Wood logs boiler with a gasication eect IGNIS KW. INSTRUCTIONS MANUAL for usage and maintenance

Similar documents
OPERATING INSTRUCTIONS with safety features

Solid fuel hot water boiler TKH KW INSTRUCTIONS MANUAL for usage and maintenance

Biomass. Biomass solid fuel boiler range

Wood gasification process...3. Wood as a fuel...3. Boiler construction - its elements...4

INSTALLATION AND OPERATING INSTRUCTIONS

Boiler Technical Specifications (2013)

MANUAL. Page 1/44

- 12, , TECHNICAL INSTRUCTIONS

INSTALLATION AND OPERATING INSTRUCTIONS. Ariterm 60+

USER MANUAL 9kW LILLY PELLET STOVE

Manual and installation instructions. Function. Operating phase

INSTRUCTIONS FOR INSTALLATION AND MANUAL Solid fuel stove for central heating THERMO IN

WHE 2.24 / WHE 2.24 FF

INSTRUCTION MANUAL. for installation and operation of solid fuel cookers. Victoria and Victoria Lux

Heating with log wood

INSTALLATION AND OPERATION MANUAL

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo

ISO 9001 TUV CERT CE

USER MANUAL FOR SOLID FUEL STOVE VOLCANO - 24kW

PELLET BURNER PV 350

HDG K SERIES. Wood pellet boiler. The perfect alternative to fossil fuels. Receive up to

Solid biofuel solutions

Importance of a Draught Regulator

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20

Heating with wood chips

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM

INSTRUCTION MANUAL & SERVICE MANUAL ORLAN 96 SUPER ORLAN 130 SUPER

AIEA Presentation. Wood pellets heating systems.

Instruction manual for installation, operation and maintenance of automatic pellet burner of series GP on solid fuel hot water boiler VIADRUS U26

Combined boiler. for solid fuel and pellets

Smart Heating Technology Ltd. U Statku 653/24, Ostrava-Bartovice Czech Republic

MANUAL FOR INSTALLATION, OPERATION AND MAINTENANCE OF AN AUTOMATED PELLET BURNER FROM SERIES GP XX SC.

BIOMASS BOILER ATTACK PELLET 30 AUTOMATIC PLUS

TECHNICAL INSTRUCTIONS USE AND MAINTENANCE

So old fashioned... As the combustion chamber is completely room sealed, it does not release any smells and does not dirty.

INSTRUCTION MANUAL & SERVICE MANUAL ORLIGNO 200

BIOMASS BOILER DUAL THERM

VICTRIX 90 VICTRIX 115 Wall-hung condensing boilers for high power

Product range Code HE1 Connection and energy management compact unit without anti-condensation valve

WOOD GASIFYING BOILER ATTACK DPX STANDARD / PROFI / LAMBDA INSTRUCTIONS FOR USE WWW. ATTACK.SK

Main components. Buying all components from same manufacturer or reseller it guarantees better compatible and service if something happens

USE AND MAINTENANCE. Cm Pelet-set (60-90 kw) TECHNICAL INSTRUCTIONS

BIO-CK P Unit TECHNICAL INSTRUCTIONS. for installation, use and maintenance of hot water boiler and installation of additional equipment

USE AND MAINTENANCE. Cm Pelet-set TECHNICAL INSTRUCTIONS. (14-35 kw) For boilers: EKO-CK P (EKO-CK 20-40) EKO-CKB P (EKO-CKB 20-40)

Cm Pelet-set - touch TECHNICAL INSTRUCTIONS FOR THE COMMISSIONING AND ADJUSTMENT

MANUAL FOR USE AND INSTALATION STOVE MODELS: D11-D17

PER-EKO type KSW & KSW PLUS Instruction Manual

TECHNICAL AND OPERATIONAL DOCUMENTATION

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO

Installation, operation and care Firewood boiler Vedolux 40 UB

Boiler. Fire tube Boiler:

Installation, operation and care. Pellmax UB. Burner not included Replaces:

it warms us up! PRICE LIST

English. Heating with logs & wood pellets 20-40

INSTRUCTION. for installation and operation of solid fuel fireplace

HERZ ECO-Line Heating with logs or wood pellets

Eligibility criteria

C Bali R. Cast-iron boilers with atmospheric gas-fired burner. Life-enhancing heat

Instruction manual. GP45 cs. for installation and operation of Automatic pellet burner. p. 1/56

High Performance Electronic Modulation Automatic Cleaning Easy Installation 4 Power Levels: 9,15,25,42kW. Pellet Boilers. Future of Ecological Heating

Smart Fire. pellets burning automatic boiler. Operation manual

Rocket heater GAMERA

The iqe Boiler Range. Combination and System T Boilers.

Gasification boiler PYROLYT INSTRUCTION MANUAL. ver. 1.1

Eco Angus Wood Pellet Boilers

DEVRON SERIES MULTI FUEL FIRED GASIFICATION HOT WATER BOILERS DEVRON-30, DEVRON-40 OPERATION, USE AND MAINTENANCE MANUAL

SERVICE AND INSTALLATION MANUAL FOR CENTRAL HEATING BOILER BENEKOV R100

Laddomat. Mixing valves for solid fuel boilers. Version 1.01

Operating manual. Pellet boiler. Orlan Pellet ISO 9001

USERS MANUAL FOR GAS BOILERS

Rozp.UE2015/ kw kw

HEATING TECHNIQUE PRODUCT CATALOGUE

PE1 Pellet. PE1 Pellet. Pellet boiler - Canada. PE1 Pellet APPROVED FOR EPA 2020 EMISSION LIMITS.

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR INSTALLATION, OPERATION AND MAINTENANCE OF PELLET BOILER OF SERIES BISOLID

GENERAL RULES. Ensure that the installation of your product conforms to all the indications given below. English CHIMNEY STACK

Aquaflam Wood boiler stoves and fireplace inserts

modern heating devices

USE AND INSTALLATION MANUAL

REV.01 /

Domestic Gas Safety Assessments (DGA) Competency Assessment Certification Scheme for Registered Gas Installers

MANUAL FOR ASSEMBLY AND OPERATION OF ELECTRIC FLOW-THROUGH BOILER/MODULE WITH THREE STAGE CONTROL

W W W. A T T A C K. S K

Installation and operation manual for pellet boiler TANGRA HP 30. Manufactured in accordance with standard: - EN Rev.

Figure 1 Solid fuel cook-stove KMŠ 70 and KVŠ 90H

WOOD CHIP HEATING HPK-RA

Wood log boiler HVS. Solarbayer Gasifying wood log boiler. Ecological hea ng with highest comfort! HVS E ECONOMIC HVS LC.

BW Type Solid Fuel Boilers Installation and Maintenance Instructions

Cm Pelet-set TECHNICAL INSTRUCTIONS FOR THE COMMISSIONING AND ADJUSTMENT. (14-35 kw) For boilers: EKO-CKB P (EKO-CKB 20-40)

robus thinking alternative ENERGY

Operation and maintenance manual for the. KSP Spark. series boilers equipped with feeders

Forward-looking and energy effi cient Biomass heating

Installation instructions PYROMAT ECO. for contractors PYROMAT ECO GB 8/2012 Dispose after installation.

WOOD CHIP HEATING HPK-RA

Olymp Werk GmbH c/o Grouped Renewables Ltd. PO Box 7180, Montrose DD10 0WX Tel: +44 (0) Web:

Cm Pelet-set (60-90 kw)

Page 1. Cube Ref:

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A

PELMAX HEATING BOILER FOR SOLID FUEL

General instructions for the Installation and use of wood-burning stoves

Pellet boiler Electronic Modulation Automatic Cleaning Grinder system Easy Installation 4 power levels: 10, 16, 25, 43 kw

Transcription:

Wood logs boiler with a gasication eect IGNIS 20-40 KW INSTRUCTIONS MANUAL for usage and maintenance Prhovacka bb 22310 Simanovci, Srbija Tel/Fax. +381 22 480404 +381 63 259422 oce@termomont.rs www.termomont.rs May 17, 2011

Contents 1 Boiler design and properties 2 1.1 Dimenzije............................................. 2 1.2 Technical properties according to EN 303-5.......................... 2 1.3 On product............................................ 3 2 How It Works 3 3 Recommendations for boiler shipment and storage 4 3.1 Delivery form........................................... 4 3.2 What's in the box........................................ 4 4 Boiler installation 5 4.1 Boiler placement......................................... 5 4.2 Chimney.............................................. 5 5 Connecting the boiler with a central heating system 7 5.1 Closed system........................................... 7 5.2 Closed system combined heating with solar panels...................... 8 5.3 Closed system combined heating with solar panels...................... 9 5.4 Open system........................................... 10 6 Boiler In Use 11 6.1 Circulation Pump Thermostat.................................. 11 6.2 Maintenance and cleaning.................................... 11 7 Safety features 11 7.1 Thermal safety in case of overheat (closed systems)...................... 11 A Deklaracija o Konformnosti 13 1

1 Boiler design and properties 1. Upper door for placing wood-logs 2. Secondary air inlet (manual regulation) 3. Lower door for cleaning 4. Primary air regulation 5. Thermostatic draught regulator 6. Chain for air regulation 7. Connectors for safety heat exchangers 8. Connection for excess water outlet 9. Sensor placement 10. Flue box 11. Flue 12. Secondary ue (ap) 13. Secondary ue ap handle 14. Opening for cleaning the ue box 15. Fill/Drain tap 16. Return 17. Base 18. Flow 1.1 Dimenzije Type IGNIS Weight (kg) A B C D E F G H I L (mm) (mm) (mm) (mm) (mm) (col) (mm) (mm) (mm) (mm) IGNIS 20 320 726 648 468 480 200 2 490 1220 900 845 IGNIS 30 340 736 858 578 590 200 2 660 1220 900 1045 IGNIS 40 350 736 1135 578 590 200 2 860 1220 900 1245 1.2 Technical properties according to EN 303-5 Nominal power IGNIS (KW) 20 30 40 Power range (KW) 15-20 20-30 30-40 Necessary draught (mbar) 25 25 28 Water content (l) 45 60 70 Flue gases temperature (at nominal power) ( C) 200 200 200 Heating chamber volume (dm3) 50 80 100 Mass ow at nominal power (kg/s) 0,016 0,021 0,045 Electrical network (V/Hz) 230/50 230/50 230/50 IP Protection 30 30 30 Temperature regulation range ( C) 60-90 60-90 60-90 Min. temperature of the return line ( C) 60 60 60 Eciency 76% 76% 75% Boiler class 2 2 2 2

1.3 2 On product Boiler primarily uses dry wood as fuel with caloric value > 15 MJ/kg, max. moisture content 15%; Boiler is produced following the guidelines of the European norm EN 303/5; According to norm demands inner walls of the boiler are 5 mm thick; Combustion takes place inside the heating chamber specially designed to put large amount of woodlogs Single combustion load can hold up to 6 hours Boiler comes with removable ash-tray, cleaning kit and thermometer; The upper zone of the boiler has a special round shape made of reproof ceramics with turbulators for optimum e ciency; Water test is done at 6 bar pressure. How It Works IGNIS uses wood-logs - by its construction it could be called a 'boiler with wood gasi cation e ect'. Following image depicts the combustion principle of this boiler. 1. Combustion chamber 2. 'Catalyst' with tubulators 3. Heat exchanger of the safety valve line 4. Tubulators (heat exchangers inside the upper zone) 5. Secondary ue opening 6. Flue box (a part of the heating chamber around the ue) 7. Boiler water 7.1 Boiler water around the ue chamber 8. Secondary air inlet 9. Primary air inlet 10. Return 11. Flow As IGNIS is similar to wood gasi cation boilers, the main properties of the wood gasi cation boilers will be outlined rst. A wood gasi cation boiler, thanks to its special geometry, and thanks to use of the 3

fan, brings the woodlogs in the state of 'gasication' - the process where light weighted hydrocarbons. The ame has a specyphic blue colour and the eciency of such solid fuel boiler is 10-15% greater than that of the conventional ones. Another interesting property of wood gasication boilers is that the woodlogs are placed in the upper chamber and the ame is inverse - going upside down contrary to conventional boilers. Wood gasication combustion requires a constant and stationary boiler operation. It is thus necessary to have an additional heat tank to accept the excess heat made by boiler. It is also necessary to perfectly adjust temperatures between the heat tank, ow and return line of the boiler to prevent condensation. All in one, wood gasication allows maximum comfort with wood-logs as a fuel, but with certain investment to be made into additional equipment. The IGNIS boiler lls the room between the less pricey conventional boilers, which demand rell of wood more often and maximum comfort yet more pricey wood gasication boilers (with heat tank). Because of its technical construction IGNIS allows the wood gasication eect (in amoutn much less than 'real' wood gasication boilers) but only using the natural draught of the boiler, without a fan and without a necessary heat tank. What is still necessary is the protection against condensation (mixed valve, by pass of the boiler). IGNIS does not have an inverse ame. As it does not posses the automatic regulation via fan, optimum combustion is achieved by setting the primary and secondary air. Primary air is controlled by the draught regulator (to be ordered separately) and the secondary air is to be set manually. In which way the wood gasication eect is achieved? Wood gasication process takes place in the upper zone of the boiler - within the so-called 'reproof catalyst'. This is a special cylindric part of the heating chamber. On its upper side there are special heat exchangers (tubulators). Below the catalyst with presence of secondary air, at very high temperatures, solid particles are accelerated to certain level until they combust completely. Short-chain hydrocarbons are released. Flue gases are passing through turbulators - in contact with increased surface of the tubulators ue gases are additionally cooled down - exit ue gas temperature is thus lower compared with conventional boilers. The eciency is higher. The concentration of dust, particles and COX/NOX is lower. IGNIS has a secondary ap inside the chamber. The role of this is to shorten the passage of ue gases and increase the draught in the boiler when necessary (during ignition for instance). when th ere is stable this secondary ap should be closed. IGNIS also has a so-called 'ue-box'. Water content of the boiler is maximized occupying a part of the ue chamber. 3 Recommendations for boiler shipment and storage 3.1 Delivery form The boiler comes in three parts, boiler chamber, pellet storage and the boiler housing packed separately. Chamber is wrapped with plastic sheet, and upper door containing reproof glass should have a small styrofoam protection sheet. The whole set is transported on wood pallet. The boiler must always stand in its vertical position. The rotation of the boiler during the shipment or installation represents a serious risk and can lead to damaging the boiler. It is forbidden to stack boilers vertically one onto other. The boiler can be stored only in closed rooms with no atmospheric inuence. The humidity in the storing room also must not exceed the critical value of 80%, so as not to create any condensate. The temperature of the storing room must be in the range of +/- 40 C. 3.2 What's in the box The following parts are supplied together with the boiler: Cleaning kit 4

Cleaning brush Warranty paper 4 Boiler installation 4.1 Boiler placement The boiler room should have air-conditioning. The boiler should be mounted in the boiler room permiting access to all its parts as shown below: 4.2 Chimney Boiler connection to the chimney is shown in the gure: Proper dimensioning of the chimney is a very important premise for optimum boiler performance. The purpose of the chimney is to take out the products of combustion but also to secure necessary air draught in the boiler. The graph shows how to chose the necessary height for the chimney as a function of chimney opening. Proper chimney insulation is very important and should be at least 50 mm thick. Depending on the necessary draught of the boiler, the cross section and the height of the chimney are determined. Please advise technical material given by chimney producer. Minimum chimney height for wood boilers is 6 m. Round chimney made of stainless steel modules is recommended in order to keep the condensation inuence low. 5

6

5 Connecting the boiler with a central heating system 5.1 Closed system The following schemes show how to connect the boiler to the central heating installation with or without a heat accumulator tank: System parts: 1. Boiler 2. Heat accumulator 3. Heat exchanger 4. Non-return valve 5. Mixing valve 6. Pump of the radiator heating 7. Automatic regulation for the radiator heating 8. Expansion vessel 9. Exchanger pump 10.Valve 11.Thermo-manometer 12. Expansion vessel 13. Four-arm mixing valve 14. 7

It is not necessary to install the heat accumulator. However, it is recommended.for 1 KW power of the boiler, a capacity of the heat accumulator of 25-50 l is recommended. One must also bear in mind that the power of the boiler must be enough in order to both warm up the water in the accumulator, as well as to provide direct feed to the installation in very cold periods the chosen power of the boiler should be 1.5 higher than the power of an oil-gas boiler for the given squaring. It is recommended that the closed central heating system is supplied with an expansion tank, the capacity of which must amount to at least one tenth of the total capacity of the system (including the water volume in the boiler). The system must also have an automatic aeration valve with the help of which air will be eliminated from the system. The use of a safety valve is obligatory (with a 2-3 bar threshold, depending on the power of the boiler) and it must be mounted near the boiler. It is also necessary that the system has a thermometer and manometer in order to read the temperature and pressure in the system. In case of using conventional solid fuel, the temperature of the return line should not fall below 60 C, so as to avoid leaking, i.e. condensation in the boiler, which can further lead to corrosion. The temperature of the starting line should not fall below 70 C. It is recommended to use a four-arm mixing valve on the return line of the boiler or a regulation group such as LADDOMAT 21. It is also recommended to mount a lth catcher on the return line. Qualied installer should be entrusted with the mounting of the heating and the initial operation. This must be a person who will take over the responsibility and guarantee the correct operation of the boiler and of the complete central heating system. In the case of an incorrectly planned system with manifesting deciencies caused by the respective person's incorrect installation of the system, which can again lead to an incorrect operation of the boiler, the complete liability for the material damage and potential new costs arising in relation to it is borne exclusively by the person who was entrusted with the mounting of the central heating system, and not by the boiler manufacturer, sales representative or seller. 5.2 Closed system combined heating with solar panels The following scheme depicts a heating system connected over a hybrid solar boiler within an accumalation tank: 8

System parts: 1. Boiler 2. Heat accumulator 3. Heat exchanger 4. Non-return valve 5. Distributor 6. Mixing valve 7. Pump of the radiator heating 8. Pump of the oor heating 9. Regulator of the automatic regulation for the radiator heating 10. Regulator of the automatic regulation for the oor heating 11. Receiver 12. Expansion tank 13. Exchanger pump 14.Valve 15.Thermo-manometer 16. Filth catcher 17. Four-arm mixing valve 18. Safety valve 5.3 Closed system combined heating with solar panels Termomont in its oer of solar boilers also has a 'hybrid' version of a heat accumulation tank and stainless steel solar boiler in one: ATS combined tank. When boiler heats up the 'technical' water inside the boiler - as do the solar panels through the spirale. The drinking water is inside the inner vessel which 9

is heaten indirectly by the technical water. 5.4 Open system The following scheme shows how to connect the boiler to the open central heating system: System parts 1. Boiler IGNIS 2. Valve 3. Thermo-manometar 4. Boiler circle pump 5. Three-way mixing valve or LADDOMAT 21 6. Heat accumulator tank 7. Three-way mixing valve 8. Automatic three-way mixing valve 9. Circulation pump for radiator heating 10. Open expansion vessel 11. Automatic regulation MRTR Plus (First) 12. Heating circle 13. Sanitary water circulation pump 14. Sanitary water accumulation tank SOLAR I 10

6 Boiler In Use 6.1 Circulation Pump Thermostat Boiler should be equipped with a thermostat for the system circulation pump. The thermostat threshold can be set on certain value and only when the temperature is higher than that, the circulation pump will be turned on. This thermostat is primarily used when ring with solid fuel, in order to prevent the low temperature of the return line which can lead to condensation as a consequence. As the heating up process with wood pellets is usually much faster compared to conventional wood, the eect of condensation should not take place at all when burning pellets. The default value for temperature threshold is set at 60 C. 6.2 Maintenance and cleaning Using wood pellets as a primary fuel means very low level of ashes (less than 1%). The cleaning of the boiler can thus be performed once per week and does not take more than 5 minutes. Burner ash-tray should be however cleaned every day or two - operation which takes less than a minute. Using pellets means also low temperature of the ue gases due to the high eciency of combustion. This means the boiler would last much longer compared to combustion with traditional solid fuels such as wood or coal. 7 Safety features 7.1 Thermal safety in case of overheat (closed systems) Burner has two main safety features: The internal feeeding auger prevents re passing from the boiler to the burner body. The other feature is that if the temperature of the ue gases does not drop below 250 C the burner will be forced to work with minimum power (which means minimum quantity of pellets added every time). For additional hydraulic protection in the closed systems it is necessary to install to safety thermal valve shown on image (to be bought separately, not an integral part of the boiler). If for some reason the temperature of the water inside the boiler should exceed 95 C this valve would release the water from the water supply system to cool down the water temperature inside the boiler. 11

Connection scheme for the thermal safety valve: 1. Cold water entering from the water supply system 2. Cold water entry into boiler 3. Hot water going outside the boiler 4. hot water ending in the sewage water system 5. Thermo-valve sensor To connect the safety valve: Connect the sensor of the valve (outter thread 1/2") at depicted place on the boiler, position 5 (inner thread 1/2") Connect the cold water entry (on valve's input is marked with C) than connect the exit line (valve marked with: ) with the corresponding exit line on the boiler (position 21) Connect position 21 (on the boiler) with the input line on the valve (valve is marked with: ) Connect the valve (marked with S) to the sewage system. 12

A Deklaracija o Konformnosti We, Termomont d.o.o. with legal seat on the address Prhova ka street bb, 22310 imanovci, Republic of Serbia, under sole responsibility declare that: Kotlovi na vrsto gorivo tipa IGNIS 20, IGNIS 30, IGNIS 40 produced 2010. and 2011. as by its construction, design and performances are in accordance with the following norms and directives prescripted by the European Union: 97/23 EEC Pressure device directive EN 303/5 Norm for solid fuel boilers" imanovci, May 17, 2011 Signature of the responsible person.................................... 13