Journal of Faculty of Engineering & Technology

Similar documents
AVOID CATASTROPHIC SITUATIONS: EXPERT FIRE AND GAS CONSULTANCY OPTIMIZES SAFETY

AVOID CATASTROPHIC SITUATIONS: EXPERT FIRE AND GAS CONSULTANCY OPTIMIZES SAFETY

Retrospective Hazard Review

Review Paper FIREWATER SYSTEM DESIGN AND SELECTION OF OPTIMIZED LOCATION FOR FIREWATER TANKS AND PUMPS IN GAS OIL SEPARATION FACILITY

CFD OIL 2008 COMPUTATIONAL MODELING OF JET FIRES. August 19th, 2008 Norman Neumann Marcelo Mendes

ADIPEC 2013 Technical Conference Manuscript

International Journal of Advance Engineering and Research Development

RADIATION BLOCKAGE EFFECTS BY WATER CURTAIN

Explosion Protection Engineering Principles

HF Experience transfer from incidents HFC Trondheim, Oct

ELC International Inc

ICHEME SYMPOSIUM SERIES NO. 144 A METHODOLOGY FOR ASSESSING AND MINIMISING THE RISKS ASSOCIATED WITH FIREWATER RUN-OFF ON OLDER MANUFACTURING PLANTS

Update on Company Emergency Response Team : Roles, Responsibilities & Requirements. MAJ THIYAGARAJAN RRS CERT Audit Team Leader HazMat Dept SCDF

Proposed Commercial Project at Plot No. C3A, Sector-16B, Greater Noida West (U.P)

Hazardous goods management Latest trends in petroleum industry. C. Sasi Assistant Vice President Total LPG India Limited

COMPARISON OF NFPA AND ISO APPROACHES FOR EVALUATING SEPARATION DISTANCES

Environmental Management System Environmental Contingency Program

The regulatory section first discusses codes and standards and then Federal and State legislative and local requirements.

FIRE & SAFETY SPRING 2016 EDITION

TOXIC AND FLAMMABLE GAS CLOUD DETECTORS LAYOUT OPTIMIZATION USING CFD

Kevin Brown and Chris Stearns

ATEX 1999/92/EC (Borehole Directive 92/91/EEC) PROCESS SAFETY ASPECTS

ANALYSIS OF HUMAN FACTORS FOR PROCESS SAFETY: APPLICATION OF LOPA-HF TO A FIRED FURNACE. Paul Baybutt Primatech Inc. and

MODULAR INTEGRATION OF PROCESS EQUIPMENT PACKAGES FOR OIL AND GAS FACILITIES

Saving lives with coatings

F&G detection system for LNG plants

QENOS ALTONA SAFETY CASE COMMUNITY INFORMATION BULLETIN 2012

Tunnels, Risks & Design Mitigation

Using CFD to Analyze Gas Detector Placement in Process Facilities

Fire and Gas Detection and Mitigation Systems

GAS DETECTOR LOCATION. Ø.Strøm and J.R. Bakke, GexCon AS, Norway

Alternative refrigerants or HFCs: an obvious choice? Safety first when choosing a refrigerant!

IMPLEMENTING RECOMMENDATIONS FROM THE ANGELLALA CREEK AMMONIUM NITRATE VEHICLE EXPLOSION

NFPA 85 COMPLIANCES OF BMS: A CASE STUDY OF BOILER CONTROL AT SBM OFFSHORE MALAYSIA COMPANY 1. AHMED ABOUELRISH 2 Universiti Teknologi Petronas

Aluminum Dust Management in a Metallizing Facility

Communication and Coordination Failures in the Process Industries

LOPA. DR. AA Process Control and Safety Group

By Dr. Maurice Stewart, PE, CSP Worldwide Petroleum Training

EMERGENCY PREPAREDNESS - POLLUTION INCIDENT RESPONSE PROGRAM

Hydrocarbon Recovery. Chapter 12 Based on presentation by Prof. Art Kidnay

Domino Effects and Storage Sites of Propane in the Netherlands

Martin Huber 26September 2017 F&G SOLUTIONS FOR THE PROCESS INDUSTRY

Fire Risks of Loviisa NPP During Shutdown States

Health and Safety Documents in connection with offshore oil and gas operations

Combustible Dust with FR Clothing June Service Experience Trust Quality Flexibility

Changes for the New Edition. Senior Engineer, NFPA NFPA

Fire Service Manual Volume 3 Building Construction

Overview of Control System Design

FRS 201. Firefighters Advanced Skills I. 45 clock hours 3 credit bouts

7.2 SAFETY CODE FOR BUILDING & FIRE FIGHTING SYSTEM

How to a Use Process Hazard Analysis (PHA) to Reduce Combustible Dust Explosion Risk

Risk and Fire Safety: Fire safety integration in potentially hazardous process industry. Engineers Australia Society of Fire Safety.

Enclosed modules, explosion pressure and operational challenges with intense cold. Liv Ranveig Rundell, Technical Safety Petroleum Safety Authority

SMOKE MANAGEMENT AND EGRESS ANALYSIS OF A SPORTS ARENA USING THE PERFORMANCE-BASED DESIGN

Public Comment No. 3-NFPA [ Chapter 7 ]

Combustible Dust Hazard Recognition and Control NFPA Standards for Combustible Dusts

Bowties in process safety auditing

Developing Sprinkler System Design Criteria for Flammable and Combustible Liquid Storage

Electrical Area Classification 101 An Introduction to Area Classification the Basics IEEE Houston CED

International IECEx Certification Scheme as seen by an Oil & Gas Operator. The TOTAL E&P company viewpoint. Eric MEYER

Fire Safety Inspection Update

Fire and Gas Mapping- Updates to ISA84 TR7

Industrial Explosion Suppression Technology

Risk Assessment of large Hydrocarbon Storage tanks. G. Unnikrishnan, Kuwait Oil Company

EM-3.1 SAFETY ALERT HEAVY EQUIPMENT VEHICLE FIRES AND SUPPRESSION SYSTEMS

FIRE HAZARD ASSESSMENT IN SUPPORTING FIRE PROTECTION SYSTEM DESIGN OF A CHEMICAL PROCESS FACILITY ABSTRACT

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements

Objectives. NFPA Dust Specific Documents. Combustible Dust Process Hazard Safety Overview of NFPA Standards for Combustible Dusts

Applying Functional Safety Engineering Technique to Optimize Defensive Fire Protection Strategy

InstrumentationTools.com

Bowties in process safety auditing

FIXED PROTECTION FOR OIL AND CHEMICAL PLANTS

Passive Fire Protection DuraSystems Barriers Inc.

SPEARFISH FIRE DEPARTMENT POLICIES AND PROCEDURES

Teflon Rotary Drum Pump

Firefighting operations on multi-tiered vehicle stacking buildings F5-13 GD

TRIPR FLAMMABLE LIQUID UNIT TRAINS

Study of Numerical Analysis on Smoke Exhaust Performance of Portable Smoke Exhaust Fan

Development of an Environmental and Economic Assessment Tool (Enveco Tool) Francine Amon, Jonatan Gehandler, Selim Stahl

Using HAZOP/LOPA to Create an Effective Mechanical Integrity Program

MINIMUM TANK GAP. Greater of 3 or one-sixth of sum of adjacent tank diameters. one-half of sum of adjacent tank diameters 20

Key Topics. Steven T. Maher, PE CSP. Using HAZOP/LOPA to Create an Effective Mechanical Integrity Program. David J. Childs

Y. ORMIERES. Fire risk analysis method for nuclear installations

EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE

Smoke detection in hazardous areas:

Fire protection on chemical manufacturing sites

Application of BS 8489 to the Protection of Generator Enclosures. IWMA, BRE 22 nd March 2017 Dr Tim Nichols CPhys FIFireE

The SIL Concept in the process industry International standards IEC 61508/ 61511

HAZARDOUS AREA CLASSIFICATION AND SELECTION OF EQUIPMENT FOR SAFE USE THEREIN FROM AN ELECTRICAL VIEWPOINT

Based on NFPA 1003: Standard for Airport Fire Fighter Professional Qualifications 2015 Edition

Webinar November 12, 2014

GUIDELINES FOR EMERGENCY PLANNING AND PREPAREDNESS. High-Hazard

Bio System Installation

Beamex Calibration White Paper. Calibration in hazardous areas

PRELIMINARY ANALYSIS OF THE NUMBER OF OCCUPANTS, FIRE GROWTH, DETECTION TIMES AND PRE-MOVEMENT TIMES FOR PROBABILISTIC RISK ASSESSMENT

U L T R A S O N I C G A S L E A K D E T E C T O R

PERFORMANCE OF PASSIVE FIRE PROTECTION IN JET FIRES

Vancouver Airport Fuel Delivery Project. Fire Prevention, Preparedness and Emergency Response

CONSERVATION PLAN BASED ON THE CONCEPT OF INTEGRITY

Bringing Hydrocarbon to the Market Training & Certification

Transcription:

JFET 21(3) (2014) 62-69 Journal of Faculty of Engineering & Technology Journal homepage: www.pu.edu.pk/journals/index.php/jfet/index Fire and Their Mitigation Efforts in Gas Processing Facilities M.K. Nawaz a, N. Ramzan a, U. Tariq b a Department of Chemical Engineering, University of Engineering and Technology, Lahore, Pakistan b Berger Paints (Pvt.) Limited, Pakistan Abstract: Many hazard identification and risk management techniques are used in chemical process industries (like HAZOP, QRA, PHA) at the design stage and in operational plants to ensure smooth and safe run of all plant operations and activities. The implementation of these techniques is robust, yet accidents happen in chemical process industry. The investigation of such accidents has shown that the active measures for prevention are inadequate and are often poorly designed. The purpose of this manuscript is to study a gas processing facility and identify the needs for such active measures which will act as first line of intervention to fire incidents, that will help in avoiding the escalation of small incident towards a catastrophic event. Keywords: Fire Zoning, Pool Fire, Spray Density, Top Event

1. Introduction Process safety in industry has used several tools such as PHA, HZAOP, QRA to cater risks and failures. Each tool or technique can prevent the transformation of hazardous events to accidents by design improvements [1]. But the history of chemical industry has shown that with all these techniques implemented, the state of the art plants can undergo accidents which will result in inevitable loss as described by the following examples. In September 2011, a fatal explosion at natural-gas plant in Mexico killed 30 workers and injured another 46. The cause of the incident was a leak from a ruptured pipe at the downstream of gas processing facility in the export line, causing an explosion [2]. In September 1998, two people were killed in an explosion and fire at the Esso Longford facility in Australia, which led to severe disruption of gas supplies to the State of Victoria s industry and retail customers for two weeks [3]. In July 1988, 167 men were killed at an offshore platform named as Piper Alpha, resulting from oil and gas leakage and probable ignition. The fire protection systems installed at the facility were inadequate and were poorly designed to cater with the small leakage event which later on escalated and engulfed the whole facility. This raised many questions on the safety practices in the offshore as well as onshore oil and gas industry [4, 5]. All these and other incidents in chemical process industry show that the active measures for the prevention of such events were inadequate or were poorly designed. The purpose of this manuscript is to identify the need of these active measures and provide the basis of design for these measures so that they can be used effectively. The basics of active measure starts from the fire zoning in which the process plant is divided into fire zones, for the purpose of allocating resources to the zone once a fire is initiated. This is done to limit the damages caused by fire in one equipment which transfers heat to nearby equipment and this heat will eventually become a source of fire for the other equipment as well. Once the fire zones are identified then, the water demand for particular equipment is calculated to extinguish the fire or control the temperature increase of the equipment so as to avoid the mechanical failure. The fire zoning is an important part to calculate the fire water demand of equipment s. The criteria for calculating the fire water demand that will be required for control of burning or cooling purposes, which will be consumed by individual equipment is calculated so that in case of any emergency the fire water to respective equipment is provided and the spreading of fire is minimized. This fire water demand calculated then helps in identifying the number of fire water equipment (hydrants, monitors, hydrant/monitor combinations etc.) and determination of their strategic location. The location is determined by keeping in mind the safety of the personnel operating these fire water equipment and damages that will be caused by the process equipment. 63

Subsequently, the isolation philosophy for this fire water equipment is decided to cater the requirements when this equipment is required. This manuscript will identify the fire zoning criteria which provides the basis for water demand calculation which will be required in case of fire for the protection of process equipment. In Pakistan, gas processing facilities are under the stage of development. Robust design and management protocols are followed at the initial stages of the project which has the result that no recordable catastrophic [6] incident has occurred in these gas processing facilities in Pakistan. But these procedures and protocols do not rule out the probability of catastrophic events, as they are a struggle to minimize such events. Identify the fire potential equipment Does the equipment hold sufficient (5m 3 ) of flammable/ combustible inventory to cause pool fire? Is there any other equipment within 15 m radius? Separate the fire zone Does this equipment also a fire potential equipment? Is there any fire barrier? Separate fire zone Fig. 1 Fire Zoning Criteria 64

2. Fire Zoning Chemical plant is divided into sections, including process area, utilities, and storage, buildings, workshops, and product transportation units/areas. Amongst these sections, the process and storage areas consist of the many hidden hazards. Amongst these hazards, lies the containment of chemicals which are the source of fire. inventory of the process units. The basis for dividing the process area into fire zones are: Equipment that are 15m apart from each other are considered to be in a separate fire zone Equipment separated by pipe racks, fire walls from other process equipments Fire in one fire zone will not spread into another fire zone. The step by step fire zoning procedure is described in figure 1.These areas are further subdivided into individual fire zones based upon the hazardous The fire zones are defined on the basis of the above mentioned criteria and fire water demand of individual fire zone is calculated. The fire water demand is calculated for individual equipment and then all the fire water demand for individual equipment is summed together to calculate the fire water demand of one fire zone. Fire Zone Separated by Pipe Rack Fire Zone Separated by 15m Fig. 2 Fire Zoning of a Gas Processing Facility 65

Figure 2 shows the fire zoning being carried out as an example, according to the criteria mentioned for hydrocarbon liquid fire in a gas processing facility. The fire zones developed under these conditions provide a conservative approach in determining the active fire protection system needs. The fire zoning helps in the calculation of fire water demand and positioning of hydrant, monitors etc. which will be used to cope with the fire scenarios and helps in optimizing the resources. Fire Water Demand The fire water demand for individual equipment is calculated on the basis that the holdup volume of the process equipment is 5m 3 or greater. The next step to calculate the fire water demand is to know the actual dimensions of that equipment. The surface area for every equipment is calculated with some margin to remain on the conservative side like for pumps and compressors an additional 0.6m [10, 11] is added to the length and width of the equipment for calculating the area. Figure 3 identifies the basic steps to calculate the fire water demand of equipment. Identify the equipment having fire potential Does the equipment hold 5m 3 or greater inventory? Dimensions of the equipment to calculate the surface area (H=7.6m) Use spray density for particular types of equipment to find the fire water demand Fig. 3 Fire Water Demand Calculation 66

The individual equipment demands add up to give the fire water demand of a fire zone. Once the area of the process equipment is calculated this area is then multiplied by the water spray density. The spray density is taken from different international standards. The resulting fire water demand of individual equipments is added together to calculate the amount of fire water needed for the complete one zone in case of pool fire. The individual equipment fire water demand is calculated because in case of fire on any equipment, the remaining euipments in that fire zone will require water for the cooling purpose especially for those equipments in which the hazardous inventory is processed near the auto-ignition temperature. As an example the fire water demand for a fire zone is calculated in Table 1. Table. 1 Fire Water Demand Calculation Water Spray Density Water Demand Area Sr.# EQIPMENT NAME (ft 2 ) (USGPM/ft 2 )[11] (GPM) 1 DEHYDRATION INLET SEPARATOR 341.19 0.25 85.29 2 INLET FILTER SEPARATORS 506.98 0.25 126.74 3 DUST FILTERS 386.67 0.25 96.66 4 GAS MOLECULAR SIEVE BEDS 322.30 0.25 80.57 5 CRYO BYPASS KO DRUM 375.00 0.25 93.75 PLATE-FIN BRAZED 6 ALUMINIUM HEAT 114.192 0.25 28.54 EXCHANGER 7 TURBO EXPANDER 196.33 0.25 98.16 8 TURBO COMPRESSOR 196.33 0.25 98.16 9 EXPANDER SUCTION DRUM 364.26 0.25 91.06 10 LOW TEMPERATURE SEPARATOR 455.44 0.25 113.86 11 DE-ETHANIZER COLUMN 780.37 0.25 195.09 12 DE-ETHANIZER CONDENSER 758.47 0.25 189.61 13 DE-ETHANIZER REBOILER 758.47 0.25 189.61 14 DE-BUTANIZER CONDENSER 193.79 0.25 48.44 15 BEBUTANIZER REBOILER 730.50 0.25 182.62 16 NGL RUNDOWN COOLER 445.19 0.25 111.29 17 DEBUTANZER 506.55 0.25 126.63 18 19 DEBUTANZER OVER HEAD DRUM DE-ETHANIZER OVER HEAD COMPRESSOR 338.20 0.25 84.55 153.81 0.25 76.90 Zone Water Demand (GPM) 1829.86 67

3. Strategic Location of Fixed Fire Water Equipments Fixed water protection systems are subdivided into fire water ring main and associated hydrants/monitors/foam system and spray/sprinkler systems. After calculating the water demand for individual equipment these systems are placed in the processing facility on the basis to provide quick intervention in case of emergency and to minimize the impacts of small event at the earliest possible stage so as to stop the escalation towards the top event. The major sources of these leaks/fires is near the valves, pump flanges, compressor flanges and major pipe flanges. The leakage is considered to be full bore leakage from the leak sources. The fire water ring is routed around the process area. The piping of the main ring is placed at 15m distance from the equipment so as in case of pool fire the network is at a safe distance from the equipment to be protected. If this distance of the main ring piping is not maintained than the piping is undergrounded. Hydrant/monitor combination is proposed for the quick response to incidents and also minimizing the probability for the operator to move in the processing area. These devices are kept at a distance of 15m from the equipment to be protected so as to provide a safe distance to the operator of these devices. The travel distance between adjacent hydrant/monitors is reduced to 30m to improve the system performance in case of the adjacent equipment is under maintenance at the time of need. These distances are allocated on the basis that the hydrants/monitors are operating in jet mode. 4. Isolation Philosophy The isolation philosophy determines the operation of this firefighting equipment in case of the blockage in the ring main or if a system in taken under maintenance and fire incident happens. For this purpose a robust isolation philosophy has been proposed which includes that the travel distance between two isolating valves be reduced to 100 m and that in no case more than three hydrant/monitor combination is isolated. On this basis the firefighting devices are optimized so as in case one portion of the ring main is isolated the fire water demand of the fire zone is fulfilled by other active hydrants/monitors combination. 5. Conclusions The catastrophic incidents are preventable only under the circumstances that the protection systems are robust and fulfill the needs of the process design. This research work was conducted to improve the design stage efforts for the gas processing facilities in Pakistan and cater the needs of small incidents of fire which will escalate to the top event if not addressed properly and in time frame manner. Due to these efforts the asset life can be enhanced and subsequent loss of finance can be minimized. 68

References 1. S.F. Avila, F.L.P. Pessoa and J.C.S. Andrade; Social HAZOP at an Oil Refinery, Process Safety Progress, (2013), 17-21 2. Carlos Navaro; Fatal Explosion at Natural-Gas Plant in Tamaulipas Exposes Safety, Staffing Problems for State-Run Oil Company PEMEX, (2012) 3. Martin Anderson, Behavioral Safety and Major Accident Hazards: Magic Bullet or Shot In the Dark?, Health and Safety Executive, 4. Dr. Sam Mannan, Lee s Loss Prevention in the Process Industries, Volume 1, Third Edition, ELSEVIER, ISBN 0 7506 7587 7, Chapter 2, (2005) 5. T.A.Kletz, Learning From Accidents, Gulf Professional Publishing, Third Edition, ISBN 0 7506 4883 X, (2003), 196-206 6. Scott Stricoff*; The future of catastrophic event prevention: Seven questions leaders need to ask, Process Safety Progress, (2012), 190-192 7. Seshu Dharmavaram, James A. Klein; An introduction to assessing process hazards, process Safety Progress, (2012), 261-265 8. Paul G. Lambert, John L. Woodward; Learning from events: Major process safety incidents from waste water in process chemical plants, or take care of your waste water or it will take care of you, Process Safety Progress, (2011), 45-51 9. Peter Okoh Stein Haugen; Maintenance-related major accidents: Classification of causes and case study, Journal of Loss Prevention in the Process Industries,(2013), 1060-1070 10. NFPA 15 Standard for Water Spray Fixed Systems for Fire Protection,2012 Edition, National Fire Protection Association, (2012) 11. NFPA 24 Standard for Installation Private Fire Service Mains and Their Appurtenances, 2013 Edition, National Fire Protection Association, (2013) 69