6 480-3-60 SCR EDH-15-13 225 540 10x6 55 75 5 0.006 1 480-3-60 SCR EDH-15-14 500 720 10x10 55 75 10 0.004 4 480-3-60 SCR Page 25 of 27

Appendix B - Schedules of Major Mechanical Equipment UNIT HEATER DATA Motor Natural Gas Number Location BTUH BTUH Gas Press. Type Arrangement cfm hp rpm V-P-Hz Vent Size Input Output in. H 2 O UH-1 Ceiling Plenum 380 1/50 1550 120-1-60 25,000 20,000 8 4 Fan Gravity Vent UH-2 Ceiling Plenum 380 1/50 1550 120-1-60 25,000 20,000 8 4 Fan Gravity Vent UH-3 Ceiling Plenum 380 1/50 1550 120-1-60 25,000 20,000 8 4 Fan Gravity Vent UH-4 Ceiling Plenum 980 1/50 1550 120-1-60 75,000 60,000 8 5 Fan Gravity Vent UH-5 Ceiling Plenum 980 1/50 1550 120-1-60 75,000 60,000 8 5 Fan Gravity Vent Number System Serving cfm Entering Air DB Temp Grains DB Temp Grains HUMIDIFIER DATA (STEAM TO STEAM) Room Air Plant Steam Humidification Steam lbs/hr Distance (in.) H-2-1 AHU-2 12,540 52.2 5.48 68 51.05 472 15 378 0 Softened 40"x40" 1130 24 H-7-1 AHU-7 11,330 52.2 5.48 68 51.05 413 15 331 0 Softened 40"x40" 1020 24 H-11-1 AHU-11 8,150 - - - - 150 15 120 0 Softened 32"x30" 1450 24 H-12-1 AHU-12 23,370 - - - - 245 15 196 0 Softened 48"x46" 1850 24 H-13-1 AHU-13 17,235 - - - - 176 15 141 0 Softened 42"x40" 1700 24 H-14-1 AHU-14 3,710 - - - - 100 15 71 0 Softened 24"x22" 1200 24 psig lbs/hr psig Feed Water Type Duct Size (WxH) Duct Velocity (fpm) Max Absorption TERMINAL AIR UNT DATA cfm SP in. H 2 O Sound Data (NC) Reheat Coil Number System Serving terminal system Air F min max Disc Radiated unit only min EAT LAT kw V-P-Hz TUS-10-1 AHU-10 Room 124 2340 2340 0.177 0.207 20 20 - - - - TUS-10-2 AHU-10 Room 094, 090 1880 1880 0.260 0.280 20 30 - - - - TUS-10-3 AHU-10 Room 123 2830 2830 0.177 0.207 20 25 - - - - TUS-10-4 AHU-10 Room 038 1610 1610 0.260 0.290 20 28 58 75 9 480-3-60 TUS-10-5 AHU-10 Room 060, 066 2000 2000 0.079 0.249 20 20 - - - - TUS-10-6 AHU-10 Room 005 1270 1270 0.146 0.166 20 25 - - - - TUS-10-7 AHU-10 Room 067, 068, 069 870 870 0.245 0.275 20 26 - - - - TUS-10-8 AHU-10 Room 004 1300 1300 0.091 0.101 20 27 58 75 7 480-3-60 TUS-10-9 AHU-10 Room 059 1560 1560 0.260 0.290 20 26 - - - - TUS-10-11 AHU-10 Room 008 190 190 0.049 0.059 20 21 - - - - TUS-10-12 AHU-10 Room 009, 018, 029 2100 2100 0.094 0.114 20 21 - - - - TUS-10-14 AHU-10 Room 006, 007 480 480 0.276 0.286 21 26 - - - - TUS-10-16 AHU-10 Room 125 360 360 0.177 0.197 20 22 58 75 2 480-3-60 TUS-10-17 AHU-10 Room 001, 002, 003 400 400 0.177 0.187 20 22 - - - - Page 26 of 27

Appendix B - Schedules of Major Mechanical Equipment Maximum cfm AUTOMATIC DAMPER DATA Damper Function Control Number System Serving Blade Arrangement L (in.) W (in.) M.O.D. ON OFF D-1 Combustion Air 96 48 Opposed X D-2 Combustion Air 96 48 Opposed X D-3 Combustion Air 96 48 Opposed X D-4 Combustion Air 96 48 Opposed X D-5 Air Compressor CA-1 Supply 3925 24 24 Opposed X D-6 Air Compressor CA-1 Supply 3925 26 22 Opposed X D-7 Air Compressor CA-1 Exhaust 3925 24 24 Opposed X D-8 Air Compressor CA-1 Exhaust 3925 24 24 Opposed X D-11-1 EF-11-1 18120 36 36 Opposed X D-14-1 EF-14-1 4025 24 20 Opposed X D-14-2 EF-14-2 4025 24 20 Opposed X D-15-1 EF-15-1 630 16 8 Opposed X D-15-2 EF-15-2 225 8 8 Opposed X D-15-3 EF-15-3 770 12 12 Opposed X Size AIR MEASURING DEVICE DATA Number System Serving cfm Face Pressure Overall Size (inches) Velocity Drop in. W H L AM-1-1 AHU-1 Supply Air 9740 1420 0.03 38 26 6 AM-2-1 AHU-2 Supply Air 12310 1540 0.04 34 34 6 AM-3-1 AHU-3 Supply Air 7350 1565 0.04 26 26 6 AM-4-1 AHU-4 Supply Air 7230 1340 0.03 28 28 6 AM-5-1 AHU-5 Supply Air 4140 1230 0.02 22 22 6 AM-6-1 AHU-6 Supply Air 4060 1210 0.02 22 22 6 AM-7-1 AHU-7 Supply Air 11330 1415 0.03 34 34 6 AM-8-1 AHU-8 Supply Air 16700 1505 0.03 40 40 6 AM-9-1 AHU-9 Supply Air 7810 1350 0.03 42 20 6 AM-11-1 AHU-11 Supply Air 8150 1222 0.03 32 30 6 AM-12-1 AHU-12 Supply Air 23370 1524 0.02 48 46 6 AM-13-1 AHU-13 Supply Air 17235 1723 0.02 40 38 6 AM-14-1 AHU-14 Supply Air 3710 1113 0.03 24 20 6 AM-15-1 AHU-15 Supply Air 7090 1511 0.03 26 26 6 Page 27 of 27