INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo

Similar documents
INSTALLATION AND OPERATING INSTRUCTIONS. Ariterm 60+

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20

INSTALLATION AND OPERATING INSTRUCTIONS

Installation, operation and care Firewood boiler Vedolux 40 UB

JÄSPI Solid Fuel Boiler

USER MANUAL 9kW LILLY PELLET STOVE

Main components. Buying all components from same manufacturer or reseller it guarantees better compatible and service if something happens

Heating, Air Conditioning, Ventilation. Отопление-Кондиционеры-Вентиляция. MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL

Varde Aura. Smoke Control Kit. Additional Installation and User Instructions for use in Smoke Control Areas

Technical Datasheet. FHG-S Models 28, and 45. Benefits at a Glance: State Route 22 Salem, NY 12865

SAUNA HEATER INSTALLATION AND OPERATING MANUAL

Gasification boiler PYROLYT INSTRUCTION MANUAL. ver. 1.1

Varde Shape. Smoke Control Kit. Additional Installation and User Instructions for use in Smoke Control Areas

For Masonry & Factory Built Fireplace Retro-Fits Revised 5 December 2013 Healthy Hearth Riverside Dr. #214 Lake Elsinore, CA 92530

Operating Manual USA & Canada.

Wood gasification process...3. Wood as a fuel...3. Boiler construction - its elements...4

Installation and Operating Instructions

INTRODUCTION TO HITZER STOVES INSTALLATION AND OPERATION

Biomass heating: a guide to small log and wood pellet systems

Description of functions

tççç= ÜÉ~íáåÖ çéíáçåë

Installation & Manual. Model T-25

SOUND-INSULATED FAN. Iso-K OPERATION MANUAL. Iso-K_v.1(2)-EN.indd :20:59

Boiler Technical Specifications (2013)

INSTALLATION, OPERATION AND MAINTENANCE. Bio burners kw

Installation and Operating Instructions

Technical Datasheet. Solo Innova Models 30 and 50. Benefits at a Glance: Solo Innova

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #

INSTALLATION, OPERATION AND MAINTENANCE. ARITERM SWEDEN AB Installation, Operation & Maintenance /28

INSTRUCTIONS FOR INSTALLATION, SETTING AND USE

Installation, operation and care. Pellmax UB. Burner not included Replaces:

Bergen PRPMXXXX. Smoke Control Kit Additional Installation and User Instructions for use in Smoke Control Areas

Product range Code HE1 Connection and energy management compact unit without anti-condensation valve

version 1.2 Made by NARVI Oy Finland Aito 16 / 20 / 24 / 16 VS / 20 VS / 24 VS Installation, user and maintenance instructions

Importance of a Draught Regulator

INSTALLATION, OPERATION AND MAINTENANCE. Multijet hydraulic

FIREWOOD HOT WATER CENTRAL HEATING BOILERS MODEL: STADLER TR

HEATING BOILERS Astra G-18 E Astra G-25 E Astra G-32 E Astra G-40 E

Rocket heater GAMERA

Maintenance 50 Serie CAUTION. Before resetting your electronic card that displays an error code. OVERHEAT MESSAGE

Biomass. Biomass solid fuel boiler range

AIREX 2S WOOD PYROLYSIS SUCKING FAN

TECHNICAL AND OPERATIONAL DOCUMENTATION

Multi Energy Boilers. Duo 1 & 2 Triplex 1000 & 3000 Biotriplex. Oil Gas LPG Wood Briquettes Electricity Solar thermal Solar photovoltaics

Installation, operation and maintenance. Accumulator tank. Acc-tank 500 CU. Acc-tank 500 UB ver: Supersedes:

(manual control) (ezi-slide control) INSET COAL EFFECT GAS CONVECTOR FIRE V1/100/B INSTALLATION & USER INSTRUCTIONS

Malm Fireplaces, Inc. 368 Yolanda Avenue, Santa Rosa, CA (707) Fax: (707)

ALDRICH COMPANY THREE PASS FIRETUBE BOILER CLASSIC SERIES OPERATING & MAINTENANCE MANUAL

ARITERM-VTT-S INSTALLATION AND OPERATING INSTRUCTIONS

PLEASE KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE PELLET STOVE HP-0020S

A totally renewable heat source

CALEFFI. Anti-condensation recirculation and distribution unit. 281 series 01224/14 GB. Replaces dp 01224/12 GB. Function

Technical Datasheet. P4 Pellet Boiler Models 8/15, 20/25, 32/38, 48/60, 80/100. Benefits at a Glance:

A-250, A-350, & A-450 Warm Air Furnace

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A

ARITERM-VTT-S INSTALLATION AND OPERATING INSTRUCTIONS

INLINE СENTRIFUGAL FAN BOX BOX-R OPERATION MANUAL

Manual and installation instructions. Function. Operating phase

Quadro 1, 2 & S-31A Insert

Installation instruction

TABLE OF CONTENTS. Site preparation 2 Placement. 2 Chimney and stove pipe connections. 2

A totally renewable heat source

USER S INFORMATION MANUAL

Troubleshooting and Maintenance: Wood Stoves

OPERATING INSTRUCTIONS with safety features

CHARNWOOD COUNTRY 6 FT

REV.01 /

USER S MANUAL, MAINTENANCE MANUAL INSTALLATION INSTRUCTIONS

INSTRUCTIONS MANUAL FOR USE AND MAINTENANCE

FLUIDIZED BED BOILERS

CHARNWOOD COUNTRY 8B WOODBURNER OPERATING INSTRUCTIONS

Installation and maintenance Vedolux 450

CONVENIENCES FEATURES ADVANTAGES APPLICATIONS

Fireplace inserts. Model SK1000, SK2000. Installation instructions Care and firing instructions

PANTHER P Automatic Boiler Operator's Manual

MOS GB INSTALLATION AND MAINTENANCE INSTRUCTIONS VEDEX 1000 VEDEX 1000 M10527 LEK

INSTALLATION AND OPERATING INSTRUCTIONS. Ariterm Biomatic+ 20

Operating and installation instructions for Fire Lotus H586

- 12, , TECHNICAL INSTRUCTIONS

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO


MODEL CF CEILING SUPPORTED CHIMNEY

BIOMASS BOILER ATTACK PELLET 30 AUTOMATIC PLUS

Technical Datasheet. P4 Pellet Boiler Models 8/15, 20/25, 32/38, 48/60. Benefits at a Glance:

ENTROPIE boiler TT100-01

GB IE INSTALLATION & USER INSTRUCTIONS. Model Number: V1/300/B (ez-slide control) HIGH EFFICIENCY INSET COAL EFFECT GAS CONVECTOR FIRE

OWNERS MANUAL MODEL DO110 & DO180 IS CERTIFIED TO: Unit Serial # Purchased From Company Address

PELLET BURNER PV 350

Operating Instructions Manual Janfire NH/Integral Pellets Burner with External Auger

LOG BURNING BOILERS. Zeroridge Biomass Ed 17A

Dovre 700CBW Cast Iron Wood Stove INSTALLATION INSTRUCTIONS 700G/1095

Pellet heating. Boilers & Burners.

K-2 & K-6 Direct Vent

HEATING BOILERS Astra H-25 E Astra H-32 E Astra H-45 E

Installation of a Brunner fireplace. General Indications

Sauna Heater. Installation and Manual

VASKA C11. gas-fireplace user manual. Saturnus 8 NL-8448 CC Heerenveen Postbus 219 NL-8440 AE Heerenveen T. +31(0) F.

INSTALLATION AND SERVICE INSTRUCTIONS. The biggest Czech producer of fi replace inserts. Accurate and precise design of details

Funnel Casing -- ZENON, I M NOT SURE WHAT THIS IS. I CAN DELETE REF- ERENCE TO IT OR PROVIDE SOME DETAIL IF YOU CAN HELP ME UNDER- STAND IT.

High Performance Electronic Modulation Automatic Cleaning Easy Installation 4 Power Levels: 9,15,25,42kW. Pellet Boilers. Future of Ecological Heating

Transcription:

INSTALLATION, OPERATION AND MAINTENANCE Ariterm Vedo

CONTENTS General...3 Installation...4-5 Laddomat 21 Connection diagram...6 Temperature control valve...7 About burning wood...8 Operation...9-11 Service and maintenance... 12-15 Measurements and connections... 16 Technical data... 17 Guarantee... 17 Declaration of conformation... 18 Notes... 19-23 2

GENERAL Ariterm Vedo is an efficient, modern wood-fired boiler, which can also be equipped with a pellet or oil burner. It complies with the newest pollution and efficiency requirements laid down in D8. The boiler also meets the safety requirements laid down in EN 303-5. Due to the boiler s excellent burning properties and good insulation, it is highly efficient and has low environmental emissions. Carefully designed convection channels store the heat efficiently. Vedo should be connected to a warm water accumulator. In proportion to its efficiency, Vedo is small and therefore easy to fit in available spaces. The boiler room is not required to have the highest fire safety classification; EI 30 is sufficient. To make optimal use of the boiler s properties, it is important to follow the instructions provided in this manual. The firewood used in Vedo should be at most 0.5 m long. Vedo is a reverse combustion boiler in which wood is combusted in a firebox lined inside a water jacket upon a ceramic grate. The fuel gasifies on the ceramic grate. The gas compounds burn at a high temperature in the bottom part of the boiler, in a afterburning chamber which is made of fireproof material. The boiler does not have its own water tank, as it must be connected to a warm water accumulator to operate properly. Instead, the boiler has a cooling spiral, on which a temperataure control valve is installed to prevent overheating. It also has an exhaust fan that enables even combustion, and there is no height requirement for the chimney. TRANSPORTATION, STORAGE AND OPENING THE PACKAGE Receiving the goods The boiler is delivered in a wooden frame. On the bottom is a pallet, which can be used to lift the boiler safely. It is advisable to open the package as close as possible to the installation location. The factory insures the boiler against transport damage, which includes transport from the factory to the first intermediate storage point. It is important that whoever receives the boiler should check its condition before accepting it. In cases of damage, the seller must be contacted immediately. Storage The boiler can be stored in the open air if protected from rain, but storage indoors is recommended. Opening the package After opening the package, open up all the hatches and check the equipment to see that all loose equipment has been supplied. Disposal of packaging: plastic cover can be recycled, wooden planks can be burned.

INSTALLATION Installation of the boiler can only be done by a company or individual with the necessary professional accreditations. Installation should be performed so that it meets the minimum requirements of the SFS 3332 standard. Electrical and burner installations must be done only by a qualified company or individual. Space requirements An area of 1 metre must be reserved in front of the boiler for cleaning and maintenance procedures. Plumbing connections are located on top of the boiler with the exception of the return from the accumulator, which is on the side. Flue connection and combustion air opening The boiler can be directly connected to a vertical flue. The seams can be sealed with 350 C silicon paste. If the flue is made of bricks, use the supplied square elbow to connect the boiler. Flue requirements: Minimum Ø 140 mm, and for a masonry flue, free cross-sectional area of at least 200 cm². If an oil burner is used as well, the flue requirement is a brick flue lined with acidproof thin-walled pipe tube or an acid-proof flue element. The free surface area of the combustion air opening must be 1.5 times the diameter of the flue. The combustion air opening must never be covered. Flue gas fan The Vedo has versatile assembly options that allow it to be fitted with different chimney solutions. The standard delivery always includes a flue gas fan. The standard connection to the chimney is straight up (image 1). Make sure to leave enough space for cleaning when installing the pipe. A chimney elbow piece also comes as a standard accessory. It allows the boiler to be connected to a brick chimney (image 2). Pic 1 Pic 2 4

INSTALLATION Plumbing connections Before installation of the boiler, the heating system must be flushed and a water pressure test carried out. The tightness of connections must be ensured after installation. The factory is not responsible for damage caused by leaking connections. Relief valve installation The pressure relief valve must be CE-approved with a maximum opening pressure of 1.5 bar and a minimum size of DN 15. It must correspond to the highest pressure class of the equipment assembly. Between the valve and the boiler, no equipment may be installed, the connection of which could be closed. The exhaust pipe must be dimensioned and installed so that it neither restricts the exhaust efficiency of the relief valve, nor causes a hazardous situation when the valve is working. The capacity of the expansion vessel must correspond to the greatest possible fluid volume change in the boiler system. In periodic heating, the expansion capacity must be approximately 10% of the system volume. We recommend that only a closed system is used (membrane expansion vessel). Filling the system Before heat is turned on, the storage tank and heating system must be filled with water. Instructions for filling Open all shutter valves, including the four-way mixing valve. The pump must be switched off. Fill in the heating system. Remove air through the accumulator and radiators. When the system is filled, you can switch on the circulation pump and start heating. When the water in the boiler has reached the set operating temperature, switch off the pump and remove air from radiators again. This has to be repeated a few times. Since there is a lot of air in the water at the start (up to 10%), it is normal for the pressure to drop as air leaves the system. Therefore it may be necessary to add water on several occasions when operating the boiler. The temperature of water returning to the boiler should be around 70 C, which is achieved through a by-pass connection illustrated in the connection diagram. A sufficiently high boiler temperature throughout the operation keeps the convection surfaces clean and achieves highly efficient combustion. This also enables a long service life for the boiler, since no corroding acids will form on the fire surfaces. 5

CONNECTION DIAGRAM Room temperature sensor A T-pipe with a min. diameter of 1 ¼ improves ventilation Flue thermostat Hot water Cold water Mixer valve Exp. vessel Automatic shunt Radiator temperature sensor Radiator Radiator pump Relief valve Electric resistor Shunt valve Warm water accumulator Boiler Filling Tank Connection to boiler top Ball check valve 1 ¼ IG Thermometer Internal thermal valve Filling connection R15 Internal pump Wilo RS 25-6/3 Thermometer Thermometer Ball check valve 1 ¼ IG Connection to boiler bottom Ball check valve 1 ¼ IG Automatic cycle valve in case of power cut Connection to accumulator tank bottom Easy-to-clean dirt pocket to prevent operating errors 6

TEMPERATURE CONTROL VALVE The Ariterm Vedo boiler must be installed in connection with a warm water accumulator. This improves its functionality and extends its life span substantially. By installing the boiler as presented here, it is possible to make the boiler temperature rise quickly and to maintain a steady, high temperature when the boiler is being used. The fact that water is layered in the accumulator ensures a quick supply of warm water soon after heating starts. The heating circuit and household water circuit are connected to the accumulator. Installing a temperature control valve to wood-fired boiler with a cooling spiral The Pressure Equipment Directive requires that manually-filled wood-fired boilers must be equipped with a safety device, which prevents the boiler from overheating. We recommend the SYR 3065 temperature control valve for this boiler. This does not, however, replace other safety devices, such as a pressure relief valve. Installation The temperature control valve is connected to the cooling spiral so that, when the valve is activated, it sends hot water down the drain. The temperature sensor is installed on the sleeve on the upper part of the boiler, using a DN 15 x 150 well. TECHNICAL DATA Max pressure of incoming water Opening temperature 10 bar 97 C Temperature control valves are available from Ariterm Product Number 5012921 7

ABOUT BURNING WOOD Before starting the boiler, check the following: Heating network and boiler are filled with water, pressure at least 0.5 bar If there is a smoke pipe damper, make sure that it is open The heat supply pump is switched on The accumulator or network valves are open The combustion air outlet is open The relief valve is in unhindered contact with the boiler and is in working order. Firewood Fresh firewood contains 80 90% water during the growing season and 70% in winter. Wood must be allowed to dry before it can be combusted. It is best to fell the trees in winter when their wood contains less water. It is important to cut firewood to the appropriate length for the boiler s combustion chamber. Good firewood should contain no more than 15-25% water. Raw wood must be cut and split to a suitable size to allow it to dry well and fit in the firebox. If the wood is from a small tree and not split, strips of bark should be removed lengthways. Large, damp pieces of wood burn poorly and carbonise slowly. This causes a lot of tar and soot to form in the boiler and burns inefficiently. You can check the water content of wood by weighing it. Cut a test piece from freshly-cut wood. It is fit for combustion when its weight has decreased by about 60%. If the fresh piece of wood weighs 1,000 g, it is fit for combustion when it weighs 400 g. Burning Wood is an organic material. Its combustible constituents are carbon and hydrogen. When wood heats up, these constituents are released and gasify. If the burning process is efficient (with sufficient primary and secondary air available), the combustion temperature rises sufficiently high to cause clean burning. Wood also contains some minerals, which result in impurities. In order to achieve good burning performance and energy production and as few polluting and sooty emissions as possible, bear the following in mind: Dry firewood. The water must evaporate before the wood is fit for combustion. If the water content is too high, the combustion is incomplete. A sufficient supply of air and a sufficiently high temperature in the combustion chamber are needed. Appropriate air flow is important. If the wood is damp, a lot of heat goes to waste. Damp weather, a cold chimney pipe and insufficient cross-sectional flue surface area have a negative impact on the draft. A good supply of oxygen is required in the ignition stage to achieve a good layer of charcoal and efficient combustion. 8

OPERATION The use of wood in the Ariterm Vedo Ariterm Vedo is designed for the combustion of solid fuels in densely populated neighbourhoods. It has been tested and approved in accordance with the latest wood-fired boiler requirements. The approval requires both ceramic grates and transfer of heat into an accumulator. Ariterm Vedo is a reverse combustion boiler in which combustion occurs downwards through the ceramic grate. 9

OPERATION Starting the fire: Open the smoke pipe damper. Adjust primary air vent to 4 and secondary air vent to 5 (on 1 to 7 scale). Adjust primary air vent to 4. Adjust sekundary air vent to 5. Start up the exhaust fan. Open the feeding hatch, which causes the fire door damper to open automatically. Stack with small firewood, enough to cover the bottom of the chamber. Apply kindling on top of the wood. Start a fire. Close the feeding hatch. When the fire is properly burning and a layer of charcoal has formed, fill the firebox up no higher than to the top of the air vents. After the fire is going well, adjust the secondary air vent approximately to position 2. Flue gas temperature should be 150 180 C 10

OPERATION Adding firewood Do not add firewood until after the first load has burnt down to a small amount of charcoal. Open the feeding hatch slowly to avoid a cloud of smoke caused by the carbon monoxide that may remain in the firebox. Add firewood. The amount of firewood should not be excessive so that the accumulator can capture all the thermal energy released from the wood. The maximum load of wood is to the top of the air vents. Pellet use Ariterm Vedo is compatible with an KMP PX21 pellet burner. Replace the stoking hatch with a hatch with an PX21 pellet stoker. If you use a pellet burner, remove the ceramic grates and secondary combustion chamber and close primary and secondary air vents. Specified instructions on the installation and use of the pellet burner come with the burner. Oil use Ariterm Vedo is also compatible with using oil as fuel. The oil burner is installed on the pellet burner hatch using an oil burner flange, which is available as an accessory. Electric use The boiler is not compatible with electric use. If electric resistors are required, they should be installed on the accumulator. 11

SERVICE AND MAINTENANCE The boiler will function properly and have a long service life when the following matters are taken care of: The boiler should be located in a dry space. The boiler should always be operated within the recommended limits. The boiler should be cleaned up when the flue gas temperature has risen 20 30 C above that of a clean boiler. If any part is damaged, it must be replaced with a new one as early as possible. Check that condensation water or water from pipe leaks cannot damage the boiler. Before each heating season Once a week and as required in Check that the holes of the grate are unblocked the heating season and that there is no combustion residue left from previous use. Always clean the convector after the flue gas temperature has risen by 30 C from clean boiler value, or the draft has weakened. Open the convector cleaning door. Also check and, if necessary, clean the blades of the flue gas fan. Remove ash from the secondary combustion chamber through the ash box door. 12

SERVICE AND MAINTENANCE Remove all turbulators. Clean the boiler convector by brushing the convector pipes clean. Make sure that the fire door damper opens and closes as you use the feeding hatch. Make sure that the fire door damper closes when you close the feeding hatch. 13

SERVICE AND MAINTENANCE Other maintenance procedures Adjustment of the hatches Check that the hatch sits tightly. A leaky feeding hatch will cause wood to combust in the wrong place. Tighten the hatches by adjusting the lock handle and hinge pieces. From time to time, you should check that the gap between the deflectors and the storage chamber is unblocked. Lift the deflectors from their supports to clean them. Also clean the walls of the storage chamber. The tightness of the hatches is important for the proper functioning of the boiler. Adjusting the lock handle: Unscrew the screw of the lock handle enough to be able to turn the eccentric sleeve in the hole. Turn the sleeve to make the handle move away from the boiler. Tighten the screw slightly. Test whether the hatch now sits more tightly on the handle side. 14

SERVICE AND MAINTENANCE Adjusting the hinge: Unscrew both mounting screws of the hinge piece enough to move the hinge. Move the hinge piece slightly in the direction of the boiler. Tighten the mounting screws slightly and test whether the hatch now sits more tightly on the hinge side. Once the hatch is sitting properly, tighten all the screws. If the adjustment tolerance on the hatch runs out, its seal will have to be replaced. 15

MEASUREMENTS AND CONNECTIONS Part Name Unit 1 Feeding hatch 2 Stoking hatch 3 Primary air vent 4 Secondary air vent 5 Convector door 6 Top door 7 Bottom door 8 Outlet to accumulator DN 32 9 Expansion vessel outlet DN 25 10 Cooling spiral Cu 15 11 Return from accumulator DN 32 12 Draining outlet DN 15 13 Water thermometer / pressure gauge 14 Flue connection 15 Flue gas fan 16 Control valve DN 15 17 Horizontal flue pipe 18 Burnet thermostat / sensor assembly DN 15 16

TECHNICAL DATA Capacity With wood With pellets With oil TECHNICAL DATA 30 kw 30 kw 30 kw Dimensions Design values Width Depth Height Weight (empty) Water capacity Flue connection Boiler pressure Permitted boiler temperature Size of warm water accumulator Maximum length of firewood 570 mm 1016 mm 1345 mm 415 kg 125 L diameter 140 mm (external) 0,5-1,5 bar Max 20-120 C 1100 2500 L 0,5 m Guarantee For Warranty Issues Ariterm Sweden AB refers to our local Distributor. Removal from use A boiler that has reached the end of its useful life can be used for scrap. 17

MANUFACTURES DECLARATION 18

NOTES 19

NOTES 20

NOTES 21

NOTES

NOTES 23

ARITERM SWEDEN AB Flottiljvägen 15 39241 Kalmar www.ariterm.se 0771-442850 05.05.2011 - All Rights to modifications and corrections reserved.