GSI White Paper #34. Status of the Electrical Leak Location Survey (ELLS) Method Among State Environmental Protection Agencies in the USA

Similar documents
GSI. Director Geosynthetic Institute. GSI White Paper #30. In-Situ Repairs of Geomembrane Bubbles, Whales and Hippos GRI

GRI White Paper #8. - on - Construction Quality Assurance-Inspectors Certification Program (CQA-ICP)

October 7, 2016 Meeting Landfill Liner Regulations with Conductive Backed Geomembranes by Doyin Adesokan B.Eng Msc. Technical Manager - Solmax

GRI White Paper #3. - on - Providing Flexibility in Destructive Seam Sampling/Testing. Robert M. Koerner and George R. Koerner

Leak Location Geosynthetic Materials in Base Liner Systems. NY Federation SWANA. May, 2014

Nondestructive Testing of Geomembranes

IMPACTS AND LIMITATIONS OF QUALITY ASSURANCE ON GEOMEMBRANE INTEGRITY. Key Words: Construction Quality Assurance, Leak Detection, Geomembrane

Limestone Cements. Why are we doing this? What are they? What s in it for you? Limestone Cements, Holcim (US) Inc.

GRI White Paper #14. Modification to the GRI-Method for the RF CR -Factor Used in the Design of Geotextiles for Puncture Protection of Geomembranes

Tempra Series WHOLE HOUSE TANKLESS ELECTRIC WATER HEATERS Whole House Comfort

GRI White Paper #12. The Development of a Benefit/Cost Ratio Matrix for Optimal Selection of a Geosynthetic Material

GSI White Paper #28. Cold Temperature and Free-Thaw Cycling Behavior of Geomembranes and Their Seams

Simply the Best WHOLE HOUSE COMFORT SAVE WHOLE HOUSE TANKLESS ELECTRIC WATER HEATERS

Simply the Best WHOLE HOUSE COMFORT SAVE WHOLE HOUSE TANKLESS ELECTRIC WATER HEATERS

Selecting the Right Closure Cap Option for Your Surface Impoundment or CCR Landfill

Alternative Cover Systems

Standards and Safety Update

Tempra / DHC-E. The Finest Tankless Electric Water Heaters Available! Simply the Best Featuring Advanced Microprocessor Control

BULK PURCHASE DISCOUNTS Valid for purchases any time of year

SWANA/A&WMA s. Third Annual Landfill Operator s Training Geosynthetics in Landfills. February 13, 2013

Exposed Geomembrane Cover Systems for Coal Ash Facilities

Geosynthetic Institute GSI GRI GT13(b) ISO Version

Advanced Microprocessor Control The Finest Tankless Electric Water Heaters Available! DHC-E / Tempra

- Residential Fire Sprinkler -

ADVANTAGE SERIES. Popular Technologies for Outdoor Living

Bosch Tankless Water Heater Troubleshooting Guide

Continuing Education Units (CEU)

Featured Fish-Week ofmay 29th

Reducing Barriers to Use of High Efficiency Lighting Systems Oct. 2001

Standard Procedure s for Tenant Fire Sprinkler Work

Presentation to NC Home Inspectors Licensure Board April 7, Opportunities and Partnerships

2018 PRICING. alderonind.com STANDARD PRODUCTS

Inventory Management Guide

Geosynthetic opportunities in shale gas fracking (revisited)

Pennsylvania State Hazardous Materials & Pipeline Safety Meeting. Paul Metro Chief, Gas Safety Division Pennsylvania PUC

ELECTRICAL LEAK LOCATION SURVEY GENERAL GUIDE AUGUST 2017

Numerical Analysis of Leakage through Geomembrane Lining Systems for Dams

LINER INTEGRITY SURVEY GENERAL GUIDE JULY 2013

ADDRESS (NO PO BOX) COMMUNICATIONS GENERAL INFORMATION. First Name*: John. Last Name*: Smith. Job Title*: President Company Name*: Custom Homes

Performance and design features to improve and sustain geomembrane performance. R. Kerry Rowe. at Queen s-rmc

D.P.E. Enviroliner. geotextile protection layer. covering new ground 2016

The use of geosynthetics in the installation of ballast layers

Arc Flash and Selective Coordination

Overview of Biosolids Composting Science, Production and Use Albert Cox Kuldip Kumar

Geosynthetics. Work platforms built with geotextile tubes at the Lach Huyen Bridge. GMA TECHLINE Exposed GM? Deformations?

SOUTH AFRICAN NATIONAL STANDARD

Oklahoma and Texas Interdependency Along the I-35 Corridor

Leakage through Liners under High Hydraulic Heads. PH (512) ; FAX (512) ;

Costs and Benefits of Geomembrane Liner Installation CQA. G.T. Darilek Leak Location Services, Inc., USA D.L. Laine ABSTRACT

USE OF A LOWER RATE WHEN APPLIED ON CEREALS AT THE HERBICIDE TIMING (FEEKES 4-6) - AL, AR, AZ ETC.

Hello. What can I do for you? QUALITY CUSTOMER SERVICE. Joseph Griffith Regional Sales Manager. Cooling Tower Depot is Global, I am Local

Griddle Stands REFRIGERATORS & FREEZERS. Call us toll free at (800) INNOVATIVE DESIGNS FOR YOUR FOODSERVICE NEEDS

Geosynthetic materials Solutions for improved ground structure. Name it. We ll do it.

Chesapeake Energy Center. Submitted To: Chesapeake Energy Center 2701 Vepco Street Chesapeake, VA 23323

Table W-4...Total Improvement Expenditures by Homeowner Characteristics:


FIRE ALARM SYSTEM INSPECTION

Table A-4...Professional and Do-It-Yourself Improvement Expenditures by Homeowner Characteristics: 2013

Table A-4...Professional and Do-It-Yourself Improvement Expenditures by Homeowner Characteristics: 2007

Liner Construction & Testing Guidance Overview

Acronyms. TRI TRI Environmental, Inc. Table of Contents. iii

Elements of Design of Multi-linear Drainage Geocomposites for Landfills

Geosynthetic materials Solutions for improved ground structure. Name it. We ll do it.

Marketing Strategies for Energy Star Water Heaters. Keith Burkhardt Marketing Manager, Water Heaters GE Appliances

Poinsettia Season Recap 2012 White Paper

T H I R D Q UA R T E R

Evaluating Tubular Drainage Geocomposites for use in Lined Landfill Leachate Collection Systems

PRACTICAL GUIDANCE RELATED TO GEOSYNTHETIC INTERFACE SHEAR AND FRICTIONAL PERFORMANCE

Cost Estimating for Landfill Design

Geomembranes and Geosynthetic Clay Liners (GCLs)

F O U R T H Q UA R T E R

GEOMEMBRANE FIELD INSTALLATION

Engineering Qualifications

GEOSYNTHETIC CLAY LINER (GCL) PANEL SEPARATION UNDER EXPOSED GEOMEMBRANES: AN UPDATE FOR DESIGNERS OF LINING SYSTEMS

Latest developments and best practice in landfill lining and capping. Rob Marshall Environment Agency

Table W-4...Total Improvement Expenditures by Homeowner Characteristics:

POND SEALING OR LINING GEOMEMBRANE OR GEOSYNTHETIC CLAY LINER

SENSOR DDS MIT. Dry Geomembrane Mobile Integrity Arc Tester. ASTM D7953 approved. SENSOR - Inventors of Geomembrane Leak Detection Systems SENSOR

Equipment pressure applied to geomembrane in composite liner system

INSTALLATION QUALITY-ASSURANCE GUIDE FOR SOLMAX-GSE S CONDUCTIVE LINER

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

Approval Date. Recertify

Consulting Engineers and Scientists. Closure Plan. Submitted by: GEI Consultants, Inc Voyager Drive Green Bay, Wisconsin

NOW I 50% OFF. CALL TODAY! H.L. Flake McDonald Dash ORDER ONLINE! HLFLAKE.COM BUY AT LIST PRICE

Pozidrain. A guide to the selection and specification of Pozidrain drainage geocomposite

LANDFILL FINAL COVER AND MANAGEMENT OF LEACHATE SEEPS BELOW FINAL COVER

This presentation is posted for public use. ACEEE does not endorse any product or service.

NOTICE OF INTENT. Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo Bluff, VA 23022

LiteEarth Advanced Synthetic Grass Geomembrane Liner INDEPENDENT THIRD PARTY PERFORMANCE TESTING REPORT. U.S. Patent No.

OVERVIEW OF STATE RADON LAWS

Energy Efficiency Program and Plans for ENERGY STAR Water Heaters

Inventory Management Guide

A 25-YEAR PERSPECTIVE ON WASTE CONTAINMENT LINER AND COVER SYSTEM DESIGN USING GEOSYNTHETICS

An Innovative Composite Liner System for Coal Combustion Residual Containment Projects

SECTION 2.5. Construction Quality Assurance Plan

Exposed geomembrane covers: Part 1 - geomembrane stresses

DEALER SUPPORT REFERENCE LIST

TECHNICAL DROP-IN SPECIFICATIONS

A PVC geomembrane integrated in the landscape

Super Gripnet INTEGRATED DRAINAGE SYSTEM (IDS) GEOMEMBRANE

Transcription:

Geosynthetic Institute 475 Kedron Avenue Folsom, PA 19033-1208 USA TEL (610) 522-8440 FAX (610) 522-8441 GEI EI GAI GRI GSI GCI GII GSI White Paper #34 Status of the Electrical Leak Location Survey (ELLS) Method Among State Environmental Protection Agencies in the USA by Jamie R. Koerner Special Projects Manager jrkoerner@verizon.net Robert M. Koerner, Ph.D., P.E., NAE Director Emeritus - Geosynthetic Institute robert.koerner@coe.drexel.edu George R. Koerner, Ph.D., P.E., CQA Director - Geosynthetic Institute gsigeokoerner@gmail.com September 9, 2016

Status of the Electrical Leak Location Survey (ELLS) Method Among State Environmental Protection Agencies in the USA Background The origin of electrical leak location surveys (ELLS hereafter) was via the Southwest Research Institute under contract to the U.S. Environmental Protection Agency in about 1980. Bob Landreth was the project officer for the EPA out of the RRL in Cincinnati, Ohio. For the next few years development work was undertaken including proof testing on a relatively large geomembrane lined pond at their facility in San Antonio, Texas. The method was patented and commercialized in about 1985. Capitalizing on the rapidly growing use of geomembranes in landfills and surface impoundments, Glen Darilek and Daren Laine founded a specialty company, Leak Location Services, Inc. (LLSI), focused completely on the technique in 1992. The company continues to be very active throughout the world having surveyed more than one million square meters in the last three years alone. Of the many organizations that followed LLSI, the implementation of the technique by Ian Peggs of I-Corp and Andre Rollin of Solmers spurred TRI-Environmental Inc. (Sam Allen and Abigail Gilson-Beck) to initiate a separate division, titled Liner Integrity Services, to provide expertise, equipment, services, training and certification of the method. Presently there are six variations of the ELLS method as follows; all are ASTM Standards. 1. ASTM D7007; Soil and water-covered dipole method 2. ASTM D7703; Water lance method 3. ASTM D7002; Water puddle method 4. ASTM D7240; Spark testing method 5. ASTM D7953; Arc testing method 6. ASTM D7909; Guide for placing blend leaks -1-

Concept of the ELLS Method The ELLS method uses a DC power source having high voltage and very low amperage from which the cathode (-) and anode (+) emanate. The cathode is grounded beneath the geomembrane (in foundation soil, compacted clay liner, geosynthetic clay liner, geocomposite drain, bottom surface of conductive geomembrane, etc.) which must have adequate moisture (or be conductive) so as to conduct current flow. The anode is placed in water above the geomembrane via ponding, puddling or water lance procedure. When there is no hole (or other continuous defect) there is no current flow, and conversely when there is a hole an electrical current is completed; see Figure 1. Figure 1a is for the geomembrane with no soil cover and Figure 1b is for a soil cover of up to 450 mm thickness, i.e., after an initial lift of backfill. The location of the hole is sensed by a technician holding a voltage indicator which responds immediately since a hydraulic circuit is completed at the precise location of the hole. The identification of the hole is then recorded for subsequent repair. So as to cover the entire footprint of a facility a technician generally walks on a grid pattern. The closer the grid pattern, the more sensitive is the technique insofar as locating smaller-and-smaller holes; see Figure 2. -2-

Figure 1a - Diagram of the Electrical Leak Location Method for surveys with water covering the geomembrane (compliments of ASTM). Figure 1b - Diagram of the Electrical Leak Location Method for surveys with earth material covering the geomembrane (compliments of ASTM). -3-

(a) Concept of ELLS Method and technician with voltmeter hole detector (compliments of LLSI). Figure 2 - Concept and examples of the ELLS method to detect geomembrane holes after initial field deployment. -4-

Soil-Covered Dipole Testing Arc Testing Water-Covered Dipole Testing Water Puddle Testing (b) Examples of ELLS Method (compliments of TRI Env.). -5-

compl. Groupe Alphard compl. GSE-Env. (c) Examples of soil covered (left) and conductive sheet (right) approaches Figure 2 - (continued) Past Electrical Leak Location Surveys of Field Sites There are many technical papers written on and about the ELLS method, most of which are in the geosynthetics literature. Perhaps the most illustrative (in the authors opinion) is that of Noski and Touze-Foltz *. They surveyed 300 geomembrane lined sites consisting of over 3,000,000 m 2 in total. The leaks were placed into five location categories as shown below. * Nosko, V. and Touze-Foltz, N. (2000), Geomembrane Liner Failures, Proc. 2 nd European Geosynthetics Conference, Bologna, Italy, pp. 557-560. -6-

Notes: 1 = flat floor 2 = corners and edges 3 = under drainage pipes 4 = pipe penetrations 5 = other (access roads, temporary storage, concrete structures) Figure 3 - Locations where holes occurred from 300 sites and over 3M m 2 of geomembrane liner (ref. Noski and Touze-Foltz, 2000). The results of their survey are shown in Tables 1 and 2 for location of the holes and cause/size of the holes, respectively. Table 1 - Location of Holes No. of Holes Flat Floor (1) Corners and Edges (2) Under Drainage Pipes (3) Pipe Penetrations (4) Other (5) 4194 100% 3261 77.8% 395 9.4% 165 3.9% 84 2.0% 289 6.9% -7-

Table 2 - Cause of Holes vs. Size of Holes Size of Holes Stones % Heavy Equip. % Welds % Cuts % Worker Directly % Total (cm 2 ) <0.5 332 11.1 - - 115 43.4 5 8.5 195-452 0.5-2.0 1720 57.6 41 6.3 105 39.6 36 61.0 105 84.4 2097 2.0-10 843 28.2 117 17.9 30 11.3 18 30.5 36 15.6 1044 >10 90 3.0 496 75.8 15 5.7 - - - - 601 Amount 2985 654 265 59 231 4194 Total 71.17% 15.59% 6.32% 1.41% 5.51% 100% These results are most significant in that such details are simply not available based on conventional methods such as destructive seam tests and/or observation. In Table 1 the most significant finding is that 77.8% of all holes are in the flat floor with no unusual construction, such as pipes or penetrations, interfering with the placement and seaming of the geomembrane itself. Complimenting and elaborating on Table 1 is Table 2 which details the cause and size of holes. Here is seen the following: Stones caused 71.2% of the holes (unfortunately there is no indication if the stones were beneath or above the geomembrane). Heavy equipment caused 15.6% of the holes (soil coverage thickness is an ongoing issue of regular concern as far as trucks and equipment trafficking is concerned). Seam welding caused only 6.3% of the holes (this is surprisingly low in comparison to the perceived concern which requires considerable destructive and nondestructive seam testing protocols). -8-

Regarding the size of the holes, 74.9% were in the range of 0.5 to 10 cm 2 (larger holes contributed 14.3% which are most significant since leakage rates are in direct proportion to the size of holes). Insofar as a generalized statement leading to the GSI survey of state environmental agencies which will follow, the authors feel that the ELLS method is excellent in identifying, locating and (subsequently) repairing holes in geomembrane liners which obviously leads to improved short and long term performance of such barrier materials. Results of this GSI Survey Regarding the ELLS Method In the summer of 2016, GSI contacted all fifty U.S. state environmental agencies concerning their knowledge and use of the ELLS method. Twenty-nine (58%) of the states responded. Questions were grouped into five categories: 1. Familiarity with the method. 2. Actual use of the method. 3. Focus of the method insofar as cross-sections are concerned. 4. Stage or timing of construction for method s use. 5. Alternative methods for determining leaks. Table 3 presents these results 1. Regarding familiarity of the method, 17 of the responding 29 states (59%) said that they were familiar, 9 said somewhat (31%), and 3 said they were not familiar (10%). It is assumed (although not confirmed) that many of the 21 state agencies not responding were not familiar with the method. -9-

2. Regarding actual use of the method, 4 of the 29 responding states (14%) require it by regulations and 10 of the states (34%) require it on a site-specific basis. Fifteen states (52%) know of the method but do not require its use. 3. Focus of the method s location insofar as its application is concerned, is mainly on the primary geomembrane (17 out of 23 responses or 74%), although in most states only single lined facilities are used for municipal solid waste (MSW) and construction and demolition (C&D) waste. Four out of 23 agencies (17%) require the method s use on the secondary geomembrane. Two agencies (9%) require the method s use on the cover geomembrane. 4. The stage of timing of the method s use resulted in 8 of 21 responses (38%) to be used after the geomembrane s installation, 11 of 21 responses (52%) after soil cover (presumably the leachate collection system) and 2 of 21 responses (10%) after operations begin. It should be recognized, however, there is a limit of soil cover thickness beyond which the method is not effective. 5. Regarding alternative leak location methods, no regulations are active at present. That said, 8 of the 28 responses (29%) stated that there was a site specific method but no details were provided. That said, we presume that all waste facilities have downgradient monitoring wells required and this is an on-going practice per U.S. federal regulations. Interestingly, California not only responded to our questionnaire, they also questioned each of their state regions. This data is given in Table 4. As seen, the responses vary greatly even within the state. In some respect California reflects the nation as a whole. Note that we used their average values in Table 3. It should be mentioned that each Regional Board has autonomy such that they can include specifications for ELLS in individual waste disposal permits. -10-

Table 3 - Results of 2016 Survey of State Environmental Agencies with Regard to Use of the Electrical Leak Location Survey (ELLS) Method Is Your agency familiar with ELLS? What is your position on its use Where in the cross section is your Which stage of construction is ELLS to be performed? What is your agency's position on ELLS for in a GM lined Landfill facilitiy? agency's focus? locating leaks in surface impoundments? YES Somewhat NO Regs Require Site Specific None Primary FML Secondary FML Final Cover After GM Installation After Soil Cover After Operations begin Regs Require Site Specific None AZ X X X CA X X X X X X CT X X X FL X X X X X X GA X X X HI X X X ID X X X X IL X X X X IO X X X X X KY X X X X X LA X X X X X X MD X X X ME X X X X X MI X X X X X MO X X X X X MT X X X X X NJ X X X X X NY X X X X X X NC X X X X X OH X X X X PA X X X RI X X X X X SD X X X TN X X X X X X X TX X X X UT X X X X X VA X X X WI X X X X X WY X X X X X Total 17 9 3 4 10 15 17 4 2 8 11 2 0 8 20 29 29 23 21 28-11-

Table 4 - Results of California by Region with Regard to Use of the Electrical Leak Location Survey (ELLS) Method Is Your agency familiar with ELLS? What is your position on its use Where in the cross section is your Which stage of construction is ELLS to be performed? What is your agency's position on ELLS for in a GM lined Landfill facilitiy? agency's focus? locating leaks in surface impoundments? YES Somewhat NO Regs Require Site Specific None Primary FML Secondary FML Final Cover After GM Installation After Soil Cover After Operations begin Regs Require Site Specific None 1 X X X X 2 3 X X X X X X 4 X X X X X 5 6 X X X X X X 7 X X X X X 8 X X X X X 9 X X X X X AVG X X X X X X -12-

Conclusions The electrical leak location survey (ELLS) method has had a rather long time interval between its initiation in 1980 to the present. The initial years delay were likely due to the original patent which has long since expired. Subsequently, only a few firms were experienced enough for its use. However, when ASTM formalized the five standards mentioned in Table 1, activity sharpened considerably. As shown in Table 3, the current status can be described as being that the method is reasonably known to the geomembrane industry and is somewhat known from an agency perspective. This White paper is meant to present the current status in this regard. Acknowledgement GSI wishes to thank the 29 state environmental agencies (and particularly California which queried all nine regions in their state) for responding to our survey. They have all been sent a copy of the results. -13-