PRE-INSTALLATION GUIDE

Similar documents
PRE-INSTALLATION GUIDE

PRE-INSTALLATION GUIDE

PRE-INSTALLATION GUIDE

PRE-INSTALLATION GUIDE for MODELS

PRE-INSTALLATION GUIDE for MODELS

Installation & Operation

Equipment Alert. P-Trap Must Be Installed to Exhaust or Warranty will be Voided. Refer to this Manual for installation Instructions

Vacuum Plumbing Layout Recommendations

Dansereau Dental. P r e - C o n s t r u c t i o n G u i d e

User s and Installation Manual

DENTAL VACUUM SYSTEM Part Numbers: VS2O, VS40, VS50, VS50H, VS80 and VS80H RECOMMEND DAILY USE OF MONARCH CLEANSTREAM USER S MANUAL

A m e r i c a s D e n t a l E q u i p m e n t C o m p a n y. Rev 2/15. D a n s e r e a u

Mojave. Superior Performance. Energy Efficiency. All In A Singular Dry Vacuum.

PowerVac G Single to Twin Conversion Kit [ ]

Read Only Document Not For Distribution

Installation Guide. 15 W. Undercounter/Freestanding Nugget Ice Machine U L. Viking Range, LLC. 111 Front Street

Special Requirements For Health Care Facilities

INSTALLATION MANUAL. Manufactured by AQUA-AIR MANUFACTURING. (801) or (800) FAX (801)

Installation. 15 W. Undercounter/Freestanding Ice Machine FGIM515 / CFGIM515 FPIM515 / CFPIM515

DENTAL AIR SYSTEM. AS12, AS22, AS50 AS70, AS12C, AS22C & AS50C International. Installation and Operation Manual

INSTALLATION INSTRUCTIONS UNDERCOUNTER DISHWASHERS

28 1/2"* 72.4 cm. (*28 1/2 " to include hinges.) 41 3/4" 106 cm. 27" 68.6 cm. 28 1/2"* 72.4 cm. (includes hinges.) 28 1/2"* 41 3/4" 106 cm

ELECTRIC COOKTOP INSTALLATION INSTRUCTIONS

USER MANUAL/Installation Instructions LRV-4

1-866-PENNERS

NAVIEN AMERICA INC FITCH AVENUE IRVINE, CALIFORNIA, USA

A PROUD HERITAGE OF EXPERIENCE & QUALITY DISHWASHER BR-DWSH01-S

Cascade Premier and Elite Premier Bathing Systems with Aqua-Aire Installation / Assembly Instructions

Dishwasher Installation Instructions DW 24XT/DW 24XV

Installation instructions for vented tumble dryer DOMESTIC. Dear Customer,

WineZone Ceiling Mount Ductless Split 15

MATERIALS Traps TRAPS. No. IPC IRC Description

A PROUD HERITAGE OF EXPERIENCE & QUALITY DISHWASHER BR- DWSH01- S

Installation. 324 Series Built-In Dishwashers U L. Viking Range, LLC 111 Front Street Greenwood, Mississippi USA (662)

HWD-2110 Hot Water Dispenser

Installation Instructions

Installation Instructions. For the 18 Built-In Dishwasher and Front Color Panels

SAVE THESE INSTRUCTIONS

Model 1820 Dehumidifier

B.C.S. Shop Heaters 26, 30 & 36 (36 shown)

VetPro Solo Installation

Quest Power Electric Heat EHS 62 Pro

Electrical cable Water supply tube Fittings for tube Coupler Teflon tape. Hole saw min. 2½" bit

Viking Installation Guide

Please FAX or completed form to FWE. KFC Pre-Installation Check Sheet Pre-Installation Information. I t w i l l h e l p u s h e l p y o u!

Install Configurations

Built-In Dishwasher. Installation Instructions. BEFORE YOU BEGIN Read these instructions completely and carefully. IMPORTANT The dishwasher MUST be

SERVICE/INSTALLATION MANUAL ICE ONLY DISPENSERS MODELS-IOD150, IOD200 AND IOD250

Quest Power Electric Heat EHS 31 Pro

Installation Instructions

Owner s Manual Phoenix FireBird

DISHWASHER INSTALLATION INSTRUCTIONS

2016 Plumbing Supplemental Plan Review List

Getz Equipment Innovators 450 lb Dual Portable Dry Chemical Fill System

INSTALLATION INSTRUCTIONS

J-PRO-24 Soda Ash Injection Installation & Start-Up Guide

INSTALLATION INSTRUCTIONS TD75. Vented tumble dryer DOMESTIC. Carefully read the instructions for use before using the dryer.

ICP Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.

Eureka - Fall Maintenance Crew 2017 List of material for plumbing works for sealift 2017

OUTDOOR DISHWASHER INSTALLATION INSTRUCTIONS

Cool IR. Model C104 - Cooling System. Instruction Manual

Installation instructions for condenser tumble dryer DOMESTIC. Dear Customer,

Sundance Spas SPA EQUIPMENT SYSTEM. Installation Instructions. P/N Rev. A

INSTALLATION MANUAL GEO-BOOST GROUND LOOP HEAT EXCHANGER

Quest Dry. Quest 110 Dual. Read and Save These Instructions. Installation, Operation and Maintenance Instructions

COBRA -H EXTRACTOR 120V

Installation Guide & Owner s Manual

Installation Manual CARBONATOR With Plain-Water Booster

MODEL CMA-180UC PARTS MANUAL Rev 1.16

IMPORTANT INSTRUCTIONS READ & SAVE

IMPORTANT INFORMATION. Revised Dishwasher Installation Instructions

model NO. LSS GALLON SKID MOUNTED HIGH PRESSURE SPRAYER ASSEMBLY / OPERATION INSTRUCTIONS / PARTS

Top Control Dishwasher

215 Gallon Waste Oil Tank With Bypass Regulator Installation Instructions

Installation Instructions

Installation and User's Manual for Residential Ice Machine. Models SCCG30 and SCCP30

Installation GUIDE VDWU524SS VDWU524WSSS FDWU524WS FDWU524 VDWU324SS FDWU324

CRAFTSMAN EXAMINATION, JUNE 2007 PLUMBING ANSWER SCHEDULE

PureLine Plumbed Combi-Steam Oven

Helpful Tip: NOTE:

IMPORTANT INSTRUCTIONS READ & SAVE

347002K/177002K/34900

Installation Instructions

Pool Power Pak. III with On/Off Switch UL Models (1 HP), (1-1/2 HP) NEC Models (1 HP), (1-1/2 HP)

ICE ONLY DISPENSERS MODELS-IOD150, IOD200 AND IOD250 INSTALLATION/SERVICE MANUAL

How To Size A Big Dipper Unit

CMA Dishmachines Knott Avenue Garden Grove, CA Undercounter High Temperature Dishwasher. Service Replacement Parts.

Installation Instructions

VENTILATION FAN / LED LIGHT

BOTTLED WATER DISPENSER DISPENSADOR DE AGUA EMBOTELLADA

MODEL CMA-180UC SERVICE & PARTS MANUAL Rev 1.10

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

VENTILATION FAN / LED LIGHT / LED NIGHT LIGHT

Installation Instructions

IMPORTANT INSTRUCTIONS READ & SAVE

MIRAI EXTRACTOR 100V DO NOT OPERATE MACHINE UNTIL YOU HAVE READ ALL SECTIONS OF THESE INSTRUCTIONS IMPROPER USE OF THE MACHINE WILL VOID THE WARRANTY

J120 STEAM BOOSTER INSTALLATION, OPERATION, AND SERVICE MANUAL J120 STEAM BOOSTER. J120 Steam Booster Manual D

Read Only Document Not For Distribution

IMPORTANT SAFETY INFORMATION

Indicates a hazardous situation which, if not avoided, will result in death or serious injury.

Transcription:

Dry Vacuum System Part Numbers V3, V5, V7, 2V3, 2V3CT, 2V5, 2V5CT, 2V7, 3V5 and 4V5 PRE-INSTALLATION GUIDE All pumps comply with NFPA 99C level 3 requirements. All installations must conform to local codes. System being installed: (AS CHECKED) q V3 q V5 q V7 q 2V3 q 2V3CT q 2V5 q 2V5CT q 2V7 q 3V5 q 4V5 Doctor: Address: Phone#: Dealer: Dealer Address: Air Techniques, Inc. P/N H5187, Rev. H February 2016

MOJAVE SYSTEM CONFIGURATIONS System Components V3 V5 V7 2V3 2V3CT 2V5 2V5CT 2V7 3V5 4V5 From Treatment Room Gas/Liquids/ Solids Gas Exhaust to Outside Vent V3 Pump Assembly 1 0 0 2 2 0 0 0 0 0 V5 Pump Assembly 0 1 0 0 0 2 2 0 3 4 V7 Pump Assembly 0 0 1 0 0 0 0 2 0 0 MT10 Separator Tank MT10 Tank Assembly 1 1 1 1 0 1 0 0 0 0 CT20 Tank Assembly 0 0 0 0 1 0 1 1 1 1 Liquids/Solids Heat Exchanger Master Controller Assembly 1 1 1 1 1 1 1 1 1 1 Maximum Users 3 5 7 6 6 10 10 14 15 20 Sewer Drain Recommended Number of Simultaneous HVE/SE Users Check Valve Gate Valve V3, V5 or V7 Vacuum Pump Typical MOJAVE System Installation V3 V5 V7 2V3 or 2V3CT 2V5 or 2V5CT 2V7 3V5 4V5 HVE SE HVE SE HVE SE HVE SE HVE SE HVE SE HVE SE HVE SE 3 + 0 5 + 0 7 + 0 6 + 0 10 + 0 14 + 0 15 + 0 20 + 0 2 + 2 4 + 2 6 + 2 5 + 2 9 + 2 13 + 2 14 + 2 18 + 4 0 + 6 2 + 6 5 + 4 3 + 6 7 + 6 12 + 4 12 + 6 13 + 14 0 + 10 4 + 6 1 + 10 5 + 10 9 + 10 9 + 12 10 + 20 Note: 1 HVE = 2 SE s 1 HVE = 2 Nitrous Scavengers 0 + 14 0 + 12 3 + 14 6 + 16 6 + 18 8 + 24 1 + 18 2 + 24 2 + 26 5 + 30 0 + 20 0 + 28 0 + 30 0 + 40 Master Controller Assembly MT10 10 Gallon Physical Characteristics Tanks Typical V3, V5 or V7 System Pump Configurations CT20 Continuum MT10 Tank Stacked onto One V3, V5 or V7 Pump One V3, V5 or V7 Pump Two V3, V5 or V7 Pumps Stacked Three V5 Pumps Stacked Width 13.5 in. (34 cm) 29 in. (74 cm) 25 in. (64 cm) 29 in. (74 cm) 25 in. (64 cm) 25 in. (64 cm) 25 in. (64 cm) Depth 3 in. (8 cm) 22 in. (56 cm) 23 in. (58 cm) 23 in. (58 cm) 21 in. (53 cm) 21 in. (53 cm) 21 in. (53 cm) Height 11 in. (28 cm) 33 in. (84 cm) 50 in. (127 cm) 50 in. (127 cm) 17 in. (43 cm) 34 in. (86 cm) 51 in. (130 cm) Weight 13 Lbs. (6 kg) 75 Lbs. (34 kg) 150 Lbs. (68 kg) 220 Lbs. (100 kg) 145 Lbs. (66 kg) 290 Lbs. (132 kg) 435 Lbs. (197 kg)

ASSEMBLY DIMENSIONS 13.5 in. (34 cm) 3 in. (8 cm) 11 in. (28 cm) 10 in. (24 cm) 11 in. (28 cm) Important: The Master Controller is mounted on the front of the MT10 or CT20 tank chassis. Never stack a CT20 Tank on top of any Pump. Never stack a Pump on top of any Tank. Recommend pumps only be stacked a maximum of two high. All units shipped with all leveling feet set to lowest position. 23 in. (58 cm) 29 in. (74 cm) Master Controller Assembly Dimensions 23 in. (58 cm) 22 in. (56 cm) 25 in. (64 cm) 21 in. (53 cm) 17.5 in. (44 cm) 25 in. (64 cm) 33 in. (84 cm) 42 in. (107 cm) 17 in. (43 cm) MT10 10 Gallon Tank Dimensions V3, V5 and V7 Vacuum Pump Dimensions CT20 Continuum Tank Dimensions 23 in. (58 cm) 50 in. (127 cm) 34 in. (86 cm) 33 in. (84 cm) 2V3 or 2V5 System Installation Recommended Stacked Pumps with Tank on Side 50 in. (127 cm) V3, V5 and V7 System Dimensions 34 in. (86 cm) 2V7, 2V3CT or 2V5CT System Installation Recommended Stacked Pumps with CT20 Tank on Side

SUB FLOOR INSTALLATION - Recommended system installation layout should be used whenever possible. Ceiling 1/2 - Inch Diameter Riser Minimum Slope: 1/4 inch per 10 Feet MAIN LINE See Notes 2, 3 & 4. Junction Box See Note 2. TREATMENT ROOM PLUMBING INSTALLATIONS Interior Wall Sub Floor Riser Connection See B. Main Line Turn Connection See A. Notes: 1. 10-foot Maximum Height from Main Line to Tank. 2. Consult Dental Unit Manufacturer's Guidelines for correct reduced size and height of termination of vacuum line inside junction box. 3. Limit branches. Orient main line under junction box or cabinet. 4. When piping line is above 3/4" I.D. or larger, use 45 Y's & elbows only. 5. Recommend installing separate line connection for scavenger when using Nitrous scavengers in overhead piping installations. Main Line Riser for connection to tank input. See Note 1. OVERHEAD INSTALLATION - Alternate system installation layout should be used only when unable to use the sub-floor plumbing layout. Minimum Slope: 1/4 inch per 10 Feet Interior Wall 1/2-Inch Diameter Riser 10-FT Maximum Height from Riser Trap to Main Line CONNECTOR DETAILS - ALL INSTALLATIONS Ceiling Junction Box See Note 2. Riser Trap See D. Overhead Riser See C. MAIN LINE See Notes 2, 3 4 & 5. q q q q Use only 45 elbows to make turns in main line. Make sure to use the proper pipe type for associated system. If piping is diverted to clear an obstruction, DO NOT MAKE A TRAP. See detail A, Main Line Turn Connections. DO NOT use standard 90 elbows. Important: All installation pipes and fittings provided by plumber. All installations must conform to local codes. A B C D 45 Elbow Clearing & Obstruction Making Turns 45 Elbow 45 ELL Main Line To Dental Unit Junction Box 1/2 Inch Riser 45 Y To Tank 45 Elbow Main Line 1" Min 45 Elbow 1/2 Inch Riser 1/2 Inch Diameter 45 Y To Tank 1/2-Inch Riser To Main Line 1/2-Inch To Dental Unit Junction Box Main Line Turn Connections Sub Floor Riser to Main Line Detail Overhead Riser to Main Line Detail (Prevents liquids from draining down the 1/2 riser.) Riser Trap Detail (45 Elbows)

TYPICAL EQUIPMENT ROOM FLOOR PLAN LAYOUT 48" D E 12" 4" 4" 20" Sewer Drain C 62" F 24" 4" MT10 or CT20 Tank B 76" G A 12" H 1" Single or Stacked Pumps (V3, V5 or V7) 4" 24" Single or Stacked Pumps (V3, V5 or V7) A J Pump/Tank Connection Manifold 4" 80" K 23" 1 Closed Vented Drain OR 2 3 2 Inch Exhaust Inch for Top Pump Connection Top 3 Inch 45 Y 2 Inch Pipe for Addition of Exhaust Vent Assembly. See Note c. Open Drain Pipe 2 Inch Pipe for Addition of Exhaust Vent Assembly. See Note c. Notes: See Installation Note J below for required pipe material. a. All piping and fittings must be 4-inch instead of 3-inch when preparing the site for a 3 pump installation. b. Use a second dual 45 Y fitting configuration when preparing the site for a 4-pump installation. INSTALLATION NOTES: 107" c. Pipe required for the installation of the Exhaust Vent Assembly supplied with each pump. See exhaust ventilation requirements provided on the back cover. A. PUMP INSTALLATION SPACE - Area for stacked or side by side pump installation. Keep 4 inch space from walls. Only stack up to 2 pumps in one area. B. TANK INSTALLATION SPACE - Area for typical side by side tank installation. Keep 4 inch space from walls. Never install the CT20 tank on top of a pump. C. SEWER DRAIN - Provide a drain for the removal of waste liquids from the MOJAVE tank. Use an open drain pipe (1 ½ inch P-Trap with 1 inch air gap or floor sink) or a closed vented drain. See detail 1. D. TANK WASHOUT - Provide a water source terminated with a ½ inch FNPT shut-off valve providing water pressure between 20 and 100 psi for daily tank washout. Valve location must be no more than 10 feet from the tank installation to allow connection of supplied 10-foot 3/8-inch Poly tubing to the tank washout port. Provisions for backflow prevention may be required. Check local code requirements. E. MASTER CONTROLLER ELECTRIC OUTLET - Master Controller requires a dedicated standalone 120V, 5 AMP grounded receptacle. F. PUMP ELECTRIC SERVICE - Each Mojave pump is wired directly with a dedicated 220V, 20 AMP, single phase 60 Hz circuit. If Main Circuit panel is not located in equipment room, a disconnect box with approved ground is needed for each pump. Disconnect boxes should be mounted no more than 3 feet of each other and 3 feet of installation center line. G. SUB FLOOR INSTALLATION VACUUM LINE - See Plumbing Requirements for connection to tank input via supplied hose. H. OVERHEAD INSTALLATION VACUUM LINE - See Plumbing Requirements for connection to tank input via supplied hose. J. HEAT EXHAUST - See Plumbing Requirements for the exhaust vent line required for specific Mojave configurations. Use metal pipe on systems whenever the Heat Exchanger is removed. Schedule 40 pipe can normally be used on typical Mojave configuration installations with a Heat Exchanger. When installing two pumps, a reducing Y adapter (shown by detail 2 above) is needed to connect both vent tubes to a common 3-inch exhaust vent line. K. PUMP/TANK MANIFOLD - User fabricated to connect 3 or 4 pumps to a tank. Used with 3V5 and 4V5 systems. See Pump/Tank Connection Manifold.

SITE REQUIREMENTS Electrical V3 & V5 V7 2V3 & 2V3CT 2V5 & 2V5CT 2V7 3V5 4V5 Master Controller Voltage Rating Volts AC All pumps 220 Volts Single Phase AC, 60 Hz 120 Voltage Minimum/Maximum 205/240 Volts AC All pumps 108/132 Volts AC Wire Size AWG Minimum Gauge Minimum Circuit Breaker Rating Incoming Power Remote (Low Voltage Wiring) (Qty 1) #10 AWG (Qty 1) (Qty 2) (Qty 2) #10 AWG (Qty 2) (Qty 3) (Qty 4) #14 AWG 20A 30A 20A (Qty 2) 20A (Qty 2) 30A (Qty 2) 20A (Qty 3) 20A (Qty 4) 15A Hard wire Connection (Each pump is supplied a 6 foot BX cable) #18 AWG (Qty 4) Wire Connection between the MMC and the Remote Switch Panel. (See Figure 14, page 26.) NEMA 5-15R for 120V (Supplied 10-ft. line cord) Plumbing V3 V5 V7 2V3 & 2V3CT 2V5 & 2V5CT 2V7 3V5 4V5 Exhaust Vent Pipe Using Heat Exchanger One 4 or three 2 PVC Two 3 or four Exhaust Vent Pipe Not Using Heat Exchanger (See note 1) One 4 or three Two 3 or four Minimum Suction Line Pipe 1 PVC 1 1 3 PVC 3 PVC 3 PVC Maximum Suction Line Pipe (See note 2) 1 2 2 4 PVC 4 PVC 4 PVC Riser Pipe Vacuum Line Termination 1 ½ FNPT 1 ½ FNPT 2 FNPT 2 FNPT 2 FNPT 2 FNPT 2 FNPT 2 FNPT Branch Line Pipe Size requirement of Branch piping differs by the number of operatories being serviced. Up to two operatories use 1" PVC Schedule 40. Three to six operatories use 1 Schedule 40. More that six operatories use 2" PVC Schedule 40 Drain Line Pipe 1 Schedule 40 Wash-Out Water Line ½ FNPT Shut-off Valve NOTES 1. Recommended for all new installations. 2. Use maximum internal diameter for the main line when preparing any new installation.

PUMP/TANK CONNECTION MANIFOLD Pump/Tank Connection Manifold Using Accessory Kit Sanitary Tee with 1-1/2 FNPT End Fitting. 3 or 4 depending on system configuration. (Supplied by Plumber) Air ow Fl 3 PVC or Copper Tubing & Elbow (Supplied by Plumber) Check Valve Installed Flat Side Facing Up Horizontal to Floor 3 or 4 Supplied Check Valve Assemblies See Kit P/N MIK4 or Copper Tubing for Tank Hose (Supplied by Plumber) 1.5 ft 3 PVC or Copper Clean-out Plug Used with P/N MIK4 (Supplied by Plumber) Barbed Connector to Pump 1 ft Flat Side Installed Facing Up 1-1/2 FNPT to Sanitary Tee Check Valve Assembly Side View Note: Hang using at least 3 pipe supports supplied by Plumber. CT20 TANK INLET CONNECTION DETAIL Swivel Elbow 1/4-inch Vacuum Sample Port to Master Controller 3/4 FNPT Reducing Bushing CustomerSupplied Tee Connector 6-inch Riser Hose Between Manifold and CT20 Tank Secured by Flexible Couplers Hoses From Manifold To Pumps Hose Between Manifold and CT20 Tank Secured by Flexible Couplers Hoses From Manifold To Pumps 2 Pipe for connection to Facility Piping from Operatory. 2 Flexible Coupling Connector V3, V5 & V7 PUMP HOSE CONNECTION DETAIL ED CL A S S IF I MEDICAL ELECTRICAL EQUIPMENT Hose from Manifold Connected to Pump via Air Input Filter Barbed Adapter WITH RESPECT TO ELECTRICAL SHOCK, FIRE, MECHANICAL AND OTHER SPECIFIED HAZARDS ONLY IN ACCORDANCE WITH UL-60601-1, CAN/CSA C22.2 NO.601.1 66CA

EXHAUST VENTILATION REQUIREMENTS HEAT EXHAUST CONNECTION NOTES Heat Exchanger 1. VENT LINE - The exhaust vent line required for MOJAVE systems using the Heat Exchanger and systems with the Heat Exchanger removed have different requirements. Use metal pipe on systems without a Heat Exchanger while PVC Schedule 40 pipe can be used on systems with a Heat Exchanger. Do not make a trap in the exhaust vent piping. Do not use 90 ο fittings. Also see Exhaust Vent Protection and Ventilation Requirements below. 2. V3, V5 & V7 PUMP EXHAUST VENT CONNECTION - Connection between the pump and exhaust vent piping is typically made via the supplied 2-inch Black Flex tubing. 3. EXHAUST VENT ASSEMBLY - The supplied assembly must be installed at the lower end of the vent pipe to collect condensation produced during pump operation. The bottom of the Y connector should be located 18 inches from floor. Attach the drain tube to the drip leg quick-connect fitting to allow drainage into floor drain/sink. Typical Flex Tubing See Note 2. 4 Exhaust Vent See Note 1. Exhaust Vent Assembly See Detail & Note 3. 18 35 V3 & V5 Pump Heat Exchanger Connection V3 or V5 Pump Top View 2 Flexible Coupler Reducing Bushing Vent Pipe 17-Inch Long Flex Tubing 3/4 MNPT X 1/4 FNPT PVC Bushing 1/4 MNPT X 1/4 Push Elbow Drip Leg Detail View Exhaust Vent Protection. If the exhaust piping is venting to the outside of the building, precautions must be taken to protect the equipment room from weather elements and animal intrusion. This can be accomplished by using one of the three methods shown on the right. Roof-Mounted Outside Vent Protection Screen Shroud & Screen Shroud & Screen Wall-Mounted Outside Vent Protection Exhaust Vent Requirements. The MOJAVE equipment must be used in a controlled-temperature environment. Maintain equipment room temperature between 40 and 105 degrees Fahrenheit. An exhaust fan is necessary if room temperature is not maintained by other methods. Adequate forced ventilation must be provided across the unit by placing an appropriate exhaust fan opposite an equivalent air intake vent. The fan should be placed higher than the associated intake vent. Recommended minimum exhaust fan requirements for each MOJAVE unit are listed to the right. MOJAVE Unit Watts (Idle) Watts (Max) BTU (Idle) BTU (Max) V3 886 1,601 3,021 5,462 V5 886 2,245 3,021 7,660 V7 1,200 2,245 3,021 7,660 2V3 & 2V3CT 886 3,202 6,042 10,924 2V5 & 2V5CT 886 4,490 6,042 15,320 2V7 See Note 1,200 4,490 6,042 15,320 3V5 886 6,735 9,063 22,980 4V5 886 8,980 12,084 30,640 Note: Only 1 pump is running when operating in idle mode.