Head office: Odense, Denmark Year offoundation: 1995 Services: complex mechanical installation of process equipment and pipelines, electrical installation, insulation, commissioning and putting intooperation Products: stainless steel vessels from 0.01 m 3 to 1000 m 3, reactors, shell-and-tube heat exchangers, vacuum evaporation units, micro- and mini-breweries, smallscale breweries ТМ «ORION Mach» Number of personnel: 250 qualified employees Market position professional specialized installation company Key branches ofindustry: food production (brewing, dairy, wine, confectionery, butter&cheese-making, alcoholic, soft drinks), chemical, pharmaceutical, atomic, oil-refining industries
85 Mechanical fitters 40 Welders 20 Insulators 20 Electricians 20 Engineers 40 Workshop personnel (manufacturing of vessels) 25 Administrative personnel Σ250 QUALIFIED SPECIALISTS ~ 100 Freelance workers
Ukraine License for economic activity in the construction field related to creationof architectural objects Permission to perform hazardous worksrussian Federation Certificate of admission to a particular type or types of work that have an impact on the safety of capital construction objects Republic ofbelarus Special permit (license) to carry out activities in the field ofindustrial safety Welders employed by Process Welding are certified in accordance with international (European) standard EN ISO 9606-1
Wastewater treatment plantwashing powder production plantpkf installation works, Osipovichi, Republic of Belarus technology equipment20102011 Bryansk region,russia 2014 Sontsa ENVIRO-CHEMIE GmbH - Customer for developer and supplier of the Scope ofworks: Mechanical, electrical installation and insulation of the water treatmentplant Assembling of spray dryer and othervessels Supply of storage vessels for chemicals (AISI304) Scope ofworks: Complex mechanical andelectrical installation of process equipment
Other projects ОАО Ivan Taranov Brewery Kaliningrad, Russia Installation of CCTs, pipelines, equipment of fermentationplant, brew house. Complex installation, electrical installation and adjusting of a filling line (60 thousand bottles/hour). Installation of refrigeration and compressorunit. ОАО Vena Brewery St. Petersburg, Russia Installation of process equipment, pipelines, CIP, process control panels for fermentationunit. OAO Inmarko refrigeration plant Omsk, Russia Installation of process equipment, pipelines, refrigeration and compressor equipment, pipeline insulation, electrical installation of automatic process control. Cadbury chocolate factory Chudovo, Russia Installation and commissioning of chocolate production lines, installation of fire extinguishing system, insulation, refrigeration and compressor equipment andpipelines. Fish-factory Sakhalin, Russia Installation and commissioning of fish freezinglines.
Other projects Baskin Robbins ice cream factory Moscow, Russia Installation and commissioning of equipmentincluding steam boilers, process equipment, refrigeration and compressor equipment, electrical equipment and treatment facilities, insulation works. Moscow Crackerplant Moscow, Russia Installation of a cracker production line, electrical equipment and steampipes. Equipment service and maintenance. ООО Balticline Kaliningrad, Russia Installation of CCTs, pipelines and equipment forfermentation unit, brew house, refrigeration and compressor unit, main pipelines. ООО Lukoil Kaliningrad Morneft Kaliningrad, Russia Piping of high pressure pumps for mobile drilling rigs. French consortium NovarkaUkraine, Kyiv reg. Chernobyl nuclear powerplant Erection of a protective confinement over the 4th unit of the nuclear powerplant. Assembling and welding of the ventilation ducts(ducts diameter 700 1200 mm, material AISI 304, X-Ray controlof welds).
Vessel for egg mass 24.8 m 3 (3 pcs.) Vessels are equipped with mixers, heating or cooling jackets Vessels are insulated: insulating layer - polyurethane foam, cladding all-welded stainless steel Material AISI 304L, AISI 316L Milk storage tank 100 m 3 (2 pcs.) Fermentation tank for sour cream 10 m 3 (4 pcs.) Retentate (milk mixture) storage tank 10 m 3 (3 pcs.) Operating pressure: atmospheric, material: AISI 304, AISI 316 Tanks are equipped with side and framemixers
Vessels are insulated: insulating layer - polyurethane foam, cladding all-welded stainless steel Goods supplied: Milk collection and drying tank 60 m 3 (pc.) Operating pressure: atmospheric + hydrostatic Material AISI 304 Goodssupplied: Fat storage tank (8 pcs.) Operating volume: 50m 3
ООО «Bikorm»
Supplied goods and performedworks: Vacuum evaporation units, shell-and-tube exchangers, buffer tanks for water and Mechanical installation of equipment, insulation, process electrical installation of process equipment Supplied goods and performedworks: Supply of buffer tanks for water, heat technological vessels technological vessels Mechanical installation of equipment, insulation, electrical installation of equipment
Notes: Process Welding Niels Bohrs Alle181 5220 Odense +45 27 60 56 60 do@process-welding.dk www.process-welding.dk